Piping
Piping
Piping
WORK FLOW
CLIENTS RELATIONS
INVITATION TO BID
BID PROPOSAL
NEGOTIATION
CONTRACT AWARD
V.P. APPROVAL
ESTIMATING
WORK PLAN
INFO D. BASE
STANDARDIZATION
CLIENT ACCEPTANCE
CHANGES COMMENTS
CLIENT REVIEW
3- BID PREPERATION
SCOPE DEFINITION & WBS RESOURCES ALLOCATION PRELIMINARY WORKPLAN
WORK BREAKDOWN STRUCTURE MANPOWER EQUIPMENT SCHDULE CLIENTS INPUT QUALITY MEASURES PLANNING,SCHEDULING & COST CONTROL PROCEDURES
4- CONTRACT PREPERATION
GENERAL CONDITIONS SPECIAL CONDITIONS SCOPE OF WORK SAFETY BILLS OF QUANTITIES & PAYMENT TERMS
LUMP-SUM BASIS UNIT RATE BASIS UNIT RATE NOT TO EXCEED
5- PROJECT KICK-OFF
MOBILIZE PROJECT MANAGER & TEAM FINALIZE THE WORK PLAN INTERNAL KICK-OFF & JOB EXPLANATION KICK-OFF MEETING W/CLIENT TO CONFIRM EXPECTATION AND SCOPE OF WORK COLLECT DATA & VISIT SITE
6- PRELIMINARY STUDIES
EXISTING FACILITIES & CONDITIONS TOPO SURVEY & GEOTECHNICAL INVEST. OBTAIN AS-BUILT DRAWINGS ENVIRONMENT CONDITIONS & IMPACT CLIENT & INTERNATIONAL STANDARDS TIE IN W/ EXISTING UTILITIES/FACILITIES CONSTRUCTABILITY MATERIALS REQUIREMENTS ( OFF SHELF LONG LEAD) RISK ASSESMENT
6- PRELIMINARY STUDIES
(CONTD)
FUNCTIONALITY ALTERNATIVE SOLUTIONS VALUE ENGINEERING PRELIMINARY / SCHEMATIC DRAWINGS MODLE PREPERATION REPORT ( PROJECT PROPOSAL) PRESENTATION TO CLINET FOR COMMENTS & APPROVAL
7- DETAILED DESIGN
DETAILED CALCULATIONS DEVELOP & DETAIL THE PRELIM. DRAWINGS CONSTRUCTION DETAILS EQUIP. DATA SHEETS MATERIAL TAKE-OFF CONSTRUCTION SPECIFICATIONS CONST. CONTRACT DOCUMENT ( SAME AS ITEM # 4) REPRODUCTION
DETAILED DESIGN
PROJECT PROPOSAL
9- BIDDING PROCESS
CONTRACTOR SURVEY SHORT LIST CONTRACTORS INVITATION FOR PREQUALIFICATION PREQUALIFY CONTRACTORS SHORT LIST CONTRACTORS INVITATION FOR BID TECHNICAL & FINANCIAL BID ANALYSIS RECOMMENDATION
SITE INSPECTION
12- SUMMARY
ENGINEERING BUSSINESS IS A MIXTURE OF:- ENGINEERING MGMT SALES
- MANAGEMENT - SALES & PUBLIC RELATION ENG. - FINANCE & ACCOUNTING - STATISTICS ARCHIVE ACCOUNT ARCHIVING & DATA MGMT.