Maintenance & Estimate
Maintenance & Estimate
Maintenance & Estimate
Quarry
Quarry
Rate
( Rs)
Distence
from
Quarry to
Site (KM)
part-B
Cost of
cartage
without
loading
Cost of
cartage
excluding
C.P. (Rs)
Total
(3+7)
(Rs)
I.S.
Transit
Tax
(Rs)
Total of
col.
(8+9)
(Rs)
Trade
Tax on
col. 11
(Rs)
G.Total of
col
11+12
(Rs)
10
11
12
Lal Kuan
500
64
494.50
268
Lal Kuan
510
64
494.50
449.55
949.55
Remarks
13
up to 50 KM = 439.75
949.55
949.55
51 to 64 KM =
73.50
959.55
959.55
Total
989.55
989.55
1049.55
1049.55
1049.55
1049.55
959.55
Lal Kuan
540
64
494.50
449.55
989.55
513.25
Lal Kuan
600
64
494.50
449.55
1049.55
Lal Kuan
600
64
494.50
449.55
1049.55
Lal Kuan
600
64
494.50
268
Lal Kuan
470
64
494.50
449.55
1049.55
1049.55
1049.55
919.55
919.55
919.55
999.55
999.55
999.55
949.55
949.55
949.55
Stone Dust
449.55
Lal Kuan
550
64
494.50
449.55
Coarse Sand
268
Lal Kuan
500
300
Local
380
64
494.50
449.55
Fine Sand
380.00
1) Distances from quarry have been taken from the shortest route.
2) Quarry rates have been taken of the respective circle applicable.
3) Cartage rates has been taken approved by SE Lko. Circle in the RMR.
4) Quarry rates are for approved quarry and RMR rates are minimum .
JUNIOR ENGINEER
EXECUTIVE ENGINEER
SUPERINTENDING ENGINEER
Quarry
Quarry
Rate
( Rs)
3
Distence
from
Quarry
5 to
Cost of
cartage
without
6
Cost of
cartage
excluding
7
Total
(3+7)
(Rs)
8
Total of
col.
(8+9)
10
Trade
Tax on
col.
1111
G.Total of
col
11+12
12
Lal Kuan
500
85
594.50
540.45
1040.45
1040.45
1040.45
Lal Kuan
510
85
594.50
540.45
1050.45
Lal Kuan
540
85
594.50
540.45
1080.45
Lal Kuan
600
85
594.50
540.45
1140.45
51 to 75 KM =
Total
1080.45
1080.45
1140.45
1140.45
1140.45
Lal Kuan
600
85
594.50
540.45
1140.45
Lal Kuan
600
85
594.50
300
Lal Kuan
470
85
594.50
540.45
1140.45
1140.45
1140.45
1010.45
1010.45
1010.45
1090.45
1090.45
1090.45
1040.45
1040.45
1040.45
Stone Dust
540.45
Lal Kuan
550
85
594.50
540.45
Coarse Sand
300
Lal Kuan
500
300
Local
380
85
594.50
540.45
Fine Sand
380.00
1) Distances from quarry have been taken from the shortest route.
2) Quarry rates have been taken of the respective circle applicable.
3) Cartage rates has been taken approved by SE Lko. Circle in the RMR.
4) Quarry rates are for approved quarry and RMR rates are minimum .
JUNIOR ENGINEER
EXECUTIVE ENGINEER
613.50
= 85 km
131.25
1050.45
1050.45
13
up to 50 KM = 439.75
76 to 85KM @4.25= 42.50
Remarks
SUPERINTENDING ENGINEER
513
(ii)
Case - II : Type B
Providing and laying of premix sand seal coat with HMP of appropriate
capacity not less than 75 tonnes/ hours using crushed stone chipping 6.7
mm size and penetration bitumen of suitable grade.
Unit = sqm
Taking output = 7858 sqm (47.16 cum)
a) Labour
Mate
Mazdoor
b) Machinery
HMP of 75 tonnes/hour.
Electric Generator Set 250 KVA
Front end loader 1 cum bucket capacity
Tipper 10 tonne capacity
Add 10 per cent of cost of carriage to cover cost of loading and unloading
Paver finisher hydrostatic with sensor attachment
Smooth wheeled 8-10 tonnes capacity
add : escaslation @ 35 % on machinery
c) Material
Bitumen@ 6.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size defined as passing 11.2 mm sieve
and retained on 2.36 mm sieve applied @ 0.06 cum per 10 sqm
day
day
0.160
4.000
125.00
125.00
20.00
500.00
hour
hour
hour
tonne.km
2.000
2.000
2.000
104 x 5'
11167.00
450.00
520.00
14.50
22334.00
900.00
1040.00
75400.00
hour
hour
2.000
2.000
629.00
297.00
7540.00
1258.00
594.00
30041.20
tonne
cum
5.340
47.160
41682.80
1049.55
222586.15
49496.56
say
41170.99
45288.09
498168.99
63.40
63.40
Junior Engineer
Assistant Engineer
Executive Engineer
Built-up-Spray Grout
Providing, laying and rolling of built-up-spray grout layer over prepared
base consisting of a two layer composite construction of compacted
crushed coarse aggregates using motor grader for aggregates. key
stone chips spreader may be used with application of bituminous
binder after each layer, and with key aggregates placed on top of the
second layer to serve as a Base conforming to the line, grades and
cross-section specified, the compacted layer thickness being 75 mm
Unit = sqm
Taking output = 3000 sqm (225 cum)
a) Labour
Mate
Mazdoor including for brooming of key aggregates
Mazdoor skilled
b) Machinery
Hydraulic self propelled chip spreader both for aggregates and key
aggregates@ 1500 sqm per hour for 3000 x 3 sqm
Bitumen pressure distributor for 3000 x 2 sqm @ 1750 sqm per hour
Tipper 5.5 cum capacity
smooth wheel roller 8 tonnes
Front end loader 1 cum bucket capacity
add : escaslation @ 35 % on machinery
c) Material
Bitumen30 kg per 10 sqm @ 15 kg per 10 sqm for each layer
Crushed stone coarse aggregate passing 53 mm and retained on 2.8
mm sieve @ 0.5 cum per 10 sqm for each layer
Key aggregates passing 22.4 mm and retained on 2.8 mm sieve @
0.13 cum per 10 sqm
d) Overhead charges @10% input on (a+b+c)
e) Contractor's profit @10% input on (a+b+c+d)
Cost for 3000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/3000
Junior Engineer
Assistant Engineer
day
day
day
0.400
8.000
2.000
125.00
125.00
130.00
50.00
1000.00
260.00
hour
6.000
1700.00
10200.00
hour
3.430
516.00
1769.88
hour
hour
hour
10.000
6.000
6.000
200.00
297.00
520.00
2000.00
1782.00
3120.00
6605.16
tonne
9.000
cum 300.000
41682.80
989.55
375145.20
296863.64
989.55
38592.27
say
73738.81
81112.70
892239.66
297.41
297.41
cum
39.000
Executive Engineer
Day
Day
Day
3.760
90.000
4.000
125.00
120.00
130.00
470.00
10800.00
520.00
hour
hour
hour
hour
6.000
6.000
45.000
12.000
206.00
11167.00
200.00
297.00
1236.00
67002.00
9000.00
3564.00
28280.70
tonne
tonne
14.970
2.460
41682.80
36075.43
623991.52
88745.55
cum 184.500
cum 92.250
1049.55
1049.55
193641.14
96820.57
112407.15
123647.86
1360126.48
132.70
132.70
say
Junior Engineer
Assistant Engineer
Executive Engineer
Tack Coat
Providing and applying tack coat with bitumen emulsion using
emulsion pressure distributor at the rate of 0.25 kg per sqm on the
prepared bituminous/granular surface cleaned with mechanical broom.
Unit = sqm
Taking output = 3500 sqm
a) Labour
Mate
Mazdoor
b)
Machinery
Mechanical broom @ 1250 sqm per hour
Air compressor 250 cfm
Emulsion pressure distributor @ 1750 sqm per hour
add : escaslation @ 35 % on machinery
day
day
0.080
2.000
125.00
125.00
sub total
10.00
250.00
260.00
hour
hour
hour
2.800
2.800
2.000
230.00
206.00
516.00
644.00
576.80
1032.00
788.48
3041.28
sub total
c) Material
Bitumen @ 0.25 kg per sqm
tonne
0.875
41682.80
sub total
a+b+c
d) Overhead charges @10% input on (a+b+c)
e) Contractor's profit @10% input on (a+b+c+d)
Cost for 3500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/3500
Say
Junior Engineer
Assistant Engineer
Executive Engineer
36472.45
36472.45
39773.73
3977.37
4375.11
48126.21
13.75
13.75
Description
(ii) Stress absorbing membrane (SAM) with crack width 6
mm to 9 mm
Providing and laying of a stress absorbing membrane over a
cracked road surface, with crack width 6 to 9 mm after
cleaning with a mechanical broom, using modified binder
complying with clause 521, sprayed at the rate of 11 kg per
10 sqm and spreading 11.2 mm crushed stone aggregates @
0.12 cum per 10 sqm, sweeping the surface for uniform
spread of aggregates and surface finished to conform to
clause 902.
Unit = sqm
Taking output = 10500 sqm
a) Labour
Mate
Mazdoor
b)
Machinery
Mechanical broom @ 1250 sqm per hour
Air compressor 250 cfm capacity
Bitumen pressure distributor @ 1750 sqm per hour
Hydraulic Chip spreader
Smooth wheeled road roller 8-10 tonne
Unit
Quantity
Rate Rs
day
day
0.240
6.000
125.00
120.00
SUB TOTAL
hour
hour
hour
hour
hour
6.000
6.000
6.000
6.000
6.000
230.00
206.00
516.00
1700.00
297.00
Material
Modified binder
Crushed stone chipping 11.2 mm size
tonne
cum
11.550
105.000
41682.80
1049.55
SUB TOTAL
A+B+C
d) Overhead charges @ input on (a+b+c)
e) Contractor's profit @ input on (a+b+c+d)
Cost for 10500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/10500
say
Junior Engineer
Assistant Engineer
Executive Engineer
Cost Rs
30.00
720.00
750.00
1380.00
1236.00
3096.00
10200.00
1782.00
17694.00
6192.90
23886.90
481436.33
110202.27
591638.60
616275.50
61627.55
67790.31
745693.36
71.02
71.00
BITUMRN RATE
FOR
( PART-B )
Rate w.e.f.
01- 05 - 2012
NH-74
IN KM
268
MATERIAL
Bitumen VG30(Bulk)
From
Mathura Refinery
Basic Rates
01-05-2012
Excise
Duty@14%
on 'A'
Education
Cess@
3% on 'B'
Cartage(1.75/km
) excluding 10%
O.H.
2792
km
Cartage(1.75/km
) excluding 10%
O.H.
489X1.75
EMPTY DRUMS
Total
'(A+B+C+D+
E)'
SAY
JUNIOR ENGINEER
248
458
CRMB-55(Bulk)
( Rs )
( Rs )
( Rs )
35740.00
32160.00
35890.00
5003.60
4502.40
5024.60
150.11
135.07
150.74
789.09
789.09
777.95
41682.80
(-)1500
36075.43
41854.43
41683
36075
41854
ASSISTANT
ENGINEER
from
Mathura Refinery
EXECUTIVE ENGINEER
BILL OF QUANTITY
Name of work : Filling Pot-holes with B.U.S.G.& Patch-repair with open graded
surfacing From km 264.00 to 275.00 of NH-74 Premix (New NH-30 )
1
2
3
4
5
6
7
Providing, laying and rolling of built-upspray grout layer over prepared base
consisting of a two layer composite
construction of compacted crushed coarse
aggregates using motor grader for
aggregates. key stone chips spreader may
be used with application of bituminous
binder after each layer, and with key
aggregates placed on top of the second
layer to serve as a Base conforming to the
line, grades and cross-section specified,
the compacted layer thickness being 75
mm
km-265
km-266
km-267
km-269
km-271
km-273
Total
Tack Coat
Providing and applying tack coat with bitumen
emulsion using emulsion pressure distributor at the
rate of 0.25 kg per sqm on the prepared
bituminous/granular
surface
cleaned
with
mechanical broom.
qty same as above item no-1
Filling Pot-holes and Patch Repairs with openGraded Premix surfacing, 20mm.
Unit
Qty.
Rate
sqm
sqm
sqm
sqm
sqm
sqm
sqm
100.00
80.00
80.00
110.00
90.00
105.00
565.00
297.41
168036.65
sqm
565.00
13.75
7768.75
sqm
sqm
sqm
sqm
280.00
245.00
310.00
295.00
Per
Amount
Unit
Qty.
Rate
sqm
sqm
sqm
250.00
265.00
1645.00
Per
Amount
132.70
218283.71
sqm
1645.00
63.40
104287.09
Seal Coat
Providing and laying seal coat sealing the voids in a
bituminous surface laid to the specified levels, grade
and cross fall using Type B seal coats
Qty same as above item no-3
Total
Signature of Contractor
498376.21
BILL OF QUANTITY
Name of work : Filling Pot-holes with B.U.S.G.& Patch-repair with open graded
surfacing From km 264.00 to 275.00 of NH-74 Premix (New NH-30 )
1
2
3
4
5
6
7
S. No.
1
Tack Coat
Providing and applying tack coat with bitumen
emulsion using emulsion pressure distributor at the
rate of 0.25 kg per sqm on the prepared
bituminous/granular
surface
cleaned
with
mechanical broom.
qty same as above item no-1
Filling Pot-holes and Patch Repairs with openGraded Premix surfacing, 20mm.
Unit
Qty.
Rate
In Figure
sqm
sqm
sqm
sqm
sqm
sqm
sqm
100.00
80.00
80.00
110.00
90.00
105.00
565.00
295.00
sqm
565.00
11.30
Rate
In Words
sqm
sqm
sqm
sqm
sqm
sqm
sqm
280.00
245.00
310.00
295.00
250.00
265.00
1645.00
130.00
sqm
1645.00
63.00
Seal Coat
Providing and laying seal coat sealing the voids in a
bituminous surface laid to the specified levels,
grade and cross fall using Type B seal coats
Qty same as above item no-3
Total
Signature of Contractor
BILL OF QUANTITY
Name of work : Crack Sealing with Stress absorbing membrane (SAM) with crack width 6
mm to 9 mm repair over a crack road surface From km 264.00 to 274.00 of NH-74 (New NH30 )
1
2
3
4
5
6
7
S. No.
1
Unit
sqm
sqm
sqm
sqm
sqm
sqm
sqm
Qty.
In Words
71.00
800.00
1050.00
1250.00
850.00
1400.00
1200.00
6550.00
I/We here by tender my / our rates ...% above/below/atpar the departmental rates.
Signature of Contractor
Analysis Of Rate
For
PART-A
Tack Coat
Providing and applying tack coat with bitumen emulsion using
emulsion pressure distributor at the rate of 0.25 kg per sqm
on the prepared bituminous/granular surface cleaned with
mechanical broom.
Unit = sqm
Taking output = 3500 sqm
a) Labour
day
day
Mazdoor
0.080
2.000
125.00
125.00
sub total
b)
10.00
250.00
260.00
Machinery
Mechanical broom @ 1250 sqm per hour
hour
2.800
230.00
644.00
hour
2.800
206.00
576.80
hour
2.000
516.00
1032.00
Material
tonne
0.875
41781.44
sub total
a+b+c
d) Overhead charges @10% input on (a+b+c)
e)
13.78
Say
Executive Engineer
NH C.D.P.W.D.Bareilly
Analysis Of Rate
36558.76
39860.04
3986.00
48230.64
A.E.
36558.76
4384.60
J.E.
788.48
3041.28
J.E.(T)
For
PART-A
13.78
Superindenting Engineer
NH28th Circle p. w.d.Bareilly
10.4
3004.2
Labour
Mate
Mazdoor
Mazdoor skilled
Day
Day
Day
3.760
90.000
4.000
125.00
120.00
130.00
470.00
10800.00
520.00
hour
6.000
206.00
1236.00
hour
6.000
11167.00
67002.00
hour
45.000
200.00
9000.00
hour
12.000
297.00
3564.00
28280.70
cum
cum
tonne
184.500
92.250
14.970
210413.03
105206.51
625468.09
tonne
2.460
1140.45
1140.45
41781.44
36075.43
b)
e)
Machinery
115070.59
126577.65
1392354.11
135.84
say
J.E.
A.E.
Executive Engineer
NH C.D.P.W.D.Bareilly
513
Seal Coat
Analysis Of Rate
88745.55
J.E.(T)
For
PART-A
135.84
Superindenting Engineer
NH28th Circle p. w.d.Bareilly
Unit = sqm
Taking output = 7858 sqm (47.16 cum)
a) Labour
Mate
day
0.160
125.00
20.00
day
4.000
125.00
500.00
HMP of 75 tonnes/hour.
hour
2.000
11167.00
22334.00
hour
hour
2.000
2.000
450.00
520.00
900.00
1040.00
tonne.km
104 x 5'
14.50
75400.00
Mazdoor
b) Machinery
hour
2.000
629.00
hour
2.000
297.00
7540.00
1258.00
594.00
30041.20
Material
tonne
cum
5.340
47.160
41781.44
1140.45
223112.86
53783.62
41652.37
45817.61
503993.66
64.14
say
J.E.
A.E.
Executive Engineer
J.E.(T)
NH C.D.P.W.D.Bareilly
Analysis Of Rate
506
Built-up-Spray Grout
64.14
Superindenting Engineer
NH28th Circle p. w.d.Bareilly
For
PART-A
day
0.400
125.00
50.00
day
8.000
125.00
1000.00
Mazdoor skilled
b) Machinery
Hydraulic self propelled chip spreader both for aggregates
and key aggregates@ 1500 sqm per hour for 3000 x 3 sqm
day
2.000
130.00
260.00
hour
6.000
1700.00
10200.00
hour
3.430
516.00
1769.88
hour
10.000
200.00
2000.00
hour
hour
6.000
6.000
297.00
520.00
1782.00
3120.00
6605.16
tonne
cum
9.000
300.000
41781.44
1080.45
376032.92
324136.36
cum
39.000
1140.45
44477.73
77143.40
84857.75
933435.20
A.E.
Executive Engineer
J.E.(T)
Superindenting Engineer
NH C.D.P.W.D.Bareilly
Sr No
Ref. to
MoRTH
Spec.
311.15
311.00
Unit
Quantity
Rate Rs
Cost Rs
5.21
a) Labour
Mate
day
0.240
125.00
30.00
Mazdoor
day
6.000
120.00
720.00
SUB TOTAL
b)
750.00
Machinery
Mechanical broom @ 1250 sqm per hour
hour
6.000
230.00
1380.00
hour
6.000
206.00
1236.00
hour
hour
hour
6.000
6.000
6.000
516.00
1700.00
297.00
3096.00
10200.00
1782.00
17694.00
6192.90
Material
Modified binder
Crushed stone chipping 11.2 mm size
tonne
11.550
cum
105.000
23886.90
41781.44
482575.58
1140.45
119747.73
602323.30
SUB TOTAL
A+B+C
626960.20
d)
e)
62696.02
68965.62
758621.85
72.25
say
J.E.
A.E.
Executive Engineer
J.E.(T)
NH C.D.P.W.D.Bareilly
Analysis Of Rate
10.5
3004.2
72.25
Superindenting Engineer
NH28th Circle p. w.d.Bareilly
For
PART-A
Unit = Sqm
Taking out put = 4900 sqm (196 cum)(450 Tonnes)
a) Labour
Mate
Mazdoor
Mazdoor skilled
b) Machinery
Air compressor 250 cfm
HMP 100-110 TPH Capacity
Tipper 10 tonnes capacity
Smooth wheeled roller 8-10 tonnes
add : escaslation @ 35 % on machinery
Day
Day
Day
2.920
70.000
3.000
125.00
120.00
130.00
365.00
8400.00
390.00
hour
hour
hour
hour
6.000
6.000
45.000
12.000
206.00
11167.00
200.00
297.00
1236.00
67002.00
9000.00
3564.00
28280.70
tonne
tonne
22.500
1.180
41781.44
36075.43
940082.29
42569.00
cum
cum
cum
99.750
65.550
114.000
1140.45
1140.45
1140.45
113759.89
74756.50
130011.30
15926.38
cum
85.500
1140.45
97508.48
cum
cum
71.250
122.550
1140.45
1140.45
81257.06
139762.15
cum
tonne
122.550
9.000
1140.45
1010.45
139762.15
9094.05
18493.77
c) Material
I) Bitumen
ii) Bitumen emulsion for tack coat .
iii) Aggregates
Grading I - 19mm(Nominal size)
20-10mm 35 per cent
10-5 mm 23 per cent
5mm and below40 per cent
Add 5 per cent for wastage
or
Grading-II 13mm (Nominal size)
(i)
143497.81
157847.59
say
1736323.46
354.35
354.00
say
148889.32
163778.25
1801560.74
367.67
368.00
J.E.
A.E.
Executive Engineer
NH C.D.P.W.D.Bareilly
J.E.(T)
Superindenting Engineer
NH28th Circle p. w.d.Bareilly
Analysis Of Rate
3004.2
For
PART-A
Labour
Mate
Mazdoor
Mazdoor skilled
Day
Day
Day
3.760
90.000
4.000
125.00
120.00
130.00
hour
6.000
206.00
hour
6.000
11167.00
hour
45.000
200.00
hour
12.000
297.00
b)
Machinery
c)
Material
cum
cum
tonne
184.500
92.250
14.970
tonne
2.460
e)
1140.45
1140.45
41781.44
36075.43
A.E.
Executive Engineer
NH C.D.P.W.D.Bareilly
J.E.(T)
say
Superindenting
NH28th Circle p.
470.00
10800.00
520.00
1236.00
67002.00
9000.00
3564.00
28280.70
210413.03
105206.51
625468.09
88745.55
115070.59
126577.65
1392354.11
135.84
135.84
Engineer
w.d.Bareilly
DETAILS OF MEASURMENTS
Name of work : Filling Pot-holes with B.U.S.G.& Patch-repair with open graded Premix
surfacing From km 295.00 to 304.00 &km264.oo to 274.00of NH-74 (New NH-30 )
S. No.
Item of work
no.
L
B
H/D
Qty
Built-up-Spray Grout
1
Providing, laying and rolling of built-upspray grout layer over prepared base
consisting of a two layer composite
construction of compacted crushed
coarse aggregates using motor grader
for aggregates. key stone chips
spreader may be used with application
of bituminous binder after each layer,
and with key aggregates placed on top
of the second layer to serve as a Base
conforming to the line, grades and crosssection specified, the compacted layer
thickness being 75 mm
km-295
1
1
1
1
1
1
1
6.70
12.40
24.70
21.60
18.70
6.80
26.00
4.00
5.80
3.70
4.80
4.20
3.90
4.60
km-296
1
1
1
1
1
1
1
1
1
10.40
22.40
27.20
12.90
20.80
12.80
8.60
20.40
10.90
3.40
6.40
4.80
3.80
4.60
3.60
4.20
3.80
4.70
km-297
1
1
1
2
1
1
9.60
14.20
7.40
16.50
3.90
6.70
5.70
5.80
5.40
4.00
2.70
3.30
26.80
71.92
91.39
103.68
78.54
26.52
119.60
518.45
35.36
143.36
130.56
49.02
95.68
46.08
36.12
77.52
51.23
664.93
54.72
82.36
39.96
132.00
10.53
22.11
341.68
km-298
1
1
1
2
1
2
9.80
16.80
20.85
12.00
11.20
6.00
4.20
5.80
3.90
4.00
4.60
3.60
km-299
1
1
1
1
1
1
1
1
6.40
7.70
17.60
3.40
16.50
5.40
18.90
10.40
3.70
3.90
3.55
2.20
2.90
3.80
4.10
3.90
km-300
1
1
1
1
1
1
1
1
20.40
9.90
11.80
22.20
16.00
17.90
7.40
16.40
2.70
4.00
3.20
2.90
3.75
3.80
3.50
3.70
km-301
1
1
1
1
1
1
1
6.70
11.20
3.80
22.20
6.90
9.80
33.30
3.30
3.50
2.40
3.00
3.20
4.20
2.80
km-302
1
1
1
1
1
2
1
1
15.40
8.40
12.00
4.80
15.80
5.60
6.80
12.30
2.70
3.00
3.30
1.80
4.20
2.20
3.20
3.50
km-303
1
1
1
1
1
1
1
1
1
4.70
23.40
9.10
28.00
21.50
5.50
16.25
26.40
7.50
2.50
3.70
2.60
4.80
3.15
2.65
3.90
4.30
3.55
41.16
97.44
81.32
96.00
51.52
43.20
410.64
23.68
30.03
62.48
7.48
47.85
20.52
77.49
40.56
310.09
55.08
39.60
37.76
64.38
60.00
68.02
25.90
60.68
411.42
22.11
39.20
9.12
66.60
22.08
41.16
93.24
293.51
41.58
25.20
39.60
8.64
66.36
24.64
21.76
43.05
270.83
11.75
86.58
23.66
134.40
67.73
14.58
63.38
113.52
26.63
542.21
1
1
1
1
1
1
1
1
11.20
6.40
9.40
22.00
7.80
4.20
2.40
3.80
2.90
4.80
3.20
4.80
3.05
2.10
1.90
2.10
32.48
30.72
30.08
105.60
23.79
8.82
4.56
7.98
244.03
4007.79
1
1
1
1
1
1
1
6.40
8.60
10.80
5.60
17.60
12.60
9.70
3.10
2.60
4.10
3.20
4.40
3.80
4.00
km-266
1
1
1
1
1
6.40
11.30
21.50
8.80
11.80
3.70
4.20
4.80
3.30
4.60
km-267
1
1
1
1
9.40
9.00
12.80
6.60
3.90
3.40
4.00
3.60
km-268
1
2
1
1
11.70
9.50
6.50
16.20
3.25
3.00
4.50
4.10
km-269
1
1
1
1
6.90
11.70
18.60
12.00
3.75
4.50
3.90
3.30
19.84
22.36
44.28
17.92
77.44
47.88
38.80
268.52
23.68
47.46
103.20
29.04
54.28
257.66
36.66
30.60
51.20
23.76
142.22
38.03
57.00
29.25
66.42
190.70
25.88
52.65
72.54
39.60
190.67
km-304
Total (A)
km-265
km-270
1
1
1
1
10.60
14.40
5.80
11.90
3.20
2.80
2.40
3.70
km-271
1
1
1
1
1
21.50
3.00
11.50
7.90
13.55
3.65
1.60
4.40
3.90
4.30
km-272
1
1
1
1
1
1
1
1
8.80
24.60
6.90
28.50
4.80
11.80
9.60
12.80
3.60
3.90
3.40
3.05
3.00
3.80
3.40
3.70
km-273
1
1
1
1
1
1
1
10.50
7.50
8.20
8.40
10.50
4.40
14.40
2.60
2.20
4.00
3.20
2.80
2.70
3.30
km-274
1
1
1
1
1
12.20
4.20
6.20
9.80
7.20
2.85
1.95
2.70
2.40
3.30
Total (B)
33.92
40.32
13.92
44.03
132.19
78.48
4.80
50.60
30.81
58.27
222.95
31.68
95.94
23.46
86.93
14.40
44.84
32.64
47.36
377.25
27.30
16.50
32.80
26.88
29.40
11.88
47.52
192.28
34.77
8.19
16.74
23.52
23.76
106.98
2081.41
km-295
1
1
1
1
1
1
1
1
7.00
12.80
18.60
9.40
10.60
32.80
7.90
27.90
4.20
5.80
3.90
4.40
3.45
4.85
4.00
4.80
km-296
1
1
1
2
1
1
1
1
1
12.40
32.40
9.60
28.50
19.45
12.90
36.00
22.40
14.90
3.60
6.40
4.75
3.85
3.30
4.85
3.30
4.80
4.80
km-297
1
1
1
1
1
1
10.60
6.40
19.40
5.90
18.40
9.70
6.30
3.80
5.40
3.50
5.00
3.80
29.40
74.24
72.54
41.36
36.57
159.08
31.60
133.92
578.71
44.64
207.36
45.60
219.45
64.19
62.57
118.80
107.52
71.52
941.64
66.78
24.32
104.76
20.65
92.00
36.86
345.37
km-298
1
1
9.80
22.80
4.20
5.80
41.16
132.24
1
1
1
2
15.70
31.70
14.60
8.80
3.55
3.90
4.80
3.90
km-299
1
1
1
1
1
1
1
1
1
8.40
14.45
7.90
6.50
21.60
36.40
6.90
12.90
15.40
4.70
4.10
3.90
3.00
4.30
4.80
3.80
4.90
4.50
55.74
123.63
70.08
68.64
491.49
39.48
59.25
30.81
19.50
92.88
174.72
26.22
63.21
69.30
575.37
km-300
1
1
2
1
1
1
2
1
22.80
12.60
15.00
9.80
18.40
21.80
9.40
22.60
4.25
4.80
3.50
5.80
4.60
3.80
3.90
4.40
km-301
1
1
1
1
1
1
1
8.40
18.20
6.80
32.20
9.25
11.40
36.30
3.65
3.90
2.80
3.60
3.75
4.40
3.80
km-302
1
1
1
2
1
1
1
17.25
9.40
16.80
7.80
21.20
9.80
18.80
3.90
3.60
3.80
3.20
4.40
3.75
3.90
96.90
60.48
105.00
56.84
84.64
82.84
73.32
99.44
659.46
30.66
70.98
19.04
115.92
34.69
50.16
137.94
459.39
67.28
33.84
63.84
49.92
93.28
36.75
73.32
418.23
km-303
1
1
1
1
1
1
1
1
1
14.70
25.40
12.85
38.20
24.00
6.80
20.80
28.80
9.85
4.20
3.90
3.85
3.45
4.50
3.65
3.90
4.80
4.00
km-304
1
1
1
1
1
1
1
16.60
9.20
16.60
10.80
7.20
24.40
7.30
4.80
4.80
4.65
3.75
2.90
3.90
2.85
km-265
1
1
1
1
1
1
1
16.80
8.70
13.80
25.90
19.60
14.65
10.70
3.50
2.80
4.10
3.90
4.90
4.80
4.60
km-266
1
1
2
1
1
1
6.90
21.30
18.00
26.80
20.75
16.80
3.75
4.20
3.80
5.40
3.80
4.60
km-267
1
1
1
1
1
9.90
29.80
28.80
22.80
6.80
4.50
3.60
4.80
4.10
4.60
km-268
1
2
1
1
21.70
12.50
38.50
19.65
3.95
3.80
4.50
4.70
Total (A)
61.74
99.06
49.47
131.79
108.00
24.82
81.12
138.24
39.40
733.64
79.68
44.16
77.19
40.50
20.88
95.16
20.81
378.38
5581.66
58.80
24.36
56.58
101.01
96.04
70.32
49.22
456.33
25.88
89.46
136.80
144.72
78.85
77.28
552.99
44.55
107.28
138.24
93.48
31.28
414.83
85.72
95.00
173.25
92.36
446.32
km-269
1
1
1
1
1
1
11.90
18.85
22.00
18.00
20.20
12.80
3.75
4.80
3.50
4.20
4.25
3.85
km-270
1
1
1
1
18.60
34.80
9.80
33.30
3.60
3.40
2.90
4.10
km-271
1
1
1
2
1
1
21.90
7.70
21.50
16.00
29.90
16.60
3.80
3.60
4.40
4.50
4.10
4.60
km-272
1
1
1
1
1
1
1
1
10.80
27.60
7.90
37.20
25.80
13.60
19.90
14.10
3.75
4.25
3.40
3.70
2.75
4.80
3.85
3.80
km-273
1
1
1
1
1
1
1
12.20
7.50
28.20
8.40
30.50
4.40
14.40
2.60
2.20
4.00
3.20
2.80
2.70
3.30
km-274
1
1
2
1
1
1
12.20
5.20
15.50
26.90
11.80
8.75
3.30
3.00
3.50
3.70
3.30
3.60
Total (B)
44.63
90.48
77.00
75.60
85.85
49.28
422.84
66.96
118.32
28.42
136.53
350.23
83.22
27.72
94.60
144.00
122.59
76.36
548.49
40.50
117.30
26.86
137.64
70.95
65.28
76.62
53.58
588.73
31.72
16.50
112.80
26.88
85.40
11.88
47.52
332.70
40.26
15.60
108.50
99.53
38.94
31.50
334.33
4447.78
DETAILS OF MEASURMENTS
Name of work : Filling Pot-holes with B.U.S.G.& Patch-repair with open graded Premix
surfacing From km 295.00 to 304.00& km 264.00 to 274.00 of NH-74 (New NH-30 )
S. No.
Item of work
Unit
Qty.
Rate
Per
Amount
3
Seal Coat
Providing and laying seal coat sealing
the voids in a bituminous surface laid to
the specified levels, grade and cross fall
using Type B seal coats
5581.66
km-295
1
1
1
1
1
1
1
1
1
1
1
17.00
45.80
22.80
38.80
49.50
42.00
18.95
62.00
59.40
7.90
27.90
2.50
2.80
3.70
2.45
2.80
2.75
3.00
3.45
3.40
2.60
2.80
42.50
128.24
84.36
95.06
138.60
115.50
56.85
213.90
201.96
20.54
78.12
1175.63
km-296
1
1
1
1
1
1
1
1
1
1
1
32.40
18.60
38.60
114.80
21.40
42.80
29.45
28.60
19.60
38.40
31.50
2.90
3.10
4.40
2.80
2.85
3.00
3.65
2.90
3.75
3.80
3.10
93.96
57.66
169.84
321.44
60.99
128.40
107.49
82.94
73.50
145.92
97.65
1339.79
km-297
1
1
1
1
1
1
1
1
1
20.60
16.40
32.50
66.60
27.55
46.10
49.40
14.90
29.70
3.30
3.80
3.15
4.60
3.90
2.90
3.75
3.50
3.40
67.98
62.32
102.38
306.36
107.45
133.69
185.25
52.15
100.98
1118.55
km-298
1
1
1
1
1
1
1
2
19.80
54.20
26.40
16.70
24.40
32.80
44.60
38.80
3.20
4.45
3.10
2.95
3.75
4.80
3.80
4.10
km-299
1
1
1
1
1
1
1
1
1
8.40
27.90
76.40
43.80
30.50
58.70
48.60
12.90
35.40
2.70
3.40
4.80
3.65
2.90
3.65
3.80
2.90
3.50
63.36
241.19
81.84
49.27
91.50
157.44
169.48
318.16
1108.88
22.68
94.86
366.72
159.87
88.45
214.26
184.68
37.41
123.90
1292.83
km-300
1
1
1
1
1
2
1
22.80
112.60
54.70
40.80
62.80
9.40
22.60
3.25
3.80
3.35
3.25
3.80
2.90
3.40
74.10
427.88
183.25
132.60
238.64
54.52
76.84
1187.83
km-301
1
1
1
1
1
1
1
1
18.40
48.20
6.80
67.20
30.00
79.00
11.40
36.30
3.60
3.90
2.80
3.60
4.00
3.75
4.40
3.30
66.24
187.98
19.04
241.92
120.00
296.25
50.16
119.79
1101.38
km-302
1
1
1
1
1
1
1
1
1
1
17.25
9.40
66.60
9.00
11.80
20.50
77.80
33.50
9.80
48.80
3.90
3.60
4.50
3.20
4.40
3.30
3.20
4.20
4.75
3.90
km-303
1
1
1
1
1
1
1
1
36.80
105.40
22.50
78.00
6.80
49.80
58.00
9.85
4.20
3.90
6.60
4.10
3.65
3.90
4.80
3.00
km-304
1
1
1
1
1
1
1
1
16.60
90.00
36.60
42.50
10.80
7.20
40.00
7.30
3.80
2.80
4.30
3.70
3.75
2.90
2.90
2.85
km-265
1
1
1
1
1
1
1
16.80
28.70
42.80
25.90
29.60
44.00
10.70
3.50
2.80
3.55
3.90
4.20
4.60
4.60
km-266
1
1
1
1
1
1
6.90
31.60
19.50
26.80
30.75
16.80
3.75
4.70
3.30
4.40
3.80
4.60
Total (A)
67.28
33.84
299.70
28.80
51.92
67.65
248.96
140.70
46.55
190.32
1175.72
154.56
411.06
148.50
319.80
24.82
194.22
278.40
29.55
1560.91
63.08
252.00
157.38
157.25
40.50
20.88
116.00
20.81
827.90
11889.40
58.80
80.36
151.94
101.01
124.32
202.40
49.22
768.05
25.88
148.52
64.35
117.92
116.85
77.28
550.80
km-267
1
1
1
1
1
9.90
39.80
52.80
22.80
6.80
4.50
3.60
3.70
4.10
4.60
44.55
143.28
195.36
93.48
31.28
507.95
km-268
1
2
1
1
1
1
21.70
22.00
45.00
35.60
8.50
19.65
3.95
3.80
3.30
4.40
4.50
4.70
85.72
167.20
148.50
156.64
38.25
92.36
688.66
km-269
1
1
2
1
1
1
38.90
18.85
36.50
34.00
70.20
12.80
3.75
4.80
4.30
3.00
3.25
3.85
145.88
90.48
313.90
102.00
228.15
49.28
929.69
km-270
1
1
1
1
18.60
45.50
9.80
48.50
3.60
3.40
2.90
4.00
66.96
154.70
28.42
194.00
444.08
km-271
1
1
1
1
1
1
21.90
120.00
37.70
55.50
9.90
26.80
3.80
4.00
4.40
4.00
4.10
4.60
83.22
480.00
165.88
222.00
40.59
123.28
1114.97
km-272
1
1
1
1
1
1
1
1
10.80
27.60
47.90
52.90
107.20
43.60
9.90
34.80
3.75
4.25
3.40
3.50
3.70
4.80
3.85
3.80
40.50
117.30
162.86
185.15
396.64
209.28
38.12
132.24
1282.09
km-273
1
1
1
1
1
1
1
1
12.20
7.50
48.20
8.40
42.00
30.50
24.40
14.40
2.60
2.20
4.10
3.20
5.20
2.80
2.70
3.30
km-274
1
1
1
1
1
12.20
35.20
6.90
31.80
60.80
3.30
3.00
3.70
3.80
3.60
Total (B)
Junior Engineer
NH, PWD, Bareilly
Assistant Engineer
31.72
16.50
197.62
26.88
218.40
85.40
65.88
47.52
689.92
40.26
105.60
25.53
120.84
218.88
511.11
7487.31
BILL OF QUANTITY
S. No.
1
Name of work : Filling Pot-holes with B.U.S.G.& Patch-repair with open graded Premix
surfacing From km 295.00 to 304.00 & km 264.00 to 274.00 of NH-74 (New NH-30 )
Item of work
Unit
Qty.
Rate
Per
Amount
Built-up-Spray Grout
Providing, laying and rolling of built-up-spray grout
layer over prepared base consisting of a two layer
composite construction of compacted crushed coarse
aggregates using motor grader for aggregates. key
stone chips spreader may be used with application of
bituminous binder after each layer, and with key
aggregates placed on top of the second layer to serve
as a Base conforming to the line, grades and crosssection specified, the compacted layer thickness
being 75 mm ( from km 294.00 to 304.00 ) A
sqm
4007.79
311.15
sqm
1247022.30
sqm
2081.41
sqm
619038.85
( from km 264.00 to 274.00 ) B
297.41
Filling Pot-holes and Patch Repairs with openGraded Premix surfacing, 20mm.
Removal of all failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of
surface, painting of tack coat on the sides and base
of excavation as per clause 503, back filling the pot
holes with hot bituminous material as per clause 511,
compacting, trimming and finishing the surface to
form a smooth continuous surface, all as per clause
3004.2 (from km 294.00 to 304.00) A
sqm
5581.66 135.84
sqm
758212.69
sqm
4447.78 132.70
sqm
590199.35
( from km 264.00 to 274.00 ) B
#
Providing and laying seal coat sealing the voids in a
#
bituminous surface laid to the specified levels, grade
#
and cross fall using Type B seal coats (from km
#
294.00 to 304.00 ) A
#
sqm
5581.66
sqm
358007.67
sqm
4447.78
63.40
sqm
281972.97
( from km 264.00 to 274.00 ) B
Stress absorbing membrane (SAM) with crack width 6 mm
to 9 mm
Providing and laying of a stress absorbing membrane over a
cracked road surface, with crack width 6 to 9 mm after cleaning
with a mechanical broom, using modified binder complying with
clause 521, sprayed at the rate of 11 kg per 10 sqm and
spreading 11.2 mm crushed stone aggregates @ 0.12 cum per
10 sqm, sweeping the surface for uniform spread of aggregates
and surface finished to conform to clause 902.
( from km
294.00 to 304.00 ) A
sqm
sqm
11889.40
7487.31
72.25
71.00
Total
J.E.
A.E.
Executive Engineer
NHCD PWD Bareilly
sqm
sqm
859005.58
531598.66
5245058.07
Superinding Engineer
NH 28th Circle PWD Bareilly
SUMMARY OF COST
Name of work : Filling Pot-holes with B.U.S.G.& Patch-repair with open Graded Premix
surfacing From km 295.00 to 304.00 &km264.oo to 274.00of NH-74 (New NH-30 )
.
S.No.
1
2
3
4
5
6
Item of Work
Filling Pot-holes with B.U.S.G.& Patchrepair with open graded Premix
surfacing From km 295.00 to 304.00 &
km 264.00 to 274.00 of NH-74(NewNH-30)
Total 'A'
Contingency 2.8%
Quality Control 1% on A
W.C. Establishment 1.5% on A
Centage Charges 9% on A
Labour cess 1% on A
Total
Amount
5245058.07
5245058.07
146861.63
52450.58
78675.87
472055.23
52450.58
6047551.96
Junior Engineer
NH, PWD, Bareilly
Assistant Engineer
NH, PWD, Bareilly
Executive Engineer
NH, PWD, Bareilly