Dis 6 W 2 H
Dis 6 W 2 H
Dis 6 W 2 H
WHAT WHERE WHICH WHY HOW TO DO COUNTERMEASURE IMMEDIATE ACTION WHO WHEN At Engine upper bkt tightening Stage Horn cable length Horn cable pinched reduced by 40mm & Discover in between engine position of cable shift upper bkt. & Engine away. DHOOT TRANSMISS March.08 ION
Gear shifter Gear shifter lever bolt head lever fitment damaged stage
Axis not match due Discover to gun foul to engine base plate
VEHICLE ASSEMBLY
June.07
Chain cover bolt threading & bkt. nut threading damaged Speedo meter glass scratches Fuel pipe leakage
Axis not match due Chain cover bolt Discover to gun faul to swing tightening with special Bolt tight by T' spanner arm (New design) steped socket. Scratch guard(Plastic film) introduced on glass. Carborrator tube angle changed for fuel pipe fitment .
VEHICLE ASSEMBLY
Dec.08
Pulsar
Handling ignorance
Take care while assembling Take care while assembling of carborrator on AC box
April.07
Pulsar
Plan
Fairing scratches
Pulsar
Fairing s/a locate one by one on trolley to mainten VEHICLE distance between two ASSEMBLY s/a
July.07
STATUS
U/IMPL
IMPL
IMPL
IMPL
U/IMPL
IMPL
PROBLEM DESCRIPTION
Inspection Poka
MODEL
QTY IN %
CONTRIBUTING PARTS
Root cause
1] Accelerator sticky
Discover
1]
Accelerator connection
Previous pin mounting arrangement changed to sliding lock type arrange Provision made in final relation gauge for bkt position checking
Discover
3]
Brake shoe liner 100 % inspection at machining incomplete vendor end for OD
3]
100 % inspection of Front wheel Front wheel axle O/D front wheel axle OD fitment stage oversize at vendor end
Discover
2]
Discover
3]
100 % inspection of Front wheel Front wheel spacer ID spacer ID at vendor fitment stage u/s end
Discover
3]
ON
Control Points
PROBLEM DESCRIPTION
Inspection Poka
MODEL
QTY IN %
CONTRIBUTING PARTS
Root cause
1]
PV inspection stage
BCU regulator /spic voltage controller failure due to dry soldering at tranzop
100 % wave form ( spic voltage inspection on ocsilloscop with magneto test bench started from 18 10 07
2] Vehicle no start
Pulsar
1]
PV inspection stage
Star Engg make. Wiring harness connecting wire( ht coil input ) found pinched & shorted
pFMEA study for the supply chain for handling of Electrical parts started to eliminate each possibility of damage in handling
3] Seat torn
Pulsar
2]
1]Seat
PV inspection stage
3]
PROBLEM DESCRIPTION
Inspection Poka
MODEL
QTY IN %
CONTRIBUTING PARTS
Root cause
Pulsar
3]
1]Harness
1]
1]Silencer
PV inspection stage
New welding fixture installed to keep resonator box position horizontal during welding.
ON
Control Points
ON
Control Points
JUNE
JULL Y
WHAT
WHERE
WHICH
WHY
Chain Chain cover cover middle fitment mtg. bkt. Nut damged
Discover Bolt t
AUG.
NOV. 03
TARG ET
SEPT.
JAN.0 6
APRI L.06
HOW TO DO
COUNTERM IMMEDIAT EASURE E ACTION
WHEN
STATUS
IMPL
WHAT
WHERE
WHICH
WHY
HOW TO DO
COUNTERMEASUR IMMEDIATE ACTION E
WHO
WHEN
STATUS
WHICH
WHAT
WHERE
WHY
HOW TO DO COUNTERMEASURE IMMEDIATE ACTION Horn cable length reduced by 40mm & position of cable shift away.
WHO
WHEN
STATUS
Discover
DHOOT Take care while fitment TRANSMISS March.08 of Engine upper bkt. ION
U/IMPL
15
VEHICLE ASSEMBLY
June.07
IMPL
Chain cover bolt threading Chain cover Discover & bkt. nut fitment stage threading damaged
Axis not match due to gun faul to swing 34 arm (New design)
Chain cover bolt tightening with special Bolt tight by T' spanner steped socket.
VEHICLE ASSEMBLY
Dec.08
IMPL
Pulsar
Handling ignorance
April.07
IMPL
Pulsar
29
Carborrator tube Take care while angle changed for fuel assembling of pipe fitment . carborrator on AC box Fairing s/a locate one by one on trolley to mainten distance between two s/a
Plan
U/IMPL
Pulsar
Fairing scratches
12
Trolley modification.
VEHICLE ASSEMBLY
July.07
IMPL