Chainless Anchoring 2
Chainless Anchoring 2
Chainless Anchoring 2
increase shop efficiency by allowing technicians to complete all structural repairs and finishing sheet metal work in a single repair bay. Whether a shop is large or small, Wedge Clamp have
proven themselves worldwide to be the leading choice for increased shop productivity.
ANCHORING
Center vehicle between Anchoring Rails. Install the EZE Tie-Down Sill Clamps at the front and rear torque box areas of the vehicle.
Slide Anchoring Bars through EZE Tie Down Sill Clamps. Make sure Anchoring Bars are centered. Insert Wedges into EZE Tie Down Sill Clamps. Secure using a 3 lbs. hammer.
Slide Rail Dogs into place on Anchoring Rails (front and rear).
Place EZE Tie Down Anchoring Towers over Rail Dogs and slide Anchoring Towers up to Anchoring Bars.
Insert EZE Tie Down Strongbacks through EZE Tie Down Anchoring Towers and over Anchoring Bars.
Drive Wedges into EZE Tie Down Strongbacks and EZE Tie Down Anchoring Towers. Youre ready-to-go.
System Includes:
1 17000 Sill Clamp Set, set of 4 1 17100 Anchoring Bar Set, set of 4
2 x 72 in. (1828 mm) bars (17100A) 2 x 80 in. (2032 mm) bars (17100C)
4 17600 Chainless Anchoring Stand 2 17704 Surface Mounting Anchor Bolt Set 2 17900 Rail, Bevelled and Slotted 1 17011 Instruction Manual