Itp Mast Truck
Itp Mast Truck
:
: : :
AR A W S
M R T/C H
V 1 2
NO.
ACTIVITY
REFERENCE DOCUMENT
VERIFIED DOCUMENT
ACCEPTANCE CRITERIA
1. DOCUMENT REVIEW
1 2 3 OWNER QA/QC Procedure Inspection Certificate & Operating Permit of Facility of Crane Base Support Derrick Manufacturer's Data Report & Operating Manual Installation Document of Derrick Support & Support Bearing Previous Inspection Report & MIGAS Operating Permit Certificate - Inspection Procedure - Applicable Code, Standard, Specification & Regulation - ASME B30.6 - ASME B30.10 - SK 84K/38/DMJ/1998 - Design, Fabrication, Installation & Inspection Procedure & Document - NDT Procedure - Derrick Manufacturer Data - Report & Derrick Manual - Inspection, Maintenance, Repair & History Record - Inspection Procedure - Applicable Code, Standard, Specification & Regulation - ASME B30.6 - ASME B30.10 S S S S S R1 R1 R1 R1 R1 -
4
5
PHYSICAL DERRICK INSPECTION (PCI) 1 Structural Component 2 Hydraulic & Electrical Components 3 Wire Rope 4 Hook Blocks & Sheaves 5 Welding & Bolting Connections 6 Non Destructive Testing (NDT) 7 Prime Mover 8 Safety Devices 9 PCI Overall Comment
S S S S S S S S S/AR
V V V V V V V V V
Page 1
:
: : :
AR A W S
M R T/C H
V 1 2
NO. 3
ACTIVITY Certification Action 1 Inspection 2 Non Destructive Testing (NDT) 3 Resume of Rectification Action
REFERENCE DOCUMENT
VERIFIED DOCUMENT
ACCEPTANCE CRITERIA
- ASME B30.10
S S S
V V V
FUNCTIONAL TESTING 1 Functional Testing Procedure 2 Functional Testing Execution 3 Post Functional Testing Inspection 4 Functional Testing Release Note
S/AR S S S/AR
R1 H V AR
LOAD TESTING ( If Required ) 1 Load Testing Procedure/Sequence 2 Load Testing Execution 3 Post Inspection of Load Testing 4 Load Testing Release Note
S S S S/AR
AR H V AR
Page 2
:
: : :
AR A W S
M R T/C H
V 1 2
NO. 6 REPORTING
1
ACTIVITY
REFERENCE DOCUMENT
VERIFIED DOCUMENT
ACCEPTANCE CRITERIA
Final Inspection Report Inspection Certificate New Load Chart & Table
- Inspection Report - Inspection Certificate - New Load Chart & Table - Any Recommendations
S S S -
S S S -
S/AR
2 3
Note 1 : This ITP is the minimum requirement, and for practical implementation, it shall be added necessarily in accordance with the actual crane type, model and or the contract requirement. 2 : Regularly, this ITP will be reviewed and evaluated for a new revision by the team formed by MIGAS.
Page 3