The document is a schedule of quantities for the construction of a bituminous approach road. It includes 3 sentences summarizing the key information:
It provides the bill of quantities for various construction works including earthwork, concrete work, brickwork, road work, and other finishing works. Quantities and rates are listed for activities like excavation, concrete laying, reinforcement, plastering, and providing stone aggregates and laying bituminous macadam and concrete pavements. The schedule is for the construction of an approach road from a state highway to an air strip road at the Indian Institute of Technology Kanpur campus.
The document is a schedule of quantities for the construction of a bituminous approach road. It includes 3 sentences summarizing the key information:
It provides the bill of quantities for various construction works including earthwork, concrete work, brickwork, road work, and other finishing works. Quantities and rates are listed for activities like excavation, concrete laying, reinforcement, plastering, and providing stone aggregates and laying bituminous macadam and concrete pavements. The schedule is for the construction of an approach road from a state highway to an air strip road at the Indian Institute of Technology Kanpur campus.
The document is a schedule of quantities for the construction of a bituminous approach road. It includes 3 sentences summarizing the key information:
It provides the bill of quantities for various construction works including earthwork, concrete work, brickwork, road work, and other finishing works. Quantities and rates are listed for activities like excavation, concrete laying, reinforcement, plastering, and providing stone aggregates and laying bituminous macadam and concrete pavements. The schedule is for the construction of an approach road from a state highway to an air strip road at the Indian Institute of Technology Kanpur campus.
The document is a schedule of quantities for the construction of a bituminous approach road. It includes 3 sentences summarizing the key information:
It provides the bill of quantities for various construction works including earthwork, concrete work, brickwork, road work, and other finishing works. Quantities and rates are listed for activities like excavation, concrete laying, reinforcement, plastering, and providing stone aggregates and laying bituminous macadam and concrete pavements. The schedule is for the construction of an approach road from a state highway to an air strip road at the Indian Institute of Technology Kanpur campus.
Download as XLS, PDF, TXT or read online from Scribd
Download as xls, pdf, or txt
You are on page 1of 12
N/W
SLNo Description Qty Unit Rate
1 CARRIAGE OF MATERIALS 1.1 Carriage of Materials by mechanical transport including loading, unloading and stacking : 1.1.1 Earth Lead - 1 Km 3500 cum 2 E A R T H W O R K 2.1 Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with tonne roller or wooden or steel rammers, and rolling every 3rd and top- most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m : 2.1.1 All kinds of soil 1300 cum 2.2 Banking excavated earth in layers not exceeding 20 cm. in depth, breaking clods, watering, rolling each layer with tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m. 2.2.1 All kinds of soil 9500 cum 2.3 Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. Name of the Firm SCHEDULE OF QUANTITY Construction of Bituminous approach road from G.T. road to Chandel Gate i/c widening of existing Air Strip Road INDIAN INSTITUTE OF TECHNOLOGY KANPUR INSTITUTE WORKS DEPARTMENT DIVISION -I NIT No.- 13/C/D1/2013-14/01 2.3.1 All kinds of soil 2200 cum 2.4 Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.4.1 All kinds of soil. 250 cum 2.5 Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : 2.5.1 All kinds of soil 2.5.1.1Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia. 105 metre 2.6 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. 250 cum 2.7 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. 15000 100 sqm 3 C O N C R E T E W O R K 3.1 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 3.1.1 1:5:10 (1 cement : 5 coarse sand : 10 graded Brick aggregate 40 mm nominal size) 55 cum 3.2 Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc., up to floor five level, excluding the cost of centering, shuttering and finishing : 3.2.1 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 0.25 cum 4 REINFORCED CEMENT CONCRETE 4.1 Centring and shuttering including strutting, propping etc. and removal of form for : 4.1.1 Suspended floors, roofs, landings, balconies and access platform. 80 sqm 4.2 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 4.2.1 Thermo-Mechanically Treated bars. 4000 kg 4.3 Add for using extra cement in the items of design mix over and above the specified cement content therein. 16 quintal 4.4 Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate / retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (NOTE- 1) Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately) 4.4.1 All works upto plinth level. 32 cum 5 B R I C K W O R K 5.1 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: 5.1.1 Cement mortar 1:6 (1 cement : 6 coarse sand) 100 cum 5.2 Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: 5.2.1 Cement Mortar 1:6 (1 cement : 6 coarse sand). 5 cum 5.3 Brick edging 7cm wide 11.4cm. deep to plinth protection with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 including grouting with cement 2215 metre 6 F I N I S H I N G 6.1 12 mm cement plaster of mix : 6.1.1 1:6 (1 cement : 6 coarse sand) 160 sqm 6.2 15 mm cement plaster on rough side of single or half brick wall of mix : 6.2.1 1:6 (1 cement : 6 coarse sand) 20 sqm 6.3 6 mm cement plaster of mix : 6.3.1 1:3 (1 cement : 3 fine sand) 90 sqm 7 R O A D W O R K 7.1 Supplying and stacking at site. 7.1.1 90 mm to 45 mm size stone aggregate. 1285 cum 7.1.2 63 mm to 45 mm size stone aggregate. 860 cum 7.1.3 53 mm to 22.4 mm size stone aggregate. 860 cum 7.1.4 Stone screening 13.2 mm nominal size (Type A). 210 cum 7.1.5 Stone screening 11.2 mm nominal size (Type B). 210 cum 7.1.6 Red bajri 235 cum 7.2 Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. 2350 cum 7.3 Providing and applying tack coat using hot straight run bitumen of grade VG - 10 including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications: 7.3.1 On W.B.M. @ 0.75 Kg / sqm. 6700 sqm 7.3.2 On bituminous surface @ 0.50 Kg / sqm. 18750 sqm 7.4 2 cm premix carpet surfacing with 1.8 cu.m. and 0.90 cu.m. of stone chippings of 13.2 mm size and 11.2 mm size respectively per 100 sq.m. and 52 kg. and 56 kg. of hot bitumen per cu.m. of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen including consolida-tion with road roller of 6 to 9 tonne capacity etc. com-plete: (tack coat to be paid for separately). 7.4.1 With paving Asphalt grade VG-30with no solvent 6700 sqm 7.4 Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. 7.4.1 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. 450 cum 7.5 Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 7.5.1 40/50 mm compacted thickness with bitumen of grade VG-30 @5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. 350 cum 7.6 Providing and applying 2.5mm thick road marking strips (retro-reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour ,T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. 650 sqm 8 D R A I N A G E 8.1 Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 8.1.1 450 mm dia. R.C.C. pipe 80 metre 8.1.2 900 mm dia. R.C.C. pipe 25 metre 9 HORTICULTURE & LANDSCAPING 9.1 Supplying and stacking of good earth at site including royalty and carriage up to 1km (earth measured in stacks will be reduced by 20% for payment). 6000 cum 10 MINOR CIVIL MAINTENANCE WORK 10.1 Extra for carriage of good earth beyond the initial lead of 1Km, as taken in respective item & lead upto 20 Km. 6000 Cum Total Amount 0 0 0 SCHEDULE OF QUANTITY Construction of Bituminous approach road from G.T. road to Chandel Gate i/c widening of existing Air Strip Road INDIAN INSTITUTE OF TECHNOLOGY KANPUR INSTITUTE WORKS DEPARTMENT DIVISION -I NIT No.- 13/C/D1/2013-14/01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0