STANDARDS/MANUALS/

GUIDELINES FOR
SMALL HYDRO DEVELOPMENT



2.2 and 2.3
Civil Works
Hydraulic and Structural Design





























Sponsor:

Ministry of New and Renewable Energy
Govt. of India


Lead Organization:

Alternate Hydro Energy Center
Indian Institute of Technology Roorkee




July 2013
Contact:
Dr Arun Kumar
Alternate Hydro Energy Centre,
Indian Institute of Technology Roorkee,
Roorkee - 247 667, Uttarakhand, India
Phone : Off.(+91 1332) 285821, 285167
Fax : (+91 1332) 273517, 273560
E-mail : aheciitr.ak@gmail.com, akumafah@iitr.ernet.in





















DISCLAIMER

The data, information, drawings, charts used in this standard/manual/guideline has been
drawn and also obtained from different sources. Every care has been taken to ensure that the
data is correct, consistent and complete as far as possible.

The constraints of time and resources available to this nature of assignment, however do not
preclude the possibility of errors, omissions etc. in the data and consequently in the report
preparation.

Use of the contents of this standard/manual/guideline is voluntarily and can be used freely
with the request that a reference may be made as follows:

AHEC-IITR, 2.2 and 2.3 Hydraulic and Structural Design, standard/manual/guideline
with support from Ministry of New and Renewable Energy, Roorkee, July 2013.
Standards/ Manuals/Guidelines series for Small Hydropower Development

General
1.1 Small hydropower definitions and glossary of terms, list and scope of different
Indian and international standards/guidelines/manuals
1.2
Part I
Planning of the projects on existing dams, Barrages, Weirs
1.2
Part II
Planning of the Projects on Canal falls and Lock Structures.
1.2
Part III
Planning of the Run-of-River Projects
1.3 Project hydrology and installed capacity
1.4 Reports preparation: reconnaissance, pre-feasibility, feasibility, detailed project
report, as built report
1.5 Project cost estimation
1.6 Economic & Financial Analysis and Tariff Determination
1.7 Model Contract for Execution and Supplies of Civil and E&M Works
1.8 Project Management of Small Hydroelectric Projects
1.9 Environment Impact Assessment
1.10 Performance evaluation of Small Hydro Power plants
1.11 Renovation, modernization and uprating
1.12 Site Investigations
Civil works
2.1 Layouts of SHP projects
2.2 Hydraulic design
2.3 Structural design
2.4 Maintenance of civil works (including hydro-mechanical)
2.5 Technical specifications for Hydro Mechanical Works
Electro Mechanical works
3.1 Selection of Turbine and Governing System
3.2 Selection of Generator
3.3 Selection of Switchyard
3.4 Monitoring, control, protection and automation
3.5 Design of Auxiliary Systems and Selection of Equipments
3.6 Technical Specifications for Procurement of Generating Equipment
3.7 Technical Specifications for Procurement of Auxiliaries
3.8 Technical Specifications for Procurement and Installation of Switchyard
Equipment
3.9 Technical Specifications for monitoring, control and protection
3.10 Power Evacuation and Inter connection with Grid
3.11 Operation and maintenance of power plant
3.12 Erection Testing and Commissioning
PREAMBLE


There are series of standards, guidelines and manuals available on electrical,
electromechanical aspect of moving machines and hydro power related issues from Bureau of
Indian Standards (BIS), Rural Electrification Corporation Ltd (REC), Central Electricity
Authority (CEA), Central Board of Irrigation & Power (CBIP), International
Electromechanical Commission (IEC), International Electrical and Electronics Engineers
(IEEE), American Society of Mechanical Engineers (ASME) and others. But most of these
are developed keeping in view the large water resources/ hydropower projects. Use of the
standards/guidelines/manuals is voluntary at the moment. Small scale hydropower projects
are to be developed in a cost effective manner with quality and reliability. Therefore a need to
develop and make available the standards and guidelines specifically developed for small
scale projects was felt.

Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee initiated the
exercise of developing standards/guidelines/manuals specifically for small scale hydropower
projects under the sponsorship of Ministry of New and Renewable Energy, Government of
India, in 2006. The available relevant standards / guidelines / manuals were revisited to
suitably adopt them for small scale hydro projects. These have been prepared by experts in
their respective fields. Wide consultations were held with all stake holders covering
government agencies, government and private developers, equipment manufacturers,
consultants, financial institutions, regulators and others through web, post and meetings.
After taking into consideration the comments received and discussions held with the lead experts
the standards/guidelines/manuals are now prepared and presented in this publication.

The experts have drawn some text and figures from existing standards, manuals, publications
and reports. Attempts have been made to give suitable reference and credit. However, the
possibility of some omission due to oversight cannot be ruled out. These can be incorporated in
our subsequent editions.

These standards / manuals / guidelines are the first edition. We request users of these to send
their views / comments on the contents and utilization to enable us to review these after about
one year of its publication.
PERSON INVOLVED

1. Dr Arun Kumar, Chair Professor (Renewable Energy), CSO and Principal Investigator,
AHEC, IIT, Roorkee
2. Dr S K Singal, SSO & Investigator,AHEC,IIT, Roorkee

Drafting Group

1. Mr. D K Agarwal, Consultant, Roorkee
2. Mr M S Verma, Consultant, Roorkee

Consultation Group

1. Dr Arun Kumar,AHEC,IIT, Roorkee
2. Dr S K Singal, AHEC,IIT, Roorkee
3. Mr. S K Tyagi, AHEC,IIT, Roorkee
4. Mr. A K Chopra, Consultant, SHP, MNRE,GOI, New Delhi
5. Mr. P C Kureel, CEA, New Delhi
6. Mr. Pankaj Kulshreshtha, UJVNL, Dehradun
7. Mr. Himanshu Tiwari, UJVNL, Dehradun
8. Mr. A K Singh, UJVNL, Dehradun
9. Mr. P K Singhal, UPJVNL, Lucknow
10. Mr. U Ukhal, HPPCL, Himachal Pradesh
11. Mr Sumer Singh, Consultant, Dehradun
12. Mr Dalip Dua, MD, Krishna Hydro Projects Pvt. Ltd., Dehradun
13. Mr Shailendra Singh, AGM, THDC India Ltd., Rishikesh
14. Mr J K Varshney, Sr Manager, THDC India Ltd., Rishikesh
15. Mr A P Singh, L&T, Faridabad
16. Mr P K Yadav, L&T, Faridabad
17. Mr C Purushothaman, TANGEDCO, Chennai
18. Mr H J Patel, Consultant, Ahmedabad
19. Dr B N Asthana, Consultant, New Delhi






CONTENTS

ITEMS PAGE NO

Guidelines for Hydraulic and Structural Design
1.0 Introduction 1

2.0 Reference 1

3.0 Civil Works 2

4.0 Data Required for Design 3
4.1 Topographical Data 3
4.2 Geological and Geotechnical Data 4
4.3 Hydrological Data 4
4.4 Other Data 4

5.0 Stage Discharge Curves 6

6.0 Diversion Structure 7
6.1 Partial Weir 7
6.2 Gabion Weir 9
6.2.1 Design of gabion weir 10
6.3 Trench Weir 12
6.3.1 Design of trench weir 13
6.4 Raised Weir (barrage) 18
6.4.1 Gauge discharge curve 18
6.4.2 Pond level 19
6.4.3 Retrogression 19
6.4.4 Waterway 19
6.4.5 Levels of crest and upstream floor 19
6.4.6 Shape of barrage / weir profile 20
6.4.7 Energy dissipation 20
6.4.8 Under sluices 20
6.4.9 Divide wall 20
6.4.10 Cut offs 20
6.4.11 Protection works 21
6.4.12 Discharge 22
6.4.13 Total floor length and exit gradient 22
6.4.14 Floor thickness 23
6.5 Concrete / Stone Masonary Gravity Dam 24
6.5.1 Gauge discharge curve 26
6.5.2 Pond level 26
6.5.3 Design of dam 26
6.5.4 Design of spillway 29
6.6 Roller Compacted Concrete Dam 29
6.6.1 Design considerations 30
6.7 Concrete / Stone Masonary Arch Dam 37
ITEMS PAGE NO

6.8 Inflatable Rubber Dam 38
6.8.1 Operation 38
6.8.2 Merits and demerits of a rubber dam 39
6.8.3 Anchoring of rubber dam 39
6.8.4 Protection against bed load 39
6.9 Earthen Dam 40
6.9.1 Criteria for safe design of earth dams 40
6.9.2 Safety against overtopping 42
6.9.3 Control of seepage line 42
6.9.4 Control of seepage 43
6.9.5 Upstream and downstream slopes of the dam 49
6.9.6 Top width 49
6.9.7 Foundation shear stresses 49
6.9.8 Safety against free flow of water from upstream to
downstream
50
6.9.9 Safety against piping 50
6.9.10 Upstream and downstream slope protection 50

7.0 Intake Works 50
7.1 Types of Intake 51
7.2 Run-of-river Type Intakes 51
7.2.1 Intake just upstream of a raised weir / barrage 51
7.2.2 Intakes for canal power house or barrage power houses 51
7.2.3 Forebay Intake 54
7.3 Reservoir Type Intakes 54
7.3.1 Intake in concrete or masonary dams 54
7.3.2 Intake for earthen dam 54
7.4 Hydraulic Design of Intake Components 58
7.4.1 Bell mouth opening and transitions 58
7.5 Centre Line of Intake 59

8.0 Water Conductor System 60
8.1 Earthen Channel 60
8.2 Lined Channel 63
8.2.1 Side slopes 64
8.2.2 Free board 64
8.2.3 Bank top width 64
8.2.4 Design of the section 64
8.2.5 Reference codes 65
8.3 RCC Channels 65
8.3.1 Design 67
8.4 Masonary Channel 67
8.4.1 Design 68
8.5 Tunnels 68
8.5.1 Sizing of tunnel 69
8.5.2 Tunnel shape 69
8.5.3 Hydraulic Design 70
ITEMS PAGE NO

8.5.4 Rock cover 76
8.5.5 Design of concrete lining 76
8.5.6 Design of rock supports 76
8.5.7 Grouting 77
8.5.8 Drainage holes 78
8.5.9 Unlined tunnels 78
8.5.10 Tunnel plugs 78
8.6 Pipes Steel, RCC, High Density Polyethylene (HDPE)
and Glass Fibre Reinforced Plastics (GRP)
79
8.6.1 Laying of pipes 81
8.6.2 Steel pipes 81
8.6.3 R.C.C. pipes 82
8.6.4 High density polyethylene (HDPE) pipes 82
8.6.5 Glass fibre reinforced plastics (GRP) pipes 82
8.7 Cross- Drainage Works 82
8.7.1 Cross drainage work with the natural drain passing
above the power channel
82
8.7.2 Cross drainage work with the natural drain passing
below the power channel
83
8.8 Desilting Devices 87
8.8.1 Desilting chamber 87
8.8.2 Design 88
8.8.3 Vortex tube 90

9.0 Forebay 92
9.1 Functions of Forebay 92
9.2 Layout of Forebay 92
9.3 Dimensioning of Forebay 93

10.0 Surge Tank 94
10.1 Introduction 94
10.2 Data Required 94
10.3 Design 94
10.3.1 Design conditions 94
10.3.2 Coefficient of hydraulic loses 95
10.3.3 Area of surge tank 96
10.3.4 Simple surge tanks 97
10.3.5 Restricted orifice surge tank 100
10.3.6 Maximum and minimum surge levels 101

11.0 Penstocks 101
11.1 Types of Penstocks 102
11.2 Number of Penstock 104
11.3 Special of Penstock 105
11.4 Economical Diameter of Penstock 105
11.5 Hydraulic Design of Penstock 106
11.5.1 Hydraulic design of penstock intake 107
ITEMS PAGE NO

11.5.2 Hydraulic losses in penstock 107
11.6 Structural Design of Surface Penstocks 111
11.7 Structural Design of Buried Penstocks 112

12.0 Power House Building 112
12.1 Location of Power House 112
12.2 Dimensioning of Power House 113
12.3 Canal Fall based Power House 114
12.4 Design of Power House 116
12.4.1 Preparation of general layout drawings 116
12.4.2 Stability analysis of unit bays and service bay 117
12.4.3 Design of substructure 118
12.4.4 Design of superstructure 119

13.0 Tailrace Channel 125

LIST OF FIGURES

FIGURE NO. TITLE PAGE NO.

1 Determination of Average River Section 6
2 General Arrangement of Partial Dam 8
3 (a) Typical Section of Gabion Weir 9
3 (b) Typical Section of Gabio Weir with Downstream Protection
Works
9
4 Loads for Stability Analysis 12
5(a) Typical Details of Trench Weir (Plan) 14
5(b) Typical Details of Trench Weir (Sections) 15
6 Typical Arrangement of Protection of Trench Weir with
Steel Rails
18
7 Drowning Ratio Vs Coefficient of Discharge Curve (in
MKS Units) (Based on Malikpur Curve) Applicable in
Broad Crested Barrages
23
8(a) Typical Details of a Raised Weir on Erodable Foundation 25
8(b) Typical Details of a Raised Weir on Erodable Foundation
(Section)
27
9 Typical Details of a Weir on Impermeable Foundation 28
10 Comparison of RCC and Mass Concrete Costs (1986
Dollars) (R-37)
30
11 Proportioning curves for equal strength concrete 35
12 Typical section of RCC dam 36
13 Typical Plan and Section of Arch Dam 37
14 Typical Cross Section of Inflatable Rubber Dam 38
15 Folding gaps or Wrinkles of Conventional Rubber Dam 40
16 Breast Wall Arrangement 41
17 Pillow Type Arrangement 41
18 Typical Arrangement of Sponge Layers inside Dam Body 42

FIGURE NO. TITLE PAGE NO.

19 Typical Section with Silty Clay 43
20 Typical Section through Rockfill Dam 44
21 Typical Details of a Cut off / Plinth 45
22 Typical Earth Dam Section with Coarse Sand Material 46
23 Typical Earth Dam Section with Coarse Sand 46
24 Typical Earth Dam Section with Pervious Foundation upto
Small Depth
47
25 Typical Earth Dam Section with Foundation Pervious to
Large Depth
47
26 Typical Earth Dam Section with Foundation Pervious to
Large Depth
47
27 Section of Earth Dam with Impervious Blanket 48
28 Upstream and Downstream Slopes of the Dam 50
29 Typical Intake Details Upstream of Raised Weir / Barrage 52
30 Canal / River Power House Intakes (Kaplan Turbines) 53
31 Canal / River Power House Intakes (Bulb Turbines) 54
32 Forebay Intake 55
33 Semi Circular Type Intake Structure 56
34 Intake in Reservoir Independent of Dams 57
35 Typical shape of intake opening 58
36 Sub-mergence Requirement of Pressure Conduits 59
37 Typical slip failure due to SHP construction 61
38 Arrangement of Lowering Water Table in Slide Prone Zone 62
39 Arrangement of Lowering Water Table 62
40(a) Canal section in cutting 63
40(b) Canal section partly in filling and partly in cutting 63
41 Section through RCC Channel 66
42 Typical Section of Open RCC Channel 66
43 Typical Section of Cut & Cover RCC Channel 67
44 Typical Section of Masonary Channel 68
45 Typical Sections of Power Tunnel 70
46 Minimum Rock Cover in Power Tunnels 76
47 Details of Plug with Inspection Gallery 80
48 Details of Plug without Inspection Gallery 81
49 Typical Arrangement of drain crossing above power channel 83
50 Cross drainage work to pass hill drain water 84
51 Geometric layout of flumed aqueduct 85
52 Typical flume section 86
53 Typical section of pipe aqueduct 86
54 Schematic Arrangement of Desilting Chamber 90
55 General Arrangement of Vortex Tube 91
56 Surge tank details 95
57(a) Typical details of forebay (Plan) 98
57(b) Typical details of forebay (section 99
58 Loss coefficients for pipe bends of smooth interior 110
59 Valve loss coefficient for butterfly valves 111


FIGURE NO. TITLE PAGE NO.

60 General details of CC saddle block 113
61 Typical layout plan of power house on existing canal 115
62 Typical layout plan of power house on existing canal 115
63 Typical Transverse Section of Power House with Horizontal
Francis Turbine
120
64 Typical Transverse Section of Power House with Horizontal
Pelton Turbine
121
65 Typical Transverse Section of Power House with Tubular
Turbine
122
66 Typical Transverse Section of Power House with Bulb
Turbine
123
67 Typical Transverse Section of Power House with Syphon
Kaplan Turbine
124
68 Typical tailrace for high Discharge Installation 125

LIST OF TABLES

TABLE NO. TITLE PAGE NO.

1 Empirical Equations for Estimation Mannings Rugosity
Coefficient for Boulder Streams
7
2 Blighs Coefficient C Values 11
3 Silt Factor and Losseness Factor 19
4 Safe Exit Gradient for Different Sediment Strata 21
5 RCC dams constructed, under construction or planned 32
6. Slopes for Different Types Soil 64
7 Free Board for Different Discharge Capacity 64
8 Recommended values of Rugosity coefficient for rigid
boundaries
65
9 Manning Values for Different Tunnel Surface 73
10 Loss coefficient for tunnel entrances 74
11 Estimated rock support categories based on tunneling
quality index
77
12 Fall Velocity of Suspended Sediment 88
13 Manning n for Different Tunnel Surface 96
14 Comparison of GRP Pipes, MS Epoxy Coated and HDPE
Pipes
103
15 Head loss in Branched Connections (Divided Flow) 109
16 Friction Coefficients for Different Surfaces 111

LIST OF ANNEXURE

ANNEXURE NO. TITLE PAGE NO.

I Rock Tunneling Quality Index, Q

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 1
GUIDELINES FOR HYDRAULIC AND STRUCTURAL DESIGN

1.0 INTRODUCTION

SHP can be broadly categorized in two types in Indian conditions as

(i) Independent hydro projects in hilly regions on small streams. These are mostly of
medium / high head utilizing small discharges and
(ii) Installations in plains which utilize water regulated for other purposes e.g.
irrigation canals, small dams, etc. These stations are usually of low head utilizing
larger discharges.

Civil structures required for SHP use construction material mostly RCC, PCC, Stone / Brick
masonry or Steel. The relevant latest version of standards issued by Bureau of Indian
standards are required to be used in each case. In all cases innovation is required on the part
of the designer to make use, as far as possible, of the locally available materials and labour.
In this context, the designer should invariably visit the project site, preferably with a
geologist, to make himself familiar with the actual site conditions and have a feel of the
project area.

2.0 REFERENCES

R1. IS: 10137 (1982) : Guidelines for selection of spillways and energy
dissipaters
R2. IS: 11527 (1985) : Criteria for structural design of energy dissipaters for
spillways
R3. IS: 4997 (1968) : Criteria for design of hydraulic jump type stilling basins
with horizontal and sloping apron
R4. IS: 7365 (1985) : Criteria for hydraulic design of bucket type energy
dissipaters.
R5. IS:10635 (1993) : Freeboard Requirement in Embankment Dams
Guidelines
R6. IS: 1498 (1970) : Classification and Identification of Soils for General
Engineering Purposes
R7. IS: 8414 (1977) : Guidelines for Design of Under-seepage Control
Measures for Earth and Rockfill Dams
R8. IS: 5050 (1992) : Code of practice for design, construction and
maintenance of relief wells
R9. IS: 7894 (1975) : Code of practice for stability analysis of earth dams
R10. IS:823 (1964) : Code of practice for protection of slope for reservoir
embankment
R11. IS: 9761-1995 : Hydropower Intakes Criteria for Hydraulic Design
R12. IS:7112 (1973) : Criteria for design of cross section for unlined canals in
Alluvial soils
R13. IS:10430 (2000) : Criteria for design of lined canals and guidance for
selection of type of lining
R14. IS:10646 (1991) : Canal linings cement concrete tiles specifications
R15. IS:11809 (1994) : Lining of canals by stone masonary code of practice
R16. IS:4558 (1995) : Under drainage of lined canals code of practice
R17. IS:4880 (Part IV) : Design and Construction of Tunnel Plugs Code of
Practice
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 2
R18. IS:11105 (1984) : Code of Practice for Concrete Structures for the
Storage of Liquids
R19. IS: 3370 : Code of Practice for Concrete Structures for the Storage
of Liquids: part 1 General Requirements
R20. IS: 9761 (1995) : Hydropower Intakes Criteria for Hydraulic Design
(First Revision)
R21. IS: 4880 (1987) : Code of Practice for Design of Tunnels Conveying
Water Part 1 General Design (First Revision)
R22. IS: 11625 (1986) : Criteria for Hydraulic Design of Penstocks
R23. IS: 5330 (1984) : Criteria for Design of Anchor Blocks for Penstocks with
Expansion Joints (First Revision0
R24. IS: 875 (Part III - 1987) : Code of Practice for Design Loads (Other than
Earthquake) for Buildings and Structures Part 3 :
Wind Loads (Second Revision)
R25. IS: 15119
(Part II -2002)
: Measurement of Liquid Flow in Open Channels Part
2: Determination of the Stage Discharge Ralation
(Superseding IS 2914:1964)
R26. IS: 10137(1982) : Guidelines for selection of spillways and energy
dissipators,
R27. IS: 6934 (1998) : Hydraulic design of high Ogee overflow spillway
R28. IS: 11485 (1985) : Criteria for Hydraulic design of sluices in concrete and
masonary dams
R29. IS: 5186 (1994) : Design of chute and side channel spillways
R30. IS: 2951 (Part II)
1965(Reaffirmed 2003)
: Recommendation for Estimation of Flow Liquids in
Closed Conduits
R31. Nigam, PS, Hydro-electric Engineering, Nem Chand & Bros, Roorkee, 1985
R32. Varshney, RS, Hydropower Structures, Nem Chand & Bros, Roorkee 2010
R33. Singh, Bharat and Varshney, RS, Embankment Dam Engineering, Nem Chand &
Bros, Roorkee, 2004.
R34. United State Department of The Interior Bureau of Reclamation (USBR) Design of
Small Dams, Oxford & IBH Publishing Company, 2001.
R35. Varshney, RS, Concrete Dams, Oxford & IBH Publishing Company, 1988
R36. Singh Bharat, Fundamentals of Irrigation Engineering, Nem Chand & Bros,
Roorkee, 2005
R37. Small Hydropower Edited by Hangzhow Regional (Asia Pacific) Centre for
Small Hydropower, 2005
R38. ACI committee, 207, Roller Compacted Concrete, Journal of American Concrete
Institute, July August 1980.
R39. Orman, ME, Sharma, HD, Nayak, GC and Jain, SC, Roller Compacted Concrete for
Dams, National Seminar on Dam Engineering (Iran), May 1987.
R40. Nayak, GC, Jain, SC and Orman, ME, Use of Fly Ash for Roller Compacted
Concrete, National Workshop on Utilization of Fly-ash, May 19-20, 1988, Roorkee.
R41. Hoek Evert, Rock Engineering, Canada, 2006
http://www.rocscience.com/hoek/corner/Practical_Rock_Engineering.pdf

3.0 CIVIL WORKS

3.1 The main civil works of a SHP are as follows:

(i) Diversion structure
(ii) Intake works
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 3
(iii) Water conductor system
(iv) Desilting tank
(v) Forebay / surge tank
(vi) Penstock
(vii) Power house building
(viii) Tailrace channel

4.0 DATA REQUIRED FOR DESIGN

4.1 Topographical Data

The following topographical data is required for the design of the various civil works:

(i) Contour plan of the project area from about 200 metres upstream of the
proposed intake works or 200 metres upstream of submergence, whichever is
more upto about 200 metres down stream of tailrace junction with the stream. In
the lateral direction the contour plan should extend by about 10 metres above the
proposed full supply level except in case of surge tank where it should be
extended by about 10 metres above the upsurge level in an area of about 100
metres around the proposed surge tank location. The scale of this contour plan
shall not be lesser than 1 in 1000 with atleast 2 metre contour interval.
(ii) Contour plan of the area around intake and diversion works from 200 metres
upstream of intake to 300 metres downstream of the proposed dam / weir
location and upto atleast 10 metres above the proposed full supply level. The
scale of this contour plan shall not be lesser than 1 in 200 with a maximum of 1
metre contour interval.
(iii) Contour plan of the area around desilting tank from the river upto 5 metres
above F.S.L. from 100 metres upstream to 100 metres downstream of the
proposed location and in a scale not lesser than 1 in 200 with 1 metre contour
interval.
(iv) Contour plan at the locations of cross-drainage works in an area of 200 m x 200
m with the proposed location of cross drainage work at the centre. The scale of
these contour plans shall be at least 1:200 with 1 metre contour interval.
(v) Contour plan of the power house complex covering proposed locations of the
surge tank / forebay, penstock, power house, switchyard, tailrace. The area
covered should be atleast 100 metres beyond the proposed locations of the
above works on either side. The scale of this contour plan shall be atleast 1:200
with 1 metre contour interval.
(vi) Longitudinal section of river water line on a particular day from 200 metres
upstream of the proposed diversion / intake location or 200 metres upstream of
submergence whichever is more upto 200 metres downstream of the propsoed
junction of tailrace and the river. The proposed locations of various works and
those of the junctions of rivulets crossing the water conductor system should be
marked on the longitudinal section.
(vii) Cross-sections of the river at the locations of diversion weir and junction of river
and tailrace and 50 metres upstream and downstream of the same. These
sections shall also be marked on contour plans mentioned in above paras 3.1(i),
3.1(ii) and 3.1(vii) and 3.1 (viii).
(viii) Longitudinal sections of the rivulets from about 200 metres upstream to about
200 downstream of the proposed locations of the cross-drawing works.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 4
(ix) Cross-section of the rivulets at the locations of cross-drainage works.

4.2 Geological and Geotechnical Data

The following geological data is required for the civil design of the various works.

Geological descriptions of the various locations of the civil works. These should be supported
by the following:

(i) Geological logs of one to three drill holes at the location of proposed weir
specially where the weir is to be designed on impermeable foundation.
(ii) Geological log of atleast one drill hole at the proposed location of intake.
(iii) Geological plan of the proposed weir & intake location with the drill holes
locations marked on it.
(iv) Geological plan of the desilting tank location. In case of underground desilting
tank, atleast one hole should be drilled at that site & geological log of the same
supplied.
(v) Geological mapping along the headrace tunnel alignment on the basis of surface
geology.
(vi) Geological log of atleast one hole drilled at the proposed location of surge tank.
(vii) Geological mapping along the proposed alignment of penstock. It should be
supported by geological logs of holes drilled at a spacing of not more than 100
metres along penstock alignment.
(viii) Geological details of foundation strata below power house. Geological log of
atleast on hole drilled at power house location in case the power house is
proposed to be founded on firm rock.
(ix) Maximum level of the ground water table at the proposed power house &
tailrace sites.
(x) C & | values of the foundation material at power house & tailrace locations.
(xi) Soil grain size distribution curves at weir, intake and power house locations
when these works are proposed to be founded on permeable foundations.
(xii) Maximum electrical resistivity of foundation strata.

4.3 Hydrological Data

The following hydrological data is required for the design of civil works

(i) Design flood discharges at locations of diversion structure and confluence of
tailrace & river.
(ii) Design discharge of power house.
(iii) Gauge and discharge data at the locations of diversion structure and confluence
of tailrace and river.

4.4 Other Data

(i) Number and capacity of machines.
(ii) The sediment particle size and concentration that is allowed to be passed though
the turbine.
(iii) d50- 50% of finer size of boundary material of the river.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 5
(iv) The following data is required for power house design from the supplier of
electro-mechanical equipment:
(a) Layout of the power house appurtenant works such as cable tunnel,
switchyard, by-pass water conductor system including tail race and access
road.
(b) General plan of the power house showing the erection bay, control room,
offices, workshop, utilities, etc, and other allied structures.
(c) Plan at generator floor level showing location of staircases, equipment and
openings, etc.
(d) Plan at turbine floor level showing location of staircases, equipment and
openings etc.
(e) Plan at centre line of spiral casing showing location of butterfly / spherical
valve, expansion joint, etc.
(f) Plans showing features such as (i) galleries, (ii) draft tube deck, (iii)
Transformers and fire walls, (iv) Transformer and gantry crane rails, (vi)
Draft tube gates and gantry crane, (vii) Drainage and dewatering sump, (vii)
Ducts, trenches and openings etc.
(g) Plan of the erection bay, control rooms and cable room.
(h) Transverse section (along the flow of water) through the centre line of
machines, through the control and administration block and erection bay.
(i) Longitudinal section (at right angles to the direction of flow) through the
centre line of machines.
(j) The shape and profile of the draft tube and its gated control along with
hoisting arrangement and its liner.
(k) Shape and profile of spiral casing.
(l) Plan and elevations of generator foundations showing details of base plates
anchor bolts, blockouts, etc.
(m) Drainage and dewatering arrangement comprising : (1) penstock, (2) draft
tube
(n) Dimension, location and arrangement of inlet valve (if provided) supports.
(o) Dimensions and clearances of EOT cranes and drawings giving details of
crane.
(p) Loads The loads imposed by the equipment and accessories should be
shown in plan and section such that the point of application of the load as
well as its base area are clearly indicated.
(1) Vertical load on stator sole plates
(2) Tangential force in direction of rotation on stator sole plates
(3) Tangential force in direction of rotation on stator sole plates
(4) Vertical force on lower bracket sole plates.
(5) Tangential force in direction of rotation on lower bracket sole plates
(6) Force due to unbalanced magnetic pull (radial force)
(7) Seismic force on stator sole plate;
(8) Seismic force on lower bracket sole plate
(9) Impact factor; and
(10) Directions and points of application of above loads
(q) Load of the inlet valves including its auxiliaries
(r) Details of crane giving information on
(1) The number and spacing of wheels of crane
(2) Maximum wheel loads & impact factor
(s) Thrust due to servomotors
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 6
(t) Reaction of pelton turbine showing jet
(u) Vertical and horizontal loads of each switchyard equipment along with its
supporting structures / towers, pulls of conductors and directions and points
of application
(v) Horizontal thrust due to water to penstock indicating mode of transfer
(w) Water-hammer load due to sudden closure of the machine

5.0 STAGE DISCHARGE CURVES

5.1 Stage discharge curves are required to be developed at the location of diversion
works as well as at the confluence of the tailrace and the river to carry out the
hydraulic design of the diversion works, to fix top levels of the various works above
high flood level and to carry out setting of the centre line of the turbines. Stage
discharge curves can be developed in accordance with the method described in IS:
15119: Part II. In case of SHP, the data required to develop a correct stage discharge
is generally not available. In such a case, a reasonable curve can be obtained by using
Mannings equation at the cross-section of the river, where stage-discharge curve is
required. The Mannings equation is as follows

,
1
2 / 1 3 / 2
S R A
n
Q=
Where,

Q = discharge in cumecs,
A = area of stream in sq.m,
R = Hydraulic mean depth in metres as ratio of area (A) with the wetted
perimeter (P),
S = Longitudinal slope of the stream, and
n = Manning Rugosity coefficient of the channel bed & sides.

For determination of cross section of the stream, cross sections at the location where stage
discharge curve is required to be evaluated and those at 50 metres upstream and 50 metres
downstream may be plotted overlapping each other and an average section of the three
sections may be considered the cross section of the river as indicated in Fig. 1 below.


Fig. 1: Determination of Average River Section
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 7

With the use of average cross section of the stream, areas of flow A and wetted perimeters
and the hydraulic mean depth R can be determined corresponding different water levels.
Longitudinal slope S can be taken as the average water slope of the stream from 200 metres
upstream to about 200 metres downstream of the stream. The value of rugosity coefficient of
the stream can be estimated from one or more of the empirical equations given in Table 1.

Table 1: Empirical Equations for Estimation Mannings Rugosity Coefficient for
Boulder Streams

S. No. Investigator(s) Equation Remarks
1. Golubtsov (1969)
33 . 0
0
222 . 0 S n =
data from central Asian rivers; S
0

= 0.4 20%
2. Anderson et.al.
(1970)
( )
6 / 1
50
0395 . 0 d n=
data from flumes and natural
rivers; S
0
<0.01, d
50
in ft
3. Bray (1979)
177 . 0
0
104 . 0 S n =
data from 67 gravel-bed rivers in
Alberta: S
0
= 0.02 1%
4. Jarret (1984)
38 . 0
0
16 . 0
39 . 0 S R n

=
for high gradient boulder streams
5. Bathrust (1985)
( ) 4 84 / log 62 . 5 + = d y n
y = depth of flow; d
84
= size of
boulders; British mountainous
rivers; S
0
= 0.004 0.04
6. Abt et.al. (1988)
( )
159 . 0
0 50
456 . 0 S d n=
d
50
in inch; and d
50
=26-157 mm;
S
0
= 0.01 0.20
7. Rice et.al. (1998)
( )
147 . 0
0 50
029 . 0 S d n=
d
50
in mm; S
0
= 0.1 0.4
8. Strickler
( ) 24 /
6 / 1
50
d n =
d
50
is in metres
d50: 50% of finer size of boundary material river

6.0 DIVERSION AVERAGE STRUCTURE

There are a number of types of diversion structures which are normally constructed. The type
of structure depends upon many factors which can be as follows:

(i) Importance and size of SHP
(ii) Availability of funds
(iii) Type of foundation strata
(iv) Longitudinal slope of the river
(v) Availability of head

The design criteria for diversion structures normally employed in SHP projects are described
below:

6.1 Partial Weir

This is a temporary structure made of mud and stones, which is constructed just downstream
of the intake to divert water into the intake mouth. This type of structure does not extend all
the way across the stream. The structure helps stream flow to head upto an extent near the
intake so that a portion of the stream discharge gets passed into the power channel. The total
height of such structure is limited to about one metre or so. This being a temporary structure
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 8
works only during lean flows and gets washed away during the floods, when the intake can
draw water due to the high stage of the stream only. A typical arrangement of partial dam is
shown in Fig. 2 from which its design is self explanatory. The mud used for the dam structure
should be well puddled clay mixed with about 10% by volume of rough wheat husk. The
stones used should be of 150 to 300 mm size and the space between the stones should be
thoroughly filled with mud. Before laying the stones the foundation area should be cleaned of
all loose material upto a depth of atleast 0.3 metre or so. As indicated in Fig. 2, a portion of
the nose of the partial dam is required to be protected with bamboo / balli crates. The
bamboos / ballies used to fabricate the crate around the nose should be atleast 50 mm in
diameter and should be driven inside the river bed upto atleast 1.5 times the scour depth
corresponding maximum non-monsoon discharge. The spacing of the bamboos ballies
should be around 300 mm in both horizontal and vertical directions.



Fig. 2: General Arrangement of Partial Weir
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 9
6.2 Gabion Weir

This type of weir comprises solid boulder structure formed by encasing boulders in G.I. wire
crates. This type is suitable for installations on small streams, where reduction in cost of
diversion structure is desired. This type of structure is exposed to damage by heavy rolling
boulders during monsoon months and hence requires maintenance specially after floods. This
option should only be adopted for the following conditions:

(i) When the drop height does not exceed 4 metres
(ii) When the specific flow i.e. maximum discharge per unit width does not exceed 3
cumec/metre width.

Normally the downstream face of the weir should be vertical as weirs with stepped / battered
downstream face are not fitted to natural streams with a significant gravel / boulder
transportation. In fact, continuous dropping & sliding of solids on downstream steps / sloping
face provokes tear of the gabion nets. The weir upstream face should always be stepped in
order to facilitate bonding between the gabions and earthfill. The earthfill on the upstream
face not only makes the weir impervious, the earthfills weight on the steps adds stability to
the structure. Typical sections of gabion weir are shown in Fig. 3(a) & 3(b).



Fig. 3 (a): Typical Section of Gabion Weir



Fig. 3 (b): Typical Section of Gabion Weir with Downstream Protection Works

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 10
6.2.1 Design of gabion weir

(i) Hydraulic Design

The length of the weir across the flow is required to be sufficient enough to pass design flood.
This is given by the following relation:

Q = c b h
3/2
,

Where,

Q = Design flood discharge in cumecs
c = Coefficient of discharge which varies from 1.71 for smooth top
surface to 1.33 for rough surface,
b = Length of weir across the flow in metres, and
h = Water depth atop the weir in metres

For a gabion weir the maximum water depth atop the weir should be limited to 3 metres.

(ii) Depth of Foundation

The type of weir shown in Fig. 3(a) does not have provision of energy dissipation device in
the downstream side. This type of weir is suitable only when the stream bed material is
resistant to erosion. In such a case the foundation of the weir should be kept at impervious
unerodable strata. The type of weir shown in Fig. 3(b) is applicable for pervious erodable
strata. In this case the foundation of the weir should be kept at atleast 1.50 times the scour
depth corresponding design flood discharge. The scour depth is given by the following
relation

R = 1.35
3 / 1
2
|
|
.
|

\
|
f
q
metres,

Where,

R = scour depth in metres below design flood level,
q = design flood discharge/ unit length of weir in cumecs/ metre, and
f = silt factor

Silt factor f can however be obtained from the following relation,

f = , 76 . 1
50
d

(iii) Height
H
of Counter Weir

The height
H
of the counter weir may vary from H/4 to H/6 depending upon the site
condition. Firstly a counter weir of height H/6 may be constructed. If the site conditions so
require, this height can be raised to H/4 by putting additional layer of gabions.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 11
(iv) Checking Against Piping

In order to keep the weir, safe against piping, the seepage length L be checked from the
following Blighs relation:

L > C Y

Where,

L = seepage length in metres
= d + l + d
1
(refer Fig. 3(b))
C = a coefficient depending upon soil characteristics as shown in Table 2
Y = Maximum water level difference between upstream and downstream
of weir in metres

Table 2: Blighs Coefficient C Values

Type of Soil Sizes of Particles (mm) C
Fine silt & mud 0.01 to 0.05 20
Coarse silt & fine sand 0.05 to 0.10 18
Fine sand 0.12 to 0.25 15
Medium sand 0.30 to 0.50 12
Coarse sand 0.60 to 1.00 10
Gravel >2.00 9-4
Hard clay 0.005 6-3

(v) Stability Analysis

The main section of weir should be safe against the following stability tests:

(a) Against excessive pressure on foundation soil
(b) Against sliding
(c) Against uplift

The stability analysis shall be done for the loads and forces shown in Fig. 4.

The loads and forces in Fig. 4 are as below

Wg = Weight of gabions
H
u
= Earth and Water pressure from upstream side
W
w
= Weight of earth and water on gabions
Hu = Water pressure from downstream side
U = Uplift pressure corresponding upstream and downstream water levels

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 12


Fig. 4: Loads for Stability Analysis

The factors of safety against sliding and uplift shall be atleast 1.50 and 1.25 respectively.

6.3 Trench Weir

Trench weir (Tyroleam, bottom intake) is eminently suitable for small hydro schemes on
steep hilly streams (>1 in 20) because of the following advantages:

(i) It is a simple structure and can be safely constructed across steep streams with
permeable erodible strata.
(ii) The structure does not materially affect the regime of the stream.
(iii) The structure has capability to draw even the minimum flow of the stream very
effectively and efficiently.
(iv) It can normally be adopted for discharges as small as 0.5 cumecs and upto 25
cumecs.
(v) The structure does not cause any obstruction for aquatic life movement.

The trench weir consists of a rectangular or trapezoidal trench constructed across the flow of
the stream. The top of the trench is kept normally at river bed level. A trash rack is provided
on top of the trench opening sloped in the direction of flow so that stones and pebbles do not
settle but roll away with stream flow. The trench is provided with a bed slope of 1 in 12.5 less
or so in the flow direction of the diverted water so that sufficient velocity is generated to
carry along the silt that may find entry into the trench through the trash rack openings. The
trench is so designed that it may carry atleast 1.2 times of the diverted discharge. The intake
structure which is mainly a vertical rectangular well is located at the end of the trench weir
well inside the river bank. It has three openings, the first at the exit end of the main trench,
the other matching the location of the power channel and the third one at the bottom of the
chamber on the downstream side for silt flushing. Sometimes a skimming slab is also
provided with its top matching with the bed level of the power channel. It is provided so that
the bed load that finds its way into the intake chamber is flushed out and does not enter into
the power channel. The flushing discharge of the intake chamber is kept about 15 to 20% of
that of the power channel. The above mentioned three opening of the intake well are
controlled by vertical gates provided at the top of the intake chamber. The power channel
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 13
originating from the intake chamber should be continued as a covered duct till a level is
reached which is above HFL of the stream to prevent the flows from the stream entering into
the water conductor system. Protection works are needed on the upstream and downstream of
the trench. These works may comprise of suitable size boulder crates with a concrete slab of
about 100 mm thickness on the top to protect the wire mesh from tearing or cement concrete
blocks. These protections are provided both upstream and downstream of the trench.
Concrete toe walls, one on the upstream and two on the downstream of the trench are
provided to serve as a safe guard against erosion. Typical details of a trench weir are shown
in Fig. 5 (a) and (b).

6.3.1 Design of trench weir

(a) Gauge Site Discharge Curve

A gauge discharge curve should first be developed at the weir site in order to arrive at the top
levels of the side walls and the intake chamber which should be atleast one metre above the
design HFL.

(b) Sizing of Trench

The top width of the trench in metres is given by:

,
2
2 1
gE L C E E
Q
B
d
=

Where,

Q = diverted discharge in cumecs
(This sould be atleast 1.2 times the sum of the following:
(i) Design discharge of the power house
(ii) Leakage, seepage or evaporation losses in the water conductor
system
(iii) Flushing discharge needed at the desilting system i.e. flushing
discharge at the intake of trench weir and flushing discharge at the
desilting chamber, if any
L = Width of stream in metres
E
1
=
trench over surface rack trash of area Total
opening rack trash of area Clear

E
2
= Ratio of trash rack openings likely to be clogged (It may be taken to
be 0.5)
Cd = Coefficient of discharge through trash rack openings (It may be
taken to be 0.46)
E = Specific energy at any section of the trench weir =
3 / 2
|
.
|

\
|
CL
Q

Where,

C = Coefficient of discharge of broad crested weir (It may be taken as
1.7)

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 14


Fig. 5 (a): Typical Details of Trench Weir (Plan)
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 15


Fig. 5 (b): Typical Details of Trench Weir (Sections)
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 16

The total area of the top of the trench should be such that velocity through the total trash rack
area even with 50% clogging should not be more than 0.4 metres / sec i.e.


L
Q
B

>
4 . 0
2


If d be water depth in metres along the section of the trench, Area A = Bd, Velocity head
h
o
at the end of the trench is given by

, 6 /
2 5 . 1
5 . 0
2 1
d
B
Bd
B
A
h
h
h = =
+
=
o


where h is a constant depending upon the bottom profile of the trench and may be taken as
0.5.

The corresponding discharge is given by

Q =
o
gh A 2
= 6 / 2 d g Bd

The water depth evaluated above should be provided at the upstream end of the trench i.e. the
end on the opposite bank of intake chamber. There should be a clearance of atleast 0.15 to 0.2
metres between the water level & the bottom of the racks.

The water depth at the intake end may be determined by providing a bed slope of atleast 1 in
12.5 in the trench. As such the water depth D in metres at the intake end of the trench is
given by


5 . 12
L
d D + >

Average depth of the trench =
2
D d +

& average area of trench in sq. metres =
( )
2
2
m
D d B +

In case bottom half of the trench gets filled up with silt,
net average depth = &
4
D d
d
n
+

net area of the trench =
( )
4
D d B
A
n
+
=


Thus half clogged section of the trench should be sufficient enough to pass the total discharge
Q.

This can be checked by the following Mannings equation:

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 17

n
S R An
Q
2 / 1 3 / 2
. .
=

Where,
R = hydraulic mean depth
=
n
n
d B
A
2 +

S = Slope of the trench =
L
d D

n = Rugosity coefficient (This can be assumed to be 0.018)

In case the value of Q as calculated above happens to be lesser than required the area / slope
of the trench will have to be increased.

(c) Depth of Cut off Walls

The depth of the upstream and downstream cut off walls below respective design flood levels
should be atleast 1.5 and 1.75 times the scour depth respectively. Scour depth can be
calculated from the following relation scour depth = 1.35 metres,
1/ 3
2
f
q
|
|
.
|

\
|


The bottom of the trench weir should also be kept atleast 1.5 times the scour depth below the
HFL. Cutoff walls should also be provided below the side walls in such a manner that the
bottom of the cutoff on the upstream matches with that of the upstream cutoff wall and the
bottom on the downstream cutoff matches with that of the downstream cutoff wall.

(d) Silt Flushing Pipe / Channel

Silt collected at the bottom of the intake chamber is required to be flushed out regularly into
the river. In order to do it, the bottom of the intake chamber is kept sufficiently below the
bottom of the trench weir at that end. A flushing channel or a pipe of sufficient size (not
lesser than 0.3 m diameter) is provided at the bottom of the intake chamber and is taken to the
river at such a point where the HFL is atleast 0.5 metre below the invert of the flushing
channel / pipe.

The flushing channel / pipe should have sufficient slope to generate a flushing velocity of 2.5
to 3.5 m/sec. In case a flushing pipe is provided the alignment of the pipe should be straight
and the pipe sections should have flanged ends so that the pipe could be easily dismantled
and cleaned in case it gets choked. The exit end of the flushing pipe/ channel should be well
protected against erosion by river.

(e) Additional Safety Measures

The trench weir option is generally adopted on small stream having steep gradient. Generally
such streams carry large amount of bed load comprising boulders upto 1 metre size or so. In
such case the following safety measures are worth taken into account:

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 18
(i) Trash racks section should be quite enough so as to withstand pounding of the
boulders.
(ii) A portion of trash rack should be easily removable so that the trench could be
cleaned of the silt deposited into it (after flood).
(iii) The top portion of the trench should be steel lined with atleast 6 mm thick plate.
(iv) In very steep stream carrying large amount of bed load, old rails at about 200
mm centre to centre can be embedded in the upstream and downstream
protection works. The heads of these raips shall protrude above the concrete
surface as shown in Fig. 6. The rails shall be laid along the flow of the stream.



Fig. 6: Typical Arrangement of Protection of Trench Weir with Steel Rails

6.4 Raised Weir (barrage)

Raised weir (barrage) is generally constructed under following conditions:

(i) The discharge required to be diverted for power generation is large.
(ii) The stream has gentle slope (flatter than 1 in 100) and some additional head is
required to be gained by raising the water level at the weir.
(iii) In case some storage is required for peaking purposes.

The weir can have erodable or or non-erodable foundation. The design for the two cases will
have to be different.

6.4.1 Gauge discharge curve

Gauge discharge curve should first be developed at the proposed weir/ barrage site in order to
arrive at the safe levels of side walls and design of energy dissipation devices.

6.4.2 Pond level

Pond level upstream of the barrage shall normally be obtained with the following
considerations.

(i) Area allowed to be submerged on the upstream of the weir / barrage.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 19
(ii) Head needed for required power generation
(iii) Geology of the weir / barrage site

6.4.3 Retrogression

Progressive retrogression of the stream on the downstream side as a result of construction of
weir / barrage causes lowering of the downstream river stages which has to be suitably
considered in the design of downstream energy dissipation works. While a retrogression of
1.25 to 2.25 m may be adopted for alluvial rivers, a retrogression of 0.3 to 0.5 m may be
considered for hilly streams with well defined section.

6.4.4 Waterway

In deep and confined streams with stable banks, the overall waterway between abutments
including thicknesses of piers should be approximately equal to the actual width of stream at
the design flood. However for alluvial rivers, the following looseness factor may be applied
to Laceys waterway as per Table 3.

Table 3: Silt Factor and Looseness Factor

Silt Factor Looseness Factor
Less than 1 1.2 to 1
1 to 1.5 1 to 0.6

Laceys waterway is given by the following formula:

P = 4.83 Q
1/2


Where,
P = waterway in metres
Q = design flood discharge in cumecs

The following additional considerations may be taken into account while deciding the final
waterway:

(a) Cost of cutoffs and protection works more the water way lesser will be depth of
cutoffs & cost of protection works.
(b) Afflux constraints (It would be optimum if in case of barrages the upstream HFL
and pond level are kept the same).

6.4.5 Levels of crest and upstream floor

The levels of the crest in the pocket upstream of the under sluices and upstream floor should
normally be kept at the normal low bed level of the stream. For weirs, the crest level shall be
kept at the required pond level. For barrages, the head required to pass the design flood at the
desired maximum upstream level determines the crest level of the bays other than under
sluice bays.

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 20
6.4.6 Shape of barrage / weir profile

Where the upstream floor level and the crest level are not the same, the crest may be provided
flat with a width of about 2 m. The upstream and downstream slopes joining the respective
floors incase of erodoble foundations may be 1 (H) :1 (V) and 3 (H) : 1 (V) respectively. On
nonerodable rocky foundation the upstream & downstream slopes of the weirs may be 0.25
(H) : 1 (V) and 0.7 (H) : 1 (V) to 1:1 respectively.

6.4.7 Energy dissipation

For barrages / weirs resting on erodable foundation, hydraulic jump type stilling basin
designed in accordance with IS:4997 would normally be required for energy dissipation.
While designing such basin a provision of 20% concentration of flow may be provided. For
barrages / weirs resting on unerodable foundations, the energy dissipation devises may be
either of the following

(i) Hydraulic jump type stilling basin designed in accordance with IS:4997
(ii) Skijump or roller bucket designed in accordance with IS:11527

6.4.8 Under sluices

A weir / barrage requires a deep pocket infront of the intake so that bed load of silt may be
got flushed downstream through the lower crest of the undersluice bays and the intake may
be provided with comparatively clearer water. A divide wall is provided between the
undersluice bays and the weir/ other bays of the barrage to produce favorable flow conditions
and to eliminate mixing of the silt deposited upstream of the weir / other bays of the barrage.
The width of undersuluice portion shall be determined on the basis of following
considerations

(i) It should be capable of passing atleast double the intake discharge.
(ii) In should be capable of passing 10 to 20% of design flood discharge.
(iii) It should be wide enough to keep the approach velocities sufficiently lower than
critical velocities to ensure maximum settling of suspended silt load
(iv) In case of weirs, it should be capable of passing fair weather floods.

6.4.9 Divide wall

The following guidelines shall be adopted in fixing the length of divide wall between under
sluice bays and weir / other bays of the barrage:

(i) It shall normally cover atleast two third to full length of the intake.
(ii) The upstream length shall not be less than two times the level difference
between the crest levels of under sluice and weir / other bays of barrage.

6.4.10 Cut offs

Cut offs are generally required on the upstream and downstream of the floors in case when
the structure in founded on erodable foundation. The upstream and downstream cutoffs
should generally be provided upto a depth of IR and 1.25 R respectively below high flood
level, where R is the depth of scour. The concentration factor shall be taken into account in
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 21
determination of scour depth. The cutoffs should be either extended into both banks upto
atleast twice their depth from the top of floors or the whole of the structure should be boxed
by providing cutoffs in the side walls also with the bottom of these side cutoffs varying from
the bottom of the upstream cutoff on the upstream side to bottom of the downstream cutoff on
the downstream side. In addition to above, the depth of the downstream cutoff alongwith the
total length of impervious floor should be sufficient to reduce the exit gradient to within safe
limits. The cutoffs may be of masonary, concrete or sheet piles depending upon the type of
foundation soil and depth of cutoff and to suit construction convenience.

The exit gradient may be determined with the help of Kholas curve. The factor of safety for
exit gradient for different types of foundation strata shall be as per Table 4:

Table 4: Safe Exit Gradient for Different Sediment Strata

Sediment Size Safe Exit Gradient
Shingle 4 to 5
Coarse sand 5 to 6
Fine sand 6 to 7

No cutoffs are required for weirs founded on impermeable foundation.

6.4.11 Protection works

Protections as mentioned below are needed to be provided for weir founded on erodible
foundations only.

(i) Upstream Block Protection

Just beyond the upstream end of the impervious floor, protection works comprising cement
concrete blocks of adequate size laid over a base of hand packed stones shall be provided.
The cement concrete blocks shall be of adequate size so as not to get dislodged and shall
generally be of size not less than 1500 x 1500 x 900 mm. The length of upstream block
protection shall be equal to depth of scour below floor level. In case of very steep stream, the
concrete blocks may be interconnected.

(ii) Downstream Block Protection

Downstream block protection shall comprise cement concrete blocks of adequate size laid
over a suitably designed inverted filter. The cement concrete blocks shall generally be of size
not less than 1500 x 1500 x 900 mm laid with gaps of 75 mm width packed with gravel. The
length of this protection shall be equal to 1.5 times the depth of scour below flood level. A
toe wall of masonary or concrete extending upto about 500 mm below the bottom of filter
shall be provided at the downstream end of the inverted filter to prevent it from getting
disturbed. The graded inverted filter should generally conform to the following design
criteria:

(a)
foundation of D
filter of D
foundation of D
filter of D
15
15
15
15
4 s >

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 22
(D
15
denote grain size such that 15% of solid grains are smaller this size).

(b) The filter may be provided in two or three layers. The grain size curves of the
filter layers and the base material should be roughly parallel.

(iii) Loose stone protection

Beyond the block protection on upstream and downstream of a weir/ barrage located on
erodable foundation, launching aprons comprising loose boulders shall be provided. The
boulders used shall not weight less than 40 kg. These may be laid in a length of 1 to 1.5 times
the scour depth and their thickness shall be from 1 to 1.5 metres.

6.4.12 Discharge

The discharge shall be obtained from the following formula:

Q = CLH
3/2


Where,
Q = discharge in cumecs,
C = coefficient of discharge (in free flow condition)
L = Clear waterway of the barrage or weir in metres, and
H = Head over the crest in metres

The value of C depends upon many factors such a drowning ratio, shape and width and
surface roughness of the sill and can, therefore, be assessed correctly only by model studies.
In the absence of model studies, the value of C can be determined from the curve shown in
Fig. 7.

6.4.13 Total floor length and exit gradient

In case of weirs founded on erodible foundations a minimum length of the impervious floor
has to be determined in order to keep the exit gradient within limits so as to eliminate the
possibility of piping phenomenon.

Exit gradient G
E
is given by the following formula:

G
E
= ,
1
t
d
H


Where,
H = Maximum static head in metres,
d = Depth of downstream cut off in metres, and
t
1
= a factor obtained from Khoslas curve against ,
d
b
in which b is the
total length of impervious floor in metres


AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 23
After fixing the value of G
E
on the basis of foundation strata & d on the basis of scour
depth, factor
t
1
can be determined and corresponding value of ,
d
b
can be read on the
Khoslas curve.

As the value ofd is known, b the total length of impervious floor can be determined. In
case the length of the floor works out to be too large, it can be reduced by increasing the
depth of cut off within practical limits. The minimum length of downstream floor is
determined by energy dissipation consideration as per para 6.4.7. The length of the floor in
excess of the downstream requirement is to be given on the upstream of the gate.


Where
Q = Discharge in cumecs
C = Coefficient of Discharge in Free Conditions
L = Clear Water Way in Meter
H = Head of Water Over Crest in Meter

Level Crest Level Water Upstream
Level Crest Level Water Downstream
Ratio Drowning

=

Fig. 7: Drowning Ratio Vs Coefficient of Discharge Curve (in MKS Units)
(Based on Malikpur Curve) Applicable in Broad Crested Barrages

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 24
6.4.14 Floor thickness

After fixing the profile of the weir section from upstream to downstream end, uplift pressures
at key points shall be determined from Khosla Theory for different flow conditions i.e.

(i) Static condition with gates closed, upstream water at full reservoir level and no
water in the downstream side,

(ii) High flood condition

The uplift pressures are then plotted along the longitudinal section of the weir for the two
conditions mentioned above. The floor thickness at any point should not be less than the
maximum ordinate between the sub soil pressure line and the water surface or floor surface, if
there is no flow, divided by (r-1), where r is the specific gravity of concrete which may be
taken as 2.25.

For weirs founded on unerodable rocks, the uplift forces can either be balanced by providing
floor thicknesses as mentioned above or they can be balanced by providing anchor bolts. For
design of anchor bolts, the vertical component of the uplift load, less the dead load of
concrete, is first determined. The anchorage value of the bars is determined on the basis of
pull out tests. In case pull out values are not available, the anchorage value can be obtained
by the following relation:

s
d
P =
3
2
2
t


Where,

P = ultimate tensile strength of the anchor bar in kg,
d = Minimum depth of embedment of the anchor bar in metres,
s = Allowable shear stress of the rock, which can vary from 4000 kg/m
2

to 5,500 kg/m
2
depending upon the quality of rock.

Normally the spacing of the anchor bolts is kept half the depth of embedment.

Typical details of a barrage founded on permeable foundation is shown in Fig. 8(a) and 8(b)
weir founded on impermeable foundation is shown in Fig. 9.

6.5 Concrete / Stone Masonary Gravity Dam

Concrete / stone masonary gravity dams are generally adopted under following conditions:

(i) When the proposed diversion site is situated in a narrow valley and sound rock is
available in the river bed and banks at a reasonal depth.
(ii) Where additional head is required to be gained without submergence of much of
useful land.
(iii) In case some storage is required for peaking purposes.
(iv) Where construction materials i.e. aggregate, cement etc. are readily available
within reasonable distance
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 25

Fig. 8(a): Typical Details of a Raised Weir on Erodable Foundation (Plan)
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 26
Concrete / masonary dams have following advantages:

(i) They are simple in construction.
(ii) They have less amount of volume as compared to earthfull dams
(iii) They can facilitate overflowing in floods even during construction as well as
during operation

The dams pertaining to SHP are normally of low height say upto about 30 m, as such stone
masonary dams should be preferred because of the following advantages:

(i) They have less rigid requirements during construction.
(ii) They use less cement and make use of local materials.
(iii) They are labour intensive and can be constructed using local labour.
(iv) The heat of hydration is lesser.

6.5.1 Gauge discharge curve

Gauge discharge curve should first be developed at the proposed dam site in order to assess
water levels on the downstream side of the dam. The G-D curve will also be helpful in
designing the most efficient energy dissipation device on the downstream side of the spillway
section.

6.5.2 Pond level

Full reservoir level / pond level upstream of the dam shall normally be obtained from the
following considerations:

(i) Area allowed to be submerged on the upstream side of the dam at pond level /
high flood level whichever is higher. (It would be better if the spillway is so
designed that the pond level & high flood levels remain the same).
(ii) Head needed for power generation on the basis of techno-economic studies.
(iii) Geological conditions of the dam site.

6.5.3 Design of dam

Structural design of dam can be done on the criteria mentioned in IS:6512 Criteria for
design of solid gravity dams.

6.5.4 Design of spillway

The spillway is required to be designed to pass design flood at a pre-determined maximum
allowable upstream water level. Spillway best suited to the prevailing site conditions can be
designed in accordance with IS: 10137 Guidelines for selection of spillways and energy
dissipators, IS: 6934 Hydraulic design of high Ogee overflow spillway and / or IS: 11485
Hydraulic design of sluices in concrete and masonary dams and / or IS: 5186 Design of
chute and side channel spillways.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 27

Fig. 8(b): Typical Details of a Raised Weir on Erodable Foundation (Section)

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 28


Fig. 9: Typical Details of a Weir on Impermeable Foundation
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 29
The design of proper energy dissipaters on the downstream side of the spillways occupies a
vital place in the design of dams. The problem of designing energy dissipaters is essentially
of reducing high velocity flow to a velocity low enough to minimize erosion of natural river
bed. The reduction in velocity can be accomplished by any, or a combination of the
following, depending upon the head, discharge intensity, tail water conditions and the quality
of bed rock / material.

(a) Hydraulic jump type spilling basins
(i) Horizontal apron type; and
(ii) Sloping apron type

(b) Jet diffusion and free jet stilling basins
(i) Jet diffusion basins,
(ii) Free jet stilling basins,
(iii) Hump stilling basins; and
(iv) Impact stilling basins

(c) Bucket type dissipaters
(i) Solid and slotted roller buckets; and
(ii) Ski jump or flip buckets

(d) Interacting jets and other special type of stilling basins

The selection and design of energy dissipation devices best suited for a particular location can
be done in accordance with the following IS: codes

IS: 10137 - Guidelines for selection of spillways and energy dissipaters
IS: 11527 - Criteria for structural design of energy dissipaters for spillways
IS: 4997 - Criteria for design of hydraulic jump type stilling basins with horizontal and
sloping apron
IS: 7365 - Criteria for hydraulic design of bucket type energy dissipaters.

6.6 Roller Compacted Concrete Dam

Roller compacted concrete dam (RCC Dam) is structurally similar to a concrete gravity dam
and can be deigned on similar lines. RCC dam construction is characterized by high-flyash
cement in the heating zone of the dam. Similar to an earth dam the concreting of such type of
dam is carried out by dumpers and vibratory rollers are used to for compacting the concrete.
No contraction joints are provided in the dam body during initial course of construction.
Transverse contraction joints are, however, sawed at regular intervals after compaction
operation. Compared with conventional concrete gravity dam, the cement consumption per
cubic meter of RCC dam as well as the overall cost of dam gets reduced by about 45% and
15% respectively and the construction period also gets reduced to a large extent. Fig. 10
which is based on RCC dam projects in USA in 1986. Unfortunately no roller compacted
concrete dam has been constructed in India so far. It would, therefore, be worth while to
consider such dams for small hydro projects.

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 30


Fig. 10: Comparison of RCC and Mass Concrete Costs (1986 Dollars) (R-37)

6.6.1 Design considerations

Placing RCC in layers that are compacted by vibratory rollers does not change the basic
design concepts for dams or other massive structures. However it does affect construction
procedure. Design and layout of appurtenant structures, construction planning and treatment
of joints should take into consideration the advantages and disadvantages of the rapid
construction that is possible with RCC. Most placements of sufficient length and width to
accommodate rollers and spreading equipment can economically benefit from RCC.

Three distinctly different concepts of design and construction of RCC dams have
independently emerged in USA, Japan and the UK. They have been classified as follows:

(i) Lean RCC Dam

This concept was developed in USA. It is characterized by low paste content concrete to
reduce the cost and the potential for heat generation. Total cementatious contents of about
120 kg/m
3
or less is used with flyash content ranging from 0-40% and aggregates have a
relatively high proportion of natural fines.

(ii) Rolled Concrete Dam (RCD)

This concept was developed in Japan. The RCD mix contains cement content of 120-140
kg/m
3
with 20-30% flyash and is spread in three to four lifts compacted in one layer of 60-70
cm thickness.

(iii) High Paste Content RCC Dam

This concept of RCC was developed in UK and also accepted in USA. To achieve a density
near to theoretical air-free density, a relatively high paste content is required. It has been
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 31
possible to obtain both a low cement content and high paste content using pozzolana. A high
paste mortar ratio also leads to improve joint properties and good bonding between the layers
with a time gap upto three days between lifts. In the mix the cement plus flyash content is
greater than 200 kg/m
3
with a high percentage of flyash.

Mix Design

The worlds RCC dams constructed, under construction or planned are given in Table 5,
which may be helpful to some extent in mix design. However, mix of RCC to be used for a
specific project, will have to be designed through laboratory tests. The object of mix design is
to produce a mix with maximum density and lowest cementatious material content
compatible with even distribution of the paste through the mix and sufficient enough to
ensure an adequate bond between layers. The following procedure of RCC mix design as
outlined in ACI committee, 207, Report on Roller compacted Concrete can be used for mix
design:

(1) Determine fly-ash / cement ratio (F/C), and Water / cementatious ratio (W/C+F) from
the trial mix strength, using ACI curve, shown in Fig. 11.
(2) Determine the volume of coarse aggregate, (Vca) by dividing the loose bulk density
of coarse aggregate to its specific gravity, in order to obtain an initial value for Vca.
(3) Calculate the volume of air-free mortar per cu. m (Vm) assuming 2 percent entrapped
air, from:

V
m
= C
v
(0.98 V
ca
),

where C
v
= unit volume of concrete.

(4) Determine of air free volume of paste content p. A minimum paste / mortar ratio, P
is required for bond between layers and to yield a high relative density, from p = Px
Vm
(5) Determine fine aggregate volume V
fa
from the relation

V
fa
= V
m
- p

(6) From F/c and W/ (C+F) ratio equations, and the known volume of paste fraction, p =
C+F+W, the cement, fly-ash and trial water content can be calculated. The proportion
by weight can be calculated by multiplying volumetric fraction to each material by
specific gravity of the material.
(7) Check the consistency by varying water content of the mix to obtain the optimum
water content which achieves maximum compacted density.

A typical section of RCC dam is shown in Fig. 12.

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 32
Table 5: RCC dams constructed, under construction or planned

S.
No.
Name of Project Country River Height
(m)
Length Dam Facing Placement Cementatious
Content
Upstream Downstream Spillway Layers
(mm)
Lifts
(mm)
OPC
(kg/m
3
)
Pozzolan
(d)(kg/m
3
) Slope Slope Slope
1. Shmajigawa Japan Shimaji 89 240 V/0.30:1 0.8:1 0.8:1 150-200 500-700 91
84
39
36
2. Holbeam Wood UK Lemon 12 80 V 0.8:1 0.8:1 250 250 105 0
3. Willow Creek USA Willo 52 543 V 0.8:1 0.8:1 300 300 47 19
4. Copperfield River Australia Copperfield 40 340 V V/0.9:1 0.8:1 300 300 80 30
5. Corraoll. E. (Ecton)
Galesville
USA Cow 51 291 V 0.8:1 0.8:1 300 300 53 51
6. Castilblanco de los
Arrayou
Spain Cala 25 123 V V/0.75:1 0.75:1 400 400 102
88
86
94
7. Kengkou China Pingshan 57 123 V 0.75:1 0.75:1 300 300 70 50
8. Craigbourne Australia Coal 25 247 V 1.0:1 1.0:1 300 300 70 60
9. De Mist Kraal S. Africa Little Fish 30 300 V 0.6:1 0.6:1 250 250 58 58
10. Arabic (now
Mokgoma Matlala)
S. Africa Olifants 36 455 V V/0.75/0.5 0.75:1 300 300 36 74
11. Bucca Weir Australia Kolan 12 128 V N.A 0.5:1 300 300 90
12. Zaaihoek S. Africa Slang 47 527 V 0.62:1 0.62:1 250 250 36 84
13. Lower Chase Creek USA Lower Chase 20 122 V 0.7:1 0.7:1 300 300 64 40
14. Upper Stillwater USA Rock Creek 90 825 V 0.32:1/0.6:1 0.6:1 300 300 79 173
15. Los Morales Spain Morales 28 200 V 0.75:1 0.75:1 300-
400
300
-400
81
73
69
140
127
153
16. Les Olivettes France La Peyne 36 255 V 0.75:1 0.75:1 300 300 0 130
17. Tamagawa Japan Tama 100 432 V/0.60:1 0.8:1 0.8:1 150-
200
750 91 39
18. Pirika Japan Shiribeshit-
oshibetsu
40 910 V/0.80:1 0.8:1 0.8:1 150-
200
500 84 36
19. Elk Creek USA Elk Creek 51 365
786
V 0.8:1 0.8:1 150 600 70 33
20. Santa Eugenia Spain Xallas 83 310 0.05:1 0.75:1 0.75:1 250 250 72
88
143
152
21. Mano Japan Mano 69 239 V 0.8:1 0.8:1 150 500 96 24
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 33
S.
No.
Name of Project Country River Height
(m)
Length Dam Facing Placement Cementatious
Content
Upstream Downstream Spillway Layers
(mm)
Lifts
(mm)
OPC
(kg/m
3
)
Pozzolan
(d)(kg/m
3
) Slope Slope Slope
200
22. Tashkumir USSR Narin 75 320 V 0.75:1 0.75:1 400 400 90 30
23. Stagecoach USA Yampa 46 115 V 0.8:1 0.8:1 300 300 71 77
24. Longmentan China Chang Creek 58 57 V/0.3:1 0.75:1 0.75:1 300 300 54 86
25. Knellpoortt* S. Africa Rietspruit 50 200 V 0.5:1 0.5:1 250 250 61 142
26. Tianshenqiao No2 China Nanpanjaing 59 499 V 0.75:1 0.75:1 300 300 55 85
27. Xitou* China Jiyang Creek 47 119 V 0.325:1 0.325:1 250 250 80 120
28. Asahiogawa Japan Ogawa 84 260 V/0.90:1 0.8:1 0.8:1 150-
200
500 n/a n/a
29. Cuesta Blanca Argentina San Antonio 83 793 V 0.8:1 0.8:1 200 600 75 15
30. Wolwedans* S. Africa Great Brak 70 268 V 0.5:1 0.5:1 250 250 58 136
31. Shangban China Wenchuan 50 122 V 0.75:1 0.75:1 n/a n/a n/a n/a
32. Wriggleswade S. Africa Kubusie 34 780 V n/a:1 n/a:1 250 250 n/a n/a
33. La Pucbla de Cazalla Spain n/a 70 n/a V 0.75:1 0.75:1 300-
400
300-
400
n/a n/a
34. Taynangba China n/a 55 n/a n/a n/a n/a n/a n/a n/a n/a
35. DAoulouz Morocco n/a 79 n/a n/a n/a n/a n/a n/a n/a n/a
36. Kennedys Vale S. Africa Groot Dwors 50 250 V 0.7:1 0.7:1 200 200 40
40
110
60
37. Los Canchales Spain n/a 18 200 n/a n/a n/a n/a n/a n/a n/a
38. Shiromizugawa Japan Shiromizu 55 367 V 0.8:1 0.8:1 150-
2000
500 n/a n/a
39. Plalanovryssi Greece Nestos 95 270 n/a n/a n/a n/a n/a n/a n/a




AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 34



Fig. 11: Proportioning Curves for Equal Strength Concrete (R-37)

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 35

Fig. 12: Typical Section of RCC Dam
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 36
6.7 Concrete / Stone Masonary Arch Dam

These types of dams have not been constructed in India so far but a number of such dams
have been constructed in China and it would be worthwhile to start constructing such dams in
India also. These dams are suitable when the diversion dam is proposed at a narrow gorge of
a river with very good geological conditions not only in the river bed but in the abutments
also. In such dams almost all of the water and silt pressure exerted on the upstream side of the
dam is transferred to the abutments via the dam body. As such the geological soundness of
the abutment rocks is very essential. In this case uplift pressures on the base of the dam are
not very important as the weight of the dam is not the primary force for resisting upstream silt
and water pressures. These types of dams require less quantity of concrete / masonary and
are, therefore, relatively cheaper than solid gravity type dams. In addition to this the arch dam
can not slide. The compressive forces which act in three dimensions in the body of the dam
tend to increase the impermeability of the dam.

Broadly the suitable range of adopting an arch dam can be taken to be as below

, 5 5 . 1 to
H
L
~

Where,
L = Length of crest of the dam, and
H = Height of the dam

Typical plan and section of an arch dam are shown in Fig. 13.




Fig. 13: Typical Plan and Section of Arch Dam

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 37
6.8 Inflatable Rubber Dam

Inflatable rubber dam is actually a rubber gate its action being, just like falling shutters. It
consists of a rubber bladder anchored to a concrete foundation across the stream, which is
proposed to be dammed. The wall of the rubber dam consists of a convas of polyamide or
nilon fiber with protective layers of polychloropene rubber or neoprene hot pressed with
synthetic rubber. The rubber sheet is available in rolls and can be installed without a mid
structure upto 150 m width of the stream. A typical cross-section of the rubber dam is shown
in Fig. 14. The rubber dam can be constructed for 0.5 m to 5.5 m height, though dams more
than 4 m height are very rare.

The concrete foundation, downstream energy dissipation devices and upstream and
downstream protection works are similar to those of raised weir. The top of the concrete
works where rubber dam is installed is normally be kept at river bed level, so that when
deflated, the work does not materially change the regime of the stream.

The rubber dams can be fixed on to the foundation by either single line anchoring or double
line anchoring (Fig. 14). While single line anchoring system is suitable for low overflow and
minimal tailwater conditions, double line anchoring system increases the stability and reduces
the vibration of the dam body allowing higher head water of overflow on top of the dam. The
rubber dams can be installed with any side slope angle upto 90
o
. The dam can either be air
filled or water filled. While water filled dam is almost free from pulsations or vibrations, it is
not very much suitable for cold climates as the freezing of water inside the rubber body may
rupture the dam.



Fig. 14: Typical Cross Section of Inflatable Rubber Dam

6.8.1 Operation

The rubber dams are operated from a control room with fully automatic, semiautomatic or
manual supply of air / water upto the specified or desired pressure and height. An ultrasonic
sensor can be used for detecting the rise and fall of the water level upstream of the dam.
When the air / water is fully exhausted, the rubber dam lies flat to the bottom thereby
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 38
completely opening the channel for free flow of water. The control system can be designed to
operate unsupervised under all adverse conditions.

6.8.2 Merits and demerits of a rubber dam

The rubber dam has following merits

(i) Rubber dam are quite cost effective for spans over 40 m and height less than 3
m.
(ii) With rubber dams the use of steel and other construction material is greatly
reduced.
(iii) The dam can be installed in a week or so as all its components are factory made.
(iv) There is far less obstruction for passing the floods.
(v) The rubber dam has good resistance to earthquakes.

The rubber dam has following demerits

(i) The service life of a rubber dam is 20 to 30 years only.
(ii) It needs more maintenance specially in silt carrying rivers.
(iii) It is difficult to repair under water.
(iv) It is highly sensitive to typhoons

6.8.3 Anchoring of rubber dam

Anchorage of the rubber dam is an important feature in the design of this type of dam as any
accident of the anchorage will result in failure of the dam.

6.8.3.1 Anchorages at bottom

The anchorage pattern can be classified into (i) single line anchorage and (ii) double line
anchorage as shown in Fig. 14. Steel plates and anchor-bolts are generally used to fix the dam
bag to the base slab.

6.8.3.2 Anchorage at the sides

Anchorages can be carried out in side walls, which may be either inclined or vertical, as
indicated in Fig. 15. In such a case when the dam bag is inflated, there are folding gaps
formed above the foot of the slopes as shown in this figure. Also when the dam is deflated,
there are folding or wrinkles formed near the foot of the slopes.

The problem of the folds & wrinkles shown above can be solved by two methods called
breast-wall arrangement and pillow type arrangement.

(a) Breast wall arrangement

In this arrangement the dam bag is anchored in the base slab only and the two ends are of
hemi-spherical shape and are stretched through the breast wall as shown in Fig. 16. In this
case the configuration of the inflated dam should match with the underlying curve of the
breast wall giving some pressure on the curved surface and making it water tight. Thus the
folding gaps and wrinkles are eliminated but the cost of breast wall will be additional.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 39


Fig. 15: Folding gaps or Wrinkles of Conventional Rubber Dam

(b) Pillow type arrangement

In this case, both ends of the rubber dam are evenly closed by rubberized canvas and are in
direct contact with the vertical abutment or intermediate pier as shown in Fig. 17. The ends of
the inflated dam body come in tight contact with the vertical wall, thus eliminating the
leakage through both ends and wrinkles & folds.

6.8.4 Protection against bed load

In streams carrying heavy silt load, once the silt gets deposited upto the top of the rubber
dam, it would be advisable to deflate the rubber dam and let the silt pass over the deflated
body. The silt while passing over the diflated dam body scratches the rubber body which gets
damaged with times. Some times sponge layers are installed inside the dam body or directly
on the foundation. The sponge layer gives some cusioning effect to rolling bed load and
results in reduction to the damage of the dam body (Fig. 18).

6.9 Earthen Dam

Earthen dams have the following advantages:

(i) It is generally possible to design an earthen dam to be safe on any type of
foundation provided that the properties of foundation materials are thoroughly
explored.
(ii) They can be designed using any type of locally available material.

6.9.1 Criteria for safe design of earth dams

The following criteria are required to be satisfied for safe design of an earth dam:

(i) There should be no possibility of the dam getting overtopped by flood waters.
(ii) The seepage line should be well within the downstream face.
(iii) The upstream and downstream slopes should be stable under worst conditions.
(iv) The foundation shear stresses should be within safe limits.
(v) There should be no opportunity for free flow of water from upstream to
downstream face.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 40
(vi) The dam foundations should be safe against piping.
(vii) The upstream face should be protected against wave action and the downstream
face against rain cuts.



Fig.16: Breast Wall Arrangement




Fig. 17: Pillow Type Arrangement

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 41

Fig. 18: Typical Arrangement of Sponge Layers inside Dam Body

6.9.2 Safety against overtopping

The following precautions are required to be taken against overtopping:

(i) Providing ample spillway capacity As the overtopping of an earthen dam
would result in failure creating catastrophic condition in the downstream side,
the spillway flood hydrograph should not be underestimated and spillway
capacity should be on the conservative side.
(ii) Provision of sufficient freeboard The freeboard should be sufficient to prevent
overtopping by waves and should take into account the settlement of
embankment and foundation. Freeboard for wave run up on slope shall be
provided in accordance with the provisions contained in IS:10635 Freeboard
Requirement in Embankment Dams Guidelines. Analysis should also be
made for computing the settlement of the embankment and of the foundations in
order to determine extra freeboard as settlement allowance. For unyielding
foundation, the amount of settlement for embankment should be restricted to 1%
of the dam height. But for compressible foundations, the settlement should be
computed on the basis of laboratory tests. Longitudinal camber varying from
zero height at the abutments to maximum at the location of the maximum height
of the dam should be provided at the top of the dam along the dam axis to take
into account the settlement.

6.9.3 Control of seepage line

It is necessary to ensure that the seepage line in the proposed dam section does not cut the
downstream face of the dam and thereby produce softening or sloughing of the toe. In order
to keep the seepage line well within the dam section, internal drainage system comprising the
following needs to be provided.

(i) Inclined or vertical filter Inclined or vertical filter abutting the downstream
slope of the impervious core is provided mainly to collect seepage emerging out
of the core and thereby keeping downstream section relatively dry (Fig. 19). The
filter can be designed on the basis of criteria mentioned in clause 5.4.12, (ii). For
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 42
three layered inclined or vertical filter, the maximum total horizontal width of
3.0 to 4.5 m is necessary.
(ii) Horizontal filter Horizontal filter collects the seepage from the inclined or
vertical filter or from body of the dam and carries the seepage to the toe drain.
(Fig. 19). For horizontal filters minimum thickness shall be 15 cms for sand and
30 cms for gravel.
(iii) Rock Toe The main functions of the rock toe are to facilitate drainage of the
seepage water and to protect the lower part of the downstream slope from tail
water erosion. For dams of low to moderate heights the rock toe should be
th

to 1/3
rd
of dam height depending upon the availability of rock.
(iv) Toe Drain The toe drain is provided at the toe of the earth dam to collect
seepage from horizontal filter and rain water falling on the downstream slope
and to discharge the same away from the dam (Fig. 19).


Fig. 19: Typical Section with Silty Clay

6.9.4 Control of seepage

The seepage through an earth dam is controlled by providing an effective cut-off. It has the
following two functions:

(a) To reduce loss of stored water through foundation and abutments, and
(b) To prevent subsurface erosion by piping.

6.9.4.1 Curtailment of seepage through embankment

(a) By impervious membrane The impervious membrane is placed at the upstream
face of a rock fill dam. It has the following advantages as compared to an earth
core:

(i). The dam with upstream membrane has a greater margin of safety against shear
failure because of low pressures in the rockfill, larger rock mass to resist water
pressure and water pressure having larger downward component,
(ii). The pervious rock embankment develops no uplift as it permits free percolation
of water upward from the foundation,
(iii). The upstream membrane is exposed for inspection and repairs,
(iv). The dam can be raised by dumping rock on the downstream side and then
extending the membrane upwards on the upstream sloping face,
(v). The dam has comparatively lesser volume of fill.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 43
A dry rubber layer between main rockfill and upstream impervious membrane may be
provided to act as a cushion for equalizing settlement and providing an even surface for
laying the membrane. The upstream membrane may be of reinforced concrete or asphaltic
concrete.

(i) Reinforced concrete membrane The reinforced concrete membrane on the
upstream face of a rockfill dam may consist of size RCC slabs of thickness 1% of
head of water with a minimum of 300 mm. The membrane have vertical
contraction joints at a spacing of 12 to 18 metres with closer spacing near the
perimeter. The horizontal joints are provided near the perimeter only. Water stops
are required to be provided to make joints water-tight. The concrete slabs shall be
provided with reinforcement in both directions and equal to about 0.5% of the
concrete volume. For 300 mm thick slabs the reinforcement may be provided in
one layer but for thicker slabs it should be provided in two layers. (Fig. 20).
(ii) Asphalic concrete membrane The asphalic concrete membrane is cheepaer than
concrete, it is more flexible, it can be constructed rapidly and the protion of the
membrane above water can be easily repaired. Being soft, it is more easily
damaged than concrete. The asphalic concrete should consist of well graded
aggregates with about 10 percent filler material passing through 75 micron IS
sieve. Pure asphalt binder of about 8 to 10 percent by mass of aggregate should
be used. The material should be mixed and compacted hot. An air content of 2 to
3 percent is optimum. A purely asphaltic concrete should have a thickness of
about 1 percent of the head of water with a minimum of 300 mm. It should be
placed in about 50 to 75 thick layers and rolled.

A cut off wall, which is also called plinth, is provided near upstream toe of the membrane of
a rock fill dam to provide water tight connection between membrane and foundation (Fig 21).
The dimensions of cut-off wall / plinth are based on following requirements:

(i) The contact length on foundation should be adequate to provide a minimum
seepage path equivalent to one twentieth to one tenth of head of water
depending upon rock quality but not less than 3m,
(ii) It should serve as a cap for consolidation / curtain grouting,
(iii) It should provide surface to facilitate putting of membrane form work, and
(iv) It should provide atleast 1 m rock fill under membrane to permit the membrane to
deflect normal to its face.


Fig. 20: Typical Section through Rockfill Dam

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 44


Fig. 21: Typical Details of a Cut off / Plinth

(b) Impervious core An impervious core may be used in earth dams as well as
rock-fill dam. Impervious soils are generally suitable for the core. IS 1498 may
be referred for suitability of soils for core. The core may be located centrally or
inclined upstream. The main advantage of the central core is that it provides
higher pressures at the contact between the core and the foundation reducing the
possibility of leakage and piping (Figs. 22, 23, 24 and 25). The inclined core, on
the other hand, reduces pore pressures at the downstream portion of the dam and
thereby increasing its safety. The inclined core also permits construction of
downstream casing ahead of the core and allows the use of relatively large
volume of random material on the downstream. The core thickness of 1/3 to of
water head with minimum top width of 3.0 m is generally satisfactory. In highly
seismic zones the core thickness should be kept on higher side. The top level of
the core should be kept atleast 1.0 metre above the maximum water level (Figs.
22, 23, 24 and 25).

(c) Curtailment of seepage through the foundation This can best be obtained by a
complete vertical cut off through pervious strata upto impervious ledge below. A
vertical cut off can be provided by one of the following methods.

(i) Cut off trench A trench is excavated upto the impervious ledge for a depth 1 to
2 m inside it. The bottom width of trench should be sufficient enough to provide
working space for compaction equipment & to provide safety against piping. A
minimum width of 4 m is recommended. In order to satisfy piping requirements,
the width should be 10 to 30 percent of hydraulic head. The cut off trench should
be backfilled with the same material as that of the impervious core. The cut off in
the flanks should normally extend upto the top of the impervious core. In case the
rock ledge into which the cutoff is terminated happens to be weathered or has
cracks & crevices, necessity of providing grouting curtain may arise. Rocks
having lugeon value more than 5 should be grouted. The use of cut off trenches is
very reliable but it becomes too expensive beyond depths of about 20 m (Figs.
23, 24 and 25).

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 45
(ii) Concrete cut off walls Concrete cut off walls of 1.5 to 2.0 m thickness can be
provided by pouring concrete in a sheeted and braced trench.

(iii) Slurry trenching and concreting A trench is excavated by a trenching machine
and is kept filled with bentonite slurry which prevents caving of the sides. The
trench is then backfilled with concrete or impervious soil (Fig. 26).

(iv) Impervious blanket A horizontal upstream impervious blanket in combination
of the impervious core is provided to increase the length of seepage path when
full cut off is not practicable. In this case the foundation is subjected to seepage
pressure and as such it becomes necessary to collect seepage water of the dam
section into a gravel filter and that of the foundation through relief wells (Fig.
27). Reference may be made to IS: 1498 for suitability of soils for the blanket.



Fig. 22: Typical Earth Dam Section with Coarse Sand Material




Fig. 23: Typical Earth Dam Section with Coarse Sand


AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 46


Fig. 24: Typical Earth Dam Section with Pervious Foundation upto Small Depth




Fig: 25: Typical Earth Dam Section with Foundation Pervious to Large Depth




Fig. 26: Typical Earth Dam Section with Foundation Pervious to Large Depth


AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 47


Fig. 27: Section of Earth Dam with Impervious Blanket

A 30 cm thick layer of random material may be put over the blanket to prevent its cracking
due to exposure to atmosphere. The design of impervious banket can be done as per IS: 8414.

Assuming the permeability of the blanket material to be negligible and rate of loss of head to
be uniform, an approximate estimate of the effectiveness of the blanket can be obtained as
follows:

With reference to Fig. 27,

Let b = base width of the impervious core,
h = seepage head,
k = permeability of permeable strata
d = depth of permeable strata upto pervious strata,
and x = length of blanket

Seepage discharge, q, per unit length of dam without blanket is approximately given by,

d
b
h
k q =

Similarly seepage discharge, q
b
, with blanket is given by

d
x b
h
k q
b
+
=

x b
b
q
q
b
+
=

Usually the blanket is 1.2 to 3.0 m thick and is made about 8 to 10 times the head in length.

(v) Relief wells Relief wells are an important adjunct for seepage control. They are
used not only with upstream impervious blanket but in other cases also to provide
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 48
additional assurance that hydrostatic pressures do not develop in the downstream
portion of the dam, which could lead to piping. They should extend deep enough
into the foundation so that the effects of minor geological details on performance
are minimized (Fig. 27). The relief wells can be designed & maintained in good
working condition as per IS: 5050 Code of practice for design, construction and
maintenance of relief wells.

6.9.5 Upstream and downstream slopes of the dam

The upstream and downstream slopes of an earthfill / rockfill dam are mainly dependent upon
stability against sliding of the construction materials. A rigorous analysis of the stability of
the dam can be done in accordance with IS: 7894 Code of practice for stability analysis of
earth dams. Generally the upstream & downstream slopes in case of earthfill dams vary from
2H:IV to 3.5 H:IV. But in case of rockfill dams, there is an adequate margin of safety against
sliding on an inclined face of the fill because of high interlock strength in the material and
absence of pore pressures. As such the slopes of a rock fill dam can be as steep as 1.5 H:IV to
1.2 H:IV. Berms are provided on the downstream as well as upstream slopes for the
following purposes:

(i) To break continuity of slopes thereby reducing surface erosion,
(ii) To provide level surfaces for construction and maintenance operations, and
(iii) To prevent undermining of riprap in case of upstream slopes

The berm should slope towards the inner edge to prevent rainwater from flowing down the
slope of dam. This slope can be of the order of 1:50. A berm may be of 3 to 6 m width. The
berms should be provided at a vertical spacing of 10 to 15 m. A berm is desirable at the top of
the rock toe also.

6.9.6 Top width

The top width of the dam should be provided according to working space requirements. It can
be from 2 to 6 m.

6.9.7 Foundation shear stresses

The safety of the foundation material against shear may be checked as below. With reference
to Fig. 28, the total horizontal shear under a slope of the dam is given by

,
2
45 tan
2
1 2
2
2
2
1
|
.
|

\
|

=
|
o
h h
r S
where,
r = effective average unit weight of the soil,
h
1
& h
2
= heights above hard stratum from top and toe of the dam, and
|
1
= equivalent angle of internal friction, determined by the equation

rh
1
tan |
1
= C + rh
1
tan |,

where C and | are the actual soil properties

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 49


Fig. 28: Upstream and Downstream Slopes of the Dam

The average shear stress S
a
is equal to S/b. It has been found that the maximum intensity of
shear stress occurs at a distance of 0.4 b from top shoulder and is equal to about 1.4 times the
average. Knowing the maximum intensity of shear stress and its location, the ratio of shear
strength to shear stress at that location determines the factor of safety against foundation
shear which should be at least 1.5.

6.9.8 Safety against free flow of water from upstream to downstream

Free flow may develop along a joint between earth and masonary of sluices or conduits or
penstocks passing through the dam unless proper bond is ensured. It is, therefore, preferable
to have no pressure conduits passing through an earthen section as any crack resulting escape
of water would have serious consequences. The necessary outlets and penstocks may better
be taken through tunnels in the hill side on either side of the dam. A continuous passage for
free flow may be made by large burrowing animals. As such large burrowing animals like
crocodiles should not be allowed to develop in the reservoir.

6.9.9 Safety against piping

Safety against piping is obtained by surrounding the drainage toe or horizontal or vertical
drainage on all sides by graded filter so that while water can get through freely, no soil
particles of the dam or foundation can enter the filter layer.

6.9.10 Upstream and downstream slope protection

The upstream and downstream slopes of an embankment dam shall be protected in
accordance with IS:823 Code of practice for protection of slope for reservoir embankment.

7.0 INTAKE WORKS

An intake should be able to perform following functions:

(i) It should be able to draw required amount of water at minimum reservoir level,
(ii) It should draw minimum amount of sediment
(iii) It should check entry of trash and debris
(iv) It should have hydraulically smooth passage so as to have minimum head loss
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 50
(v) In case the intake is directly connected to an under pressure water conductor
system, the inlet should be so located as to eliminate vortex formation.

In order to attain the above functions, the following design details are necessary:

(i) The centre line of the intake and the size of inlet should be such that the intake
could draw the required amount of water at minimum reservoir level without
vortex formation and at a sufficiently low velocity.
(ii) The sill of the intake should be kept at the highest possible level in order to
reduce silt entry upto minimum extent.
(iii) Looking from the river towards the bank, the intake, as far as possible should be
located on the concave side so as to reduce silt content.
(iv) The inlet opening should be of bell mouth shape and transitions should be
hydraulically streamlined.
(v) A trash rack structure should be provided at the entrance and the velocity
through the trash racks should be limited to 0.75 m / sec., where manual
cleaning of racks is provided and 1.5 m/sec, where mechanical cleaning is
adopted.

7.1 Types of Intake

There may be many types of intakes depending upon the type of scheme, location, etc. The
intakes can be broadly classified as Run-of-river type intakes, and Reservoir type intakes
(Refer IS: 976):

7.2 Run-of-river Type Intakes

7.2.1 Intake just upstream of a raised weir / barrage

In such a case an under-sluice with a low crest is provided adjacent to the bank, where the
intake is proposed. A divide wall upto the end of intake is provided by extending the pier of
the river side end of the under-sluice, thus creating a deep pool. The intake is aligned at 90
o
to
110
o
to the weir / barrage axis with its sill as much above the crest of the under-sluice bays as
possible. A typical arrangement of the intake is given in Fig. 29.

7.2.2 Intakes for canal power house or barrage power houses

An intake which is an integral part of the power house is located across large canals to utilize
the head of a canal fall or across a river to utilize the head created by the barrage. In such
power houses Kaplan turbines with concrete spiral casing or tubuler / bulb turbines are used
for power generation. Typical layouts are shown in Figs. 30 & 31.

7.2.3 Forebay Intake

In some canal power projects, where the power house is planned at some distance from the
intake location and head is appreciable, the free flow of the canal is terminated in a basin
known as forebay and the intake for the penstocks is provided at the downstream end of the
forebay. The forebay is a broadened portion of the canal which is utilized to absorb the surges
created by the load variations of the power house. A typical layout of forebay intake is shown
in Fig. 32.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 51



Fig. 29: Typical Intake Details Upstream of Raised Weir / Barrage
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 52


Fig. 30: Canal / River Power House Intakes (Kaplan Turbines)


AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 53

Fig. 31: Canal / River Power House Intakes (Bulb Turbines)

7.3 Reservoir Type Intakes

7.3.1 Intake in concrete or masonary dams

When the power house is located at the toe of a concrete or masonary dam and the penstock
is embedded in the dam body, a semi-circular cage type intake is provided at upstream face of
the dam. The layout of such intake is shown in Fig. 33.

7.3.2 Intake for earthen dam

In case of an earthen dam, normally the water conduit is not taken through the dam. In this
case the pressure conduit takes off from a suitable place in the reservoir. A typical layout of
such intake is shown in Fig. 34.

7.4 Hydraulic Design of Intake Components

7.4.1 Bell mouth opening and transitions

The area of the intake should be as follows:

Area at inlet =
| Cos C
penstock Area
c


where,

C
c
= Coefficient of contraction (C
c
= 0.6 for high and medium heads & C
c
=
0.7 for low heads)
| = Angle of inclination of the centre line of penstock to horizontal

The shape of the intake entrance is shown in Fig. 35.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 54


Fig. 32: Forebay Intake

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 55


Fig. 33: Semi Circular Type Intake Structure
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 56


Fig. 34: Intake in Reservoir Independent of Dams
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 57


Fig. 35: Typical shape of intake opening

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 58
With reference to Fig. 35,

H
1
= D [(1.2 tan
2
| + 0.0847)
1/2
+ ], tan 1 . 1
2
1
|
|

Cos

h
2
= D , tan 077 . 0
791 . 0
(

+ |
| Cos

h
e
= h
1
+ h
2
,
b
e
=
e
h
opening inlet of Area


In the above relations, D = diameter of penstock.

The transition from rectangular opening to circular section should be designed
according to following guidelines:

(i) Transitions should be made about the centre line of mass flow and should be
gradual,
(ii) Side walls should expand at a maximum of 5
o
from the centre line of mass flow,
(iii) All gate slots etc. should normally be beyond the transition zone.

7.5 Centre Line of Intake

Vorticity can appear in pressurized power intakes and should be avoided as it
interferes with good performance of turbines. Lack of sufficient sub-mergence and
asymmetrical approach are the most common causes of vortex formation. The minimum
depth of submergence h is defined as shown in Fig. 36.



Fig. 36: Sub-mergence Requirement of Pressure Conduits

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 59
Minimum value of h should be as below:

h , . .
2
D V C
D
+
where,

D = diameter of conduit beyond transitions,
V = velocity corresponding D,
C = 0.7245 for asymmetric approach conditions and
= 0.5434 for symmetric approach conditions

In addition to above, the level diffence between minimum water level and the centre of inlet
opening should not be less than 0.8 h
e
, where h
e
is the height of inlet opening. Besides a
minimum submergence, anti-vortex measures like parallel fins at the top of intake opening,
floating grating, perforated breast wall above intake opening may help to protect from vortex
formation. (Refer to clause 5.2.3 of IS: 9761-1995 Hydropower Intakes Criteria for
Hydraulic Design.)

8.0 WATER CONDUCTOR SYSTEM

The water conductor system from intake upto surge tank / forbeay may comprise the
following type of works:

(i) Earthen channel
(ii) Lined channel
(iii) RCC channel
(iv) Stone masonary channel
(v) Tunnel-concrete lined or unlined
(vi) Pipes steel, RCC, HDPE, GRP
(vii) Cross-drainage works

Before deciding the type of conveyance system, the layout of the water conductor system
should be marked on the contour plan of 1:1000 scale. This layout will include the locations
of intake works, desilting device, if any, and forebay / surge tank. The choice for adopting
any type of conveyance system shall depend upon the following:

1. Availability of construction material
2. Ease of construction
3. Economical considerations Apart from total cost of the system, consideration
should also be kept for the construction time.
4. Geology and topography of the terrain along the proposed alignment.

Depending upon the above considerations, the water conductor system may comprise one or
more types of above mentioned works.

8.1 Earthen Channel

In case of small hydropower projects, earthen channels are normally used only on canal
related projects where power projects are constructed to utilize canal falls for power
generation. In such cases the diversion system of the canal, where the power house is
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 60
constructed should be designed on the same lines as the existing canal. In this case IS:7112
Criteria for design of cross section for unlined canals in Alluvial soils can be refereed to.

In hilly terrains the structures of water conductor system are generally located on hill slope
and slope instability due to construction of canal is a major problem in small hydro projects.
Generally the main causes of slope failure are:

(i) Water leakage from canals or forebay or desilting tank (Fig. 37),
(ii) Infiltration of surface run off
(iii) Erosion due to surface torrents
(iv) Where the bedding planes of rocks happen to be parallel to surface
(v) Surfacial jointing and weathering of rock slopes, etc.



Fig. 37: Typical slip failure due to SHP construction

Generally most slope failures take place during or after rainstorms or prolonged rains.

Small hydro projects can not afford detailed geological investigation and as such great
attention is required to be paid to field inspections and either the design of the work should be
modified or the location of the works shifted from sites which appear to be unstable. Certain
engineering measures as mentioned below can be taken to improve upon potential unsafe
locations:

(a) Checking and diverting surface run off from entering potential sliding area
(b) Sealing or blanketing the infiltration area in the potential sliding zone by clay
blanket.
(c) Lowering the ground water table in slide prone areas by a network of drains as
shown in Fig. 38 or drainage wells as shown in Fig. 39.
(d) Removal of upper part of potential slide to reduce sliding force
(e) Putting retaining wall at a safe distance from slope foot to avoid foot cutting.

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 61
(f) Slope protection by stone pitching
(g) Rock bolting of unstable rock slopes



Fig. 38: Arrangement of Lowering Water Table in Slide Prone Zone




Fig. 39: Arrangement of Lowering Water Table


8.1.1 In hilly areas the canals are aligned along the contours giving required longitudinal
slope. Typical cross-sections of unlined canals are shown in Fig. 40 (a) and Fig. 40
(b). The canal is designed for the maximum discharge of the plant, but it will be
operated under much smaller discharges in lean season, thus resulting in serious
silting. As such a cross-location designed for maximum discharge should have a
reasonably high velocity to prevent silting during running with smaller discharge.


AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 62
Fig. 40 (a): Canal section in cutting Fig. 40 (b): Canal section partly in filling
and partly in cutting

A comparatively narrow canal should be given preference to a wide one because shallow
depth in a canal has smaller hydraulic mean depth, thus resulting more deposition of silt. In
case the canal passes through ice zones, a narrow and deep canal is preferable and the
velocity should not be lesser than 0.9 to 1.2 m/sec.

8.2 Lined Channel

The aims of canal lining are:

(i). To prevent leakage from the canal,
(ii). To properly raise the mean velocity, which will not only reduce the area of
cross-section of the canal but also be beneficial against silting and plant growth,
(iii). The reduce possibility of land slides due to leakage,
(iv). To reduce friction loss,
(v). To reduce maintenance cost

The types of canal lining in small hydro power projects may be as follows:

(i). Lining with gravel laid with clay morter in a thickness of about 150 mm.
(ii). Blanketing with hydrated lime-clay mixture in a proportion of 1:4 to 1:7 by
weight and of thickness 150 to 200 mm. It should be cured for atleast 14 days
with additional spraying and recompacted several times. This type of lining can
withstand a velocity of several meters per second after 28 days. It is not suitable
for very cold regions.
(iii). Blanketing with 150 to 200 mm thick cement soil mixture in a proportion of
1:7 to 1:10 by weight & well compacted.
(iv). Stone-pitched lining 150 to 200 mm thick laid over a bed of 12 mm thick 1:2
lime- sand mortar or 1:3 cement sand mortar.
(v). 200 thick lining with burnt bricks and 1:4 cement sand mortar.
(vi). 100 to 150 mm thick M-15 or M-20 grade cement concrete lining placed in situ.

A particular type of lining is selected on the basis of the following considerations:

(i) Type of sub-grade
(ii) Position of water table
(iii) Climatic conditions
(iv) Availability of materials
(v) Speed of construction and time schedule
(vi) Performance of lining in existing projects in adjoining areas.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 63
In case the channel is aligned through rock, it may be lined with 100 to 150 mm thick M-15
grade cement concrete. In the side, the concrete may be supported with 16 to 20 mm diameter
rock bolts at 1500 to 2500 centre to centre both ways. If required weep holes can be left in the
concrete to release back side drainage.

8.2.1 Side slopes

Inner side slopes of lined channels should be such that no earth pressure or any other external
pressure is exerted over the back of the lining. Sudden drawdown of water level in the lined
channel should be controlled by strict operation rules and regulations. In addition, suitable
measures like adequate drainage should be provided before the commencement of lining. In
general slopes may be adopted as per Table 6.

Table 6: Slope for Different Types Soil

S. No. Type of Soil Side Slope (Horizontal : Vertical)
1. Sandy loam / sandy gravel / murum 1.5:1 to 2:1
2. Clay soils 1.5:1 to 2:1 in cutting and 1.5:1 to 2.5:1 in
embankment
3. Rock 0.25:1 to 0.5:1

8.2.2 Free board

The minimum free board above full supply level may be provided as per Table 7.

Table 7: Free Board for Different Discharge Capacity

Channel Discharge (cumes) Free Board (mm)
> 10 600
3 to 10 500
1 to 3 400
< 1 200 to 300

8.2.3 Bank top width

The top width of the banks may be between 1.0 m to 3.0 m as per requirement and site
conditions.

8.2.4 Design of the section

The channel section can be designed with the help of Mannings equation given is para 5.1.

The limiting velocities may vary from 1.5 to 2.75 m/sec. the recommended values for
Manning Rugosity coefficient of lining may be taken as per Table 8.

8.2.5 Reference codes

Following Bureau of Indian Standards can be referred for design of canal lining:

(i) IS:10430 criteria for design of lined canals and guidance for selection of type
of lining
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 64
(ii) IS:10646 Canal linings cement concrete tiles specifications
(iii) IS:11809 Lining of canals by stone masonary code of practice
(iv) IS:4558 Under drainage of lined canals code of practice

Table 8: Recommended Values of Rugosity Coefficient for Rigid Boundaries

S. No. Surface Recommended Value of n
1. Earthen Channel 0.0225 to 0.0300
2. Cement Plaster 0.011
3. Cast Iron 0.013
4. Steel 0.011
5. Concrete 0.013 to 0.014
6. Drainage Tiles 0.012 to 0.017
7. Brick Work 0.013
8. Rubble Masonary 0.017 to 0.025
9. Rock Cuts 0.035 to 0.040

8.3 RCC Channels

RCC channels are constructed as power channels in the following cases:

(i) When the hill slopes happen to be too steep
(ii) When due to freezing temperatures, it becomes necessary to cover the channel
(iii) When due to geological or topographic reasons it becomes necessary to provide
a cut and cover section of the power channel. Such a situation normally arises in
the upstream reaches of the channel taking off from the trench weir.

The RCC channel may be both covered or open. In both cases contraction joints with 225 to
300 wide water stops should be provided at a spacing of about 30 metres centre to centre. In
case the thickness of the concrete happens to be less than 150 mm, the walls, bottom and top
slabs should be thickened to atleast 150 mm upto 300 mm length on both sides of the
contraction joints to accommodate the water stop as shown in Fig. 41.


Fig. 41: Section through RCC Channel
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 65
In case of covered channels atleast 800 m x 800 m size manholes should be provided at 60 to
100 metres centre to centre for maintenance purposes. In case of RCC channel, a maximum
velocity of 2 m / sec. is permissible. However, more velocity means more head loss but small
size of channel section. A free board of 300 to 500 mm depending upon the size of channel is
normally adequate Typical sections of open and cut and cover channel sections are shown
in Figs. 42 and 43.



Fig. 42: Typical Section of Open RCC Channel



Fig. 43: Typical Section of Cut & Cover RCC Channel

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 66
8.3.1 Design

While the open channel section is designed as a trough, the cut and cover section is designed
as box section. The channel section should be designed considering the most unfavourable
combination of the following loads and forces:

(a) Load due to backfill including surcharge.
(b) Internal water pressure
(c) External water pressure, if any
(d) Live load
(e) Seismic forces

The longitudinal slope of the channel way be decided on the basis of maximum allowable
velocity or considering the head loss. The size of the section can be determined by Mannings
equation, in which the rugosity coefficient of concrete surface can be taken as 0.018 and the
ratio of the width & water depth of channel may vary from 1:1 to 1.5:1.

8.4 Masonary Channel

The power channels can be lined with RR masonary instead of RCC on the basis of:

(i) Economic considerations
(ii) Availability of unskilled labour.

The minimum thickness of RR masonary lining should be 450 mm, it should be carried out in
1:4 cement sand mortar and the inner and top surface should be plastered with 20 mm thick
1:4 cement sand mortar. The inner and top surfaces can alternatively be provided with 75 mm
thick RCC in M-15 grade concrete alongwith reinforcement camprising 6 mm | bars @300
c/c at the centre of the concrete. A typical section of masonary channel is shown in Fig. 44.



Fig. 44: Typical Section of Masonary Channel
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 67
8.4.1 Design

As far as sizing of channel area of the masonry channel is concerned, it will be carried out
similar to that of RCC channel. The thickness of the masonary wall can be as shown in Fig.
44.

8.5 Tunnels

Tunnels are introduced in the water conductor system under the following situations:

(i) When the side slopes of the hill are too weak to support a canal
(ii) When side slopes are too steep to construct a canal
(iii) When the river takes a sharp loop and the straight route taken by the tunnel is
much shorter than the long route of the canal along the contour.
(iv) When the rock quality and the dip of the rock foliations is favourable for
tunneling.

The adoption of the option of tunneling has many inherent advantages as mentioned below:

(i) The natural beauty of the project area along the tunnel route remains almost
unaltered.
(ii) The tunnels remain unaffected by land slides and rock falls.
(iii) The tunnels take almost the shortest route and as such, the head loss is lesser than
the surface water conductor system which is constructed along the contour.
(iv) The tunnels do not need any cross-drainage works
(v) The maintenance cost of tunnels is almost negligible in comparison of surface
channels

8.5.1 Sizing of tunnel

Average permissible velocity in a concrete lined pressure tunnel may be about 4 to 5 metres
per second. However, if economic size of the tunnel is determined by adding the operating
charges including operation and maintenance charges, interest on capital, ammortisation and
revenue loss due to head loss in friction, the economic velocity in the tunnel is likely to be of
the order of 2.5 to 3.5 metre per second. Since the carrying out of such are analysis is a tedius
process specially at the design stage, when the rates of the various items of work such as
underground excavation, shotcreting, concreting, rockbolting, rib fixing, grouting etc. and the
geology along the tunnel alignment are uncertain. For small hydro project, the section of the
tunnel can be decided by adopting an average velocity of 3 to 3.5 metre per sec.

8.5.2 Tunnel shape

The following shapes (Fig. 45) are generally used for tunnel sections

(a) Circular section
(b) D-section
(c) Horse show section
(d) Modified horse shoe section
(e) Modified horse shoe section for small size tunnels

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 68
8.5.2.1 Circular section

The circular section is most suitable from structural consideration. However, it is difficult to
excavate, particularly when the cross-sectional area is small.

8.5.2.2 D-section

D-section is suitable for tunnels located in very good quality rock where the external
pressures due to water or rock upon the lining are small and lining is not required to be
designed from internal pressure. It is most suitable for free flow tunnels. The only advantage
of this section is flat invert resulting more working space during construction.

8.5.2.3 Horse shoe and modified horse shoe sections

These sections are a compromise between circular and D-sections. These sections are quite
strong against external pressure.

8.5.2.4 Modified horse-shoe section for small size tunnels

The minimum size of tunnel, which can be excavated without much difficulty is, 2.0 m(W) x
2.5 m (H). The section shown in Fig. 45 can be used for small size tunnels which are likely to
be subjected to external pressure.



Fig. 45: Typical Sections of Power Tunnel
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 69
8.5.3 Hydraulic Design

8.5.3.1 Obligatory levels of tunnel

In case of a pressure tunnel the depth of intake shall be such that no air is sucked in under any
condition. The location of outlet of a tunnel shall be such that the entry of air would not
adversely affect tunnel operation and safety provided that sufficient precautions for
preventing air locks are taken. The tunnels should preferably have positive gradient in the
direction of flow, since they may have to be emptied and drainaed from time to time for the
purpose of inspection and maintenance.

8.5.3.2 Cavitation

Design shall be such that negative pressures are avoided. To make sure that cavitation is
avoided and to allow for uncertainties, the residual positive pressure shall not be less than 3
m of water head in concrete lined tunnels.

8.5.3.3 Transition shapes

From the tunnel section, either entry into or exit from the tunnel requires transition to reduce
the head losses to a minimum and to avoid cavitation. The recommended shapes for entrance,
contraction or expansion and exit transitions for pressure tunnels are given below. However,
for partly flowing tunnels the methods of design shall be the same as for open transition.

(a) Entrance To minimize head losses and to avoid zones where cavitation pressures
may develop, the entrance to a pressure tunnel shall be streamlined to provide gradual
and smooth changes in flow. To obtain best inlet efficiency the shape of entrance
should simulate that of a jet discharging into air and should guide and support the jet
with minimum interference until it is contracted to the tunnel dimensions. If the
entrance curve is too sharp or too short, subatmospheric pressure areas which may
induce cavitation, will develop. A bellmounth entrance which conforms to or slightly
encroaches upon free jet profile will provide the best entrance shape.

(i) For a circular tunnel the bellmouth shape may be approximated by an elliptical
entrance curve represented by the following equation:


( ) ( )
, 1
15 . 0 5 . 0
2
2
2
2
= +
D
y
D
x


where x and y are coordinates and D is the diameter of the tunnel at the end of
entrance transition. The x-axis of the elliptical entrance is parallel to and a distance of
0.65 D from the tunnel centre line; y-axis is normal to the tunnel centre line and 0.5 D
downstream from the entrance face.

(ii) The jet issuing from a square or rectangular opening is not as easily defined as one
issuing from a circular opening; the top and bottom curves may differ from the side
curves both in length and curvature. Consequently, it is more difficult to determine a
transition which will eliminate subatmospheric pressures. An elliptical curved
entrance which will tend to minimize the negative pressure effects may be defined by
the following equation:
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 70

( )
, 1
33 . 0
2
2
2
2
= +
D
y
D
x


where D is the vertical height of the tunnel for defining the top and bottom curves,
and also is the horizontal width of the tunnel for defining the side curves. The major
and minor axes are positioned similar to those indicated for the circular bellmouth.

(iii) For rectangular entrance with the bottom placed even with the upstream floor and
with curved guide piers at each side of entrance openings, both the bottom and side
contractions will be suppressed and a sharper contraction shall take place at the top of
the opening. For this condition the top contraction curve may be defined by the
following equation:


( )
, 1
67 . 0
2
2
2
2
= +
D
y
D
x


where D is the vertical height of the tunnel downstream from the entrance.

(b) Contraction and Expansion To minimize head losses and to avoid cavitation
tendencies along the tunnel surfaces, contraction and expansion transitions to and
from gate control sections in a tunnel should be gradual.

(i) For contractions, the maximum covergent angle should not exceed that indicated by
the relationship:

,
1
tan
U
= o
where
o = angle of the tunnel wall surfaces with respect to its centre line,
U = arbitrary parameter ,
gD
v

v and D = average of the velocities and diameters at the beginning and end of
the transition, and

g = acceleration due to gravity

(ii) Expansion should be more gradual than contraction because of the danger of
cavitation where sharp changes in the side walls occur. Furthermore, head loss
coefficients for expansions increase rapidly after the angle o exceeds about 10
o
.
Expansion should be based on the following relationship:


U 2
1
tan = o

The notations are the same as for equation given in (i) above. For pressure tunnels, the
angle o may not normally exceed 10
o
.

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 71
(c) Exit When a circular tunnel flowing partly full empties into a chute, the transition
from the circular section to one with a flat bottom may be made in the open channel
downstream from the tunnel portal, or it may be made within the tunnel so that the
bottom will be flat at the portal section. Ordinarily, the transition should be made by
gradually decreasing the circular quadrants from full radius at the upstream end of the
transition to zero at the downstream end. For usual installations the length of the
transition can be related to the exit velocity. An empirical rule which may be used to
design a satisfactory transition for velocities upto 6 m/s is as follows:

,
3
2 D v
L =
where
L = length of transition in m,
v = exit velocity in m/s, and
D = tunnel diameter in m.

8.5.3.4 Pressure flow losses

(a) Friction Losses Friction factors for estimating the friction losses shall be based on
actual field observations. For tunnels flowing full, friction loss may be computed by
the use of Mannings formula.

For concrete lined tunnels the value of rugosity coefficient n varies from 0.012 to
0.018.

The value of rugosity coefficient n for use in the Mannings formula for an unlined
tunnel depends on the nature of the rock and the quality of trimming, and is possibly
influenced by the amount and distribution of overbreak. Recommended. Values of n
for various rock surface conditions are given in Table 9.

Table 9: Manning Values for Different Tunnel Surface

Surface Characteristics Manning n
Min Max
Very rough 0.04 0.06
Surface trimmed 0.025 0.035
Surface trimmed and invert concreted 0.020 0.030

(b) Trash Rack Losses Trash rack structure which consists of widely spaced structural
members without rack bars will cause very little head loss and trash rack losses in
such a case may be neglected in computing tunnel losses. When the trash rack
consists of a rack of bars, the loss will depend on bar thickness, depth and spacing and
shall be obtained from the following formula:


g
v
K h
t t
2
2
=
Where
h
t
= trash rack head loss,
K
t
= loss coefficient for trash rack
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 72
= , 45 . 0 45 . 1
2
(


t
n
t
n
a
a
a
a

a
n
= net area through trash rack bars,
a
t
= gross area of the vent (racks and supports),
v = velocity in net area, and
g = acceleration due to gravity

Where maximum loss values are desired, 50% of the rack area shall be considered
clogged. This will result in twice the velocity through the trash rack. For minimum
trash rack losses, the openings may not be considered clogged when computing the
loss coefficient or the loss may be neglected entirely.

(c) Entrance Losses Entrance loss shall be computed by the following equation:

,
2
2
g
v
K h
e e
=
where
h
e
= head loss at entrance,
K
e
= loss coefficient for trash rack,
v = velocity, and
g = acceleration due to gravity

Values of loss coefficient K
e
for various types of entrances shall be assmed to be as
given in Table 10.

(d) Transition Losses Head loss in gradual constructions or expansions in a tunnel may
be considered in relation to the increase to decrease in velocity head and will vary
according to the rate of change of area and length of transition. These losses shall be
assumed as specified in IS:2951 (Part II).

Table 10: Loss Coefficient for Tunnel Entrances

S.
No.
Type of Entrance Loss Coefficient for Entrance, K
e

Maximum Minimum Average
(1) (2) (3) (4) (5)
i. Gate in thin wall-unsuppressed
contraction
1.80 1.00 1.50
ii. Gate in thin wall-bottom and
sides suppressed
1.20 0.50 1.00
iii. Gate in thin wall-corners rounded 1.00 0.10 0.50
iv. Square-cornered entrances 0.70 0.40 0.50
v. Slightly rounded entrances 0.60 0.18 0.25
vi. Fully rounded entrances
15 . 0 >
D
r

0.27 0.08 0.10
vii. Circular bellmouth entrances 0.10 0.04 0.05
viii. Square bellmouth entrances 0.20 0.07 0.16
ix. Inward projecting entrances 0.93 0.56 0.80
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 73

For gradual contractions, loss of head h
e
shall be computed by the following equation:

,
2 2
2
1
2
2
(

=
g
v
g
v
K h
e e

where
K
e
= loss coefficient for contraction,
v
2
= velocity in contracted section,
v
1
= velocity in normal section, and
g = acceleration due to gravity

The value of loss coefficient K
e
, shall be assumed to vary from 0.1 for gradual
contractions to 0.5 for abrupt contractions. Where flare angle does not exceed those
specified in 8.5.3.3 (b) the loss coefficient shall be assumed to vary in straight line
relationship to a maximum of 0.5 for a right angle contraction.

(e) Bend and Junction Loss Head loss at bends and junctions shall be assumed as given
in IS: 2951 (Part II).

(f) Gate Loss in Pressure Tunnels No gate loss need to be assumed if the velocity of
flow is less than 1 m/s. Where a gate is mounted at either the upstream or downstream
side of a thin head wall such that the sides and bottom of jet are suppressed and the
top is contracted, loss coefficients given in Table 9 shall be taken. Where a gate is so
mounted in a tunnel that the floor, sides and the roof, both upstream and downstream,
are continuous with the gate openings, only the losses due to the slot shall be
considered as given below assuming the value of loss coefficient K
g
not exceeding
0.10:

,
2
2
g
v
K h
g e
=
where
h
e
= head loss at entrance,
K
g
= loss coefficient for gate,
v = velocity, and
g = acceleration due to gravity

(g) Exit Losses Where no recovery of velocity head will occur, such as where the
release from a pressure tunnel discharges freely, or is submerged or supported on a
downstream floor, velocity head loss coefficient K
ex
shall be assumed to be equal to
1.0. Head loss at exit shall be computed by the following equation:

,
2
2
g
v
K h
ex g
=
where
h
e
= exit head loss,
K
ex
= loss coefficient for gate
v = exit velocity, and
g = acceleration due to gravity

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 74
Where a diverging tube is provided at the end of tunnel, recovery of a portion of the
velocity head will be obtained if the tube expands gradually and if the end of the tube
is submerged, the loss coefficient K
ex
shall be reduced from the value of 1.0 by the
degree of head recovery.

8.5.3.5 Air locking and remedial measure

The presence of air in a pressure tunnel can be a source of grave nuisance. The following
steps are recommended to prevent the entry of air in a tunnel:

(a) Shallow intakes are likely to induce air being sucked in. Through out the tunnel the
velocity should either remain constant or increase towards the outlet end. It should be
checked that at no point on the tunnel section negative pressures are developed.
(b) Vortices that threaten to supply air to a tunnel should be avoided, however, if
inevitable they should be suppressed by floating baffles, hoods or similar devices.
I Partial gate openings that result in hydraulic jumps should be avoided.
(d) Traps or pockets along the crown should be avoided.

8.5.4 Rock cover

The minimum vertical as well as horizontal rock cover should be as shown in Fig. 46 In this
minimum value of R in metres shall be equivalent to maximum internal pressure head in
metres inside the tunnel.



Fig. 46: Minimum Rock Cover in Power Tunnels

8.5.5 Design of concrete lining

The design of concrete lining may be carried out as per IS:4880 (Part IV). The minimum
thickness of lining will, however, be governed by requirements of construction. For
preliminary design of lining of tunnels, the following criteria may be adopted:

(i) The minimum thickness of unreinforced concrete lining should be 150 mm.
(ii) The minimum thickness of reinforced concrete lining should be 300 mm.
(iii) For big size tunnels in reasonably stable rock, the concrete lining thickness may
be taken to be 60 mm per metre of finished diameter of tunnel.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 75
(iv) Where structural steel supports are used, they may be considered as
reinforcement by use of high tensile bolts at joints or by welding the joints. A
minimum concrete cover of 150 mm should be provided over the inner flanges of
steel supports.

8.5.6 Design of rock supports

Once the finished size and thickness of the lining is fixed, the excavated size of the tunnel is
determined, the rock supports are required to be designed for this overall size of the bore. As
the tunnels generally pass through different types of rock formations, it will be necessary to
workout alternative cross-sections of the tunnel depicting acceptable and safe types of
support systems. For preliminary as well as for final design of rock supports, Rock Tunnel
Quality Index Q method suggested by Grimstad and Barton can be used. The method is
explained in Appendix I. Rock Mass Quality Q which is a measure of rock mass
characteristics is required to be determined by an experienced geologist. The value of ESR
for various categories of excavation can, however, be determined from the Table 11.

Table 11: Estimated rock support categories based on tunneling quality index

Excavation Category ESR
A. Water tunnels for hydropower (excluding high
pressure penstocks)
1.6
B. Surge chambers, access tunnels 1.3
C. Power stations, portal intersections 1.0

8.5.7 Grouting

(a) Purpose

The purposes of grouting are as follows:

(i) To fill up the gap between concrete lining and rock
(ii) To consolidate the rock around the tunnel to enable it to share a sufficient portion
of internal pressure in the tunnel.
(iii) To introduce a certain degree of prestress in the lining as well as in the compound
system of concrete and rock to avoid / reduce tensile stresses in the concrete.
(iv) To reduce drainage water.

(b) Types of grouting

The types of grouting are as follows:

(i) Backfill (contact) Grouting The main purpose of contact grouting is to fill up
all the voids and cavities between concrete lining and the rock. The contact
grouting is normally restricted to the upper part of the tunnel. Grouting is done by
drilling holes about 300 mm deep inside the rock, one on either side of the crown
at 3 to 5 m apart and staggered in plan and at a longitudinal spacing of 3 to 5
metres. The grout pressure usually ranges from 2 to 3 kg/cm
2
. Backfill grouting
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 76
should be done not earlier than 21 days of concreting when the lining has attained
enough strength.
(ii) Consolidation Grouting Consolidation grouting is done to increase rock
elasticity, to plug rock fissures so as to stop leakage and to introduce a
compressive stress in the concrete lining and surrounding rock so as to reduce
tensile stress in concrete lining caused by inside water pressure. As a thumb rule,
a grout pressure of 1.5 times the water pressure in the tunnel may be used subject
to the strength of concrete lining and safety against uplift of overburden. For
small tunnels, rings of grouting holes may be spaced at about 3 metres centre and
each ring may have four grout holes duly staggered in consecutive rings. The
depth of holes may vary between 3 to 5 metres inside rock.

(c) Grout Mix

Grout mixes may vary from a very thin mixture of 20:1 to 0.5:1 (ratio of weight of water and
cement). The normal range mixtures fall between 5:1 to 0.8:1. The choice of the grout
mixtures at the start of grouting operations is based on the water tests before grouting or
intake of holes already grouted. If the grout is too thick, passage of grout travel may get
obstructed and fine seams may not be filled up. On the other hand if thin grout is continued
for too long a time, the grouting operation may get unduly prolonged and may become too
expensive. As a guide, the grouting should be started with a thin mix and the mix should be
thickened if there is no increase in the pressure after a continuous grouting of about 10
minutes or after about 8 to10 bays of cement have been pumped. If the grout intake is too
heavy, the cost of grouting can be reduced by thickening the grout by using inert materials
like pozzolaous, fine sand, rock powder, clay or bentonite.

8.5.8 Drainage holes

Drainage holes may be provided in the crown portion in free flowing tunnels and even in the
pressure tunnels to release external water pressure at the time of dewatering of tunnel. when
the mountain material is likely to be washed into the tunnel. When pressure tunnel water
coming out of the drainage holes is likely to endanger the side slopes of the hill mass,
drainage holes should not be provided. When provided, at successive sections one vertical
drainage hole may be drilled in the crown alternating with two horizontal holes drilled at the
springing to a depth of 150 to 300 mm inside the rock.

8.5.9 Unlined tunnels

The power tunnels can be left unlined under the following conditions:

(i) When the rock quality is good and there is no likelihood of rock pieces getting
detached due to flowing water
(ii) When there is no possibility of leakage of water through the crevices of the rock
mass around the tunnel resulting water loss and destabilization of side slopes of
the hill
(iii) When the available water head for power generation is substantial and a little
extra head loss occurring due to rough surface of the unlined tunnel does not
materially affect the economics of the project. If the tunneling is carried out by
Tunnel Boring Machine, the surface roughness of the tunnel will be very much
less.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 77
8.5.10 Tunnel plugs

Concrete plugs are provided at the junctions of construction adits and the main tunnel. The
plug may be a solid concrete plug or a concrete plug with an inspection gate.

8.5.10.1 Design of plug

(a) Design Head The design head shall correspond to maximum reservoir level with
surge and water hammer effects, if any.

(b) Plug length The length of the plug shall not be less than the excavated diameter of
the tunnel. The plug length may be calculated based on the following formulae:

(i)
section tunnel of perimeter stress shear average e Permissibl
plug the on force c Hydrostati
plug of Length

>
(ii)
plug of length unit per resistance Frictional
plug the on force c Hydrostati
plug of Length >
(ii)
plug of length unit per
anchors of resistance shear and plug of resistance Frictional
plug the on force c Hydrostati
plug of Length >

Values of permissible average shear stress / shear friction between the plug and
surrounding concrete/ rock should be on conservative side and ample factor of safety
should be considered. It is preferable to cast the whole length of plug in one block
without any construction joint.

(c) Key in Concrete / Rock Wedge shaped keys are provided at rock / concrete interface
and within concrete (if the concrete has been poured in two stages) to ensure effective
plug action by providing adequate bearing of the plug concrete on the tunnel lining or
plug concrete / tunnel lining the surrounding rock. The depth of the key may be
calculated from the average bearing stress in concrete / rock from the following
formula. The permissible stresses in concrete shall be as per IS:456. In many cases the
stresses in concrete will govern as rock is generally stronger.

area bearing projected Effective
plug the on force c Hydrostati
stress bearing Average =
The effective projected bearing area shall be assumed 75% of the total projected
bearing area of the kays to allow for imperfections in grouting. The depth of any key
will not be less than 450 mm.

(d) Grouting Contact and consolidation grouting as described in clause 8.5.7 shall be
done around the plug in order to improve the quality of surrounding rock and to
ensure better shear friction.

Typical details of concrete plugs are shown in Fig. 47 and 48.

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 78
8.6 Pipes Steel, RCC, High Density Polyethylene (HDPE) and Glass Fibre
Reinforced Plastics (GRP)

Use of different types of pipes in the water conductor systems of small hydro projects is quite
common. The use of pipes as a water conductor system has the following inherent
advantages:

(i) In case the means of communication upto the project site are good, the
construction of the water conductor system can be done very speedily.
(ii) Depending upon the availability of the pipes at a nearby place, the work may be
more economical.
(iii) Maintenance cost of the pipe system is lesser.
(iv) The chances of water leakage and thus destabilizing of hill slopes are lesser.
(v) Since the value of rugosity coefficient in any type of the pipe will be lesser than
that of the earth surface or concrete surface, the head loss in the water conductor
system will be lesser.

8.6.1 Laying of pipes

As a part of water conductor system, the pipes are laid along the contour. The pipes may run
under pressure or free flow. In any case, there should not be any hump along the alignment. If
designed to be free flow, the pipes should be laid at sufficient slope so as to carry the
designed discharge.

8.6.2 Steel pipes

Steel pipes can be installed underground as well as exposed on ground surface.

(i) Underground pipes

(a) The pipes do not need any saddle supports nor any expansion joints.
(b) The pipes are quite safe against rock falls and seismic shocks
(c) The pipes do not need painting and are almost maintenance free.

Since the underground pipes are liable to get rusted, they should be wrapped with some
anticorrosive sheet or be provided with a layer of 150 mm thick shotcrete.

(ii) Surface pipes Pipes laid on surface as a part of water conductor system, are installed
at a very mild longitudinal slopes of 1 in 100 or lesser. The pipes as such do not need any
anchor blocks but should be installed on saddles at a spacing of 5 to 6 metres. The saddles
should be atleast 600 mm above ground, so that the outer surface of the pipes could be
painted as and when required and it could be away from vegetation. The pipes would need
anchor blocks or straps anchored to the adjoining rock at the locations of horizontal curves.
Additionally the surface pipes will be required to be provided with expansion joints at a
spacing of 50 to 100 metres, lesser spacing being at the locations of horizontal curves. The
design of steel pipes, whether underground or surface can be carried out on lines similar to
those of penstocks mentioned in subsequent chapter.

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 79

Fig. 47: Details of Plug with Inspection Gallery

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 80


Fig. 48: Details of Plug without Inspection Gallery

8.6.3 R.C.C. pipes

RCC pipes are available in sizes from 300 mm to 2200 diameter and in lengths of 2000 mm
to 4000 mm. RCC pipes can be installed above ground or below the ground surface.
However, they should preferably be installed underground at a depth of about 1 metre or so.
Underground pipes are safe against rock falls and seismic shocks. The individual pieces of
the pipes should be jointed together as per instructions of the manufacturer. If installed
underground, these are almost maintenance free. These pipes can withstand upto 60 metres of
water pressure.

8.6.4 High density polyethylene (HDPE) pipes

HDPE pipes are available in sizes from 200 mm to 1000 mm diameter and in lengths of 5 to
20 metres. These are needed to be protected from sunlight and as such they should be
installed underground and individual pieces should be jointed according to the instructions of
the manufacturer. The rugosity coefficient these pipes is of order of 0.01 and they can
withstand upto 160 metres of water pressure.

8.6.5 Glass fibre reinforced plastics (GRP) pipes

GRP pipes are available in sizes from 200 mm to 3000 mm diameter and in lengths upto 12
metres. These pipes can be installed on the surface as well as underground. The rugosity
coefficient of these pipes is of the order of 0.01 and they can withstand upto 30 to 150 metres
of water pressure. These are relatively much lighter compared to steel pipes and can be
installed at faster pace.

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 81
8.7 Cross- Drainage Works

Cross drainage works of small hydro-electric projects may be of two categories:

(1) Drainage passing on the top of the power channel
(2) Drainage passing under the power channel

8.7.1 Cross drainage work with the natural drain passing above the power channel

When the conditions so demand, the natural drainage can be passed over the RCC section of
the power channel as shown in Fig. 49. In this case the power channel will be designed for
the load of the drainage bed material as well as drain water corresponding maximum water
level. The sides of the drain will be protected by guide bunds with their foundations at a
depth of atleast 1.25 times the scour depth. The clear width of between the guide bunds will
have to be sufficient enough to pass the estimated flood water of the drain. The top of the
guide bunds should be atleast 0.5 metre above the maximum estimated water level of the
drain.



Fig. 49: Typical Arrangement of drain crossing above power channel

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 82
8.7.2 Cross drainage work with the natural drain passing below the power channel

This type of cross-drainage works may be divided into three categories:

(i) Drainage crossings to pass rain water of the hill toe drain
(ii) Drainage crossing across major drainages with RCC aqueduct
(iii) Drainage crossing across major drainage with pipe aqueduct.

8.7.2.1 Drainage crossing to pass rain water of the hill toe drain

A typical section of a drainage crossing to pass rain water of the drain constructed along the
toe of the hill towards valley side is shown in Fig. 50.

Such types of cross-drainage should be constructed at an interval of 300 to 500 metres. The
cross drainage may comprise an RCC barrel of atleast 1 m x 1 m size or a pipe of atleast 0.9
m internal diameter so that a man can go inside to clear the debris deposited therein. As far
as possible, the location of these works should be chosen in such a way, that the outlet end of
the drainage barrel is located on good unerodoble rock face. In the absence of such a
situation, the hill face at the location of the outlet end of drainage barrel should be protected
with stone pitching in sufficient width ie. in a width of atleast 1 to 2 metres on either side of
the barrel.



Fig. 50: Cross Drainage work to Pass Hill Drain Water

8.7.2.2 Drainage crossing across major drainage with RCC aqueduct

A typical arrangement of an RCC aqueduct is shown in Fig. 51. Such an arrangement is quite
suitable for aqueducts upto 10 metres span. In such a case there is no need to provide a
central pier. The foundations of the abutments should either be kept on firm unerodable rock
or should be taken upto a depth of 1.75 times the scour depth below high flood level. There
should be a headroom of atleast one metre between the high flood level of the drainage and
the bottom of the bottom slab of aqueduct. In case the power channel is rectangular, the same
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 83
size can be maintained in the aqueduct portion also, but if the shape of the power channel is
trapezoidal, it will be needed to be converted into a rectangular section keeping the width and
water depth in the flumed section almost the same. In case of a power channel of trapezoidal
section, the principal dimensions of the entry and exit transitions and the flume section of the
aqueduct can be determined in the following manner.

With reference to Fig. 51, A = BD + DS where A is the area of cross-section of the
trapezoidal headrace channel and d ~ b ~ D.

The invert elevations across the entry and exit structures can be calculated by Bernaulis
equation as below:

For sections (1) & (2)


len i
h
g
V
d Z
g
V
D Z + + + = + +
2 2
2
2
2
2
1


Where,
Z
1
and Z
2
are elevations,
V
1
& V
2
are average velocities at sections (1) and (2) respectively, and

h
len
= 0.1
g
V
B
b
2
1
2
2
|
.
|

\
|



Fig. 51: Geometric Layout of Flumed Aqueduct

From the above equation, Z
2
can be determined as all the remaining parameters are known.
For sections (2) to (3), the slope of the flume section can be determined from Mannings
equation,

Slope s = ,
.
2
3 / 2 (

R
n V
the value of n for concrete channels can be taken as 0.014.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 84

For section (3) & (4),


lex
u
H
g
V
D Z
g
V
d Z + + + = + +
2 2
2
4
2
3
3


In this Z
3
= Z
2
s x L and h
lex
= 0.2
g
V
B
b
2
1
2
3
|
.
|

\
|


Since all the other parameters are known, Z
4
can be determined.

The structural design of the flumed section can be carried out as RCC trough section. It
would be better if the flumed section is designed as a closed section so that the top slab could
be used as a bridge across the drain. A typical section of the flume is shown in Fig. 52.

In this case the side walls are designed as beams to withstand the loads of water as well as
dead and live load on top slab. In case the depth of the side walls as beams is found to be
insufficient, the side parapets may also be considered as part of the beams. The concrete used
should be of atleast M-25 grade and the bottom slabs & side walls should be designed as
water retaining structures as per IS: 3370- Code of Practice for Concrete Structures for the
Storage of Liquids.


Fig. 52: Typical flume section

8.7.2.3 Drainage crossing across major drainage with pipe aqueduct

A typical arrangement of a pipe aqueduct is shown in Fig. 53.

This arrangement can be used upto 150 to 200 metres of the aqueduct. As mentioned in para
8.7.2.2, the foundations of the abutments and the central piers should either be kept on firm
unerodable rock or should be taken upto a depth of 1.75 times the scour depth below high
flood level of the drain. There should be a headroom of atleast one metre between the high
flood level of the drain and the bottom of the pipe. The distance between the intermediate
piers / saddles should not be more than 5 to 6 metres. The velocity in the pipe can be upto 4
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 85
metres per second and it can be designed as a pressure pipe. The design of the pipe can be
carried out on lines similar to surface penstock as described in subsequent pararas.


Fig. 53: Typical Section of Pipe Aqueduct

8.8 Desilting Devices

Intakes on rivers and streams are designed to eliminate floating debris and a large amount of
bed load. However, they can not prevent the entrance of suspended sediment and the entire
amount of bed load. Desilting devices are, therefore, required to avoid sedimentation of the
water conductor system and to limit the possible damage of the turbine parts due to abrasion
against the sediments. Normally two types of arrangements i.e. (i) Desilting chamber (ii)
Vortex type, are provided for silt removal. Sometimes either of these or both of these are
provided in series.

8.8.1 Desilting chamber

Desilting chamber is the most commonly used device, to reduce silt load. Removal of silt is
affected through reduction in flow velocity by increasing the flow area and thus letting the
bigger size silt particles settle to the bottom of the tank. The settled particles are removed
continuously through a silt flushing arrangement provided at the bottom of the chamber.

8.8.1.1 Silt flushing discharge

The silt flushing discharge should be able to flush out the pebbles of 30 to 50 mm size at a
flushing velocity of 3 to 4 metres / sec. The silt flushing discharge normally ranges from 20
to 25% of the intake discharge. As such, if Q cumecs is the design discharge required for
power generation, the intake should draw a discharge of Q/0.8 to Q/0.75 cumecs to allow a
flushing discharge of 20 to 25%.

8.8.1.2 Flow through velocity

The limiting flow through velocity can be determined by the relation
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 86

, d a V =
Where,
V = flow through velocity in m/sec.,
d = diameter of particle upto which sediment load is desired to be
removed in mm and
a = constant which is equal to
0.36 for d > 1 mm
0.44 for 1 mm > d > 0.1 mm

In small hydro projects normally the silt particles more than 0.25 mm size are removed. For
this the flow through velocity works out to 0.44 25 . 0 = 0.22 m/sec.

8.8.1.3 Fall velocity

Fall velocity of suspended sediment can be determined from the Table 12.

Table 12: Fall Velocity of Suspended Sediment

Particle Size in mm Fall Velocity in cm / sec. at a Water Temperature of
0
o
C 15
o
C 40
o
C
0.15 1.00 1.50 2.00
0.20 1.70 2.10 3.00
0.25 2.10 3.00 4.00
0.30 3.00 4.00 5.00
0.40 4.20 5.30 6.50
0.60 7.00 9.00 11.00
0.80 10.00 12.00 14.00
1.00 13.00 15.00 17.00
2.00 26.00 27.50 30.00
4.00 42.00 43.00 44.00
7.00 60.00 60.00 60.00
10.00 72.50 72.50 72.50

8.8.1.4 Upstream and downstream transitions

The desilting chamber is joined with the water conductor system at its upstream and
downstream ends through gradual expansion and contraction transitions respectively. These
transitions should not be steeper than 1:6 in expansion transition and 1:3 in contraction
transition.

8.8.1.5 Data required for design

The following data is required for the design of desilting chamber:

(i) Design discharge Q
d
in cumecs at the outlet end of desilting chamber
(ii) Silt flushing discharge Q
f
in cumecs
(iii) Total discharge Q in cumecs at inlet end = Q
d
+ Q
f

(iv) Minimum particle size d to be removed in mm and corresponding fall velocity
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 87
(v) Type of flow i.e. free flow or pressure flow
(vi) Available width in metres for constructing the chamber

8.8.2 Design

The design of desilting chamber involves following steps

(i) Determine flow through velocity in m/sec corresponding minimum particle size
to be removed.
(ii) Determine the area of the desilting area by dividing the total discharge Q by
flow through velocity.
(iii) Fix the width W of the desilting chamber in accordance with the space
available at site. In case of underground desilting chamber, the width of the
cavity will have to be decided on the basis of geological considerations. A lesser
width will result greater depth of desilting chamber and larger length and vice-
versa
(iv) With area and width of the desilting chamber, determine the depth D of the
chamber.
(v) Determine the fall velocity V
f
of silt particles as per Table 5.
(vi) Calculate moderated setting velocity V
fm
to take into account the turbulence at
the inlet transition by the following relation

V
fm
=
D
V
V
f
f

132 . 0


(vii) Calculate the settling length L of the chamber by the following relation

fm
V
D Velocity through Flow
L

=

(viii) Divide the length of the chamber into a suitable number of hoppers, generally
the shape of hoppers is a square as shown in Fig. 54. In case the width of the
desilting chamber is too large, there can be two or more number of rows of
hoppers along the length of the chamber. The slope on all the four sides of the
hoppers is kept at an angle of 45
o
so that any silt that falls into the hopper slides
down into the hole provided at the bottom of the hopper. Alternatively instead of
providing hoppers only side slopes of 45
o
are provided at the bottom of desilting
chamber as indicated in section A A of Fig. 54. In this arrangement a slab with
holes segregates the desilting chamber from the silt flushing channel. The sizes
of holes varies from upstream to downstream, the upstream holes being bigger
and downstream holes being smaller.

(ix) The sizes of the holes provided at the bottom of the hoppers is fixed with the
following criteria:

(a) The first hole / the first row of holes, if there are more than one row of
hoppers, should be able to carry a minimum of 10% of the flushing
discharge.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 88
(b) The size of other holes / other row of holes shall be decided on the criteria of
passing equal discharge through each hole. It will be done by equalizing the
head losses from inlet of the hole upto the end of desilting chamber in the
silt flushing channel. As such the sizes of holes will go on reducing from
upstream to downstream.

(x) Determine the size of the silt flushing tunnel in such a way that the velocity in
the tunnel is never less than 3.0 m per sec.
(ix) Silt flushing tunnel should preferably be lined with 10 to 12 mm thick steel plate
and it should discharge into the river at such a location that the invert of the
tunnel remains atleast 1.0 metre above the high flood level of the river at that
location.





Fig. 54: Schematic Arrangement of Desilting Chamber
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 89
8.8.3 Vortex tube

The vortex tube is an open tube placed across the power channel bed either normal to flow or
at angle of 30
o
to 45
o
to the flow. As the water flows tangentially over the tube, vortex flow
with a speed of rotation of the order of 200 to 500 rpm is set up in the tube, which is
sufficient enough to eject coarse gravel and even cobbles. The rate of outflow at the
downstream end of the vortex tube is controlled by a gate. For maximum efficiency both the
lips of the tube should be kept at the same level and Froude number
gd
V
should be around
0.8. The diameter of the vortex tube should be equal to about the depth of flow. In case the
Froude number happen to be less, the same can be increased by contracting the width of the
channel at the location of the tube. Vortex tubes can be used with or without desilting
chamber, which, if provided, should be provided in series at the downstream side of the tube.

8.8.3.1 Design data

The following data is required for the design of vortex tube:

(i) Cross-section of channel at the proposed location of vortex (this should be modified
as per recommendation given in para 8.8.3).
(ii) Design discharge Q of the channel.
(iii) Allowable flushing discharge, which may vary from 10 to 20% of the total discharge
at the location of the tube.
(iv) Material size distribution of bed load


Fig. 55: General Arrangement of Vortex Tube

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 90
8.8.3.2 Design procedure

The design can be carried out in following steps:

(i) Determine the fall velocity of sediment fractions d
10
, d
30
, d
50
, d
70
, d
75
and d
90
and let
they be V
f10
, V
f30
, V
f50
, V
f70
, V
f75
& V
f90
respectively.
(ii) Choose operating head h
o
i.e. the head difference between the centre line of tube in
the channel and that at the outlet end. This can vary from 0.1 m to 0.7 m or so
according to site conditions.
(iii) Calculate the minimum tangential velocity U
o
at the closed end of tube using the
formula:

, 2
693 . 0
o o
gh
r Cosh
U =

in which L
dt
L
r ,
2422 . 0
= being the length of the tube and d
t
its diameter. For
efficient flushing of the vortex tube, U
o
should be greater than V
f90
. Thus substituting
U
o
= V
f90
, the above equation can be solved for cosh r and thus
dt
L
can be determined.
Since L is known, dt can be found out. For the value of
dt
L
obtained above and an
assumed value of h
o
, determine the average velocity in the tube U
a
as


o r a
gh U 2 tanh 721 . 0 =

This equation is valid for a slit width equal to 0.3 d
t
, which is the recommended value.
The flushing discharge flowing in the tube Q
f
can now be determined from the
following relation:


a t f
U d Q |
.
|

\
|
=
2
4
t


(iv) The ratio of
Q
Q
f
can thus be determined. In case it does not lie between the
acceptable limit of 0.1 to 0.2, the design will be required to be repeated by modifying
either h
o
or L. Possibility of using two or three tubes instead of one can also be
considered.

9.0 FOREBAY

The forebay is a small storage pond located in between head race channel and penstocks. It
provides immediate water demand on starting the generating units and required water seal
over the penstock inlet against air entrainment. Suitable spillway is provided on one side of
forebay to dispose off safely the excess inflows during load rejection.

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 91
9.1 Functions of Forebay

Following functions are sewed by forebay tank:
(a) Distribution of Flow The forebay should have enough length to distribute flow
smoothly and uniformly and necessary width for arranging the intake, trash racks,
penstock and spillway.
(b) Regulation of flow The forebay should have certain storage volume to regulate the
flow when the plant is suddenly loaded.
(c) Protection against silting and floating debris Silt sluice and trash racks should be
provided in the forebay against harmful particles of silt and floating debris pasing into
the turbines.
(d) Provision of water seal over intake - The forebay provides minimum required water
seal over the intake at MDDL against air entrainment.
(e) It should have adequate provision to escape the design discharge in the event of
sudden closure of machines.

9.2 Layout of Forebay

The layout and dimensioning of the forebay depend on the topographic and geological
conditions and layout of its appurtenances such as spillway, silt sluices, intake structure etc. It
should be located as near to the power house as possible so as to have minimum length of
penstock.

9.3 Dimensioning of Forebay

The forebay should be so dimensioned to meet out its functions and normal operation of the
plant. The minimum capacity of forebay is normally kept corresponding to a storage of 2 to 3
minutes of the design discharge with an operating depth of 2 to 3 metres. The dimensioning
of forebay is so adjusted to meet out required volume of storage and accommodate its
appurtenances. Thus, the hydraulic design parameters of forebay are determined as follow:

(a) Capacity of Forebay in cubic metre = 120 to 180 Q
d
, where, Q
d
is the design
discharge of head race channel in cumec

(b) Width of forebay is determined in accordance with the topographical conditions at the
site. In case of steep terrain the forebay can have less width and more length and
should be aligned along the contours. In case the penstocks emerge from the other end
of the forebay, the width of the forebay should be enough to accommodate the
penstocks. The penstocks can also take off perpendicular to the length of the forebay
depending upon the location of power house.

(c) IMaximum water depth of flow in forebay is generally kept from 2 m to 3 m below
steady state level with an average flow velocity in forebay less than 0.5 m/s or even
less so that it can be expected to settle out the harmful sediment particles.

(d) After fixing the width and depth of the tank, the length can be determined. The length
should be aligned along the existing contour.

(e) Submergence depth of intake

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 92
The minimum submergence required at the centre line of penstock below MDDL
against air entrainment may be calculated by the following formula given by Gordon,


r
s
F
D
h
2 5 . 0 + = (4)

Where,
h
s
= depth of submergence at intake centre line below MDDL
D = depth of opening at intake gate axis
F
r
= Fronde number =
gD
V

V = Velocity of flow through intake
g = acceleration due to gravity

In order to achieve the required submergence, the bottom of the forebay floor is normally
depressed at the location of the penstock. The forebay floor may be further depressed by
about 0.5 m to 0.75 m below the bottom level of penstock to accommodate the silt flushing
sluice.

(f) Transition between HRC and forebay

A suitable expansion transition having a side splay of 5:1 and bed slope of 4 (H) : 1 (V) may
be provided to join headrace channel with forebay.

(g) Spillway

In case of small hydropower projects an ungated spillway crest of suitable length at the
steady state level of forebay is designed for the design discharge of head race channel for a
limited head of about 0.3 m to 0.5 m over the crest in order to dispose off the incoming
discharge at the time of sudden tripping of the machines. The spillway crest is ogee shaped
and is aligned along the wall of forebay in such a way so that it could be discharge safely
through a spill channel / pipe into a nearby drain or river. A typical layout of forebay tank
shown in Fig. 56.

10.0 SURGE TANK

10.1 Introduction

Surge tank is provided at the junction of headrace tunnel / pressure conduit and the penstock.
The surge tank absorbs the water hammer or elastic shock waves coming from the penstock
as a result of hydraulic transient conditions during load rejection or acceptance by the power
house and also to supply / store additional water during load demand / rejection until the
pressure conduit velocity has accelerated / decelerated to the new steady state value. Surges
or mass oscillations occur in the surge tank. The hydraulic design of surge tank should be so
as to keep the surges within reasonable limits. There are five types of surge tanks; simple
surge tank, restricted orifice surge tank, double chamber surge tank, surge tank with over
flow weir and differential surge tank. Out of these a simple or restricted orifice type surge
tank is commonly used in small hydropower projects. General details of surge tanks are
shown in Fig. 57 (a) and 57 (b).
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 93
10.2 Data Required

The following data are required for the hydraulic design of surge tank:

(a) Length, diameter and maximum discharge of head race tunnel
(b) Length, diameter, number of penstocks and discharge of each.
(c) Net head on turbine
(d) Maximum and minimum operating levels of reservoir
(e) The maximum and minimum head losses in head race tunnel
(f) Critical transient conditions of load changes.
(g) If the power station operates in isolation or in grid.

10.3 Design

10.3.1 Design conditions

The surge tank is designed to accommodate the maximum and minimum surge levels under
worst transient conditions of power house. The following conditions are considered for
design:

(a) Maximum upsurge level in the surge tank is worked out corresponding to full load
rejection with minimum friction losses in HRT at highest operating reservoir level
or
Where considered necessary specified load acceptance followed by full load rejection
at the instant of maximum velocity in HRT and higher of the two is adopted.

(b) For minimum down surge level, the worst of the following two conditions is
considered.

(i) Full load rejection at MDDL followed by a specified load acceptance at the instant
of maximum negative velocity in HRT.
(ii) Specified load acceptance at MDDL with maximum friction losses in HRT.

10.3.2 Coefficient of hydraulic loses

For tunnels flowing full, friction loss may be determined by using Mannings formula.
For various types of tunnels, the value of Mannings Rugosity coefficient n may be taken as
given in Table 13:

Table 13: Manning n for Different Tunnel Surface

S.
No.
Tunnel Surface Condition Value of n
Minimum Maximum
1. Concrete lined 0.012 0.014
2. Unlined very rough 0.04 0.06
3. Unlined trimmed 0.025 0.035
4. Side faces unlined and trimmed and invert concreted 0.02 0.03

The minimum value of n gives worst upsurge while the maximum value gives the worst
down surge. As such maximum and minimum values of n should be used for the relevant
conditions.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 94


Fig. 56: Surge Tank Details

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 95
10.3.3 Area of surge tank

To ensure the hydraulic stability of surge tank, its area is governed by Thoma criteria
applicable for a power station in isolation, which is;


g
V
H V
A L
A
t
o t
t
th
2
2
2
|
=

Where,
A
th
= Thoma area of surge tank.
A
t
= Cross sectional area of head race tunnel
H
o
= Net head on turbine
L = Length of head race tunnel
V
t
= Velocity of flow in head race tunnel
| = Coefficient of hydraulic losses in HRT such that h
f
=
2
t
V |
g = Acceleration due to gravity
h
f
= Hydraulic losses in HRT

If power station always operates in a grid, the stabilizing effect of the grid may be taken into
account and area of surge tank (A
s
) is modified by following formula:

A
s
= A
th
[1-1.5 (1-K)]

Where K = ratio of total power generated by the station to that of the grid

The area of surge tank calculated by adopting above said equation is the minimum area of
surge tank. A factor of safety of 2.0 and 1.6 on the minimum area should be used in case of
simple and restricted orifice surge tank respectively to secure rapid rate of damping required
in practical operation.

10.3.4 Simple surge tanks

The extreme water levels in the surge tank for the conditions mentioned in para 10.3.1 are
determined by integrating the equations of mass oscillations of the system.

The maximum up surge level for the case of complete load rejection may be determined from
the following formula:

( ) 0
2
2 2
2
0
2
0
2 2
0
2
0
2
=
(

+ V Z
L
g
e
V g
L
V
Z
V g
L
m
m
|
|
|| | ||


where,
| = Ratio of area of surge tank to that of conduit = ,
At
As

V
o
= Velocity of flow in tunnel corresponding to maximum steady flow upstream
of surge tank,
Z
m
= Maximum surge level above maximum reservoir level


AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 96


Fig. 57 (a): Typical Details of Forebay (Plan)
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 97


Fig. 57 (b): Typical Details of Forebay (Section)


AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 98
The minimum downsurge may be approximately determined from the following formula:

Z
min
=
( )
,
' ' 2
1
1
1 "
(

+

m Cos e m
h
m
f
t


where,
m' =
( )
2
1
"
2 m
m
m and
LA
gA
V
hf
t
s
o

=
m = damping factor =
t
s
LA
gA
| 2
Z
min
= Minimum surge level measured from the minimum reservoir level in
the starting

10.3.5 Restricted orifice surge tank

The surges will depend on the resistance offered by the orifice. The resistance offered by the
orifice may be calculated by the following formula:


g A C
Q
h
o d
o
or
2
2 2
2
=

Where,
A
o
= Area of orifice
Q
o
= Maximum discharge through the turbines
C
d
= Discharge coefficient of orifice usually varies between 0.6 to 0.9
depending upon the shape of orifice

The area of orifice is so chosen as to satisfy the condition given by Calame and Gaden for
maximum flow as follows:


f o f
h
Z
h h
Z
r
4
3
2
4
1
2
* *
+ s s +

Where,
Z
*
= is surge height corresponding to change in discharge neglecting
friction and orifice losses, is given by following equation;

s
t
t
A
A
g
L
V Z =
*


A
s
= Area of surge tank provided

10.3.6 Maximum and minimum surge levels

The maximum and minimum surge levels can be calculated by an approximate method given
by Parmakian (1960) as follows.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 99
(a) Maximum upsurge level

The maximum upsurge height (Z
max
) above steady state level in surge tank for total rejection
of load is given by;

Z
max
=
f
h b
89 . 0
0
05 . 1



Where,
b
o
=
L
A g A
Q
h
t s
t
f

h
f
= Total head losses in HRT with minimum friction + , 2 /
2
g V
t

Q
t
= Discharge through the tunnel

and Maximum up surge level = Maximum reservoir level in upstream of HRT h
f
+ Z
max


A free board of 1.5 to 2.0 m may be provided above the maximum up surge level to fix up the
top level of surge tank.

(b) Minimum down surge level

The lowest down surge height (Z
min
) below the steady state level corresponding MDDL is
given by the following equation:

Z
min
=
f
h b
91 . 0
0
88 . 0



Where,
h
f
= Total head losses with maximum friction in HRT + g V
t
2 /
2

and Minimum down surge level = Steady state level in surge tank with maximum friction in
HRT at MDDL Z
min


The bottom of surge tank may be kept 2.0 m below the lowest surge level or corresponding to
required water seal above the orifice equal to 1.5 to 2.0 times the velocity head through
orifice whichever is maximum. In all important works, it is recommended that the results are
verified by model studies.

11.0 PENSTOCKS

Pressure conduits carrying water from forebay / surge tank to the power house are termed as
penstock. Penstocks are required to bear maximum water pressure including water hammer,
they are quite costly and are a very important part of the water conductor system. As such
they should be designed and installed at the site with utmost care.

11.1 Types of Penstocks

(A) According to location The penstocks may be buried inside the ground or they can be
installed on surface along the natural terrain.
(i) Buried penstocks Such penstocks are installed inside a trench and continuously
supported on the soil at the bottom of the trench. After installation, the trench is
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 100
backfilled with the excavated material. In this case these should be an earth cover
of atleast 1.0 metre over the top of the penstock. In case the penstock pipe happen
to be of steel, the steel pipe should be protected against corrosion by wrapping it
with some anticorrosive sheet or the outer surface of the pipe can be covered with
atleast 75 mm thick shortcrete or 150 thick PCC. The inside of the such steel
penstock should be painted with long life heavy duty apoxy paint. In case of
HDPE or GRP penstock pipes, they can be buried without any treatment, but the
top of these pipes should also be atleast 1 m below the finished ground level.
There are certain advantages and disadvantages of this type of penstocks.

Advantages:

(a) Protection against the effect of temperature and as such no expansion joints are
required.
(b) Protection against freezing of conveyed water
(c) Landscape remains unchanged
(d) Immunity against rock slides, falling trees etc
(e) Protection against earthquakes
(f) Being continuously supported on soil, they are not required to be designed for beam
action resulting reduced plate thickness.

Disadvantages:

(a) Need special coating against corrosion
(b) Though almost maintenance free, but if required, maintenance and repairs will be very
difficult and costly

(ii) Exposed penstocks

They are laid along the profile of the existing terrain on the hill slope preferably on the ridge
of the hill. They are supported on anchor blocks and saddles and bottom of the penstocks is
kept atleast 0.6 m above the natural ground in order have ease in painting and to keep the
penstock away from the vegetation. Penstocks comprising HDPE pipes should not be
installed on surface. The advantages and disadvantages of exposed penstocks are:

Advantages:

(a) Easy inspection, maintenance and repairs
(b) Less expensive installation

Disadvantages:

(a) Full exposure to temperature variation and thus requiring expansion joints at the
downstream side of each anchor block.
(b) Chances of water conveyed being frozen in cold climates
i Development of longitudinal stress due to beam action and friction at the saddle
blocks
(d) Vurnerability in case of earthquake, rock falls etc.
(B) According to material being used

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 101
The penstocks may comprise steel pipes, HDPE pipes, GRP pipes or wooden staves.
Presently wooden staves pipes are not in common use and as such these are not covered in
this code. The merits and demerits of the other three types of penstocks are as shown in Table
14.

Table 14: Comparison of GRP Pipes, Epoxy Coated MS and HDPE Pipes

S.
No.
Description GRP Pipes Epoxy Coated
MS
HDPE
1. Corrosion
resistance
Good To avoid inside
corrosion
additional epoxy
coating is
required. For
outside corrosion
protection
wrapping,
coating,
Cathodic
protection is
required.
Good
2. Maintenance Almost
maintenance free
External coating
may peel off in
due course of
time due to
rough handling
and
environment.
Periodical
maintenance is
required.
Almost maintenance
free
3. Life GRP pipes are
designed for 50
years of life
Life of the pipe
is 50 years
Life of HDPE pipe is
20 to 25 years
depending upon the
service condition
4. Underground
Application
Generally kept
underground
Needs to be
wrapped with
some
anticorrosive
sheeting
Generally kept
underground
5. Mannings Rugosity
Coefficient ()
0.01 0.011 0.01
6. Design Available from 200
to 3000 diameter &
upto 3.0 Mpa
pressure
(IS:127093)
Upto 400 NB-
Standard size.
Above 400 NB
design includes
corrosion
allowance
Available from 20 to
1000 mm diameter &
upto 1.60 Mpa
7. Specific Gravity 1.8-1.9 7.85 0.95
8. Wight Light in weight 4 times higher Weight is higher than
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 102
S.
No.
Description GRP Pipes Epoxy Coated
MS
HDPE
than GRP GRP due to higher
wall thickness
9. Handling Handling is very
easy since very
light in weight
Difficult, due to
heavy weight
Handling is very easy
10. Wall thickness Lesser wall
thickness due to
proper fiber
orientation
For a particular
pressure rating,
wall thickness is
higher than GRP
For a particular
pressure rating, wall
thickness is higher
than GRP
11. Tensile strength Hoop tensile
strength = 375 Mpa
Min 400 Mpa 35 Mpa
12. Modulus of
elasticity
Hoop tensile
modulus = 35 Gpa
219-240 Gpa 5 Gpa

11.2 Number of Penstocks

Either a separate penstock can be provided for each machine or a single penstock may serve
more than one machine or all the machines of the power house. In case one penstock serves
more than one unit, a suitable branching arrangement is required to be provided at the power
house side of the penstock. The various factors affecting the choice are size, transport
limitation, economy etc.

11.2.1 As the plate thickness of the penstock is directly proportional to the diameter, a single
penstock of bigger size will need thicker plates or special type of steel, which will
entail problems of procurement and fabrication.

11.2.2 Transport and installation problems may limit the size of penstocks.

11.2.3 While separate penstock for each unit affords a more convenient arrangement with
better operational facility, in case when a single penstock serves a member of
machines, if there is damage to the penstock, all the machines suffer closure.
Additionally the design, fabrication and installation of branching arrangement is
difficult and there will be significant head loss at the manifold.

11.2.4 From purely economic point of view, if the same discharge is passed through a
number of penstocks, cost will be greater as compared to single penstock whether in
terms of cost of steel or increased friction head loss. In case where the length of
penstock is small, adoption of individual penstock for each machine may be more
economical and vice-versa.

11.3 Specials for Penstock

A number of specials are normally required for use in the penstocks i.e.

(a) Bends
(b) Reducer pieces
(c) Branch pieces
(d) Expansion joints and dresser couplings
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 103
(e) Manholes
(f) Bulk heads
(g) Air vents and air valves, and
(h) Other miscellaneous penstock accessories like piezometric connections, flanged
connections, filling connections, drainage connections.

Detailed description and design procedure of these items are available in IS:11639 (Part 3),
IS:11639 (Part 1) and IS:2825.

11.4 Economical Diameter of Penstock

The economic diameter of penstock is the diameter for which the annual cost, which includes
the cost of power lost due to friction and charges for amortization of construction cost,
maintenance, operation, etc. is minimum. The economic diameter is calculated by evaluating
the annual power loss and annuated cost of penstock and equating first derivative with respect
to D i.e. the penstock diameter in metres to zero. On this basis the economic diameter of an
underground steel lined penstock of which the gap between steel ferrules and rock has been
backfilled with concrete can be determined by the following formula:


( )
,
1 121
6 . 0 39 . 1
10 36 . 2
2 3 6
3 / 22
p
ej
i C H
C C
c pt e n Q
D
a
s
c e
p
(

+
+ +

=
o


Where,
D = diameter of penstock in metres,
Q = weighted discharge through penstock in m
3
/sec,
n = Mannings Rugosity coefficient of penstock,
e = Overall efficiency of plant,
pt = annual load factor,
C
p
= cost of 1 kWh of energy in rupees,
C
e
= unit cost of excavation in rupees / m
3
,
C
c
= unit cost of backfilled concrete in rupees / m
3
,
C
s
= Cost of steel in rupees / kg,
H = head on penstock including, water hammer in m,
I = percentage by which steel in penstock is over weight due to provision of
stiffeners, corrosion allowance etc.,
o
a
= allowable tensile stress in seel in kg/cm
2
,
e
j
= joint efficiency of penstock, and
p = ratio of annual fixed operation and maintenance charges to construction cost
of penstock

(Note: The derivation of the above formulae is available in Appendix A of IS:11625)

Determination of economical diameter by the above criteria at the design stage is too difficult
because of the uncertainty of the cost and quantities of various items, sale cost of energy, load
factor etc. As such it would be enough to determine the economical diameter using empirical
formulae. A few empirical formulae are given below:

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 104
(i) GS Sarkarias formula (1958)

, 62 . 0
65 . 0
43 . 0
H
P
D=
Where,
D = diameter of penstock in metres,
P = rated metric horse power of turbine and
H = rated head on turbine in metres
Or D = 3.55
4 / 1
2
2
(

gH
Q

Where
Q = rated discharge in penstock in cumecs

(ii) PJ Biers formula (USBR 1949)

, 2 125 . 0 gH V =

where, V = permissible velocity in penstock in m/sec.

(iii) PJ Biers formula (USBR 1958)

( )
466 . 0
/ 176 . 0 H P D =

(iv) G Isakassons formula

D = Q
0.40
for steel lined penstocks at depths from 30 to 80 metres

(v) F. Fahbushs formula (Water Power Feb. 1987)

D
C
= 0.62 Q
0.48

D
S
= 1.12 H
-0.12
Q
-.45
,

Where,
D
C
= diameter of concrete lined conduits in metres
D
s
= diameter of steel lined conduits in metres

11.5 Hydraulic Design of Penstock

The hydraulic design of penstocks covers hydraulic design of penstock intake, hydraulic
losses in penstock, pressure rise or pressure drop due to turbine operations, etc.

11.5.1 Hydraulic design of penstock intake

The hydraulic design of the various components of the penstock intake is similar to that
already described in paras 7.4 and 7.5. IS:9761, IS:4880 and IS:11625 can also be referred in
this regard.

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 105
11.5.2 Hydraulic losses in penstock

The hydraulic losses in the penstock comprise the following:

(a) Head loss at trash rack,
(b) Head loss at entrance,
(c) Friction losses,
(d) Other losses at the bends, bifurcations, transitions, valves etc.

11.5.2.1 Head loss at trash rack

It may be determined as already given in para 8.5.3.4 (b)

11.5.2.2 Head loss at entrance

It may be determined as already given in para 8.5.3.4 I

11.5.2.3 Friction losses

Friction losses may be determined by Mannings formula:

,
3 / 4
2 2
R
L n V
h
f
=
where,
h
f
= friction head loss in metres,
V = velocity through the penstock in metres / sec.,
L = Length of penstock in metres,
R = hydraulic radius
|
|
.
|

\
|
perimeter wetted
Area
in metre,
n = Rugosity coefficient

11.5.2.4 Bend loss

The bend loss excluding friction loss for a circular conduit depends upon the shape of bends,
deflection angle and ratio of radius of bend to the diameter of the conduit. The bend loss may
be calculated from the following formula:

,
2
2
g
V
k h
b b
=
where,
h
b
= head loss due to bend in metres,
k
b
= bend loss coefficient, which can be obtained from Fig. 58
V = velocity in the pipe in metres/ sec.

11.5.2.5 Loss due to contraction

For gradual contractions, loss of head can be computed by the following formula:

,
2 2
2
1
2
2
(

=
g
V
g
V
k h
c c

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 106
where,
h
c
= head loss due to contraction in metres,
v
2
= velocity in m/sec. at the contracted section,
v
1
= velocity in m/sec. at the initial section, and
k
c
= contraction loss coefficient which will vary from 0.1 for a flare angle
of 10
o
to 0.5 for a right angle contraction. In between, the value of k
c

may be assumed to vary linearly

11.5.2.6 Loss due to expansion

Expansion transitions should normally be avoided in penstocks. In case they are essential, the
flare angle should not be more than 10
o
and in that case the head loss can be computed from
the following formula:

,
2 2
2
1
2
2
(

=
g
V
g
V
k h
e e

where,
h
e
= head loss due to expansion in metres,
v
1
= velocity in m/sec. at the initial section, and
v
2
= velocity in m/sec. at the expanded section,
k
e
= 0.2

11.5.2.7 Loss in valves

Either butterfly or spherical valves are provided in the penstocks. These valves remain either
in fully closed or fully open position. Under fully open position, the head loss in spherical
valve in negligible. Head loss in fully open butterfly valve can be determined from the
following formula:


g
V
k h
v v
2
2
=
where,
h
v
= head loss due to valve in metres,
V = velocity in m/sec. corresponding gross area of valve, and
k
v
= valve loss coefficient to be determined from Fig. 59

11.5.2.8 Losses in penstock branches and wyes

Head losses in branched connections are given by the following formula:


g
v
k h
y y
2
2
=
where,
h
y
= head loss at junction in metres,
v = velocity before Y-junction in m/sec, and
k
y
= resistance coefficient as given in Table 15.

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 107
Table 15: Head Loss in Branched Connections (Divided Flow)


Head loss at branching (h
y
) =
g
y
v
K
2
2

Where,
K
y
is resistance coefficient, and
q, v, D and q
b
, v
b
, D
b
are discharge average velocity and diameter of original and
branch pipes resistively.

Angle or
Divergence
| in
Degrees

3 . 0 /
1 . 0
=
=
q q
b
b
D r Edged
Rounded Sharp


3 . 0 /
1 . 0
=
=
q q
b
b
D r Edged
Rounded Sharp


3 . 0 /
1 . 0
=
=
q q
b
b
D r Edged
Rounded Sharp

(1) (2) (3) (4) (5) (6) (7)
90

=
=
=
85 . 0
3 . 0
y
K
b
D
b
D
u
u

=
=
=
76 . 0
3 . 0
y
K
b
D
b
D
u
u

=
=
=
87 . 0
5 . 0
y
K
b
D
b
D
u
u

=
=
=
74 . 0
5 . 0
y
K
b
D
b
D
u
u

=
=
=
00 . 1
7 . 0
y
K
b
D
b
D
u
u

=
=
=
80 . 0
7 . 0
y
K
b
D
b
D
u
u
60

=
=
=
7 . 0
3 . 0
y
K
b
D
b
D
u
u

=
=
=
59 . 0
8 . 0
61 . 0
y
K
b
D
b
D
u
u

=
=
=
59 . 0
5 . 0
y
K
b
D
b
D
u
u

=
=
=
54 . 0
8 . 0
79 . 0
y
K
b
D
b
D
u
u

=
=
=
57 . 0
7 . 0
y
K
b
D
b
D
u
u

=
=
=
52 . 0
7 . 0
y
K
b
D
b
D
u
u
45

=
=
=
43 . 0
9 . 0
58 . 0
y
K
b
D
b
D
u
u

=
=
=
35 . 0
9 . 0
58 . 0
y
K
b
D
b
D
u
u

=
=
=
42 . 0
5 . 0
y
K
b
D
b
D
u
u

=
=
=
32 . 0
9 . 0
75 . 0
y
K
b
D
b
D
u
u

=
=
=
34 . 0
7 . 0
y
K
b
D
b
D
u
u

=
=
=
3 . 0
7 . 0
y
K
b
D
b
D
u
u

(Source IS: 2951 (Part II) 1965(Reaffirmed 2003))

Note: These values are based on the experiments conducted at the Hydraulic Laboratory of
the Technical University of Munich, Germany, for most efficient case.

11.5.2.9 Pressure rise and pressure drop

Pressure rise & pressure drop in the penstock due to turbine operation should be enquired
from the turbine manufacturer and should be taken care of in the design of penstock ferrules
and the anchor blocks.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 108


Fig. 58: Loss Coefficients for Pipe Bends of Smooth Interior
(Source IS: 2951 (Part II) 1965 (Reaffirmed 2003))
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 109

Fig. 59: Valve Loss Coefficient for Butterfly Valves
(Source IS: 2951 (Part II) 1965(Reaffirmed 2003))

11.6 Structural Design of Surface Penstocks

Surface penstocks are laid either along the natural terrain above ground or in open tunnels.
These are provided with anchors at all bends and at intermediate points where the distance
between any two bends requiring anchors exceeds 150 metres or so. Expansion joints are
required to be provided in all surface penstocks just at the downstream side of the anchor
blocks in order to absorb contraction or expansion of the penstock due to temperature
changes. The expansion joints can be designed as per IS:11639 (Part 3). For design of anchor
blocks IS: 5330 may be referred to. Saddle supports are provided in between the anchor
blocks at such an interval as not to produce excessive bending stresses in the penstock shell.
The saddle supports are generally spaced at 5 to 6 m centre to centre. The saddle supports are
designed for the weight of the penstock with or without inside water, to resist an axial friction
force caused by expansion and contraction of the penstock due o temperature changes and
seismic forces. Friction coefficient between the penstock and the saddle surface may be taken
as given in Table 16.

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 110
Table 16: Friction Coefficients for Different Surfaces

S. No. Type of Surface Friction Coefficient
1. Steel on concrete 0.60
2. Steel on concrete with asphalt roofing paper in between 0.50
3. Steel on steel (rusty) 0.50
4. Steel on steel (greased) 0.25
5. Steel on steel with two layers of graphite service sheets in
between
0.15
6. Rocker support 0.15
7. Roller support 0.10

The penstock is generally supported on the saddles at a supporting angle of 120
o
. The top of
the concrete saddle support is lined with a curved steel plate, the curve of which matches with
the outer surface of the penstock. This curved plate has serrations on its surface with grease
nipples at their ends for periodical greasing of the steel plate to reduce friction between the
penstock and the saddle and to resist rusting. The general details of the concrete saddle are
shown in Fig. 60.

The structural design of surface penstocks involving determination of thicknesses of the
ferrules at various locations can be done with the help of IS:11639 (Part I).

11.7 Structural Design of Buried Penstocks

The structural design of buried/ embedded steel penstocks can be done in accordance with
IS:11639 (Part II).

12.0 POWER HOUSE

The functions of the power house are to support and house the generating units and their
accessories as well as the water passages with the purpose of (i) good performance of the
plant, (ii) cost saving and (iii) easy inspection and maintenance. In the initial stage, the layout
and dimensions of the power house are carried out on the basis of data of the existing power
houses or as per IS:12800 Part I&III. In the final design stage, the power house should be
planned and dimensioned based on the data of the supplier of the electro-mechanical
equipment.

12.1 Location of Power House

The power houses related to small hydro are normally surface power houses. In case of run
off the river schemes, the power house is generally located on some flat terrace near the river.
The power house building should be located well beyond the hill toe so that while excavating
the power house pit, the hill mass may not get disturbed. The approach level of the power
house should be atleast one metre above the design flood level in the river. As such it would
be ideal if level of the terrace happens to be just above the HFL. In the case of canal based
scheme, the power house is normally located on a byepass channel. The actual location of a
canal based power house should be so fixed that dewatering effort during power house pit
excavation even when the canal is running at FSL is manageable and within economic limit.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 111


Fig. 60: General Details of CC Saddle Block

12.2 Dimensioning of Power House

The dimensions of the power house in plan are determined by the dimensions of generating
equipment including governor. In the case of power houses with very low heads, the
dimensions of the of the spiral case and draft tube govern the size of power house. The power
house normally comprises unit bays, service bay and the control block. For a power house
having 2 to 3 units, the width of the service is generally kept equal to one unit bay width. In
case of a power house with very small capacity units, the unit can be planned to be
overhauled outside the powerhouse building and as such there can be no service bay at all.
The centre to centre spacing of the unit bays is so determined that the clearance between the
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 112
turbine & generator including governor and the walls is enough for the erection and
disassembly of the units. It is generally 1.5 to 2 metres. The passage way for operators should
be 1 to 1.5 m. The determination of the centre line of the runner i.e. setting of turbine is very
important for the power house design. For reaction turbines, the centre line of runner is
determined by the parameters of the turbine with respect to minimum tail water level just
downstream of the powerhouse. For this suction head which is a function of specific speed of
turbine, barometric pressure at the location of the power house and prevailing temperature
can be determined in accordance with the formulae and curves given in IS:12800 Part I & III.
The elevation of the entry into the power house is fixed taking into account the highest flood
level in the tailrace. The entry level should be atleast 1 m above the high flood level. In case
of Pelton turbine, the runner is set at atleast 2 to 3 metres above the highest tail water level.
The height of the power house is determined by the size of the largest piece of equipment to
be lifted above the machine hall / service bay floor providing the necessary clearance
required by the crane operating hook to lift equipment by attachement of the sling, the height
of the EOT/HOT crane itself above the crane girder and a clearance of about 150 mm of the
crane from the bottom of the roof members. The width and length of the power house are
needed to be checked for adequacy considering the extreme positions of the lifting hooks of
the crane.

12.3 Canal Fall based Power House

Canal fall based power houses can be of the following two categories

(i) Power house located in the main canal
(ii) Power house located adjacent to main canal in a separate bypass channel

(i) Power house located in the main canal This category is applicable when the
construction of the power house is taken alongwith the construction of the fall
structure of the canal. The power station is planned adjacent to the fall structure in the
canal. With this arrangement the power house is constructed adjoining the fall as an
integral structure. The canal flow is diverted into the power house by widening and
deepening the canal. The widening and deepening is achieved by suitable splays at the
sides and deepening with gentle slopes of the order of 1(V) : 4 (H) or flatter. The
intake and draft tubes are kept at suitable levels on the basis water cushion
requirements for the intake and the cavitation requirements as advised by the turbine
manufacturer. Gates are normally provided at the intake and at the downstream ends
of draft tubes. Trash racks are provided at the upstream end of intake in order to
eliminate the possibility of passing the floating debris through the turbine. The gates
and trash racks are supported by piers and abutments at the sides of the turbines which
are suitably extended for this very purpose. The service bay is provided at one end of
the power house at a level above the FSL of the canal at the downstream side of the
powerhouse. Typical plan and cross-section of the powerhouse is shown in Fig. 61.

(ii) Power house located in bypass channel In this case while the fall remains in the
main canal, the power house is constructed across a bypass channel which takes off
just upstream of the fall structure and is taken parallel to the main canal and then joins
the canal at the downstream of the fall. Typical layout of such scheme is shown in
Fig. 62.

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 113


Fig. 61: Typical Layout Plan of Power House on Existing Canal

In both of the above options, automatic gates are required to be provided in the fall structure
so that water can pass through them during instantaneous closure of turbines. The gates
operate with a system of floats and as soon as the water rises behind the gates generally by
about 150 mm, the gates automatically come into operation and release discharge into the
main canal. Similarly, when the turbines start working and the water upstream of gates begins
to fall, the gates corresponding begin to close.



Fig. 62: Typical Layout Plan of Power House on Existing Canal

12.4 Design of Power House

The substructure and the super structure of the power house are designed for the following
loads
(a) Dead load
(b) Live load
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 114
(c) Wind load
(d) Earthquake forces
(e) Crane load including transverse & longitudinal normal and striking crane surges
as per IS: 875 (Part III)
(f) Penstock thrust corresponding maximum water hammer
(g) Weight of water in substructure
(h) Uplift pressure
(i) Equipment loads
(j) Upstream and downstream earth and water pressures

The various load and load combinations for design are given in IS:4247 (Part I to III).
The design of a surface power house involves following steps:

(i) Preparation of general layout drawings
(ii) Stability analysis of unit bays and service bay
(iii) Design of substructure
(iv) Design of superstructure

12.4.1 Preparation of general layout drawings

General layout drawings of the power house are prepared mainly on the basis of the
requirements of and the data of electro-mechanical equipment supplied by the machine
supplier. Firstly the level of the centre line of the runner should be fixed on the basis of the
suction head required by the machine manufacturer and the minimum water level of the
tailrace which is obtained by developing the gauge discharge curve just at the downstream of
the power house. In case of a horizontal machine, there is normally one floor of the machine
hall, where the turbines and generators are installed. In case of vertical machine, there may be
two to three floors depending upon the requirement of auxiliary equipment. Each of floor
should have a minimum head room of 4.0 metres. The level of the service bay is fixed atleast
1.0 metre above the high flood level. The service bay can be located either on the left or right
side of the machine hall on the basis of the location of the approach road as all the power
house equipment is first unloaded and erected in the service bay. Normally gates are required
to close the draft tube outlet openings for segregating the machines from downstream water at
the time of erection, maintenance and repairs. These gates are required to be operated from
the draft tube deck of the machine hall by either a gantry crane, monorail or fixed rope drum
hoists for each gates. The level of this deck is also normally kept atleast 1.0 metre above the
maximum downstream water level. The control block can either be kept on the upstream or
downstream side of the machine hall or in a separate building adjoining the power house. The
main unit transformers can either be kept on the draft tube or at a location upstream of the
power house or in the switchyard itself. A drainage and dewatering of sump is normally
required to collect all the drainage of the power house & dewatering the draft tubes for
maintenance and repairs. The sump can be located either at the end of the machine hall, or
somewhere in the middle, in the erection bay or below the draft tube deck. The portion of the
power house below the service bay floor is termed as substructure and that above the erection
bay which houses the overhead gantry crane required for erection and maintenance of
machines is known as superstructure. The height of the superstructure is fixed on the basis of
the clearances required to lift and carry the biggest size machine part through out the power
house. The upstream and downstream columns, that support the gantry crane and the roof
above it, are known as gantry columns. The locations of these columns in plan is fixed on the
following basis:
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 115

(i) The upstream and downstream gantry column should be just in front of each other so
that the roof trusses could be installed on their top.
(ii) They should be free from the locations of penstocks on the upstream side and draft
tube openings on the downstream side.
(iii) As per as possible the gantry column should be in the line of the counter forts to
support the substructure walls of the power house on the upstream side and the draft
tube gate piers on the downstream side.

The roof of the power house normally comprises steel trusses covered with G.C. sheeting.
Various layouts of the power houses having Francis, Pelton, Bulb and Tubular turbines are
shown in Figs. 63 to 66. Sometimes in case of very low head power houses such as canal
based power houses both intake and draft tube gates are eliminated by keeping the turbine
runner above upstream water level. In such cases, the turbine in run by creating siphoning
action with the help of a suction pump. An arrangement of such a power house is shown in
Fig. 67. Normally transverse contraction / expansion joints are provided between service bay
and the machine hall as the structures accommodating the machines and service bay are quite
different. In such case twin gantry columns are provided at the joint. In some cases, when the
length of the machine hall is too long i.e. more than 35 metres or so, additional joints should
be provided in the machine hall also. In big power houses, normally with vertical machines,
the transverse joints with twin columns are provided between each machine or at the junction
of every two machines. Normally contraction joints are provided in the substructure and
expansion joints in the superstructure. These joints are required to be water proofed with the
help of double PVC water stops upto atleast 1.0 metre above the ground level and single
water stop upto roof level.

12.4.2 Stability analysis of unit bays and service bay

The stability of the unit bays between transverse joints and the erection bay should be
checked for the worst combination of the loads and forces mentioned in clause 12.4. When on
one hand dead loads of the structure and those of the permanently embedded machine parts
will always be there, the other loads and forces may or may not be there. The structures
should be checked for the following:

(i) Bearing pressures Bearing pressures should be within allowable limits both with or
without uplift.
(ii) Shear Friction Factor Shear friction factor Q between the structure and the
foundation strata should be determined from the following equation:

,
.


+
=
H
V f CA
Q
where,
C = cohesion or unit shearing strength in kg/cm
2
applied on the area
under compression,
A = Area of base under compression in cm
2
,
f = friction coefficient or tan |, where |is the angle of internal friction of
the foundation material in submerged condition,
V = algebraic sum of normal forces and uplift in kg., and
H = algebraic sum of the forces parallel to the plane of sliding in kg.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 116

The value of shear friction factor should not be less than the following;

Condition Completed Construction Stage
For normal loading condition 3.5 2.5
For extra-ordinary loading conditions 2.0 1.1

(iii) Floatation Factor Floatation of the structure may take place on account of uplift
forces caused by water. The factor of safety against floatation F is given by the
following equation:

,
U
V
F

=
where,
V = algebraic sum all vertical loads except uplift, and
U = Uplift

The value F should be atleast 1.1 in construction or extraordinary loading condition
and 1.25 in completed condition.

12.4.3 Design of substructure

The primary function of the substructure is to distribute the superimposed loads to the
foundation strata in such a way that the foundation reactions are within permissible limits.
The shape of the substructure is quite complex and the acting loads and forces are also not
simple. As such an exact analysis of the structure is not possible. The structure is thus divided
into simpler sub-divisions which are supposed to have similar structural ehavior. For
simplification, the analysis is made simpler by splitting it in two parts one in transverse
direction (along the direction fo flow), and the other in the longitudinal direction
(perpendicular to the direction fo flow).

12.4.3.1 Analysis of substructure in transverse direction

In transverse direction, the superimposed loads vary considerably from one point to the other.
Besides vertical loads, there are considerable horizontal forces like penstock thrust, wind,
earth and water pressure etc. The effect these loads in to vary the foundation reaction from
upstream to downstream. In transverse direction, the structure can be designed as a
continuous footing which is supposed to be an endless contilever. The moment at any point of
the raft being the algebraic sum of the moments of the loads on the top of the substructure
and that of the soil reaction from the bottom. Similarly the shear force at any section can be
determined by the algebraic sum of all the loads from the top and reaction from bottom on
one side of the section.

12.4.3.2 Analysis of substructure in longitudinal direction

The analysis in longitudinal direction is required in order to check and provide for the
structural strength of draft tube substructure in order that it may support the equipment and
other superimposed loads in-spite of various cavities. The various sections in longitudinal
direction can be designed as box sections or Usections for the loads from top, sides and
reactions from bottom.
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 117
12.4.4 Design of superstructure

The superstructure of a power house normally consists of a frame work of columns and
longitudinal beams which support the gantry crane, panel walls and the roof, which normally
consists of steel trusses covered by GC sheeting. The two ends of the trusses are generally
hinged at the top of the upstream and downstream gantry columns. The transverse forces are
usually assumed to be resisted by individual portal frames comprising upstream and
downstream gantry columns and the roof truss. In longitudinal direction, the forces are
resisted by multi-storeyed frame work consisting of columns and beams on each side of the
building. The centre to centre spacing of the longitudinal beams is kept from 5 to 6 metres
and one longitudinal beam is necessarily provided at the top of the columns. Besides the
upstream and downstream gantry columns, there may be, in some cases, intermediate
columns and beams in the lower portion to support lower floors.

13.0 TAILRACE

After passing through the turbines, the water is discharged into the stream through a short
channel called tailrace. In case of reaction turbines, the tailrace should be designed to ensure
minimum tail water level required to maintain safe suction head for smooth operation of the
turbine. In case of impulse turbine, maximum water level in the tailrace should not rise to a
limit that it interferes with the turbine runner. For power houses running on relatively high
discharges, common tailrace is provided for all the units as shown in Fig. 60 but for
installations running on relatively low discharges and high head, normally separate tailrace
channels are provided for individual machines. Normally and specially in vertical machines
the bottom of the draft tube exit end happens to be much below the river bed level, where the
power house discharge is required to be dropped. In such a case a reverse slope not steeper
than 4H to IV is provided in the upstream reaches of the tailrace, though there are examples
where this reverse slope is of the order of 0.5 H to 1 V.


AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 118


Fig. 63: Typical Transverse Section of Power House with Horizontal Francis Turbine
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 119




Fig. 64: Typical Transverse Section of Power House with Horizontal Pelton Turbine

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 120


Fig. 65: Typical Transverse Section of Power House with Tubular Turbine






AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 121




Fig. 66: Typical Transverse Section of Power House with Bulb Turbine








AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 122



Fig. 67: Typical Transverse Section of Power House with Syphon Kaplan Turbine
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 123


Fig. 68: Typical tailrace for high Discharge Installation

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 124
ANNEXURE-I

ROCK TUNNELLING QUALITY INDEX, Q
(Ref. The Development of Rock Engineering by Evert Hoek)

On the basis of an evaluation of a large number of case histories of underground
excavations, Barton of the Norwegian Geotechnical Institute proposed a Tunnelling Quality
Index (Q) for the determination of rock mass characteristics and tunnel support requirements.
The numerical value of index Q varies on a logarithmic scale from 0.001 to a maximum of
1,000 and is defined by:


SFR
J
J
J
J
RQD
Q
w
a
r
n
= (A1)
where,
RQD is the Rock Quality Designation
J
n
is the joint set number
J
r
is the joint roughness number
J
a
is the joint alteration number
J
w
is the joint water reduction factor
SRF is the stress reduction factor

In explaining the meaning of the parameters used to determine the value of Q, Barton
offer the following comments:

The first quotient (RQD/J
n
), representing the structure of the rock mass, is a crude
measure of the block or particle size, with the two extreme values (100/05 and 10/20)
differing by a factor of 400. If the quotient is interpreted in units of centimeters, the extreme
particle sizes of 200 to 0.5 cm are seen to be crude but fairly realistic approximations.
Probably the largest blocks should be several time this size and the smallest fragments less
than half the size. (Clay particles are of course excluded).

The second quotient (J
r
/J
a
) represents the roughness and frictional characteristics of
the joint walls or filling materials. This quotient is weighted in favour of rough, unaltered
joints in direct contact. It is to be expected that such surfaces will be close to peak strength,
that they will dilate strongly when sheared, and they will therefore be especially favourable to
tunnel stability.

When rock joints have thin clay mineral coatings and fillings, the strength is reduced
significantly. Nevertheless, rock wall contact after small shear displacements have occurred
may be a very important factor for preserving the excavation from ultimate failure.

Where no rock wall contact exists, the conditions are extremely unfavourable to
tunnel stability. The friction angles (given in Table A2) are a little below the residual
strength values for most clays, and are possibly down-graded by the fact that these clay bands
or fillings may tend to consolidate during shear, at least if normal consolidation or if
softening and swelling has occurred. The swelling pressure of montmorillonite may also be a
factor here.

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 125
The third quotient (J
w
/SRF) consists of two stress parameters. SRF is a measure of: 1)
lossening load in the case of an excavation through shear zones and clay bearing rock, (2)
rock stress in competent rock, and (3) squeezing loads in plastic incompetent rocks. It can be
regarded as a total stress parameter. The parameter J
w
is a measure of water pressure, which
has an adverse effect on the shear strength of joints due to a reduction in effective normal
stress. Water may, in addition, cause softening and possible out-wash in the case of clay-
filled joints. It has proved impossible to combine these two parameters in terms of inter-block
effective stress, because paradoxically a high value of effective normal stress may sometimes
signify less stable conditions than a low value, despite the higher shear strength. The quotient
(J
w
/SRF) is a complicated empirical factor describing the active stress.

It appears that the rock tunneling quality Q can now be considered to be a function of
only three parameters which are crude measures of:

1. Block size (RQD/Jn)
2. Inter-block shear strength (Jr/Ja)
3. Active stress (Jw/SRF)

Undoubtedly, there are several other parameters which could be added to improve the
accuracy of the classification system. One of these would be the joint orientation. Although
many case records include the necessary information on structural orientation in relation to
excavation axis, it was not found to be the important general parameter that might be
expected. Part of the reason for this may be that the orientations of many types of excavations
can be and normally are, adjusted to avoid the maximum effect of unfavourably oriented
major joints. However, this choice is not available in the case of tunnels, and more than half
the case records were in this category. The parameters Jn, Jr and Ja appear to play a more
important role than orientation, because the number of joint sets determines the degree of
freedom for block movement (if any), and the frictional dilatational characteristics can vary
more than the down-dip gravitational components of unfavourably oriented joints. If joint
orientations had been included the classification would have been less general, and its
essential simplicity lost.

Table A2 (After Barton 1974) gives the classification of individual parameters used to
obtain the Tunnelling Quality Index Q for a rock mass.

In relating the value of the index Q to the stability and support requirements of
underground excavations, Barton (1974) defined an additional parameter which they called
the Equivalent Dimension, De, of the excavation. This dimension is obtained by dividing the
span, diameter or wall height of the excavation by a quantity called the Excavation Support
Ratio, ESR. Hence:


( )
ESR ratio support Excavation
m height or diameter span, Excavation
D
e
= (A2)

The value of ESR is related to the intended use of the excavation and to the degree of
security which is demanded of the support system installed to maintain the stability of the
excavation. Barton (1974) suggest these values as per Table A1:



AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 126
Table A1: ESR Values for Various Excavation Category

Excavation Category ESR
A. Temporary mine openings 3-5
B. Permanent mine openings, water tunnels for hydro power (excluding high
pressure penstocks), pilot tunnels, drifts and headings for large excavations
1.6
C. Storage rooms, water treatment plants, minor road and railway tunnels, surge
chambers, access tunnels
1.3
D. Power stations, major road and railway tunnels, civil defence chambers,
portal intersections.
1.0
E. Underground nuclear power stations, railway stations, sports and public
facilities, factories.
0.8

Table A2: Classification of individual parameters used in the Tunnelling Quality Index Q

DESCRIPTION VALUE NOTES
1. Rock Quality Designation RQD
A. Very Poor 0-25 1. Where RQD is
reported or measured as
s 10 (including 0), a
nominal value of 10 is
used to evaluate Q.

2. RQD intervals of 5,
i.e. 100, 95, 90 etc. are
sufficiently accurate.
B. Poor 25-50
C. Fair 50-75
D. Good 75-90
E. Excellent 90-100
2. Joint Set Number J
n

A. Massive, no or few joints 0.5-1.0
B. One joint set 2
C. One joint set plus random 3
D. Two joint sets 4
E. Two joint sets plus random 6
F. Three joint sets 9 1. For intersections use
(3.0 x J
n
)
2. For portals use (2.0 x
J
n
)
G. Three joints sets plus
random
12
H. Four or more joint sets,
random, heavily jointed,
sugar cube, etc.
15
J. Crushed rock, earthlike 20
3. Joint Roughness Number J
r
1. Add 1.0 if the mean
spacing of the relevant
joint set is greater than 3
m
2. J
r
= 0.5 can be used
for planar, slickensided
joints having lineations,
provided that the
lineations are oriented
for minimum strength.
a. Rock wall contact
b. Rock wall contact
before 10 cm shear

A. Discontinuous joints 4
B. Rough and irregular,
undulating
3
C. Smooth undulating 2
D. Slickensided undulating 1.5
E. Rough or irregular, planar 1.5
F. Smooth, planar 1.0
G. Slickensided, planar 0.5
c. No rock wall contact
when sheared

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 127
DESCRIPTION VALUE NOTES
H. Zones containing clay
minerals thick enough to
prevent rock wall contact
1.0 (nominal)
J. Sandy, gravely or crushed
zone thick enough to
prevent rock wall contact
1.0 (nominal)
4. Joint Alternation Number J
a
|r degrees
(approx.)
1. Values of |r, the
residual friction angle,
are intended as an
approximate guide to the
mineralogical properties
of the alteration
products, if present.
a. Rock wall contact
A. Tightly healed, hard, non-
softening, impermeable
filling
0.75
B. Unaltered joint walls,
surface staining only
1.0 25-35
C. Slightly altered joints walls,
non-softening mineral
coatings, sandy particles,
clay-free disintegrated rock,
etc.
2.0 25-30
D. Silty, or sandy-clay
coatings, small clay-friction
(non-softening)
3.0 20-25
E. Softening or low-friction
clay mineral coatings, i.e.
kaolinite, mica.Also
chlorite, talc, gypsum and
graphite etc., and small
quantities of swelling clays.
(Discontinuous coatings, 1-
2 mm or less)
4.0 8-16
b. Rock wall contact
before 10 cm shear

F. Sandy particles, clay-free,
disintegrating rock etc.
4.0 25-30
G. Strongly over-consolidated,
non-softening clay mineral
fillings (continuous < 5 mm
thick)
6.0 16-24
H. Medium or low over-
consolidation, non-softening
clay mineral fillings
(continuous < 5 mm thick)
8.0 12-16
J. Swelling clay fillings, i.e.
montmorillonite,
(continuous < 5 mm thick).
Values of J
a
depend on
percent of swelling clay-size
particles, and access to
8.0-12.0 6-12
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 128
DESCRIPTION VALUE NOTES
water.
c. No rock wall contact
when sheared

K. Zones or bands of
disintegrated or crushed
6.0
L. Rock and clay (see G, H and
J for clay) M condition
8.0
M
.
Rock & clay 8.0-12.0 6-24
N. Zones or bands of silty or
sandy-clay, small clay
friction, non-softening
5.0
O. Thick continuous zones or
bands of clay
10.0-13.0
P
&
R.
See G, H and J for clay
conditions
6.0-24.0
5. Joint Water Reduction J
w
Approx.
water
pressure
(kgf/cm
2
)

A. Dry excavation or minor
inflow i.e. < 5 l/m locally
1.0 < 1.0 1. Factors C to F are
crude estimates;
increase J
w
if
drainage installed.

2. Special problems
caused by ice
formation are not
considered
B. Medium inflow or pressure,
occasional outwash of joint
fillings
0.66 1.0-2.5
C. Large inflow or high
pressure in competent rock
with unfilled joints
0.5 2.5-10.0
D. Large inflow or high
pressure
0.33 2.5-10.0
E. Exceptionally high inflow
or pressure at blasting,
decaying with time
0.2-0.1 >10
F. Exceptionally high inflow
or pressure
0.1-0.05 >10
6. Stress Reduction Factor SRF
a. Weekness zones
intersecting excavation
, which may cause
lossening of rock mass
when tunnel is
excavated

A. Multiple occurrences of
weakness zones containing
clay or chemically
disintegrated rock, very
loose surrounding rock any
10.0 1. Reduce these values
of SRF by 25-50%
but only if the
relevant shear zones
influence do not
AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 129
DESCRIPTION VALUE NOTES
depth intersect the
excavation

2. For strongly
anisotropic virgin
stress field (if
measured): when
5so
1
/o
3
s 10, reduce
o
c
to 0.8 o
c
and o
t
to
0.6 o
c
and 0.6 o
t
,
where
o
c
= unconfined
compressive
strength, and
o
t
= tensile strength
(point load) and o
1

and
o
3
are the major and
minor principal
stresses.

3. Few case records
available where
depth of crown
below surface is less
than span width.
Suggest SRF
increase from 2.5 to
5 for such cases (see
H).
B. Single weakness zones
containing clay, or
chemically distegrated rock
(excavation depth <50 m)
5.0
C. Single weakness zones
containing clay, or
chemically distegrated rock
(excavation depth >50 m)
2.5
D. Multiple shear zones in
competent rock (clay free),
loose surrounding rock (any
depth)
7.5
E. Single shear zone in
competent rock (clay free)
(depth of excavation < 50
m)
5.0
F. Single shear zone in
competent rock (clay free)
(depth of excavation > 50
m)
2.5
G. Loose open joints, heavily
jointed or sugar cube, (any
depth)
5.0
b. Competent rock, rock
stress problems
SRF
o
c
/o
1
o
t
o
1

H. Low stress, near surface >200 >13
J. Medium stress 200-10 13-0.66 1.0
K. High stress, very tight
structure (usually
favourable to stability, may
be unfavourable to wall
stability)
10-5 0.66-0.33 0.5-2
L. Mild rockburst (massive
rock)
5-2.5 0.33-0.16 5-10
M
.
Heavy rockbrust (massive
rock)
<2.5 <0.16 10-20
c. Squeezing rock, plastic
flow of incompetent
rock under influence of
high rock pressure

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 130
DESCRIPTION VALUE NOTES
N. Mild squeezing rock
pressure
5-10
O. Heavy squeezing rock
pressure
10-20
d. Swelling rock, chemical
swelling activity
depending on presence
of water

P. Mild swelling rock pressure 5-10
R. Heavy swelling rock
pressure
10-15

ADDITIONAL NOTES ON THE USE OF THESE TABLES

When making estimates of the rock mass quality (Q), the following guidelines should be
followed in addition to the notes listed in the tables:

1. When borehole core is unavailable, RQD can be estimated from the number of joints
per unit volume, in which the number of joint per metre for each joint set are added. A
simple relationship can be used to convert this number to RQD for the case of clay
free rock masses: RQD = 115-3.3 J
v
(approx.), where J
v
= total number of joints per
m
3
(0<RQD < 100 for 35 > J
v
> 4.5).
2. The parameter J
n
representing the number of joint sets will often be affected by
foliation, schistosity, slaty cleavage or bedding etc. If strongly developed, these
parallel joints should obviously be counted as a complete joint set. However, if there
are few joints visible, or if only occasional breaks in the core are due to these
features, then it will be more appropriate to count them as random joints when
evaluating J
n
.
3. The parameters J
r
and J
a
(representing shear strength) should be relevant to the
weakest significant joint set or clay filled discontinuity in the given zone. However, if
the joint set or discountinuity with the minimum value of J
r
/ J
a
is favourably oriented
for stability, then a second, less favourably oriented joint set or discontinuity may
sometimes be more significant, and its higher value of J
r
/J
a
should be used when
evaluating Q. The value of J
r
/J
a
should in fact relate to the surface most likely to allow
failure to initiate.
4. When a rock mass contains clay, the factor SRF appropriate to loosening loads should
be evaluated. In such cases the strength of the intact rock is of little interest. However,
when jointing is minimal and clay is completely absent, the strength of the intact rock
may become the weakest link, and the stability will then depend on the ratio rock-
stress/rock-strength. A strongly anisotropic stress field is unfavourable for stability
and is roughly accounted for as in note 2 in the table for stress reduction factor
evaluation.
5. The compressive and tensile strengths (o
c
and o
t
) of the intact rock should be
evaluated in the saturated condition if this is appropriate to the present and future is
situ conditions. A very conservative estimate of he strength should be made for those
rocks that deteriorate when exposed to moist or saturated conditions.

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 131
The equivalent dimension, De, plotted against the value of Q, is used to define a
number of support categories in a chart published in the original paper by Barton (1974). This
chart has recently been updated by Grimstad and Barton (1993) to reflect the increasing use
of steel fibre reinforced shotcrete in underground excavation support. Fig. A is reproduced
from this updated chart.

Loset (1992) suggests that, for rocks with 4 < Q < 30, blasting damage will result in
the creation of new joints with a consequent local reduction in the value of q for the rock
surrounding the excavation. He suggests that this can be accounted for by reducing the RQD
value for the blast damaged zone.

Barton (1980) provide additional empirical equations for the determination of
rockbolt length, maximum unsupported spans and roof support pressures to supplement the
support recommendations published in the original 1974 paper. For selection of the support
measures using the Q-system, the designer should consult the original paper by Barton et.al.
or the book by Hoek and Brown.

Rockbolt length (L) =
ESR
width Excavation
15 . 0 0 . 2 + (A3)

The maximum unsupported span = 2 ESR Q
0.4
(A4)

Based upon analyses of case records, Grimstad and Barton (1993) suggest that the
relationship between the value of Q and the permanent roof support pressure P
roof
is estimated
from:


Jr
Q Jn
P
roof
3
2
3
1

= for less than three joint sets


=
r
J
Q
22 . 0
2

for three or more joint sets (A5)

Rock mass quality (Q
wall
) for computing wall pressure is given by:

Q
wall
= 5.0 Q for Q>10
= 2.3 Q for 0.1 < Q < 10 and
= 1.0 Q for Q < 0.10 (A6)


AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 132


Fig. A1: Estimated Support Categories Based on the Tunneling Quality Index Q
(Source: The Development of Rock Engineering by Evert Hoek)

AHEC-IITR/MNRE/SHP Standards/Civil WorksHydraulic and Structural Design 133
Design Steps of Support Requirements

The various steps involved in arriving at the rock support requirement using Bartons
classification are as given below:

(i) Assess the various rock parameters and their corresponding values using Table A2
and find out the value of rock mass quality Q by equation A1
(ii) Workout the value of equivalent dimension (D
e
) using equation A2.
(iii) Find out roof support pressure using equation A5
(iv) Depending upon the value of Q and D
e
select the suitable support requirements from
Fig. A1.

You might also like