Radiographic Testing
Radiographic Testing
Radiographic Testing
HS&E Section
Job Safety Analysis
Doc. No: PM3-HSE-GEN-PR-F-00!
Re"ision: 0
Date: J#ne $00%
Pa&e: A''en(i) 3
JOB SAFETY ANALYSIS WORKSHEETS
JOB SAFETY ANALYSIS DATE PERMIT NO:
JOB Radiographic Testing (RT)
WORK TEAM RT Tech.
SEQUENCE OF BASIC JOB STEPS POTENTIAL ACCIDENTS OR HAZARDS RECOMMENDED SAFE JOB PROCEDURES
1. Raise the Radiography work permit. Conflict with other activities.
2. Conduct surface preparation. Slip and fall. se certified access or scaffold.
!. "arricade area for activities. #$posure to radiation. %nnouncement via &% system to warn others of
the coming RT activities in the area.
!. 'ilm placement on weld (oint. )andling of radio*
isotopes (+amma*Camera)
"ack in(ury. %void lifting with your ,ack and avoid ,ody
twisting.
-. &erforming the radiographic testing (RT) onsite. .sotope stuck in its wind*out remote. (/etective).
#$posure to radiation.
Stand,y with .sotope recovery #mergency kit and
follow procedures. %dhere to RT shooting
procedures.
0. 'ilm processing 1 interpretation in dark room. Chemical splash. 2ear right &&# for handling chemical complete
with face shield and goggles.
WHAT TO CHECK AND NOT LIMITED TO WITH REFERENCE TO APPENDIX 1 & 2 OF THE JOB SAFETY ANALYSIS SECTION OF MOGP MANUAL
EXPERIENCE YES NO YES NO
)ave you done this (o, ,efore3 4
%re you knowledgea,le with the (o, to ,e
performed3
4
)ave you referred to technical drawing4vendor
procedure4SS&3
4 .s supervision4e$perienced assistance re5uired3 4
PPE YES NO YES NO
)ard hat3 4 2ork vest3 4
Safety +lasses3 4 %pron3 4
Safety shoes3 4 +oggle3 4
#ar plugs3 4 'ace shield3 4
Right type of gloves3 4 Respiratory protection3 4
Safety harness3 4
POTENTIAL HAZARDS YES NO YES NO
Slippery floor3 4 Trapped pressure3 4
Congested area3 4 &ressuri6ed e5uipment4vessel ha6ard3 4
Tripping3 4 'ire4e$plosion ha6ards3 4
7verhead work3 4 #scape route3 4
TML MANAGING OPERATIONS WITH GENERAL PROCEDURES Rev. 0
Talisman Malaysia Limited
HS&E Section
Job Safety Analysis
Doc. No: PM3-HSE-GEN-PR-F-00!
Re"ision: 0
Date: J#ne $00%
Pa&e: A''en(i) 3
2orking at height3 4 Shock4electricity4static3 4
Scaffolding3 4 "reaker rack out3 4
Secure ladder3 4 8alve isolation3 4
)eavy load3 4 +uard rotating e5uipment3 4
)ammer strikes3 4 &ower tools ha6ards3 4
&inch4trap finger9 hand3 4 )igh noise area9 dou,le ear protection3 4
"ack in(ury ha6ard3 4 Spark4hot slag3 4
Swinging o,(ect3 4 "urn (heat4chemical)3 4
'alling o,(ect3 4 :ear radioactive materials4sources3 4
7thers close,y3 4 #nvironmental spill3 4
Sharp o,(ect3 4 )ose connection3 4
#ye in(ury3 4 2indy3 4
+rating4deck opening3 4 /usty3 4
"locked drains3 4
&repared ,y;<......................... << Reviewed ,y; <<<<<<<<<<.. Closed out; =========================
TML MANAGING OPERATIONS WITH GENERAL PROCEDURES Rev. 0