This document is a daily drilling report summarizing operations over the past 24 hours on well Riohacha 04 in Colombia. It details drilling of the 12 1/4" hole section from 5,687 feet to 5,888 feet, with no safety incidents reported. Mud checks and drilling parameters are provided. Repairs were made to the rig pump. The projected plan is to continue drilling the 12 1/4" directional hole section.
This document is a daily drilling report summarizing operations over the past 24 hours on well Riohacha 04 in Colombia. It details drilling of the 12 1/4" hole section from 5,687 feet to 5,888 feet, with no safety incidents reported. Mud checks and drilling parameters are provided. Repairs were made to the rig pump. The projected plan is to continue drilling the 12 1/4" directional hole section.
This document is a daily drilling report summarizing operations over the past 24 hours on well Riohacha 04 in Colombia. It details drilling of the 12 1/4" hole section from 5,687 feet to 5,888 feet, with no safety incidents reported. Mud checks and drilling parameters are provided. Repairs were made to the rig pump. The projected plan is to continue drilling the 12 1/4" directional hole section.
This document is a daily drilling report summarizing operations over the past 24 hours on well Riohacha 04 in Colombia. It details drilling of the 12 1/4" hole section from 5,687 feet to 5,888 feet, with no safety incidents reported. Mud checks and drilling parameters are provided. Repairs were made to the rig pump. The projected plan is to continue drilling the 12 1/4" directional hole section.
Depth Progress: 975 Report Date: 10/18/2012 Business Unit Latin America Country Colombia State/Province La Guajira Surface UWI RCH_004 ChevNo RH_004 Current KB to Ground (ft) 25.50 Current KB to Mud Line (ft) Current KB to Csg Flange (ft) Current KB to Tubing Head (ft) Ground Elevation (ft) 3.94 Water Depth (ft) Well Name Riohacha 04 Lease Guajira Association Field Name Riohacha Primary Wellbore Affected Riohacha 04 ST Directional Type Build-Hold-Turn/Build Wellbore UWI RCH_004 Wellbore ChevNo RCH_004 J ob Category Drill and Complete Primary J ob Type Drill and Complete Actual Start Date 9/19/2012 09:00 Actual End Date HES Incidents Incident Category Employee Category Sub-Category Cause Caused NPT? Safety/Inspections Des Safety Check Inspected By Result Com HES ACTIVITIES Trip Drill DSM Acceptable - Kick drill and evacuation while drilling; good answer of every crew member and a feedback to all people in the master point was done by DSM. HES ACTIVITIES Safety Procedures HES TEAM Acceptable Pre-tours: Second SLT meeting with participation of a representative of each one of the service companies in the location, analyzing issues about people well-being and OE-HES performance improvement. Slip and fall hazard hunt was done and findings were shared in order to reinforce good practices to avoid incidents especially in current rain season. Pre-tour meetings were leaded by CVX and the topics were: eColor IDP to exercise the Shut-in Well Authority during a well kick and, sharing of findings related to slip and fall hazard hunt tour. PTW audit to Superiors works related to 9 5/8 casing inspection. Supervision of HP's hazardous waste delivery to TWS certified company. OE-HES induction to new backhoe operator (Mi Swaco). Daily Operations Evacuation Time Incidents? No Recordable Incident? No Days Since Rec. 241 Days Since Lost Time Incident 241 Rig Time (hr) 24.00 Cum Rig Time (days) 29.63 Rotating Time (hr) 21.50 Head Count 100.0 Personnel Total Hours (hr) 1,176.00 Operations Summary Drilled 12 1/4" hole section from 4,712 ft to 5,025 ft. Rig pump failure repaired. Drilled 12 1/4" hole section from 5,025 ft to 5155 ft. Pit and BOP drill executed Ok. Drilled 12 1/4" hole section from 5155 ft to 5687 ft. Status at Reporting Time Drilling 12-1/4"directional hole section @ 5888 ft Projected Operations Drill 12-1/4" directional hole section according directional plan. Comments Operations 00:00-0600 hrs: Drilled 12-1/4"directional hole section from 5687 ft to 5872 ft. Avg Background Gas 1.00 Avg Connection Gas Avg Drill Gas 6.00 Avg Trip Gas Weather Conditions Wind Dir Wind Spd (knots) Wave Ht (ft) P Bar (mmHg) Heave (ft) Pitch () Roll () Mud Checks Checked By Halliburton Mud/Brine Type Water Based Fluid Density (lb/gal) 10.90 Funnel Viscosity (s/qt) 82 PV Calc (cp) 25 YP Calc (lbf/100ft) 25 Gel 10 sec (lbf/100ft) 8.0 Gel 10 min (lbf/100ft) 22.0 Gel 30 min (lbf/100ft) 30.0 API Filtrate (cc/30min) 5.7 API Filter Cake (1/32") pH 10.0 HTHP Temperature (F) HTHP Filtrate (cc/30min) HTHP Filter Cake (1/32") 1 Sand by Volume (%) 0.20 Electric Stability (V) Low Gravity Solids (%) 2.9 Retort NAF (%) Retort Water (%) Retort Solids (%) Solids (%) High Gravity Solids (%) 8.2 Filtration Sz (m) NAF/Water Ratio Gel 6 Sec (lbf/100ft) Mud Calcium (mg/L) Mud CL (mg/L) Excess Lime (lb/bbl) W PhaseSal (mg/L) MBT (lb/bbl) 20.0 Calcium (mg/L) 60 Chlorides (mg/L) 1,200 Pm (mL/mL) 1.0 Pf (mL/mL) 0.45 Mf (mL/mL) 1.1 Time Log Start Time Dur (hr) Phase Activity Com UE Ref No. UE Time (hr) 00:0 0 7.50 INTCSG1, DRILL DRLRS Drilled 12 1/4" hole section from 4,712 ft to 5,025 ft. 800 GPM, 3,100 PSI, 150 RPM, 3-6K Torque, 8-10K WOB. Pumping weighted vis pill every 400 ft and checking flow before every connection. AFE/WBS Number 20276000E972 AFE Interest (%) 43.00 Total AFE Amount (Cost) 17,302,971 AFE+Sup Amt (Cost) 17,302,971 Daily Field Est Total (Cost) 135,513 Cum To Date (Cost) 7,016,326 Daily Mud Field Est (Cost) 36,732 Cum Mud Cost (Cost) 371,453 Depth Start (MD) (ftKB) 4,712 Depth End (MD) (ftKB) 5,687 Start Depth (TVD) (ftKB) 4,302.7 End Depth (TVD) (ftKB) Target Formation Ballena Limestone Target Depth (MD) (ftKB) 8,549 Time Log Total Hours (hr) 24.00 Problem Time Hours (hr) 1.00 Percent Problem Time (%) 4.17 Cum Prob Time (%) 35.63 At Risk Casing Size Rot Hrs on Csg Last Phase INTCSG1, DRILL Phase % Complete (%) 69.0 Days ahead/rem (days) -0.67 J ob Days Ahead (days) -11.58 Projected Phase End Date 10/30/2012 Projected J ob End Date 11/28/2012 Tan/Int Rpt Fld Est (Cost) Cum Fld Est (Cost) 12,533 991,044 Int 122,980 5,692,692 Tan 0 332,590 Safety Check Summary Type Last Date Next Date BOP Control Function Test 9/23/2012 9/24/2012 Casing Pressure Test 9/23/2012 9/24/2012 Man Down Drill 9/29/2012 9/30/2012 Safety Procedures 10/18/201 2 10/19/201 2 Trip Drill 10/18/201 2 10/19/201 2 BBS/Safety Observations Observation Typ #Rpts Safe Behavior 10 Un-safe Behavior 10 Un-safe Condition 9 Daily Contacts Contact Edward Collins Title Drill Site Manager Phone Office (57) 3173633508 Contact Rodolfo Zambrano Title Drill Site Manager Phone Office (57) 3173633508 Contact Oscar A. Arenas Title Drilling Engineer Phone Office (57) 3173706428 Drilling Mud Volumes Detail Total Volume (bbl) Reserve Mud Volume 90.0 Whole Mud 1,364.0 Hole Volume 808.0 Surface Pit Volume 466.0 Well Fluids Lost Fluid Detail Volume Lost (bbl) Cum Vol Lost (bbl) Fluid Lost to Hole 0.0 300.0 Daily Job Supply Summary Supply Item Des Consumed On Loc Rig/Unit Rig/Unit Contractor Helmerich & Payne Rig/Unit #/ Name H&P 237 Rig/Unit Start Date 9/19/2012 Rig/Unit Release Date Rig/Unit Supervisor Daniel Hurtado Phone Office (57) 3204758957 Last 5 Formations Formation Name Prog Top MD (ftKB) Drill Top MD (ftKB) Castilletes 0.00 0.0 Intra-Castilletes 2,831.00 2,800.0 Upper J imol 4,439.00 4,520.0 Incident Free Operations: 241 days Page 2/3 Report Printed: 10/19/2012 Rpt #: 30, DFS: 29.63 Depth Progress: 975 Report Date: 10/18/2012 Time Log Start Time Dur (hr) Phase Activity Com UE Ref No. UE Time (hr) 07:3 0 1.00 INTCSG1, DRILL UNITRPR Circ W/ 420 GPM, 1000 PSI, 40 RPM reciprocating D.P. while work on mud pumps. #1 pump changed piston. SCR at 5,025 ft Mud Wt 10.9 #1 pump 30 stk 170 psi / 40 stk 230 psi / 50 stk 330 psi #2 pump 30 stk 170 psi / 40 stk 225 psi / 50 stk 330 psi 13 1.00 08:3 0 2.50 INTCSG1, DRILL DRLSLD Drilled 12 1/4" hole section from 5,025 ft to 5,155 ft. 800 GPM, 3,100 PSI, 150 RPM, 3-6K Torque, 8-10K WOB. Pumping weighted vis pill every 400 ft and checking flow before every connection. 11:0 0 0.50 INTCSG1, DRILL HESPDRL BOP drill at 5,155 ft Crew reaction time 39 sec. All evacuation time 56 sec. 11:3 0 6.00 INTCSG1, DRILL DRLSLD Drilled 12 1/4" directional hole from 5155 ft to 5468 ft with 800 gpm, 3100-3150 psi, 150 rpm, TQ: 4-6 klb-ft, WOB: 5-10 klb. Flow checking @ 5185, 5279 ft per 5 min, well static O.K. Pumped 40 bbls heavy viscous pill ( 180 sec/qt, 12.4 ppg) @ 5278 ft. 17:3 0 1.00 INTCSG1, DRILL CC Circulated due max Hydrocarbons out 22% with 800 gpm, 3150 psi, 150 rpm, TQ: 4-6 klb-ft. Reciprocated string and checked static well O.K. No mud cut on Btm's up. 18:3 0 5.50 INTCSG1, DRILL DRLRS Drilled 12 1/4" directional hole from 5468 ft to 5687 ft with 800 gpm, 3100-3200 psi, 150 rpm, TQ: 4-6 klb-ft, WOB: 5-12 klb. Pumped 40 bbls heavy viscous pill ( 200 sec/qt, 12.4 ppg) @ 5629 ft. Flow checking @ 5563 ft, 5657 ft per 5 min, static well O.K. At 5,580 ft an increase of GUMBO at shakers lasted 8 - 10 minutes. Unscheduled Event #: 13 Event Type NPT Unsch Maj Cat RREQ Unscheduled Detail CIRSYS Start Date 10/18/2012 Start Depth (ftKB) 5,025 End Depth (MD) ( 5,025 Est Cost (Cost) 5,000 Est Lost Time (hr) Event Description Repaired Rig pump #1. Accountable Party Rig Contractor Service Contractor Helmerich & Payne, Rig Contractor Drill String/BHA Bit Run 2 Size (in) 12 1/4 Model FXD65R Serial Number 11950443 IADC Bit Dull ------- Bit Total Fluid Area (nozzles) (in) 1.38 Nozzles (1/32") 13/13/13/13/15/15/15/15 String Length (ft) 6,649.20 Weight of String in Air (1000lbf) 191 BHA ROP (ft/hr) 40.2 String Components Security DBS FXD65R, Rotary Steerable Geo-Pilot 9600, 8" PM Collar, X-Over Sub, Convertion sub, 8" PWD, 8" HCIM Collar 175C 25KSI, 8" SHOC, 8" Float Sub, 12 1/8" Omni Reamer, X-Over Sub (Pin 6 5/8" x Box 4 1/2", 6 1/2" Drill Collar, X-Over Sub (Pin 4 1/2" XH x Box 4, Heavy Weight Drill Pipe, Drill Pipe, Heavy Weight Drill Pipe, 6 1/2" Drilling J ar, Heavy Weight Drill Pipe, 6 1/2" Accelerator, Heavy Weight Drill Pipe, Drill Pipe Jars Item Description 6 1/2" Drilling J ar Condition Run Starting Hours (hr) 64.00 End Hours (hr) 100.50 Last Inspection Date 9/18/2012 Days Fm. Insp. (days) 30.46 Drilling Parameters Wellbore Riohacha 04 ST Depth Start (MD) (ftKB) 4,712 Depth End (MD) (ftKB) 5,687 Cum Depth Drilled (ftKB) 1,467 Drill Time (hr) 21.50 Cum Drilling Time (hr) 36.50 Interval ROP (ft/hr) 45.3 Flow Rate (gpm) 800 RPM (rpm) 150 Weight on Bit (1000lbf) 3 SPP (psi) 3,100.0 Drill Str Wt (1000lbf) 88 PU Str Wt (1000lbf) 90 SO Str Wt (1000lbf) 88 Drilling Torque 4,000.0 Off Bottom Torque Underbalanced Parameters Q Gas Inj (ft/min) T Inj (F) P BH Ann (psi) T BH (F) P Surf Annulus ( T Surf Annulus ( Q Liq Return (gpQ Gas Return (ft Hydraulic Calculations Bit Hydraulic Power (hp) HSI (hp/in) Bit J et Velocity (ft/s) Bit Pressure Drop (psi) % P @ bit (%) Max Casing AV (ft/min) Max Open Hole AV (ft/min) Min Casing AV (ft/min) Min Open Hole AV (ft/min) ECD End (lb/gal) Survey Data MD (ftKB) Incl () Azm () Build (/100ft) TVD (ftKB) NS (ft) EW (ft) VS (ft) DLS (/100ft) Depart (ft) Turn (/100ft) 5,249 55.06 264.44 0.18 4,616.71 -351.17 -1,703.28 1,615.30 1.95 1,739.11 2.37 5,342 54.67 265.08 -0.42 4,670.23 -358.12 -1,779.02 1,688.65 0.70 1,814.71 0.69 5,437 54.74 268.04 0.07 4,725.13 -362.77 -1,856.40 1,764.02 2.54 1,891.52 3.12 5,533 54.87 272.00 0.14 4,780.48 -362.74 -1,934.83 1,841.23 3.37 1,968.54 4.13 5,627 54.79 275.15 -0.09 4,834.63 -357.95 -2,011.50 1,917.56 2.74 2,043.10 3.35 Last Casing Sz Casing Description Surface Set Depth (MD) (ftKB) 1,657 Set Depth (TVD) (ftKB) 1,657.0 String Nominal OD (in) 13 3/8 Top Depth (MD) (ftKB) -6 Top Depth(TVD) (ftKB) Last Leak Off or FIT Test Csg Des Typ Test Date Eq. Fld Density (lb/gal) P LeakOff (psi) Fluid Surface Formation Integrity 10/12/2012 13.00 1,174.9 Mud Offline Activities Description Offline Start Date 10/18/2012 End Date 10/19/2012 Incident Free Operations: 241 days Page 3/3 Report Printed: 10/19/2012 Rpt #: 30, DFS: 29.63 Depth Progress: 975 Report Date: 10/18/2012 Offline Activity Time Log Start Date 10/18/2012 Dur (hr) 12.00 End Date 10/18/2012 Activity OFFLOAD Inac N Comment Swaco summary: Cutting disposal for hole and total. - 17 : Cumm: 1040 bbls. - 12 1/4": 0 bbls Cumm: 2590 bbls - 12 1/4" ST: 170 bbls Cumm: 1050 bbls Water disposal for hole and total. - 17 : Cumm: 1290 bbls. - 12 1/4": 0 bbls Cumm: 3300 bbls - 12 1/4" ST: 180 bbls Cumm: 1340 bbls Dewatering for hole and total. - 17 : Cumm: 535 bbls. - 12 1/4": 0 bbls Cumm: 2000 bbls - 12 1/4" ST: 160 bbls Cumm: 1090 bbls Start Date 10/18/2012 Dur (hr) 12.00 End Date 10/19/2012 Activity OFFLOAD Inac N Comment - Daily water well consumption: 34 m3 (1006 m3 cumulated from pre-spud dates). - Performed SIMOP's meeting with facilities supervisor. - Superior 9-5/8"casing inspection with 120 joints ready. - Smith truck backload with fishing tools. - 60 m3 of cuttings mix material arrive to location from Macuira. Incident Free Operations: 241 days