C Ch hi ir ro op pr ra ac ct ti ic c R Ra ad di io og gr ra ap ph hi ic c F Fa ac ci il li it ty y
For further information, please contact:
Radiation Protection | Environmental Health Services
LL0073, 655 12
th
Ave W | Vancouver BC V5Z 4R4
T: 604.707.2442 | F: 604.707.2441 | E: rpsinfo@bccdc.ca
This guideline may be used to determine the shielding required for a new installation or when modifying an existing one,
provided the following criteria apply to the installation. Before using the guideline, first read the Explanatory Notes
provided. If the following Criteria do not apply, contact Radiation Protection, Environmental Health Services office for
assistance. Note: the shielding specified in this guideline is designed to protect workers outside the x-ray room to the
WorkSafeBC Action Level* (1 mSv/year) rather than to the Dose Limit (20 mSv/year). Owners wishing to shield to a level
greater than 1 mSv/year outside the room should not use this guideline and should be aware of the regulatory
implication if the Action Level is or may be exceeded.
Criteria
The current/future x-ray workload in the room does not exceed 20 exposures (films) in a 40-hour work week
schedule, with the primary beam directed to an upright bucky. In addition, a workload of up to 2 exposures per
week for radiographing extremities can be included, provided the primary beam is directed vertically down to the
floor of the room
The x-ray unit is operated at up to 100 kVp, with a maximum film (cassette) size of 35cm x 43cm (14 x 17).
The room containing the unit has dimensions no smaller than 2m x 4.5m.
Unexposed x-ray film is stored in a film bin, lined with at least 0.8mm (2 lb/ft) lead.
Shielding is required to provide protection outside the room, a) for workers, to meet the Action Level of
1mSv/year, as specified in the WorkSafeBC Occupational Health and Safety Regulation (see WSBC website:
http://http://www2.worksafebc.com/Publications/OHSRegulation/Home.asp), and b) for members of the public
not to exceed the recommended public dose limit of 1 mSv/year.
For workers directly involved in the taking of x-rays, this guideline provides an option for shielding the control
booth to either 20 mSv/year (the maximum permissible dose) or to 1 mSv/year (WSBC Action Level). Note that
control booth shielding is based on providing protection against secondary radiation (i.e. leakage & scatter) only,
not the primary beam.
Occupancy outside barriers: the shielding options (over) allow for consideration of the amount of time
(occupancy) spent by persons outside each of the barriers (i.e. walls/doors)
Full occupancy applies to areas occupied by workers or other persons for a total of more than 30 minutes per
day, and applies to adjacent rooms and tenanted facilities.
Partial occupancy applies to areas occupied by workers and other persons for a total of no more than 30
minutes per day, and applies to areas such as adjacent stairwells, parkades and parking lots, lanes, gardens
and infrequently used rooms (storage). Areas that can be converted from Partial Occupancy to Full
Occupancy (e.g. from storage to office) should be considered as Full Occupancy for shielding requirements.
If the facility has accessible areas (e.g. rooms) above and/or below the x-ray room, protection for these areas
must be provided in the intervening floors (see over). For confirmation of construction material requirements for
the intervening floor, above and/or below the x-ray room, please refer to the current BC Building Code.
If your facility design and use meets the above criteria, you can use the shielding information (over) to determine the
thickness of materials required for the barriers. Complete the assessment and provide a copy to the responsible
person carrying out the installation.
N.B. Building plans are NOT required to be submitted to the Radiation Protection, Environmental Health Services.
over
Guideline for Determining the X-ray Shielding Requirements for a
Chiropractic Radiographic Facility
Keep a copy of this signed document on record for future reference/inspection. Attach a copy
of room plan showing adjacent areas and their function with this document.
Area
(see Room Layout Diagram below)
Shielding Required *
20 Bucky & 2 Extremity Exposures/Week
Check
one per
Area
Regular Drywall Construction: = 1.6 lbs/ft
2
| 7.8 kg/m
2
= 2.2 lbs/ft
2
| 10.7 kg/m
2
Control Booth
or
Shielding (to 1 mSv/year) 0.8 mm (2 lb/ft
2
) lead and equivalent for view window
Shielding (to 20 mSv/year)
2.5 cm (1") regular drywall construction and 1.25 cm (") plate glass
window
Wall Labeled 'A'
or
Full Occupancy (1 mSv/year) 0.8 mm (2 lb/ft
2
) lead
Partial Occupancy (1 mSv/year) 2.5 cm (1") regular drywall construction
Wall labeled 'B'
or
Full Occupancy (1 mSv/year) 0.8 mm (2 lb/ft
2
) lead
Partial Occupancy (1 mSv/year) 2.5 cm (1") regular drywall construction
Wall labeled 'C'
or
Full Occupancy (1 mSv/year) 2.5 cm (1") regular drywall construction
Partial Occupancy (1 mSv/year) 2.5 cm (1") regular drywall construction
Wall labeled 'D'
or
Full Occupancy (1 mSv/year) 0.8 mm (2 lb/ft
2
) lead from Wall 'A' as far as control booth
Partial Occupancy (1 mSv/year) 2.5 cm (1") regular drywall construction
Door on Wall 'B' Not applicable
or
Full Occupancy (to 1 mSv/year) 1.3 mm steel
Partial Occupancy Standard material adequate
Door on Wall 'C' Not applicable
or
Full Occupancy (to 1 mSv/year) 1.3 mm steel
Partial Occupancy Standard material adequate
Intervening Floor (above) No occupancy space above x-ray room no shielding required
or
Full Occupancy (1 mSv/year) 5 cm (2") solid concrete or 0.8 mm (2 lb/ft
2
) lead
Partial Occupancy (1 mSv/year) No additional shielding required
Intervening Floor (below) No occupancy space below x-ray room no shielding required
or
Full Occupancy (1 mSv/year) 5 cm (2") solid concrete or 0.8 mm (2 lb/ft
2
) lead
Partial Occupancy (1 mSv/year) No additional shielding required
*Note: For shielding installation requirements, see Guideline & Checklist for Installation of Lead Shielding in a Diagnostic X-ray Facility.