Fw-Pump Tbe
Fw-Pump Tbe
Fw-Pump Tbe
E01
11/8/2011
D01
11/2/2011
REV
DATE
DMW
HTR
DMW
DESCRIPTION
ORIG
APPROVED BY:
COMPANY APPROVAL:
DATE:
DATE:
DOCUMENT CONTROL
NO.
Project
Area
Discipline
Type
Originator
Package
CHK
Sequence-Sht
DOCUMENT CONTROL
NO.
MSP
CP00
MEC
EVA
PAR
0000
00020-00
CS
BD
APPR
Revision
D01
Signature Page
Change Log
REV
SECTION
CHANGE DESCRIPTION
Document Holds
None.
A9066-00-052006-0024
Page 6 of 43
A9066-00-052006-0024
Page 7 of 43
CHANGE DESCRIPTION
A9066-00-052006-0024
Page 8 of 43
A9066-00-052006-0024
Page 9 of 43
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev E01
Supplier
SPECIFICATIONS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
ADDERS
Two Year Spares
Commissioning Spares
Spare 9000 GPM Firewater Pump (Bowl Assembly Only w/ Perf & Hydro)
Spare 9000 GPM Firewater Pump (Bowl, CS Discharge Head, Column, Shafting)
Spare Diesel for 9000 gom Pump
Spare Right Angle Gear Drive for 9000 gpm Pump
Spare 2250 GPM Firewater Pump (Bowl Assembly Only w/ Perf & Hydro)
29
30
31
32
33
34
35
36
37
38
Spare 2250 GPM Firewater Pump (Bowl, CS Discharge Head, Column, Shafting)
Spare Diesel for 2250 gom Pump
Spare Right Angle Gear Drive for 2250 gpm Pump
SS Enclosure for 9000 gpm Pump
SS Enclosure for 2250 gpm Pump
900 Gallon Fuel Tank
507 Gallon Fuel Tank
Super Duplex Head for 9000 gpm Pump
For both 9000 gpm and 2250 gpm, Plate and Frame Heat Exch
Pre-Post Lube Oil Pump
NEMA 4X Enclosure
20 Amp Charging Circuit
Pressure Transducer
5150 Module
String Test
For 9000 gpm skid, discharge piping, relief valve piping, MPRV piping, and flowmeter piping
installed on common skid.
For 9000 gpm, supervised valves
9000 gpm Pump Listed
2250 gpm Skid Pressure Relief Valve Listed
For 2250 gpm skid, discharge piping, relief valve piping, MPRV piping, and flowmeter piping
installed on common skid.
For 2250 gpm Skid, supervised valves
For 2250 gpm Skid, Engine Listed
For 2250 gpm Skid, NFPA 20 Fuel Tank
2250 gpm Pump Listed
For 2250 gpm Skid, Equipment to meet T# area temperature classification EEMUA #107
DXP
HQ-88808-11-JJ Tech
8/17/2011
Angola
N
Fluid-Power Equipment
QOTE
8/17/2011
Angola
N
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Optional
Optional
Optional
Optional
Optional
Optional
Optional
Optional
Optional
Optional
Optional
Optional
Optional
Optional
Optional
Not Available
No Response
No Response
No Response
No Response
No Response
No Response
Optional
No Response
No Response
No Response
No Response
No Response
No Response
No Response
No Response
No Response
Optional
Optional
No Response
No Response
No Response
Optional
Optional
Optional
Optional
Optional
Optional
Optional
By Others
Optional
1
1
1
By Others
Y
By Others
Optional
Optional
Optional
No Response
Optional
1
1
1
1
By Others
Y
Y
Y
Optional
Optional
Optional
Optional
No Response
Optional
REQUIREMENTS
Project:
MSP
Client:
Chevron
Job Number:
A9066
MR #
A9066-00-052006-0020
MR Rev #
E01
REMARKS
QTY
39
46
A9066-00-052006-0020
CBA Worksheet
Page 10 of 43
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev E01
MR #
MR Rev #
INQUIRY NO. :
COMPANY
SPECIFICATIONS
1 Proposal
2 Proposal
REQUIREMENTS
Reference No.
Date
VENDORS
VENDOR
VENDOR
VENDOR
3 Location
4 Description
5 Required
Options
Data Sheet
(Y/N)
7 Exceptions
8 TECHNICAL ACCEPTANCE (Y/N)
9 SCOPE OF SUPPLY
6 Process
Disqualified
10 GENERAL
11 Packaged
No
gpm
12 Rated
29
Y/N
Y/N
Y/N
Listed
Y/N
Supervised
Listed
Y/N
Supervised
Listed
Y/N
Listed
Y/N
Listed
Supervised
Y/N
Y/N
Discharge OS&Y
30
31
32
Discharge Butterfly
33
34
35
Check
36
37
Metering Devices
38
39
40
Backflow Devices
41
Supervised
Listed
42
43
Y/N
Y/N
rpm
44
45 Line
ft
Shaft
46
47
48
Starting of Pumps
DATA
Net Pressure (Total Differential
51 Head)
Critical Speed
Open
Material
Hollow
49 Sequence
Y/N
50 DESIGN
52 NPSHa
53 NPSHr
54 Total
55 Total
Rated Head
Disch Head
A9066-00-052006-0020
ft
ft
ft
ft
ft
REMARKS
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev E01
MR #
MR Rev #
INQUIRY NO. :
COMPANY
SPECIFICATIONS
REQUIREMENTS
ft
56 Pumps
57 Shutoff
Head
Head
Head @150% design flow
59 condition
60 Pressure
Discharge
61 Packing, if applicable
Stuffing Box
62 Transportation Loading
63 Marine Growth
64 COUPLING AND FLEXIBLE CONNWECTING SHAFT
65 Make
66 Flexible Connecting Shaft
ft
ft
ft
58 Velocity
psig
in
Y/N
Y/N
Y/N
Listed
Directly Connected to Flywheel
67
68
69 Guard
ANSI B15.1
70
71 RIGHT ANGLE
72 Gear
Y/N
GEAR DRIVE
Drive
Listed
Y/N
Y/N
73 Torsional Anaslysis
Critical Speed
74
75 Watercooled
76 Nonreversing
77 Safety
78 Output
Y/N
Y/N
Ratchet
Factor
Shaft
rpm
79 Head
Material
Lined
80
81
82 Noise
83 ENGINE
DRIVER
84 Engine
Ambient Temperature
Listed
4 Hour Minimum HP Rating
85
86
87
F
Y/N
88 Manufacturer/Model
89 Rated
HP
RPM
91 Primary Starting System
92
Air
90 Rated
93
94
95
96
97
98
99
100
101
102 Secondary
Starting System
103
104 Fuel
System
105
106 Lube
Oil System
A9066-00-052006-0020
hp
rpm
20sec max
Air Tank Capacity 180 sec cont.
starting
ASME Stamped
Electric
20sec max
Battery Contactors
Listed
Y/N
Manual Operator
Listed
Y/N
Two Independent Battery Chargers
Listed
Y/N
Air / Electric / Hydraulic
Hydraulic
20sec max
Fuel consumption @rated HP
gpm
Fuel Type
DF#1/DF#2
VENDORS
VENDOR
VENDOR
VENDOR
REMARKS
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev E01
MR #
MR Rev #
INQUIRY NO. :
COMPANY
SPECIFICATIONS
Water Supply From Disch of Pump
Lube Oil Cooler
Maximum Ambient Cooling Water
DP Across Exch
107
108
109
110
111 Engine
Y/N
REQUIREMENTS
VENDOR
VENDOR
Submersible
F
Psi
Cooling System
Water Cooled Exchanger
Plate and Frame / Shell and Tube
Maximum Ambient Cooling Water
Supply Taken From Disch of Pump
DP Across Exch
Automatic Valve
Air Cooled
112
113
114
115
116
117
118
119 Jacket
VENDORS
VENDOR
F
Y/N
Psi
Y/N
Water Heater
120F
120
121 Exhaust
Silencer
Expansion joint
Material
122
123
124 Governor
Y/N
125 Electronic
126
127
Y/N
Y/N
Y/N
128
129 Speed
Engine Speed
Critical Speed
Full Load
130
131
132
133 FUEL
rpm
rpm
SUPPLY
134 Tank
1320 g
> 1320 g
135
136
Capacity
Grade of Fuel
137
138
Horsepower Derated
139
List Hose
140
Y/N
Y/N
141 PIPING
Materials
Nominal Diameter
142
143
144 FIRE
in
PUMP
145 Type
146 Rated
Capacity
147 Rated Speed
Listed
148
149 Pumping
Temperature
150 Column
Material
Max Section Length
Schedule
151
152
153
154 Suction
Screens
155
156
157
Flow
158
159 Lubrication
A9066-00-052006-0020
Number
Clearning
Corrosion Resistant Material
150% of Rated Capacity @ 65% of Total Rated gpm
Head
Lb/ft
REMARKS
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev E01
MR #
MR Rev #
INQUIRY NO. :
COMPANY
SPECIFICATIONS
Oil
Water
160
161
Horsepower Rating
Size
164 Suction Size
165 Impellers
50 ft
162 Brake
hp
nominal
nominal
163 Discharge
166
167
168 Bowl
REQUIREMENTS
Number
Diameter
Material
in
Material
169 ELECTRICAL
170 Electrical
Classification
Panel
171 Instrument
Y/N
Y/N
172 NFPA 70
173 Controller
174
175
176
177
Listed
Pressure Recording Device
Timer Start and Run Engine Once Week
Enclosure
Y/N
Y/N
Y/N
178 STRUCTURAL
SKID
Lugs for the Skid
180 Coaming for the Skid
181 Skid Drain
182 Painting
183 GENERAL STANDARDS
184 Noise Level
185 QUALITY ASSURANCE
186 Inspection Testing Plan
187 Inspection Matrix
188 TESTING
189 Hydrostatic test
190 Field Acceptance Testing
179 Lift
85 @ 3'
Y/N
191
192 SPARE
204
205
206
A9066-00-052006-0020
Y/N
ft
lb
VENDORS
VENDOR
VENDOR
VENDOR
REMARKS
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev E01
MR #
MR Rev #
INQUIRY NO. :
COMPANY
SPECIFICATIONS
REQUIREMENTS
A9066-00-052006-0020
VENDORS
VENDOR
VENDOR
VENDOR
REMARKS
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev E01
AMEC
2 Proposal
REQUIREMENTS
Reference No.
Date
MSP
Client:
Chevron
Job Number:
A9066
MR #
A9066-00-052006-0020
MR Rev #
E01
VENDORS
SPECIFICATIONS
1 Proposal
PBE -
Project:
3 Location
4 Description
Options
Data Sheet
7 Exceptions
(Y/N)
8 Others
9 TECHNICAL ACCEPTANCE (Y/N)
10 SCOPE OF SUPPLY
DXP
HQ-88808-11-JJ Tech
17-Aug-11
Angola
Firewater Pump
Fluid-Power Equipment
QOTE
17-Aug-11
Angola
Firewater Pump
Framo
2010073
02-Aug-11
Angola
Firewater Pump
N
Y
Y
Y
Y
N
REMARKS
5 Required
6 Process
Disqualified
11 GENERAL
12 Packaged
No
gpm
13 Rated
1
2250
NFPA 20
1
Optional
Optional
Y
Optional
4
Seawater
Submersible
Y
By Supplier
Seawater
1
2340
N
Y
Optional
4
Seawater
84
84
Not Provided
Y/N
1.03
Y
-50
By Supplier
1.03
Y
-49
Y
1.03
Y
-50
Y
Y/N
Y/N
By Supplier
By Supplier
Y
Y
Y
Y
Y
NA
Y
Super Duplex
Y
Y
NA
By others
By others
By others
By others
By others
NA
By others
By others
NA
By others
By others
By others
By others
By others
By others
By others
NA
By others
By others
N
NA
Y
Super Duplex
Y
NA
Optional
Optional
Y
NA
NA
Optional
Optional
Optional
Optional
Optional
Optional
Optional
Optional
Optional
Optional
Optional
Optional
Optional
Optional
Y
Y
NA
Y
Super Duplex
Y
NA
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Duo-Check
N
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
NA
NA
NA
By Supplier
Supplier to Provide
465
By Supplier
80.7
Flooded
19
20 Specific
21 Corrosive/Erosive
22 Caisson
Btm Depth
Speed
ft
23 Constant
30 Valves
31
32
33
34
35
Listed
Y/N
Supervised
Listed
Y/N
Discharge OS&Y
36
37
38
40
41
43
Y/N
Listed
Y/N
Listed
Supervised
Y/N
Y/N
45
46
Supervised
Listed
48
49
Y/N
Y/N
rpm
50
Shaft
52
53
54
55
Starting of Pumps
57 DESIGN DATA
Net Pressure (Total Differential
58 Head)
59 NPSHa
Critical Speed
Enclosed
Open
Material
Hollow
56 Sequence
A9066-00-052006-0020
Y
Y
Backflow Devices
47
Y
Y
Metering Devices
44
Y
Y
Supervised
Listed
Check
42
Y
Y
Y
Y
Discharge Butterfly
39
51 Line
Y/N
ft
ft
Y
Y
1
Seawater
NA
Not Provided
Not Provided
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev E01
AMEC
ft
ft
ft
ft
61 Total
Rated Head
62 Total Disch Head
Total Head Vertical Turbine
63 Pumps
64 Shutoff Head
65 Velocity Head
Head @150% design flow
66 condition
67 Pressure
Discharge
68 Packing, if applicable
Stuffing Box
69 Transportation Loading
70 Marine Growth
71 COUPLING AND FLEXIBLE CONNWECTING SHAFT
72 Make
73 Flexible Connecting Shaft
ft
ft
ft
psig
in
Y/N
Y/N
Y/N
Listed
Directly Connected to Flywheel
74
75
76 Guard
ANSI B15.1
77
78 RIGHT ANGLE
79 Gear
Y/N
Drive
Listed
Y/N
Y/N
Critical Speed
81
82 Watercooled
Y/N
Y/N
Ratchet
84 Safety
Factor
85 Output Shaft
86 Head
rpm
Material
Lined
87
88
89 Noise
90 ENGINE
A9066
MR #
A9066-00-052006-0020
MR Rev #
E01
REMARKS
REQUIREMENTS
By Supplier
By Supplier
By Supplier
DXP
23.8
457.0
457.0
Fluid-Power Equipment
25.2
616
616
Framo
Not Provided
By Supplier
No response
465
Not Provided
By Supplier
By Supplier
Y
No response
625.000
465.000
By Supplier
No response
Not Provided
Not Provided
Not Provided
180
NON ASBESTOS YARN
Y
4
179.5
Accrylic yarn and graphite
Later
Y
180.0
Non Asbestos yarn
Later
Y
NA
Not Provided
Not Provided
By Supplier
Y
Y
Y
Y
Y
AR
Y
N
Y
Centra or Vulkan
N
N
Y
(2) CentaFlex
Not Provided
NA
NA
Not Provided
Y
Y
By Supplier
By Supplier
Y
1.5
1750
Y
Y
Y
Internal Cooling Coil
Y
1.6
1780
Y
Y
Y
Shell and Tube Exch
Y
1.5
1732
NA
NA
NA
By Supplier
By Supplier
85 db @ 3'
Diesel
55 - 95
Y
Y
By Supplier
By Supplier
1800
Diesel
Y
Y
Y
CAT / 3516
1985
1750
Diesel
55 - 95
N
Y
CAT / 3516
1985
1900
Diesel
Not Provided
Not Provided
Not Provided
MTU 12V4000P83
Not Provided
1800
Y
Y
NA
180
Not Provided
NA
Y
NA
NA
NA
NA
Y
Y
Electric
NA
Later
Y
Y
NA
NA
NA
NA
Y
Y
Electric
NA
0.37
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Electric
NA
Not Provided
NA
NA
NA
NA
See DXP clarification 32
DRIVER
91 Engine
Ambient Temperature
Listed
4 Hour Minimum HP Rating
92
93
94
F
Y/N
95 Manufacturer/Model
96 Rated
HP
RPM
98 Primary Starting System
99
Air
97 Rated
100
101
102
103
104
105
106
107
108
109 Secondary
Starting System
110
111 Fuel
Chevron
Job Number:
GEAR DRIVE
80 Torsional Anaslysis
83 Nonreversing
MSP
Client:
VENDORS
SPECIFICATIONS
60 NPSHr
PBE -
Project:
System
A9066-00-052006-0020
hp
rpm
20sec max
Air Tank Capacity 180 sec cont.
starting
ASME Stamped
Electric
20sec max
Battery Contactors
Listed
Y/N
Manual Operator
Listed
Y/N
Two Independent Battery Chargers
Listed
Y/N
Air / Electric / Hydraulic
Hydraulic
20sec max
Fuel consumption @rated HP
gpm
Y
Y
NA
NA
NA
NA
Y
Y
Electric
NA
By Supplier
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev E01
AMEC
VENDORS
SPECIFICATIONS
Fuel Type
112
113 Lube
PBE -
Project:
MSP
Client:
Chevron
Job Number:
A9066
MR #
A9066-00-052006-0020
MR Rev #
E01
REMARKS
REQUIREMENTS
#2
DXP
Y
Fluid-Power Equipment
#2
Framo
Not Provided
By Supplier
By Supplier
87
10
Y
Shell and Tube
87.0
No response
Y
Shell and Tube
87.0
10.0
Not Provided
Not Provided
87.0
10.0
Y
Plate and Frame
87
By Supplier
10
NA
NA
Y
Y
Y
Y
SS
Y
By Supplier
Y
Y
Y
Y
Shell and Tube
87.0
Y
No response
NA
NA
Y
Y
Y
Y
SS
NA
NA
NA
NA
Y
Y
Optional
87.0
Y
No response
NA
NA
Y
N
Y
Y
SS
Y
NA
NA
NA
Y
Not Provided
rpm
rpm
By Supplier
By Supplier
20 s
1750
Y
Y
1750
Y
Y
1800
Not Provided
Not Provided
1320 g
> 1320 g
Y/N
Y/N
NFPA 20
NFPA 37
1 g / hp +5% exp + 5% sump
#2
Y
Y
507
Y
Y
Y
Y
Y
N
N
Optional
#2
No response
Y
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
in
NA
NA
NA
NA
NA
NA
NA
NA
Submersible
1800
1780
1732
Not Provided
Optional
84
77
80.000
Lb/ft
FRP
10
Table7.3.2.1(a)
FRP
10.000
N
FRP
10.000
N
2
Y
Y
N
Y
Super Duplex
N
N
SS
DF#1/DF#2
Oil System
Water Supply From Disch of Pump
Lube Oil Cooler
Maximum Ambient Cooling Water
DP Across Exch
114
115
116
117
118 Engine
F
Psi
Cooling System
Water Cooled Exchanger
Plate and Frame / Shell and Tube
Maximum Ambient Cooling Water
Supply Taken From Disch of Pump
DP Across Exch
Automatic Valve
Air Cooled
119
120
121
122
123
124
125
126 Jacket
Y/N
F
Y/N
Psi
Y/N
Water Heater
120F
127
128 Exhaust
Silencer
Expansion joint
Material
129
130
131 Governor
Y/N
132 Electronic
133
134
Primary to Secondary Manual Operation
135
Y/N
Y/N
Y/N
136 Speed
Engine Speed
Critical Speed
Start
137
138
139
140 FUEL
SUPPLY
141 Tank
142
143
Capacity
Grade of Fuel
144
145
Horsepower Derated
146
List Hose
147
148 PIPING
Materials
Nominal Diameter
149
150
151 FIRE
PUMP
152 Type
153 Rated
Capacity
154 Rated Speed
Listed
155
156 Pumping
Temperature
See DXP clarification 58 and Fluid-Power clarification 50. Framo meets NFPA
20 but not listed
See DXP clarification 3 and Fluid-Power clarification 3
157 Column
Material
Max Section Length
Schedule
158
159
160
161 Suction
Screens
162
163
164
A9066-00-052006-0020
Number
Clearning
Corrosion Resistant Material
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev E01
AMEC
Flow
MSP
Client:
Chevron
Job Number:
A9066
MR #
A9066-00-052006-0020
MR Rev #
E01
VENDORS
SPECIFICATIONS
165
PBE -
Project:
REMARKS
REQUIREMENTS
DXP
Fluid-Power Equipment
Framo
By Supplier
Supplier to Provide
NA
Y
By Supplier
By Supplier
By Supplier
By Supplier
By Supplier
Super Duplex
Super Duplex 2507
NA
Y
381
Y
Y
4
11.5
Super Duplex
Super Duplex
NA
Y
378
Optional
Optional
4
12.6
Super Duplex
Super Duplex
NA
Not Provided
Not Provided
NA
NA
1
Y
Y
N
Firetrol
Y
Y
Y
NEMA 4X
Not Provided
Not Provided
Not Provided
Allen Bradley
N
Not Provided
Not Provided
NEMA 4X
Y
Y
Y
Y
Y
Y
Y
Not Provided
Not Provided
Not Provided
Not Provided
166 Lubrication
Oil
Water
167
168
Horsepower Rating
Size
171 Suction Size
172 Impellers
50 ft
169 Brake
hp
nominal
nominal
170 Discharge
173
174
Number
Diameter
Material
in
175 Bowl
Material
176 ELECTRICAL
177 Electrical Classification
178 Instrument Panel
179 NFPA 70
180 Controller
Y/N
Y/N
Listed
Pressure Recording Device
Timer Start and Run Engine Once Week
Enclosure
181
182
183
184
Y/N
Y/N
Y/N
SKID
Lugs for the Skid
187 Coaming for the Skid
188 Skid Drain
185 STRUCTURAL
Y
Y
Y
MSP-GN00-CRR-SPC-CHV0000-00001-00
186 Lift
189
Painting
190 GENERAL
STANDARDS
Level
192 QUALITY ASSURANCE
193 Inspection Testing Plan
194 Inspection Matrix
195 TESTING
196 Hydrostatic test
197 Field Acceptance Testing
191 Noise
85 @ 3'
Optional Enclosure
85 @ 3'
By Supplier
By Supplier
No response
No response
Y
Y
Not Provided
Not Provided
Y
Y
Y
Y
Y
Y
Y
Y
Y
Not Provided
Not Provided
N
Y
Y
Y
Y
Later
Later
Optional
Optional
Optional
Y
Y
Optional
Optional
Optional
Optional
Y
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Not Provided
Y/N
198
199 SPARE
211
212
213
A9066-00-052006-0020
Y
Y/N
ft
lb
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev E01
AMEC
SPECIFICATIONS
REQUIREMENTS
A9066-00-052006-0020
PBE -
VENDORS
DXP
Fluid-Power Equipment
Framo
Project:
MSP
Client:
Chevron
Job Number:
A9066
MR #
A9066-00-052006-0020
MR Rev #
E01
REMARKS
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev D01
DATE
DOCUMENT NUMBER
TITLE
1
2
11/17/2011
11/18/2011
MSP-PP02-MER-DAS-CHV-0000-00121-00
MSP-PP02-MER-DAS-CHV-0000-00121-00
11/18/2011
NFPA 20
11/18/2011
NFPA 20
11.2.4.3.1
11/18/2011
NFPA 20
11/18/2011
NFPA 20
11/18/2011
CLARIFICATION
General
General
11.2.4.3
4.18.4.1
Supplier provide
4.11.1.1
Unless the requirements of 4.11.1.7 are met, each pump shall have an
automatic relief valve listed
Supplier provide
NFPA 20
4.15.7
A listed indicating gate valve or butterfly valve shall be installed on the fire Supplier provide
protection system side of the pump discharge check valve.
11/18/2011
NFPA 20
4.16.1
Supplier provide
11/18/2011
NFPA 20
4.15.6
Supplier provide
10
11/18/2011
NFPA 20
4.20.2.1.1
Supplier provide
11
11/18/2011
NFPA 20
4.16.2
Supplier provide
12
11/18/2011
NFPA 20
7.3.5.2.1
13
11/18/2011
NFPA 20
7.3.2.7
A9066-00-052006-0024
Data Sheet
Data Sheet
SECTION
automatic air release valve shall be provided to vent air from the column Supplier provide
Included.
The pump line shafting shall be sized so ctitical speed shall be 25 percent Supplier verify
above the operating speed of the pump.
OPEN/CLOSED
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev D01
DATE
DOCUMENT NUMBER
14
11/18/2011
MSP-PP02-MER-DAS-CHV-0000-00121-00
Data Sheet
Material
15
11/18/2011
NFPA 20
12.7.2.4
Parallel operation-see data sheet MSP-PP02-MER-DAS-CHV-000000121-00 under operating conditions. The controller for each unit of
multiply pump units shall incorporate a sequential timing device
16
11/18/2011
NFPA 20
A.3.3.23
Head
Supplier provide
17
11/18/2011
NFPA 20
7.1.2.2
The total shutoff head shall not exceed 140 percent of the total rated
head
Supplier provide
18
11/18/2011
NFPA 20
7.1.2.1
Pumps shall furnish not less than 150 percent of the rated capacity at a
total head of not less than 65 percent of the total rated head.
Supplier provide
19
11/18/2011
MSP-GN00-MAR-SPC-CHV-0000-00007-00
MSP-GN00-MAR-SPC-CHV-0000-00008-00
Motion Analysis
Accelerations
20
11/18/2011
NFPA 20
7.3.1.2
The pump head shall be designed to support the driver, pump, column
assembly
Supplier provide
Noted; we comply.
21
11/18/2011
NFPA 20
11.2.3.2.1
Supplier provide
22
23
11/18/2011
18/19/2011
NFPA 20
NFPA 20
4.12.8
7.5.1.7.4
Supplier provide
Supplier provide
Noted.
There are no UL Listed right angle gear
drives for this application.
24
18/19/2011
NFPA 20
7.5.1.6.1
Supplier provide
25
18/19/2011
NFPA 20
11.2.3.1.2
Supplier verify
26
18/19/2011
NFPA 20
7.5.1.8.1
Supplier verify
27
28
18/19/2011
18/19/2011
MSP-LQ02-MEC-DAS-PAR-0000-00213-00
MSP-LQ02-MEC-DAS-PAR-0000-00213-00
Remarks
Supplier verify
Supplier provide
Confirmed.
A9066-00-052006-0024
TITLE
SECTION
25.2
7.10
Operating
Conditions
CLARIFICATION
OPEN/CLOSED
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev D01
DATE
DOCUMENT NUMBER
29
18/19/2011
NFPA 20
11.2.2.5
30
18/19/2011
NFPA 20
31
18/19/2011
NFPA 20
32
18/19/2011
NFPA 20
33
18/19/2011
MSP-LQ02-MEC-DAS-PAR-0000-00213-00
34
35
18/19/2011
18/19/2011
NFPA 20
NFPA 20
12.5.1
12.6
36
18/19/2011
NFPA 20
37
18/19/2011
NFPA 20
38
18/19/2011
MSP-LQ02-MEC-DAS-PAR-0000-00213-00
39
40
18/19/2011
18/19/2011
MSP-LQ02-MEC-DAS-PAR-0000-00213-00
NFPA 20
41
18/19/2011
NFPA 20
A9066-00-052006-0024
TITLE
SECTION
CLARIFICATION
11.2.1
Supplier provide
11.2.2
Engine ratings
Supplier verify
Confirmed.
11.2.7.1
Supplier verify
Confirmed.
Supplier provide
Supplier to provide commercial impact to
comply with NFPA 20
Confirmed.
Chargers are integral within the UL Listed
engine controller, and, by extension, are UL
Listed.
11.4.5.2
an engine listed for use with DF#2 shall be permitted to be used but
shall have the nameplate and rated horsepower derated 10 percent
4.11.1.7
Supplier verify
Supplier provide
Supplier verify
Starting System- Air tank designed by vendor per ASME VIII Div1 and stamped
Remarks
11.2.4.3.3
In event of a failure of the varible speeds control system, the engine shall Supplier verify
be fully functional with the governor
OPEN/CLOSED
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev D01
DATE
DOCUMENT NUMBER
42
18/19/2011
NFPA 20
11.2.4.2.1
Supplier verify
43
18/19/2011
NFPA 20
12.7.3.1.4
Supplier provide
44
18/19/2011
MSP-LQ02-MEC-DAS-PAR-0000-00213-00
Speeds
Supplier provide
45
18/19/2011
NFPA 20
11.2.7.3.4
The diesel engine as installed shall be capable of carrying its full rated
load within 20 seconds
Supplier verify
Confirmed.
46
18/19/2011
NFPA 20
11.4.1.2.3
Tanks used in accordance with the rules of this standard shall be limited in Supplier provide
size to 1320 gal. For situations where fuel tanks in excess of 1320 gal are
used , the rules of NFPA 37shall apply.
47
18/19/2011
NFPA 20
11.4.2.1
48
18/19/2011
MSP-GN00-FGS-SPC-CHV-0000-00003-00
Firewater pumps
3.7 (1)
49
50
18/19/2011
18/19/2011
NFPA 20
NFPA 20
11.4.4.1
4.7.1
Supplier provide
Supplier provide
Confirmed.
To the best of my knowledge, there are
currently no UL Listed 9000 GPM pumps.
At extra costs, it is possible to secure a
special listing from UL, however the design
and materials of construction must comply
with NFPA 20 Standards and UL 448.
Please advise.
51
18/19/2011
MSP-LQ02-MEC-DAS-PAR-0000-00213-00
Material
52
18/19/2011
MSP-LQ02-MEC-DAS-PAR-0000-00213-00
Engine
53
18/19/2011
MSP-GN00-FGS-SPC-CHV-0000-00003-00
Firewater pumps
Instrumentation
54
18/19/2011
NFPA 20
A9066-00-052006-0024
TITLE
SECTION
General
3.10.3.10
4.29.2
CLARIFICATION
All electrical components, clearances, and wiring shall meet the minimum Supplier to provide commercial impact to
requirements of the applicable NFPA 70,
comply with NFPA 20
OPEN/CLOSED
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev D01
DATE
DOCUMENT NUMBER
55
18/19/2011
NFPA 20
12.1.3.1
Supplier provide
56
18/19/2011
NFPA 20
12.4.4.1
A listed pressure recording device shall be installed to sense and record Supplier provide
the pressure in each fire pump controller pressure-sensing line at the input
to the controller
57
18/19/2011
NFPA 20
12.7.2.7.1
Supplier provide
Confirmed.
58
18/19/2011
NFPA 20
12.3.3.1.1
59
18/19/2011
MSP-GN00-CRR-SPC-CHV-0000-00001-00
Paint Specification
60
18/19/2011
MSP-GN00-FGS-SPC-CHV-0000-00003-00
Firewater pumps
Supplier provide
61
18/19/2011
MSP-GN00-TEC-SPC-CHV-0000-00002-01
85 dba @ 3'
Supplier provide
62
18/19/2011
A9066-00-052006-0020
Firewater package
All
Supplier verify
63
18/19/2011
NFPA 20
4.22.2.1
Supplier verify
Confirmed.
64
18/19/2011
NFPA 20
14.2.1
65
18/19/2011
MSP-LQ02-MEC-DAS-PAR-0000-00213-00
Spare Parts
66
18/19/2011
MSP-LQ02-MEC-DAS-PAR-0000-00213-00
Spare Parts
Normal 2 Yr Maintenance
67
18/19/2011
A9066-00-052006-0020
Firewater package
68
18/19/2011
NFPA 20
Included.
A9066-00-052006-0024
TITLE
SECTION
All
All
Inspection and
Test Plan
14.3
CLARIFICATION
OPEN/CLOSED
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev D01
DATE
DOCUMENT NUMBER
69
18/19/2011
NFPA 20
4.14.8.2
Supplier provide
70
18/19/2011
NFPA 20
4.14.8.3
Supplier provide
71
A9066-00-052006-0024
TITLE
SECTION
CLARIFICATION
OPEN/CLOSED
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev D01
SN
DATE
DOCUMENT NUMBER
TITLE
Installation of Stationary Fire Pumps
11/27/2011
NFPA 20
11/27/2011
NFPA 20
10/27/2011
MSP-LQ02-MER-DAS-CHV-0000-00053-00
Firewater Pump
10/27/2011
MSP-GN00-FGS-SPC-CHV-0000-00003-00
Firewater Pump
SECTION
Table 7.3.2.1 (a)
CLARIFICATION
FPE RESPONSE
Supplier verify
Liquid
3.2 (4)
Line shaft shall be supported at no greater than 10 foot (3 meter) intervals. Supplier verify
Confirmed.
4.18.4.1
Supplier provide
4.11.1.1
Unless the requirements of 4.11.1.7 are met, each pump shall have an
Supplier provide
automatic relief valve listed
A listed indicating gate valve or butterfly valve shall be installed on the fire Supplier provide
protection system side of the pump discharge check valve.
Supplier provide
Supplier provide
Supplier provide
1
2
4.12.1
3
4
11/18/2011
NFPA 20
11/27/2011
NFPA 20
5
6
4.15.7
11/27/2011
NFPA 20
11/27/2011
NFPA 20
7
8
4.16.1
4.15.6
11/27/2011
NFPA 20
Supplier provide
9
4.20.2.1.1
11/27/2011
NFPA 20
11/27/2011
NFPA 20
11/27/2011
NFPA 20
10
11
12
A9066-00-052006-0024
4.16.2
7.3.5.2.1
automatic air release valve shall be provided to vent air from the column Supplier provide
OPEN/CLOSED
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev D01
SN
DATE
DOCUMENT NUMBER
TITLE
SECTION
7.3.2.7
11/27/2011
NFPA 20
10/27/2011
NFPA 20
11/27/2011
NFPA 20
11/27/2011
NFPA 20
11/27/2011
NFPA 20
11/27/2011
NFPA 20
CLARIFICATION
The pump line shafting shall be sized so ctitical speed shall be 25 percent Supplier verify
above the operating speed of the pump.
13
14
FPE RESPONSE
12.7.2.4
Parallel operation-see data sheet MSP-PP02-MER-DAS-CHV-000000121-00 under operating conditions. The controller for each unit of
multiply pump units shall incorporate a sequential timing device
A.3.3.23
Head
Supplier provide
The total shutoff head shall not exceed 140 percent of the total rated
head
Pumps shall furnish not less than 150 percent of the rated capacity at a
total head of not less than 65 percent of the total rated head.
Supplier provide
Accelerations
The pump head shall be designed to support the driver, pump, column
assembly
engines shall be connected to vertical shaft pumps by means of a right
angle gear drive with a listed flexible connecting shaft
Supplier provide
Noted; we comply.
Supplier provide
4.12.8
7.5.1.7.4
Supplier provide
Supplier provide
Noted.
There are no UL Listed right angle gear
drives for this application. This gearbox is
FM Approved.
7.5.1.6.1
Supplier provide
11.2.3.1.2
Supplier verify
7.5.1.8.1
Supplier verify
Supplier provide
15
16
17
7.1.2.2
7.1.2.1
Supplier provide
18
25.2
7.10
11/27/2011
MSP-GN00-MAR-SPC-CHV-0000-00007-00
MSP-GN00-MAR-SPC-CHV-0000-00008-00
Motion Analysis
11/27/2011
NFPA 20
19
20
7.3.1.2
11.2.3.2.1
21
22
11/27/2011
NFPA 20
11/27/2011
NFPA 20
11/27/2011
NFPA 20
11/27/2011
NFPA 20
11/27/2011
NFPA 20
23
24
25
11/27/2011
NFPA 20
26
27
Operating
Conditions
18/19/2011
MSP-LQ02-MER-DAS-CHV-0000-00053-00
11/27/2011
NFPA 20
28
11.2.2.5
29
A9066-00-052006-0024
OPEN/CLOSED
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev D01
SN
DATE
DOCUMENT NUMBER
TITLE
SECTION
11.2.1
30
31
32
33
34
11/27/2011
NFPA 20
11/27/2011
NFPA 20
11/27/2011
NFPA 20
11/27/2011
MSP-LQ02-MER-DAS-CHV-0000-00053-00
11/27/2011
NFPA 20
11/27/2011
NFPA 20
CLARIFICATION
Supplier provide
Supplier verify
Supplier verify
Confirmed.
Confirmed.
Supplier provide
Supplier to provide commercial impact to
comply with NFPA 20
Confirmed.
Chargers are integral within the UL Listed
engine controller, and, by extension, are UL
Listed.
11.4.5.2
an engine listed for use with DF#2 shall be permitted to be used but
shall have the nameplate and rated horsepower derated 10 percent
4.11.1.7
Supplier verify
Cooling System
Cooling System
11.2.8.2
Supplier provide
Supplier verify
11.2.2
11.2.7.1
Engine ratings
Engines shall be equipped with a reliable starting device and shall
accelerate to rated output speed within 20 sec.
Starting System- Air tank designed by vendor per ASME VIII Div1 and stamped
Remarks
12.5.1
12.6
35
10/27/2011
NFPA 20
10/27/2011
NFPA 20
36
37
38
39
10/27/2011
MSP-LQ02-MER-DAS-CHV-0000-00053-00
10/27/2011
MSP-LQ02-MER-DAS-CHV-0000-00053-00
10/27/2011
NFPA 20
10/27/2011
NFPA 20
40
41
A9066-00-052006-0024
FPE RESPONSE
11.2.4.3.3
In event of a failure of the varible speeds control system, the engine shall Supplier verify
be fully functional with the governor
OPEN/CLOSED
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev D01
SN
DATE
DOCUMENT NUMBER
TITLE
10/27/2011
NFPA 20
10/27/2011
NFPA 20
10/27/2011
MSP-LQ02-MER-DAS-CHV-0000-00053-00
10/27/2011
NFPA 20
SECTION
CLARIFICATION
FPE RESPONSE
11.2.4.2.1
Supplier verify
12.7.3.1.4
Supplier provide
Vibration
Supplier provide
11.2.7.3.4
The diesel engine as installed shall be capable of carrying its full rated
Supplier verify
load within 20 seconds
Tanks used in accordance with the rules of this standard shall be limited in Supplier provide
size to 1320 gal. For situations where fuel tanks in excess of 1320 gal are
used , the rules of NFPA 37shall apply.
Confirmed.
11.4.2.1
3.7 (1)
42
43
44
45
11.4.1.2.3
10/27/2011
NFPA 20
10/27/2011
NFPA 20
10/27/2011
MSP-GN00-FGS-SPC-CHV-0000-00003-00
Firewater pumps
10/27/2011
NFPA 20
10/27/2011
NFPA 20
46
47
48
49
11.4.4.1
4.7.1
Supplier provide
Supplier provide
Confirmed.
We can provide a UL Listed pump, but the
MOC of a UL Listed pump does not comply
with CVX specification. If you wish a UL
Listed Pump, please advise materials of
construction desired.
Material
Engine
Instrumentation
50
18/19/2011
MSP-LQ02-MER-DAS-CHV-0000-00053-00
51
18/19/2011
MSP-LQ02-MER-DAS-CHV-0000-00053-00
10/27/2011
MSP-GN00-FGS-SPC-CHV-0000-00003-00
Firewater pumps
10/27/2011
NFPA 20
10/27/2011
NFPA 20
52
3.10.3.10
53
54
55
4.29.2
12.1.3.1
12.4.4.1
10/27/2011
NFPA 20
10/27/2011
NFPA 20
All electrical components, clearances, and wiring shall meet the minimum Supplier to provide commercial impact to
requirements of the applicable NFPA 70,
comply with NFPA 20
All controllers shall be specifically listed for diesel engine-driven service. Supplier provide
A listed pressure recording device shall be installed to sense and record Supplier provide
the pressure in each fire pump controller pressure-sensing line at the input
to the controller
56
12.7.2.7.1
57
A9066-00-052006-0024
Supplier provide
Confirmed.
OPEN/CLOSED
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev D01
SN
DATE
DOCUMENT NUMBER
TITLE
SECTION
12.3.3.1.1
10/27/2011
NFPA 20
Supplier provide
85 dba @ 3'
Supplier provide
Supplier verify
Supplier verify
Spare Parts
Spare Parts
Normal 2 Yr Maintenance
All
MSP-GN00-CRR-SPC-CHV-0000-00001-00
Paint Specification
10/27/2011
MSP-GN00-FGS-SPC-CHV-0000-00003-00
Firewater pumps
MSP-GN00-TEC-SPC-CHV-0000-00002-01
10/27/2011
A9066-00-052006-0020
Firewater package
10/27/2011
NFPA 20
10/27/2011
NFPA 20
18/19/2011
MSP-LQ02-MER-DAS-CHV-0000-00053-00
18/19/2011
MSP-LQ02-MER-DAS-CHV-0000-00053-00
10/27/2011
A9066-00-052006-0020
Firewater package
10/27/2011
NFPA 20
OPEN/CLOSED
58
10/27/2011
FPE RESPONSE
CLARIFICATION
59
3.1 (10) (g), (h)
60
All
10/27/2011
61
Inspection and Test All
Plan
62
4.22.2.1
63
14.2.1
64
65
66
Scope of Supply
Item 8, 9, 10
67
68
10/27/2011
NFPA 20
14.3
4.14.8.2
4.14.8.3
Supplier provide
69
10/27/2011
NFPA 20
70
A9066-00-052006-0024
MSP-CP00-MEC-EVA-PAR-0000-00020-00
Rev D01
SN
DATE
DOCUMENT NUMBER
TITLE
Installation of Stationary Fire Pumps
10/27/2011
SECTION
Table 4.8.2
CLARIFICATION
NFPA 20
Supplier provide
Included.
NFPA 20
71
General
11/27/2011
MSP-LQ02-MER-DAS-CHV-0000-00053-00
Data Sheet
10/27/2011
NFPA 20
FPE RESPONSE
72
73
74
A9066-00-052006-0024
7.5.1.7.5
OPEN/CLOSED
DXP - TECHNICA
RFQ NO.: A9066-00-052006-0020 FIREWATER PKG
SUBMITTED DATE: 10/25/11
SUBMITTED BY: AMEC TO DXP
Mafumeira Sul Project
SN
DATE
11/18/2011
DOCUMENT NUMBER
TITLE
Firewater Pump
MSP-PP02-MER-DAS-CHV-0000-00121-00
NFPA 20
SECTION
General
2
3
11/18/2011
11/18/2011
MSP-PP02-MER-DAS-CHV-0000-00121-00
Firewater Pump
Liquid
Verical Turbine
Pump Caisson
Arrangement
11/18/2011
MSP-PP02-MER-DAS-CHV-0000-00121-00
Firewater Pump
11/18/2011
NFPA 20
11.2.4.3
11/18/2011
NFPA 20
11.2.4.3.1
11/18/2011
NFPA 20
4.18.4.1
11/18/2011
NFPA 20
4.11.1.1
11/18/2011
NFPA 20
4.15.7
11/18/2011
NFPA 20
4.16.1
11/18/2011
NFPA 20
4.15.6
11/18/2011
NFPA 20
4.20.2.1.1
11/18/2011
NFPA 20
4.16.2
4
5
6
7
8
9
10
11
12
13
A9066-00-052006-00XX
Page 33 of 43
14
15
16
17
18
19
11/18/2011
NFPA 20
7.3.5.2.1
11/18/2011
NFPA 20
7.3.2.7
11/18/2011
NFPA 20
12.7.2.4
11/18/2011
11/18/2011
MSP-PP02-MER-DAS-CHV-0000-00121-00
NFPA 20
Data Sheet
Installation of Stationary Fire Pumps
Operating
Conditions
A.3.3.23
11/18/2011
NFPA 20
7.1.2.2
11/18/2011
NFPA 20
7.1.2.1
11/18/2011
MSP-GN00-MAR-SPC-CHV-0000-00007-00
MSP-GN00-MAR-SPC-CHV-0000-00008-00
Motion Analysis
11/18/2011
NFPA 20
7.3.1.2
11/18/2011
NFPA 20
11.2.3.2.1
11/18/2011
NFPA 20
4.12.8
18/19/2011
NFPA 20
7.5.1.7.4
18/19/2011
NFPA 20
7.5.1.3
18/19/2011
NFPA 20
7.5.1.6.1
18/19/2011
NFPA 20
7.5.1.7.5
18/19/2011
NFPA 20
7.5.1.7.3
20
21
22
25.2
7.10
23
24
25
26
27
28
29
A9066-00-052006-00XX
Page 34 of 43
30
31
18/19/2011
NFPA 20
11.2.3.1.2
18/19/2011
NFPA 20
7.5.1.8.1
A9066-00-052006-00XX
Page 35 of 43
- TECHNICAL CLARIFICATIONS
9000gpm unit
CLARIFICATION
Supplier to provide commercial impact to
comply with NFPA 20
RESPONSE
Pump hydraulics meet NFPA20 as quoted
The fire pump, driver, controller shall be protected against Supplier to provide commercial impact to
explosion, fie, earthquake..
comply with NFPA 20
Pumping temperature
Supplier provide
Supplier provide
Neither is included
Not Included
Supplier provide
by others
by others
Supplier provide
A9066-00-052006-00XX
Supplier provide
Supplier provide
Supplier provide
Supplier provide
Supplier provide
by others
by others
by others
by others
by others
Page 36 of 43
Supplier provide
Supplier verify
Supplier to provide commercial impact to
comply with NFPA 20
by others
OK
OK
Diff Head
Supplier provide
Head
Supplier provide
The total shutoff head shall not exceed 140 percent of the total
Supplier provide
rated head
refer to proposal
refer to proposal
OK
Pumps shall furnish not less than 150 percent of the rated
capacity at a total head of not less than 65 percent of the total
rated head.
OK
Supplier provide
Accelerations
OK
OK
Supplier provide
Supplier provide
Supplier provide
Confirmed
OK
OK
OK
A9066-00-052006-00XX
Supplier provide
Supplier provide
OK
Page 37 of 43
Supplier verify
Supplier verify
Exception
A9066-00-052006-00XX
Page 38 of 43
OPEN/CLOSED
A9066-00-052006-00XX
Page 39 of 43
A9066-00-052006-00XX
Page 40 of 43
A9066-00-052006-00XX
Page 41 of 43
DATE
DOCUMENT NUMBER
10/27/2011
NFPA 20
10/27/2011
NFPA 20
10/27/2011
MSP-LQ02-MER-DAS-CHV-0000-00053-00
10/27/2011
TITLE
Installation of Stationary Fire Pumps
SECTION
Table 4.8.2
Firewater Pump
Liquid
Pumping temperature
Supplier provide
MSP-GN00-FGS-SPC-CHV-0000-00003-00
Firewater Pump
3.2 (4)
Supplier verify
10/27/2011
NFPA 20
11.2.4.3
10/27/2011
NFPA 20
11.2.4.3.1
NFPA 20
4.18.4.1
10/27/2011
NFPA 20
4.11.1.1
10/27/2011
NFPA 20
4.15.7
10/27/2011
NFPA 20
4.16.1
10/27/2011
NFPA 20
4.15.6
10/27/2011
NFPA 20
4.20.2.1.1
10/27/2011
NFPA 20
4.16.2
10/27/2011
NFPA 20
7.3.5.2.1
10/27/2011
NFPA 20
7.3.2.7
9
10
11
12
13
14
OPEN/CLOSED
7
8
RESPONSE
The fire pump, driver, controller shall be protected against Supplier to provide commercial impact to
explosion, fie, earthquake..
comply with NFPA 20
4
5
CLARIFICATION
4.12.1
Confirmed
Neither is included
Not Included
PRV is not in DXP's scope of supply
Not in DXP's scope of supply
Not Applicable.
Supplier provide
Supplier provide
Supplier provide
Supplier provide
Supplier provide
Supplier verify
15
10/27/2011
NFPA 20
12.7.2.4
10/27/2011
MSP-LQ02-MER-DAS-CHV-0000-00053-00
Data Sheet
10/27/2011
NFPA 20
Operating
Conditions
A.3.3.23
10/27/2011
NFPA 20
7.1.2.2
10/27/2011
NFPA 20
7.1.2.1
10/27/2011
MSP-GN00-MAR-SPC-CHV-0000-00007-00
MSP-GN00-MAR-SPC-CHV-0000-00008-00
Motion Analysis
10/27/2011
NFPA 20
16
17
18
19
20
21
22
A9066-00-052006-00XX
25.2
7.10
7.3.1.2
Supplier provide
Refer to proposal
Head
Supplier provide
The total shutoff head shall not exceed 140 percent of the total
Supplier provide
rated head
Refer to proposal
Confirmed
Pumps shall furnish not less than 150 percent of the rated
capacity at a total head of not less than 65 percent of the total Supplier provide
rated head.
Confirmed
Accelerations
Page 42 of 43
25
26
27
28
29
30
31
Supplier provide
confirmed
Supplier provide
Supplier verify
NFPA 20
11.2.3.2.1
10/27/2011
NFPA 20
4.12.8
10/27/2011
NFPA 20
7.5.1.7.4
11/27/2011
NFPA 20
10/27/2011
NFPA 20
7.5.1.6.1
Included
10/27/2011
NFPA 20
7.5.1.7.5
Confirmed
10/27/2011
NFPA 20
7.5.1.7.3
10/27/2011
NFPA 20
11.2.3.1.2
Supplier verify
10/27/2011
NFPA 20
7.5.1.8.1
Supplier verify
23
24
10/27/2011
A9066-00-052006-00XX
Supplier provide
Supplier provide
confirmed
Not Applicable.
Confirmed
Page 43 of 43