G OVERNMENT P ROCUREMENT
R EFORM A CT
ARTICLE I
GENERAL PROVISIONS
SECTION 1. Short Title.
Procurement Reform Act.
R.A. 9184 was signed by Her Excellency President Gloria Macapagal-Arroyo on 10 January 2003, and was
published on 11 January 2003, in two (2) newspapers of general nationwide circulation, namely, Manila Times
and Malaya. It took effect fifteen (15) days after its publication or on 26 January 2003.
1
opening of bids, evaluation of bids, post-qualification, and award of contract, the specific
requirements and mechanics of which shall be defined in the IRR to be promulgated under
this Act.
(f) Consulting Services refer to services for Infrastructure Projects and other
types of projects or activities of the Government requiring adequate external technical and
professional expertise that are beyond the capability and/or capacity of the government to
undertake such as, but not limited to: (i) advisory and review services; (ii) pre-investment or
feasibility studies; (iii) design; (iv) construction supervision; (v) management and related
services; and (vi) other technical services or special studies.
(g) G-EPS refers to the Government Electronic Procurement System as provided
in Section 8 of this Act.
(h) Goods refer to all items, supplies, materials and general support services,
except consulting services and infrastructure projects, which may be needed in the
transaction of public businesses or in the pursuit of any government undertaking, project or
activity, whether in the nature of equipment, furniture, stationery, materials for
construction, or personal property of any kind, including non-personal or contractual
services such as the repair and maintenance of equipment and furniture, as well as trucking,
hauling, janitorial, security, and related or analogous services, as well as procurement of
materials and supplies provided by the procuring entity for such services.
(i) GPPB refers to the Government Procurement Policy Board established in
accordance with Article XX of this Act.
(j) Head of the Procuring Entity refers to: (i) the head of the agency or his duly
authorized official, for national government agencies; (ii) the governing board or its duly
authorized official, for government-owned and/or -controlled corporations; or (iii) the local
chief executive, for local government units. Provided, That in a department, office or
agency where the procurement is decentralized, the Head of each decentralized unit shall be
considered as the Head of the Procuring Entity subject to the limitations and authority
delegated by the head of the department, office or agency.
(k) Infrastructure Projects include the construction, improvement, rehabilitation,
demolition, repair, restoration or maintenance of roads and bridges, railways, airports,
seaports, communication facilities, civil works components of information technology
projects, irrigation, flood control and drainage, water supply, sanitation, sewerage and solid
waste management systems, shore protection, energy/power and electrification facilities,
national buildings, school buildings, hospital buildings and other related construction
projects of the government.
(l) IRR refer to the implementing rules and regulations to be promulgated in
accordance with Section 75 this Act.
(m) Portal refers to a website that aggregates a wide variety of content for the
purpose of attracting a large number of users.
(n) Procurement refers to the acquisition of Goods, Consulting Services, and the
contracting for Infrastructure Projects by the Procuring Entity. Procurement shall also
include the lease of goods and real estate. With respect to real property, its procurement
shall be governed by the provisions of Republic Act No. 8974, entitled An Act to Facilitate
ARTICLE II
PROCUREMENT PLANNING
SEC. 7. Procurement Planning and Budgeting Linkage. All procurement
should be within the approved budget of the Procuring Entity and should be meticulously
and judiciously planned by the Procuring Entity concerned. Consistent with government
fiscal discipline measures, only those considered crucial to the efficient discharge of
governmental functions shall be included in the Annual Procurement Plan to be specified in
the IRR.
No government Procurement shall be undertaken unless it is in accordance with the
approved Annual Procurement Plan of the Procuring Entity. The Annual Procurement Plan
shall be approved by the Head of the Procuring Entity and must be consistent with its duly
approved yearly budget. The Annual Procurement Plan shall be formulated and revised only
in accordance with the guidelines set forth in the IRR. In the case of Infrastructure Projects,
the Plan shall include engineering design and acquisition of right-of-way.
ARTICLE III
PROCUREMENT BY ELECTRONIC MEANS
SEC. 8. Procurement By Electronic Means. To promote transparency and
efficiency, information and communications technology shall be utilized in the conduct of
procurement procedures. Accordingly, there shall be a single portal that shall serve as the
primary source of information on all government procurement. The G-EPS shall serve as the
primary and definitive source of information on government procurement. Further, the
GPPB is authorized to approve changes in the procurement process to adapt to
improvements in modern technology, provided that such modifications are consistent with
the provisions of Section 3 of this Act.
To take advantage of the significant built-in efficiencies of the G-EPS and the volume
discounts inherent in bulk purchasing, all Procuring Entities shall utilize the G-EPS for the
procurement of common supplies in accordance with the rules and procedures to be
established by the GPPB. With regard to the procurement of non-common use items,
infrastructure projects and consulting services, agencies may hire service providers to
undertake their electronic procurement provided these service providers meet the minimum
requirements set by the GPPB.
4
SEC. 9. Security, Integrity and Confidentiality. The G-EPS shall ensure the
security, integrity and confidentiality of documents submitted through the system. It shall
include a feature that provides for an audit trail for on-line transactions and allow the
Commission on Audit to verify the security and integrity of the systems at any time.
ARTICLE IV
COMPETITIVE BIDDING
SEC. 10. Competitive Bidding. All Procurement shall be done through
Competitive Bidding, except as provided for in Article XVI of this Act.
ARTICLE V
BIDS AND AWARDS COMMITTEE
SEC. 11. The BAC and its Composition. Each procuring entity shall establish a
single BAC for its procurement. The BAC shall have at least five (5) members, but not more
than seven (7) members. It shall be chaired by at least a third ranking permanent official of
the procuring entity other than its head, and its composition shall be specified in the IRR.
Alternatively, as may be deemed fit by the head of the procuring entity, there may be
separate BACs where the number and complexity of the items to be procured shall so
warrant. Similar BACs for decentralized and lower level offices may be formed when
deemed necessary by the head of the procuring entity. The members of the BAC shall be
designated by the Head of Procuring Entity. However, in no case shall the approving
authority be a member of the BAC.
Unless sooner removed for a cause, the members of the BAC shall have a fixed term
of one (1) year reckoned from the date of appointment, renewable at the discretion of the
Head of the Procuring Entity. In case of resignation, retirement, separation, transfer, reassignment, removal, the replacement shall serve only for the unexpired term: Provided,
That in case of leave or suspension, the replacement shall serve only for the duration of the
leave or suspension. For justifiable causes, a member shall be suspended or removed by
the Head of the Procuring Entity.
SEC. 12. Functions of the BAC. The BAC shall have the following functions:
advertise and/or post the invitation to bid, conduct pre-procurement and pre-bid
conferences, determine the eligibility of prospective bidders, receive bids, conduct the
evaluation of bids, undertake post-qualification proceedings, recommend award of contracts
to the Head of the Procuring Entity or his duly authorized representative: Provided, That in
the event the Head of the Procuring Entity shall disapprove such recommendation, such
disapproval shall be based only on valid, reasonable and justifiable grounds to be expressed
in writing, copy furnished the BAC; recommend the imposition of sanctions in accordance
with Article XXIII, and perform such other related functions as may be necessary, including
the creation of a Technical Working Group from a pool of technical, financial and/or legal
experts to assist in the procurement process.
In proper cases, the BAC shall also recommend to the Head of the Procuring Entity
the use of Alternative Methods of Procurement as provided for in Article XVI hereof.
The BAC shall be responsible for ensuring that the Procuring Entity abides by the
standards set forth by this Act and the IRR, and it shall prepare a procurement monitoring
report that shall be approved and submitted by the Head of the Procuring Entity to the GPPB
on a semestral basis. The contents and coverage of this report shall be provided in the IRR.
5
SEC. 13. Observers. To enhance the transparency of the process, the BAC shall,
in all stages of the procurement process, invite, in addition to the representative of the
Commission on Audit, at least two (2) observers to sit in its proceedings, one (1) from a duly
recognized private group in a sector or discipline relevant to the procurement at hand, and
the other from a non-government organization: Provided, however, That they do not have
any direct or indirect interest in the contract to be bid out. The observers should be duly
registered with the Securities and Exchange Commission and should meet the criteria for
observers as set forth in the IRR.
SEC. 14. BAC Secretariat. To assist the BAC in the conduct of its functions, the
Head of the Procuring Entity shall create a Secretariat that will serve as the main support
unit of the BAC. The Head of the Procuring Entity may also designate an existing organic
office within the agency to serve as the Secretariat.
SEC. 15. Honoraria of BAC Members. The Procuring Entity may grant payment
of honoraria to the BAC members in an amount not to exceed twenty five percent (25%) of
their respective basic monthly salary subject to availability of funds. For this purpose, the
Department of Budget and Management (DBM) shall promulgate the necessary guidelines.
Professionalization of BAC, BAC Secretariat and Technical
SEC. 16.
Working Group Members. The GPPB shall establish a sustained training program for
developing the capacity of the BACs, BAC Secretariats and Technical Working Groups of
Procuring Entities, and professionalize the same.
ARTICLE VI
PREPARATION OF BIDDING DOCUMENTS
SEC. 17. Form and Contents of Bidding Documents. The Bidding Documents
shall be prepared by the Procuring Entity following the standard forms and manuals
prescribed by the GPPB. The Bidding Documents shall include the following:
(a)
(b) Instructions to Bidders, including criteria for eligibility, bid evaluation and postqualification, as well as the date, time and place of the pre-bid Conference (where
applicable), submission of bids and opening of bids;
(c)
Terms of Reference;
(d)
Eligibility Requirements;
(e)
(f)
(g)
(h)
(i)
(j)
ARTICLE VII
INVITATION TO BID
SEC. 20. Pre-Procurement Conference. Prior to the issuance of the Invitation
to Bid, the BAC is mandated to hold a pre-procurement conference on each and every
procurement, except those contracts below a certain level or amount specified in the IRR, in
which case, the holding of the same is optional.
The pre-procurement conference shall assess the readiness of the procurement in
terms of confirming the certification of availability of funds, as well as reviewing all relevant
documents in relation to their adherence to law. This shall be attended by the BAC, the unit
or officials who prepared the bidding documents and the draft Invitation to Bid, as well as
consultants hired by the agency concerned and the representative of the end-user.
SEC. 21. Advertising and Contents of the Invitation to Bid. In line with the
principle of transparency and competitiveness, all Invitations to Bid for contracts under
competitive bidding shall be advertised by the Procuring Entity in such manner and for such
length of time as may be necessary under the circumstances, in order to ensure the widest
possible dissemination thereof, such as, but not limited to, posting in the Procuring Entitys
premises, in newspapers of general circulation, the G-EPS and the website of the Procuring
Entity, if available. The details and mechanics of implementation shall be provided in the
IRR to be promulgated under this Act.
The Invitation to Bid shall contain, among others:
(e)
(f) The period of availability of the Bidding Documents, and the place where these
may be secured;
(g)
(h)
ARTICLE VIII
RECEIPT AND OPENING OF BIDS
SEC. 23. Eligibility Requirements for the Procurement of Goods and
Infrastructure Projects. The BAC or, under special circumstances specified in the IRR,
its duly designated organic office shall determine the eligibility of prospective bidders for the
procurement of Goods and Infrastructure Projects, based on the bidders compliance with
the eligibility requirements within the period set forth in the Invitation to Bid. The eligibility
requirements shall provide for fair and equal access to all prospective bidders. The
documents submitted in satisfaction of the eligibility requirements shall be made under oath
by the prospective bidder or by his duly authorized representative certifying to the
correctness of the statements made and the completeness and authenticity of the
documents submitted.
A prospective bidder may be allowed to submit his eligibility requirements
electronically. However, said bidder shall later on certify under oath as to correctness of the
statements made and the completeness and authenticity of the documents submitted.
SEC. 24. Eligibility Requirements and Short Listing for Consulting Services.
The eligibility of prospective bidders for the Procurement of Consulting Services shall be
determined by their compliance with the eligibility requirements prescribed for the
Competitive Bidding concerned, within the period stated in the Invitation to Bid. The
eligibility requirements shall provide for fair and equal access to all prospective bidders. The
prospective bidder shall certify under oath as to the correctness of the statements made,
and the completeness and authenticity of the documents submitted.
A prospective bidder may be allowed to submit his eligibility requirements
electronically. However, said bidder shall later on certify under oath as to correctness of the
statements made and the completeness and authenticity of the documents submitted.
The eligible prospective bidders shall then be evaluated using numerical ratings on
the basis of the short listing requirements prescribed for the Competitive Bidding concerned,
within the period stated in the Invitation to Bid to determine the short list of bidders who
shall be allowed to submit their respective bids.
SEC. 25. Submission and Receipt of Bids. A bid shall have two (2)
components, namely the technical and financial components which should be in separate
8
sealed envelopes, and which shall be submitted simultaneously. The bids shall be received
by the BAC on such date, time and place specified in the invitation to bid. The deadline for
the receipt of bids shall be fixed by the BAC, giving it sufficient time to complete the bidding
process and giving the prospective bidders sufficient time to study and prepare their bids.
The deadline shall also consider the urgency of the procurement involved.
Bids submitted after the deadline shall not be accepted.
Notwithstanding the provisions of this Section and Section 26 of this Act, the GPPB
may prescribe innovative procedures for the submission, receipt and opening of bids
through the G-EPS.
SEC. 26. Modification and Withdrawal of Bids. A bidder may modify his bid,
provided that this is done before the deadline for the receipt of bids. The modification shall
be submitted in a sealed envelope duly identified as a modification of the original bid and
stamped received by the BAC.
A bidder may, through a letter, withdraw his bid or express his intention not to
participate in the bidding before the deadline for the receipt of bids. In such case, he shall
no longer be allowed to submit another Bid for the same contract either directly or
indirectly.
SEC. 27. Bid Security. All Bids shall be accompanied by a Bid security, which
shall serve as a guarantee that, after receipt of the Notice of Award, the winning bidder shall
enter into contract with the Procuring Entity within the stipulated time and furnish the
required performance security. The specific amounts and allowable forms of the Bid security
shall be prescribed in the IRR.
SEC. 28. Bid Validity. Bids and Bid securities shall be valid for such reasonable
period of time indicated in the Bidding Documents. The duration for each undertaking shall
take into account the time involved in the process of Bid evaluation and award of contract.
SEC. 29. Bid Opening. The BAC shall publicly open all bids at the time, date,
and place specified in the bidding documents. The minutes of the bid opening shall be
made available to the public upon written request and payment of a specified fee.
ARTICLE IX
BID EVALUATION
SEC. 30. Preliminary Examination of Bids. Prior to Bid evaluation, the BAC
shall examine first the technical components of the bids using "pass/fail" criteria to
determine whether all required documents are present. Only bids that are determined to
contain all the bid requirements of the technical component shall be considered for opening
and evaluation of their financial component.
SEC. 31. Ceiling for Bid Prices. The ABC shall be the upper limit or ceiling for
the Bid prices. Bid prices that exceed this ceiling shall be disqualified outright from further
participating in the bidding. There shall be no lower limit to the amount of the award.
SEC. 32. Bid for the Procurement of Goods and Infrastructure Projects.
For the procurement of Goods and Infrastructure Projects, the BAC shall evaluate the
financial component of the bids. The bids that passed the preliminary examination shall be
ranked from lowest to highest in terms of their corresponding calculated prices. The bid
with the lowest calculated price shall be referred to as the "Lowest Calculated Bid."
SEC. 33. Bid Evaluation of Short Listed Bidders for Consulting Services.
For the Procurement of Consulting Services, the Bids of the short listed bidders shall be
evaluated and ranked using numerical ratings in accordance with the evaluation criteria
stated in the Bidding Documents, which shall include factors such as, but not limited to,
experience, performance, quality of personnel, price and methodology. The Bids shall be
ranked from highest to lowest in terms of their corresponding calculated ratings. The Bid
with the highest calculated rating shall be the Highest Rated Bid. After approval by the
Head of the Procuring Entity of the Highest Rated Bid, the BAC shall invite the bidder
concerned for negotiation and/or clarification on the following items: financial proposal
submitted by the bidder, terms of reference, scope of services, methodology and work
program, personnel to be assigned to the job, services/facilities/data to be provided by the
Procuring Entity concerned, and provisions of the contract. When negotiations with the
first-in-rank bidder fails, the financial proposal of the second rank bidder shall be opened for
negotiations: Provided, That the amount indicated in the financial envelope shall be made
as the basis for negotiations and the total contract amount shall not exceed the amount
indicated in the envelope and the ABC. Whenever necessary, the same process shall be
repeated until the bid is awarded to the winning bidder.
ARTICLE X
POST-QUALIFICATION
SEC. 34. Objective and Process of Post-qualification. Post-qualification is
the stage where the bidder with the Lowest Calculated Bid, in the case of Goods and
Infrastructure Projects, or the Highest Rated Bid, in the case of Consulting Services,
undergoes verification and validation whether he has passed all the requirements and
conditions as specified in the Bidding Documents.
If the bidder with the Lowest Calculated Bid or Highest Rated Bid passes all the
criteria for post-qualification, his Bid shall be considered the Lowest Calculated Responsive
Bid, in the case of Goods and Infrastructure or the Highest Rated Responsive Bid, in the
case of Consulting Services. However, if a bidder fails to meet any of the requirements or
conditions, he shall be post-disqualified and the BAC shall conduct the post-qualification on
the bidder with the second Lowest Calculated Bid or Highest Rated Bid. If the bidder with
the second Lowest Calculated Bid or Highest Rated Bid is post-disqualified, the same
procedure shall be repeated until the Lowest Calculated Responsive Bid or Highest Rated
Responsive Bid is finally determined.
In all cases, the contract shall be awarded only to the bidder with the Lowest
Calculated Responsive Bid or Highest Rated Responsive Bid.
SEC. 35. Failure of Bidding. There shall be a failure of bidding if:
(a)
(b) No bid qualifies as the Lowest Calculated Responsive Bid or Highest Rated
Responsive Bid; or,
(c) Whenever the bidder with the highest rated/lowest calculated responsive bid
refuses, without justifiable cause to accept the award of contract, as the case may be.
10
Under any of the above instances, the contract shall be re-advertised and re-bid.
The BAC shall observe the same process and set the new periods according to the same
rules followed during the first bidding. After the second failed bidding, however, the BAC
may resort to negotiated procurement as provided for in Section 53 of this Act.
SEC. 36. Single Calculated/Rated and Responsive Bid Submission. A
single calculated/rated and responsive bid shall be considered for award if it falls under any
of the following circumstances:
(a) If after advertisement, only one prospective bidder submits a Letter of Intent
and/or applies for eligibility check, and meets the eligibility requirements or criteria, after
which it submits a bid, which is found to be responsive to the bidding requirements;
(b) If after the advertisement, more than one prospective bidder applies for
eligibility check, but only one bidder meets the eligibility requirements or criteria, after which
it submits a bid which is found to be responsive to the bidding requirements; or
(c) If after the eligibility check, more than one bidder meets the eligibility
requirements, but only one bidder submits a bid, and its bid is found to be responsive to the
bidding requirements.
In all instances, the Procuring Entity shall ensure that the ABC reflects the most
advantageous prevailing price for the Government.
ARTICLE XI
AWARD, IMPLEMENTATION AND TERMINATION OF THE CONTRACT
SEC. 37. Notice and Execution of Award. Within a period not exceeding
fifteen (15) calendar days from the determination and declaration by the BAC of the Lowest
Calculated Responsive Bid or Highest Rated Responsive Bid, and the recommendation of the
award, the Head of the Procuring Entity or his duly authorized representative shall approve
or disapprove the said recommendation. In case of approval, the Head of the Procuring
Entity or his duly authorized representative shall immediately issue the Notice of Award to
the bidder with the Lowest Calculated Responsive Bid or Highest Rated Responsive Bid.
Within ten (10) calendar days from receipt of the Notice of Award, the winning
bidder shall formally enter into contract with the Procuring Entity. When further approval of
higher authority is required, the approving authority for the contract shall be given a
maximum of twenty (20) calendar days to approve or disapprove it.
In the case of government-owned and/or -controlled corporations, the concerned
board shall take action on the said recommendation within thirty (30) calendar days from
receipt thereof.
The Procuring Entity shall issue the Notice to Proceed to the winning bidder not later
than seven (7) calendar days from the date of approval of the contract by the appropriate
authority. All notices called for by the terms of the contract shall be effective only at the
time of receipt thereof by the contractor.
SEC. 38. Period of Action on Procurement Activities. The procurement
process from the opening of bids up to the award of contract shall not exceed three (3)
months, or a shorter period to be determined by the procuring entity concerned. Without
11
prejudice to the provisions of the preceding section, the different procurement activities
shall be completed within reasonable periods to be specified in the IRR.
If no action on the contract is taken by the head of the procuring entity, or by his
duly authorized representative, or by the concerned board, in the case of governmentowned and/or -controlled corporations, within the periods specified in the preceding
paragraph, the contract concerned shall be deemed approved.
SEC. 39. Performance Security. Prior to the signing of the contract, the
winning bidder shall, as a measure of guarantee for the faithful performance of and
compliance with his obligations under the contract prepared in accordance with the Bidding
Documents, be required to post a performance security in such form and amount as
specified in the Bidding Documents.
SEC. 40. Failure to Enter into Contract and Post Performance Security. If,
for justifiable causes, the bidder with the Lowest Calculated Responsive Bid or Highest Rated
Responsive Bid fails, refuses or is otherwise unable to enter into contract with the Procuring
Entity, or if the bidder fails to post the required performance security within the period
stipulated in the Bidding Documents, the BAC shall disqualify the said bidder and shall
undertake post-qualification for the next-ranked Lowest Calculated Bid or Highest Rated Bid.
This procedure shall be repeated until an award is made. However, if no award is possible,
the contract shall be subjected to a new bidding.
In the case of a failure to post the required performance security, the bid security
shall be forfeited without prejudice to the imposition of sanctions prescribed under Article
XXIII.
SEC. 41. Reservation Clause. The Head of the Agency reserves the right to
reject any and all Bids, declare a failure of bidding, or not award the contract in the
following situations:
(a) If there is prima facie evidence of collusion between appropriate public officers
or employees of the Procuring Entity, or between the BAC and any of the bidders, or if the
collusion is between or among the bidders themselves, or between a bidder and a third
party, including any act which restricts, suppresses or nullifies or tends to restrict, suppress
or nullify competition;
(b) If the BAC is found to have failed in following the prescribed bidding
procedures; or
(c) For any justifiable and reasonable ground where the award of the contract will
not redound to the benefit of the government as defined in the IRR.
SEC. 42. Contract Implementation and Termination. The rules and
guidelines for the implementation and termination of contracts awarded pursuant to the
provisions of this Act shall be prescribed in the IRR. The rules and guidelines shall include
standard general and special conditions for contracts.
ARTICLE XII
DOMESTIC AND FOREIGN PROCUREMENT
SEC. 43. Procurement of Domestic and Foreign Goods. Consistent with the
countrys obligations under international treaties or agreements, Goods may be obtained
12
from domestic or foreign sources and the procurement thereof shall be open to all eligible
suppliers, manufacturers and distributors. However, in the interest of availability, efficiency
and timely delivery of Goods, the Procuring Entity may give preference to the purchase of
domestically-produced and manufactured goods, supplies and materials that meet the
specified or desired quality.
ARTICLE XIII
BIDDING OF PROVINCIAL PROJECTS
SEC. 44. Bidding of Provincial Projects. Priority programs and infrastructure
projects funded out of the annual General Appropriations Act which are intended for
implementation within the province shall be subject to the same public bidding and to the
procurement processes prescribed under this Act. For purposes of this Article, Engineering
District civil works projects, subject to consultation with the concerned Members of
Congress, are included and subsumed in the term provincial projects and shall be
governed by this Section and Section 45 hereof.
SEC. 45. Provincial Bidders. Within five (5) years from the effectivity of this
Act, a contractor who participates in the bidding of provincial priority programs and
infrastructure projects, whose principal office is within the same province, and who submits
the lowest bid among the provincial bidders which is higher than the lowest bid made by a
contractor with principal office outside the said province shall be granted the privilege to
match the bid made by the latter: Provided, however, That the release of funds for said
projects shall be published in a local newspaper with the widest circulation and the website
of the DBM, the mechanisms of which shall be spelled-out in the IRR.
ARTICLE XIV
LEASE OF COMPUTERS, COMMUNICATIONS, INFORMATION AND OTHER
EQUIPMENT
SEC. 46. Lease Contracts. Lease of construction and office equipment,
including computers, communication and information technology equipment are subject to
the same public bidding and to the processes prescribed under this Act.
ARTICLE XV
DISCLOSURE OF RELATIONS
SEC. 47. Disclosure of Relations. In addition to the proposed contents of the
Invitation to Bid as mentioned under Section 21 of this Act, all bidding documents shall be
accompanied by a sworn affidavit of the bidder that he or she or any officer of their
corporation is not related to the Head of the Procuring Entity by consanguinity or affinity up
to the third civil degree. Failure to comply with the aforementioned provision shall be a
ground for the automatic disqualification of the bid in consonance with Section 30 of this
Act.
ARTICLE XVI
ALTERNATIVE METHODS OF PROCUREMENT
SEC. 48. Alternative Methods. Subject to the prior approval of the Head of the
Procuring Entity or his duly authorized representative, and whenever justified by the
conditions provided in this Act, the Procuring Entity may, in order to promote economy and
efficiency, resort to any of the following alternative methods of Procurement:
13
14
SEC. 51. Repeat Order. When provided for in the Annual Procurement Plan,
Repeat Order may be allowed wherein the Procuring Entity directly procures Goods from the
previous winning bidder whenever there arises a need to replenish goods procured under a
contract previously awarded through Competitive Bidding, subject to post-qualification
process prescribed in the Bidding Documents and provided all the following conditions are
present:
(a)
contract;
(b)
The unit price must be equal to or lower than that provided in the original
The repeat order does not result in splitting of requisitions or purchase orders;
(c) Except in special circumstances defined in the IRR, the repeat order shall be
availed of only within six (6) months from the date of the Notice to Proceed arising from the
original contract; and,
(d) The repeat order shall not exceed twenty-five percent (25%) of the quantity of
each item of the original contract.
SEC. 52. Shopping. Shopping may be resorted to under any of the following
instances:
(a)
related scopes of work; it is within the contracting capacity of the contractor; the contractor
uses the same prices or lower unit prices as in the original contract less mobilization cost;
the amount involved does not exceed the amount of the ongoing project; and, the
Provided, further, That negotiations for the
contractor has no negative slippage:
procurement are commenced before the expiry of the original contract. Whenever
applicable, this principle shall also govern consultancy contracts, where the consultants have
unique experience and expertise to deliver the required service; or,
(e) Subject to the guidelines specified in the IRR, purchases of Goods from another
agency of the Government, such as the Procurement Service of the DBM, which is tasked
with a centralized procurement of commonly used Goods for the government in accordance
with Letters of Instruction No. 755 and Executive Order No. 359, series of 1989.
SEC. 54. Terms and Conditions for the use of Alternative Methods. The
specific terms and conditions, including the limitations and restrictions, for the application of
each of the alternative methods mentioned in this Article shall be specified in the IRR.
ARTICLE XVII
PROTEST MECHANISM
SEC. 55. Protests on Decisions of the BAC. Decisions of the BAC in all stages
of procurement may be protested to the head of the procuring entity and shall be in writing.
Decisions of the BAC may be protested by filing a verified position paper and paying a nonrefundable protest fee. The amount of the protest fee and the periods during which the
protests may be filed and resolved shall be specified in the IRR.
SEC. 56. Resolution of Protests. The protests shall be resolved strictly on the
basis of records of the BAC. Up to a certain amount to be specified in the IRR, the decisions
of the Head of the Procuring Entity shall be final.
SEC. 57. Non-interruption of the Bidding Process. In no case shall any
protest taken from any decision treated in this Article stay or delay the bidding process.
Protests must first be resolved before any award is made.
SEC. 58. Report to Regular Courts; Certiorari. Court action may be resorted
to only after the protests contemplated in this Article shall have been completed. Cases that
are filed in violation of the process specified in this Article shall be dismissed for lack of
jurisdiction. The regional trial court shall have jurisdiction over final decisions of the head of
the procuring entity. Court actions shall be governed by Rule 65 of the 1997 Rules of Civil
Procedure.
This provision is without prejudice to any law conferring on the Supreme Court the
sole jurisdiction to issue temporary restraining orders and injunctions relating to
Infrastructure Projects of Government.
ARTICLE XVIII
SETTLEMENT OF DISPUTES
SEC. 59. Arbitration. Any and all disputes arising from the implementation of a
contract covered by this Act shall be submitted to arbitration in the Philippines according to
the provisions of Republic Act No. 876, otherwise known as the "Arbitration Law": Provided,
however, That, disputes that are within the competence of the Construction Industry
Arbitration Commission to resolve shall be referred thereto. The process of arbitration shall
16
ARTICLE XIX
CONTRACT PRICES AND WARRANTIES
SEC. 61. Contract Prices. For the given scope of work in the contract as
awarded, all bid prices shall be considered as fixed prices, and therefore not subject to price
escalation during contract implementation, except under extraordinary circumstances and
upon prior approval of the GPPB.
For purposes of this Section, extraordinary circumstances shall refer to events that
may be determined by the National Economic and Development Authority in accordance
with the Civil Code of the Philippines, and upon the recommendation of the procuring entity
concerned.
SEC. 62. Warranty. (a) For the procurement of Goods, in order to assure that
manufacturing defects shall be corrected by the supplier, manufacturer, or distributor, as the
case may be, for a specific time after performance of the contract, a warranty shall be
required from the contract awardee for such period of time as may be provided in the IRR,
the obligation for which shall be covered by either retention money in the amount equivalent
to a percentage of every progress payment, or a special bank guarantee equivalent to a
percentage of the total contract price, to be provided in the IRR. The said amounts shall
only be released after the lapse of the warranty period, provided that the Goods supplied
are free from defects and all the conditions imposed under the contract have been fully met.
(b) For the procurement of infrastructure projects, the contractor shall assume full
responsibility for the contract work from the time project construction commenced up to a
reasonable period as defined in the IRR taking into consideration the scale and coverage of
the project from its final acceptance by the government and shall be held responsible for
any damage or construction of works except those occasioned by force majeure. The
contractor shall be fully responsible for the safety, protection, security, and convenience of
his personnel, third parties, and the public at large, as well as the works, equipment,
installation and the like to be affected by his construction work and shall be required to put
up a warranty security in the form of cash, bank guarantee, letter of credit, Government
Service Insurance System bond, or callable surety bond.
The contractor shall undertake the repair works, at his own expense, of any defect or
damage to the infrastructure projects on account of the use of materials of inferior quality
within ninety (90) days from the time the Head of the Procuring Entity has issued an order
to undertake repair. In case of failure or refusal to comply with this mandate, the
government shall undertake such repair works and shall be entitled to full reimbursement of
expenses incurred therein upon demand.
Any contractor who fails to comply with the preceding paragraph shall suffer
perpetual disqualification from participating in any public bidding and his property or
17
ARTICLE XX
THE GOVERNMENT PROCUREMENT POLICY BOARD
SEC. 63. Organization and Functions. A Government Procurement Policy
Board (GPPB) is hereby established to: (a) protect national interest in all matters affecting
public Procurement, having due regard to the countrys regional and international
obligations; (b) formulate and amend, whenever necessary, the IRR and the corresponding
standard forms for Procurement; (c) ensure that Procuring Entities regularly conduct
Procurement training programs and prepare a Procurement operations manual for all offices
and agencies of government; and (d) conduct an annual review of the effectiveness of this
Act and recommend any amendments thereto, as may be necessary.
The GPPB shall convene within fifteen (15) days from the effectivity of this Act to
formulate the IRR and for other related purposes. The GPPB shall be supported by a
technical support office.
In addition to the powers granted under this Act, the GPPB shall absorb all the
powers, functions and responsibilities of the Procurement Policy Board created under
Executive Order No. 359, series of 1989. All affected functions of the Infrastructure
Committee of the National Economic and Development Authority Board are hereby
transferred to the GPPB.
SEC. 64. Membership. The GPPB shall be composed of the Secretary of the
Department of Budget and Management, as Chairman, the Director-General of the National
Economic and Development Authority, as Alternate Chairman, with the following as
Members; the Secretaries of the Departments of Public Works and Highways, Finance, Trade
and Industry, Health, National Defense, Education, Interior and Local Government, Science
and Technology, Transportation and Communications, and Energy, or their duly authorized
representatives and a representative from the private sector to be appointed by the
President upon the recommendation of the GPPB. The GPPB may invite a representative
from the Commission on Audit to serve as a resource person.
ARTICLE XXI
PENAL CLAUSE
SEC. 65. Offenses and Penalties. (a) Without prejudice to the provisions of
Republic Act No. 3019, otherwise known as the Anti-Graft and Corrupt Practices Act and
other penal laws, public officers who commit any of the following acts shall suffer the
penalty of imprisonment of not less than six (6) years and one (1) day, but not more than
fifteen (15) years:
(1) Open any sealed Bid including but not limited to Bids that may have been
submitted through the electronic system and any and all documents required to be sealed or
divulging their contents, prior to the appointed time for the public opening of Bids or other
documents.
(2) Delaying, without justifiable cause, the screening for eligibility, opening of bids,
evaluation and post evaluation of bids, and awarding of contracts beyond the prescribed
periods of action provided for in the IRR.
18
(3) Unduly influencing or exerting undue pressure on any member of the BAC or
any officer or employee of the procuring entity to take a particular action which favors, or
tends to favor a particular bidder.
(4)
bidding.
(5) When the head of the agency abuses the exercise of his power to reject any
and all bids as mentioned under Section 41 of this Act with manifest preference to any
bidder who is closely related to him in accordance with Section 47 of this Act.
When any of the foregoing acts is done in collusion with private individuals, the
private individuals shall likewise be liable for the offense.
In addition, the public officer involved shall also suffer the penalty of temporary
disqualification from public office, while the private individual shall be permanently
disqualified from transacting business with the Government.
(b) Private individuals who commit any of the following acts, including any public
officer, who conspires with them, shall suffer the penalty of imprisonment of not less than
six (6) years and one (1) day but not more than fifteen (15) years:
(1) When two or more bidders agree and submit different Bids as if they were
bona fide, when they knew that one or more of them was so much higher than the other
that it could not be honestly accepted and that the contract will surely be awarded to the
pre-arranged lowest Bid.
(2) When a bidder maliciously submits different Bids through two or more persons,
corporations, partnerships or any other business entity in which he has interest to create the
appearance of competition that does not in fact exist so as to be adjudged as the winning
bidder.
(3) When two or more bidders enter into an agreement which call upon one to
refrain from bidding for Procurement contracts, or which call for withdrawal of Bids already
submitted, or which are otherwise intended to secure an undue advantage to any one of
them.
(4) When a bidder, by himself or in connivance with others, employ schemes which
tend to restrain the natural rivalry of the parties or operates to stifle or suppress competition
and thus produce a result disadvantageous to the public.
In addition, the persons involved shall also suffer the penalty of temporary or
perpetual disqualification from public office and be permanently disqualified from transacting
business with the Government.
(c) Private individuals who commit any of the following acts, and any public officer
conspiring with them, shall suffer the penalty of imprisonment of not less than six (6) years
and one (1) day but not more than fifteen (15) years:
(1) Submit eligibility requirements of whatever kind and nature that contain false
information or falsified documents calculated to influence the outcome of the eligibility
screening process or conceal such information in the eligibility requirements when the
information will lead to a declaration of ineligibility from participating in public bidding.
19
(2) Submit Bidding Documents of whatever kind and nature that contain false
information or falsified documents or conceal such information in the Bidding Documents, in
order to influence the outcome of the public bidding.
(3) Participate in a public bidding using the name of another or allow another to
use ones name for the purpose of participating in a public bidding.
(4) Withdraw a Bid, after it shall have qualified as the Lowest Calculated
Bid/Highest Rated Bid, or refuse to accept an award, without just cause or for the purpose
of forcing the Procuring Entity to award the contract to another bidder. This shall include
the non-submission within the prescribed time, or delaying the submission of requirements
such as, but not limited to, performance security, preparatory to the final award of the
contract.
(d) When the bidder is a juridical entity, criminal liability and the accessory penalties
shall be imposed on its directors, officers or employees who actually commit any of the
foregoing acts.
SEC. 66. Jurisdiction. Jurisdiction over the offenses defined under this Article
shall belong to the appropriate courts, according to laws existing at the time of the
commission of the offenses.
ARTICLE XXII
CIVIL LIABILITY
SEC. 67. Civil Liability in Case of Conviction. Without prejudice to
administrative sanctions that may be imposed in proper cases, a conviction under this Act or
Republic Act No. 3019 shall carry with it civil liability, which may either consist of restitution
for the damage done or the forfeiture in favor of the government of any unwarranted
benefit derived from the act or acts in question or both, at the discretion of the courts.
SEC. 68. Liquidated Damages. All contracts executed in accordance with this
Act shall contain a provision on liquidated damages which shall be payable in case of breach
thereof. The amount thereof shall be specified in the IRR.
ARTICLE XXIII
ADMINISTRATIVE SANCTIONS
SEC. 69. Imposition of Administrative Penalties. (a) In addition to the
provisions of Articles XXI and XXII of this Act, the Head of the Procuring Entity, subject to
the authority delegated to the BAC, if any, shall impose on bidders or prospective bidders,
the administrative penalty of suspension for one (1) year for the first offense, and
suspension of two (2) years for the second offense from participating in the public bidding
process, for the following violations:
(1) Submission of eligibility requirements containing false information or falsified
documents.
(2) Submission of Bids that contain false information or falsified documents, or the
concealment of such information in the Bids in order to influence the outcome of eligibility
screening or any other stage of the public bidding.
20
(3) Allowing the use of ones name, or using the name of another for purposes of
public bidding.
(4) Withdrawal of a Bid, or refusal to accept an award, or enter into contract with
the government without justifiable cause, after he had been adjudged as having submitted
the Lowest Calculated Responsive Bid or Highest Rated Responsive Bid.
(5) Refusal or failure to post the required performance security within the
prescribed time.
(6)
Refusal to clarify or validate in writing its Bid during post-qualification within a period
of seven (7) calendar days from receipt of the request for clarification.
Any documented unsolicited attempt by a bidder to unduly influence the outcome of
the bidding in his favor.
All other acts that tend to defeat the purpose of the Competitive Bidding.
(b) In addition to the penalty of suspension, the Bid security or the performance
security posted by the concerned bidder or prospective bidder shall also be forfeited.
(c) The Head of the Procuring Entity may delegate to the BAC the authority to
impose the aforementioned administrative penalties.
SEC. 70. Preventive Suspension. The head of the procuring entity may
preventively suspend any member of the Technical Working Group or the Secretariat, or the
BAC if there are strong reasons or prima facie evidence showing that the officials or
employees concerned are guilty of the charges filed against them under Articles XXI and
XXII of this Act or for dishonesty as defined by the Civil Service Laws. In all cases,
procedural and substantive due process as mandated by the Constitution and Civil Service
Laws, rules and regulations, shall be strictly observed.
SEC. 71. Lifting of Suspension and Removal of Administrative Disabilities.
Lifting of preventive suspension pending administrative investigation, as well as removal
of administrative penalties and disabilities shall be in accordance with the provisions of
Sections 52 and 53, Chapter 6 (Civil Service Commission), Book V of Executive Order No.
292, the Administrative Code of 1987.
ARTICLE XXIV
LEGAL ASSISTANCE AND INDEMNIFICATION OF BAC MEMBERS
SEC. 72. Private Legal Assistance. All the members of the BAC are hereby
authorized to engage the services of private lawyers or extend counsel immediately upon
receipt of Court Notice that a civil or criminal action, suit or proceeding is filed against them.
The lawyer's fee shall be part of the indemnification package for the BAC members, subject
to the provisions of Section 73 hereof.
SEC. 73. Indemnification of BAC Members. The GPPB shall establish an
equitable indemnification package for public officials providing services in the BAC, which
may be in the form of free legal assistance, liability insurance, and other forms of protection
and indemnification for all costs and expenses reasonably incurred by such persons in
21
connection with any civil or criminal action, suit or proceeding to which they may be, or
have been made, a party by reason of the performance of their functions or duties, unless
they are finally adjudged in such action or proceeding to be liable for gross negligence or
misconduct or grave abuse of discretion.
In the event of a settlement or compromise, indemnification shall be confined only
on matters covered by the settlement, as to which the Procuring Entity had been advised by
counsel that the public officials to be indemnified have not committed gross negligence or
misconduct in the performance of their functions and duties.
The members of the BAC and the BAC Secretariat shall also be entitled to medical
assistance for injuries incurred in the performance of their functions.
ARTICLE XXV
FINAL PROVISIONS
SEC. 74. Oversight Committee. There is hereby created a Joint Congressional
Oversight Committee to oversee the implementation of this Act for a period not exceeding
five (5) years from the effectivity of this Act. The Committee shall be composed of the
Chairman of the Senate Committee on Constitutional Amendments and Revision of Laws and
two members thereof appointed by the Senate President, and the Chairman of the House
Committee on Appropriations, and two members thereof to be appointed by the Speaker of
the House of Representatives.
SEC. 75. Implementing Rules and Regulations and Standard Forms.
Within sixty (60) days from the promulgation of this Act, the necessary rules and regulations
for the proper implementation of its provisions shall be formulated by the GPPB, jointly with
the members of the Oversight Committee created under Section 74 hereof. The said rules
and regulations shall be approved by the President of the Philippines. For a period not later
than thirty (30) days upon the approval of the implementing rules and regulations, the
standard forms for Procurement shall be formulated and approved.
SEC. 76. Repealing Clause. This law repeals Executive Order No. 40, series of
2001, entitled Consolidating Procurement Rules and Procedures for All National Government
Agencies, Government-Owned-or-Controlled Corporations and/or Government Financial
Institutions, and Requiring the Use of the Government Electronic Procurement System;
Executive Order No. 262, Series of 2000, entitled "Amending Executive Order No. 302, series
of 1996, entitled "Providing Polices, Guidelines, Rules and Regulations for the Procurement
of Goods/Supplies by the National Government" and Section 3 of Executive Order No. 201,
series of 2000, entitled "Providing Additional Policies and Guidelines in the Procurement of
Goods/Supplies by the National Government"; Executive Order No. 302, series of 1996,
entitled "Providing Policies, Guidelines, Rules and Regulations for the Procurement of
Goods/Supplies by the National Government" and Presidential Decree No. 1594 dated June
11, 1978, entitled 'Prescribing Policies, Guidelines, Rules and Regulations for Government
Infrastructure Contracts." This law amends Title Six, Book Two of Republic Act No. 7160,
otherwise known as the "Local Government Code of 1991"; the relevant provisions of
Executive Order No. 164, Series of 1987, entitled "Providing Additional Guidelines in the
Processing and Approval of Contracts of the National Government"; and the relevant
provisions of Republic Act No. 7898 dated February 23, 1995, entitled An Act Providing for
the Modernization of the Armed Forces of the Philippines and for Other Purposes. Any
other law, presidential decree or issuance, executive order, letter of instruction,
administrative order, proclamation, charter, rule or regulation and/or parts thereof contrary
22
to or inconsistent with the provisions of this Act is hereby repealed, modified or amended
accordingly.
SEC. 77. Separability Clause. If any provision of this Act is declared invalid or
unconstitutional, the other provisions not affected thereby shall remain valid and subsisting.
SEC. 78. Effectivity Clause. This Act shall take effect fifteen (15) days following
its publication in the Official Gazette or in two (2) newspapers of general circulation.
23