Energo Catalogue
Energo Catalogue
Energo Catalogue
Projects Limited
a profile
Registered Office:
E42/2,Okhla Industrial Area, Phase-II,
New Delhi - 110 020 (INDIA)
Tel:+91-11-30854901
Fax: +91-11-30854900
E-mail: energo@energoindia.com
URL: www.energoindia.com
Corporate Office:
A-57/4,Okhla Industrial Area, Phase-II,
New Delhi - 110 020 (INDIA)
Tel:+91-11-26385323/28/29/38
Fax: +91-11-26385333
E-mail: energo@energoindia.com
URL: www.energoindia.com
Gurgaon Office:
C-249, Udyog Vihar, Phase - IV
Gurgaon, Haryana (India)
Tel:+91-11-26385323/28/29/38
Fax: +91-11-26385333
E-mail: energo@energoindia.com
URL: www.energoindia.com
Manufacturing Unit:
175-176 K.G. Chavadi,Palakkad
MainRoad, Thirumalayampalyam
Coimbatore - 641 105,
Tamil Nadu (INDIA)
Ph:+91-422-2656544,
Fax: +91-422-2656499
E-mail: energo@energoindia.com
World Class
Solutions
for
Balance of Power Plants
Business model
EPC
In-house Engineering, Procurement & Construction Facility
Current Portfolio includes projects of over 20,000 MW
Capacity
Material Handling
Coal Handling System
Bulk Conveying/Logistics
Port Handling System
Ash Handling System
Operation & Maintenance
Over 10 operational sites with customers including PSUs,
SEBs and Corporate
Reference list includes NTPC, LANCO, APGENCO,
MAHAGENCO, PSPCL, Essar Oil, etc.
Power Plant Development
Developing 2 x 300 MW Coal based power plant in Tamil
Nadu
Renewable Energy
Solar Power Plants: Developing 11MW Plant in Rajasthan
Hydel Power Plants: Developing 21 MW Plant in Jammu &
Kashmir
Energy Services
Energy Audit
Renovation & Modernization
Consultancy & Advisory Services
Remnant Life Assessment & Life Extension
Performance Testing
In house
Energo / Contractors
In house (Energo)
In house (Energo)
Project Development
In house (Energo)
EPC :
Electrical & C&I (Including
Switchyard, Transmission Lines,
Control Rooms)
Construction :
Civil Works Erection &
Commissioning
Energo houses
Engineering, Project
Management, Construction
and Manufacturing facilities
to undertake Coal Handling
Systems for multiple power
projects simultaneously
NTPC Korba
CHP for 2 X 660 MW Kawai
CHP for Jayant Mines, Northern Coalfields Ltd.
CHP for 2 X 660 MW Lanco Amarkantak
CHP for 2 X 660 MW MoserBaer, Annuppur
CHP for 2 X 600 MW Lanco Anpara
CHP for 2 X 600 MW Lanco Udupi
CHP for 4 X 270 MW Abhijeet Chandwa
CHP for 4 X 250 MW JSPL Tamnar
LHP for 2 X 125 MW NLC, Barsingsar
MRHS for 3 X 660 MW Jaypee, Prayagraj
Koniambo Ferro Nickel MHS
Accomplishments:
Largest Conveying Capacity : 4800 TPH
Largest Capacity of
Stacker Reclaimer
: 3X3700 TPH
Largest Capacity of
: 5X25 TIPS of
140 Ton Wagons
Largest Capacity of
: 2X1600 TPH
: 4070 TPH
: 4X2035 TPH
: 3600 mm
: 5 T/hr
Conveyor Capacity
: 4.2 m/sec
4800 TPH
Largest DE/DS
Ventilation Capacities
: 3X800 MW
Duty Applications
Mine End Material Handling Loading Station.
Thermal Power Plant Coal/Lignite Handling
Systems.
Iron Ore & Flux Handling for Steel Plants.
Iron Ore Pellet Handling Wide Conveyors.
Slag Ash Conveyors.
Nickel Chrome Handling Storage & Packaging
Coal Stacking & Reclaiming
Systems.
APGENCO (R&M)
AHP for 2 X 660 MW Kawai TPP
AHP for 3 X 660 MW Mahagenco, Koradi TPP
AHP for 2 X 500 MW NTPL, Tuticorin TPP
AHP for 2 X 250 MW NLC TPP
AHP for 2 X 500 MW NTPC, Talcher (R&M)
AHP for 6 X 210 MW NTPC, Vindhyachal (R&M)
AHP for 1 X 195 MW Kota STPP
Accomplishments:
Largest Bottom Ash Slurry
: 225 TPH
Conveying Capacities
Largest Fly Ash Slurry
: 240 TPH
Conveying Capacities
Largest Ash Slurry Disposal
Capacities
Largest HCSD Capacities
: 800m3/hr
: 273 TPH @
4.5 km
Capacities (Vacuum)
: 260 TPH
Conveying Capacities
(Pressure)
Transport Vessels for Dense Phase
Pneumatic Conveying Systems
: 219 TPH
Longest Distance
Clinker Grinder
Its common knowledge that, on an average, more than 50% of the total supplies in a typical ash / pneumatic handling turn-key contract are
bought-out items including conveying pipes; prime movers such as compressors, vacuum pumps, blowers, Motors, Electrical, Control &
Instrumentation items, etc. Therefore, the expert edge in terms of manufacturing for the Ash Plant supplier comes from their in-house
equipments, besides process design & engineering. We manufacture the following ash / pneumatic handling equipments in-house:
: 1200 meter
Longest Distance
: 11.7 km
Jet Pumps
Vacuum Producers
Wetting Head
Feeder Ejector
Collector Tank
Air Separator Tank
Telescopic Chute
Air Water Conveyor Tank
Fluidizing Feeder
Metering Cut off Gate
Hydromix Dust
Conditioner
Rotary Feeder
Air Washer
Storage Capacities
Aeration Block
Enhydrash Separator / Venturies
Envac Fittings (Alloy C.I)
Enthermal Lock Joints
Sluice Way Liners
Flushing Jetting Nozzles
Special Alloy Castings
Inspection Window / Poke Door
Flushing Apparatus
Encycrubber (Hydrocyclone)
Pressure Valve
Bag Filters & many more...
: 1600 cu m
: 360 TPH
Civil Works
Scope of Work
General Civil & Structural Works
Site improvement works like site clearing, grading,
boundary walls, road & drains, Civil work for ash
dyke, Pump houses including Raw water Pump
Houses, CW pump Houses, switchgear room.
chlorination room / structures, stop log gates, screen,
miscellaneous tanks, Pipe Rack, Raw Water
Reservoir, Fuel handling system, Railway track inside
the plant Miscellaneous buildings such as workshop,
ware house, Admin building, fire station, Fuel Oil
Pump House, Air Washer Room, Gate and Service
Buildings as well as township for the proposed
Thermal Power Plant on EPC Basis.
Accomplishments:
Medical Insurance.
Online CCTV monitoring of large size
Energo / GEA EGI as a part of their EPC responsibilities have in depth experience in Design /
Engineering / Automation of specialized BOP Package, Cooling/ Water /Coal/ Ash/ Fuel Oil /
Compressed Air System including provision of Protection, Metering Online Monitoring Systems.
Generator Transformers,
Station Transformers,
Unit Transformers,
Service Transformers,
Bus Duct including Generator bus ducts,
segregated and non segregated phase bus ducts,
HT switchgear & LT switchgear (Load centre
substation, PDBS) & MCC,
DC System,
UPS System.
Power & Control cables & trays,
Control & relay panels,
Switchyard equipment including SCADA, Lighting
System,
Plant communication system including EPABX &
public address system,
Earthing and lighting protection including Cathodic
protection,
Generator Circuit Breaker.
Electrical lab equipment
Insulation
Transmission
Designing protection system,
energy metering services, test
and analysis of incidents in
electrical installations,
implementation of sub-station C&I
systems, audit of existing HV &
MV lines and sub-stations.
ENERGO is among the top ten fastest growing corporate in Indian Energy / Power
Sector with average CAGR of over 100% in last 5 years, and are in existence
since 1987. Presently, we are doing engineering, manufacturing of BOP Systems
of Thermal Power Plants for major Utility Projects aggregating to 20000MW. We
are also Consultants for all the major Power Plant Renovation & Modernization
Projects currently being funded by the World Bank in India, and have completed
similar assignments for over 80 units of 30/660 MW Ratings. Besides, we are also
leading ESCO Company in India with Services cutting across Municipalities, Power
Plants, Mines, Ports, Industries etc.
te
sa
en
nd
Parameters
SRC
MRC
Developed
Early 1990s
Early 1950s
Brazed
Flooding problem
Negligible
More
Easy
Difficult
More
Less
More
Less
Weight/bundle
Less
More
Air Pockets
Static Pressure
Less
More
Less
More
Co
or
at
ga
le
ph
De
te
a
ns
de
n
Co
ACC Team Technology BV has vast experience in Air Cooled Condenser (ACC)
technology. They have provided consulting services to power sector and other
processing industries spanning across geography (EU, US, China etc.). Following
services are provided by ACC Team Technology BV:
Products
Base Material:
Aluminium 3003
with a Layer of
4343 AlSi
Heller Tower
1950
1970
1990
Aluminum fin
Brazing
Aluminum Layer
SRC Brazing
In conformance with the principle of friendly co-operation, Energo and ACC Team
Technology BV are working together to provide complete solutions for direct dry
condenser cooling (ACC). Similarly for Heller System, Energo and GEA EGI have
entered into long term MoU to co-develop the Indian Market.
Certified Staff
1. Elliptical CS Tube
4. Brazing Process
5. Finned Tube
6. Final Assembly
Water Systems
Scope of Work for Water System
The Total Water Systems critically affect Efficiency and Environmental issues of Thermal
Power Station . It also forms substantial portion of Capital / O&M Cost and therefore, a
very high degree of specialization is required for achieving optimum consumption / cost.
ENERGO / GEA EGI possess comprehensive range of Water Process Technologies and
Project Execution Experience, including Reverse Osmosis, Desalination, Demineralization,
Pre-treatment, Effluent Treatment, Condensate Polishing etc.
We are highly Environment Conscious and highly concerned about optimization of process
/ auxiliary water consumption. Our optimization have reduced water consumption on
Thermal Power Stations by as high as 98%. The process involves Dry Condenser Cooling,
Dry Fly Ash Extraction / Conveying, High Concentration Ash Slurry Disposal (HCSD) and
Zero Effluent Discharge Systems.
References
F H G
B 1
A0
A.5
0
A.2
F PP N
-2
A50
-1
D
A50
PQP P P P
I R
P PPP R GR
H
G
M MMP
Aolatile)
V
F
MP
O
I R
O J MP
FPQP
C
F H I
O R ALKALINE