349 Advance Us CT Boiler Des
349 Advance Us CT Boiler Des
349 Advance Us CT Boiler Des
Page 1 of 6
OTSC 800 MW
Boiler type
Circulation
Once thru Supercritical with low load recirculation Once thru Supercritical with low load recirculation
Layout
Description
Load
HP Heater In
BMCK TMCK 60% TMCR 35% BMCR
Main Steam
Steam flow at SH Outlet t/h
2160.0 1955.5
1123.3
756.0
308.0
306.4
204.8
131.2
Temperature at SH Outlet C
703.0
703
703.0
703.0
Reheat Steam
Steam flow at RH Outlet t/h
1694.7 1617.1
1009.9
724.1
73.28
69.74
48.13
26.51
455.4
4476
458.4
404.3
2.75
2.61
1 82
1.02
70.53
67.13
46.31
25.49
703.0
703.0
703.0
703.0
Feed Water C
3092
305.0
270.0
2400
Unit
Boiler Parameters
Main Steam Flow
tph
2160
2600
kg/cm2(g)
308
255
703/703
568/596
309.2
294.2
SH Duty
MkCal/h
1178
1246
RH Duty
MkCal/h
242
291
Total
MkCal/h
1420
1537
7.6
Base
Heat Duty
Unit
Design Coal
Worst Coal
Proximate Analysis
Indian
Fixed carbon
38.0
30.0
Volatile Matter
26.0
20.0
http://www.infraline.com//power/topical/349AdvanceUSCTBoilerDesign.aspx
10/10/2014
Moisture
Page 2 of 6
8.0
12.0
38.0
Ash
28.0
Total
100
100
HHV
Kcal/kg
4700
4100
LHV
Kcal/kg
Ash
kg/ 10 Kcal
Ultimate Analysis
Carbon
51.2
41.38
Hydrogen
3.00
2.85
Sulphur
0.40
0.50
Nitrogen
1.50
0.75
Oxygen (difference)
7.90
4.52
Moisture
8.00
12.0
Ash
28.00
38.0
50
50
Deg C
1150
1150
ST - Softening temp H = W
Deg C
1200
HT Hemispherical temp H = W / 2
Deg C
Over 1400
1300
FT = fusion temp
Deg C
Over 1400
1400
A - S2O2
56.66
61.85
A - Al2 O3
27.46
27.36
B - Fez O3
7.60
5.18
B - CoO
1.81
1.47
B - MgO
0.96
1.00
B - Na2 O
1.20
0.71
1.94
1.84
Ash Characteristics
Ash Constituents
B - K2 O
A - Ti O2
P2 O5
1.10
0.54
SO3
0.27
0.05
0.16
3.54
Chloride
Site Conditions
z
z
z
http://www.infraline.com//power/topical/349AdvanceUSCTBoilerDesign.aspx
10/10/2014
Page 3 of 6
SH / RH / ECO Arrangement
z
z
z
Design Criteria
z
z
z
http://www.infraline.com//power/topical/349AdvanceUSCTBoilerDesign.aspx
10/10/2014
Page 4 of 6
Unit
NHI
MkCal/h
1746
1894
PA Loading
MkCal/h-m2
4.16
4.52
EPRS Loading
10s kCal/h-m2
1.49
1.62
64577
70478
11/05/2011
FUEL ANALYSIS
11/05/2011
SITE CONDITIONS
11/05/2011
FURNACE SIZING
01/06/2011
10/06/2011
30/06/2011
z
z
z
z
z
z
z
Furnace Sizing
{ Spiral wall height
{ Vertical Wall height
Number of stages of Superheater and Reheater
Location of Superheaters and Reheaters
Heating surface area of Superheater, Reheater in Radiation zone and in Convection zone
Preliminary heating surface arrangement data of Superheater and Reheater (Tube OD, Transverse Pitch, Longitudinal Pitch, Number of loops, Number of
element per assembly, Number of assemblies)
Soot blower location. Furnace opening requirements
Economiser area requirement.
Back pass height requirement
The final pressure part arrangement will be finalised after analysing the feasibility of using T91 materials for Water wall tubes and fins
Advanced Ultra Super Critical Technology
Test Loop for testing fire side corrosion properties of advanced materials
http://www.infraline.com//power/topical/349AdvanceUSCTBoilerDesign.aspx
10/10/2014
Page 5 of 6
ASME Spec,
52.0
11.50
N06617
52.0
9.50
SA 213 S304H
54.0
5.60
SA 213 T91
44.5
moo
SA 213 T91
SH INLET UNK
159.0
30.0
SA 335 P22
219.1
25.0
SA 335 P91
SH OUTLET HEADER
219.1
40.0
N06617
SH OUTLET LINK
127.0
20.0
N06617
168.3
20.0
N06617
127.0
20.0
SA 335 P22
127.0
8.0
SA 213 Gr B
MIXING Piece
219.1
40.0
N06617
UNK TO HRH
219.1
32.0
SA 335 P22
150
164.4
555
127
173.3
434
219.1
49
555
MO
49
5S5
Gate
SH Vent Valve
GLV
PRV
127
164.4
715
PRV
127
173.3
434
2 ton/hr Capacity
Other Equipments
Equipments
Details
Qty
Remarks
MTM Thermocouples
http://www.infraline.com//power/topical/349AdvanceUSCTBoilerDesign.aspx
10/10/2014
Acromat Thermocouples
20
PT
TE-TT
Header Thermocouples
Page 6 of 6
Project Status - Test loop for testing the Fire-side Corrosion property of Advanced Materials (Super 304 H & Inconel 617)
z
z
z
Meeting was held among IGCAR, NTPC and BHEL on 26th May 2011 at Trichy. BHEL presented on the Test loop proposed
Dadri 210 MW unit is taken as reference for implementing the Test loop (final confirmation is to be received from NTPC)
It is decided to place the test loop in the open upper furnace of 210 MW which is in Radiation zone
Project Status - Test loop for testing the Rre-side Corrosion property of Advanced Materials (Super 304H & Irtconel 617)
The following work has been carried out
z
z
z
z
z
z
z
z
The exact tap-off location will be finalised jointly by NTPC and BHEL during Site Visit.
The next course of action will be to review the test loop design, finalization of specification and material forecasting.
http://www.infraline.com//power/topical/349AdvanceUSCTBoilerDesign.aspx
10/10/2014