Alstoms ECO 100 Platform

A new generation of 3MW turbines combining


high power output and three rotor diameters to
optimize wind farm projects in Turkey
Rubn Martnez Fanals
Product Management Alstom Wind
ICCI 2012, Istanbul, April 2012

Alstom Group
3 main activities in 4 sectors
Grid
3.6 bn

Thermal Power
9.7 bn

Corporate
2%
Thermal Power
41%

Grid
20%

Transport
5.6 bn

Renewable Power
11%

Renewable Power
2 bn

Total sales 2010/11:


20.9 bn
2.9 GW offshore wind
substation references

92 000 employees in 100


countries
30 years of wind turbine
expertise

Source: Alstom FY 2010/11

P2

Transport
26%

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

Leading power generation


equipment supplier

Alstom in Turkey

Gebze
Istanbul

Power Transformers &


Service Factories

Sales Office

Ankara

Hatay

Head office
Sales Office
Grid Turnkey Systems Business

Senky wind farm


27 MW 9 x ECO 100

Izmir
Sales Office

OFFICES
FACTORIES
WIND REFERENCES

Over 1,200 employees, a 60-year history


P3

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

Alstoms Wind business


References in Turkey - EMEA
Senky wind farm
27 MW - 9 x ECO 100
Operational in H1 2012
Customer:
Hatay
Senky wind farm

Alstoms first wind power contract in the country


P4

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

Alstoms Wind business


Product platform evolution

30 years of experience in wind technology


P5

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

Alstoms Wind business


Broad product portfolio

International footprint
Richmond
Operations North
America

Output

Rio del Pozo

Saint Nazaire

O&M workshop

Assembly offshore WTG

Somozas
Component Assembly

Toulouse
Site development & Sales office

R&D Group
North America

Assembly WTG

Barcelona

Operations Asia

R&D Headquarter

Barcelona

Bahia
Assembly WTG

So Paulo
Operations Latin America

Headquarter &
Operations EMEA

Buuel
Assembly WTG

Coreses
OFFICES
FACTORIES
R&D

Haliade 1506MW offshore

Beijing

Richmond
Amarillo

6MW

Melbourne

3.0MW
2.7MW

ECO 122

1.67MW

ECO 86

ECO 110

ECO 100

ECO 80

Sales office

Tower Manufacturing

Low

Medium

High

Over 3 000 MW and 2 200 wind turbines in 120 wind farms


installed and under construction
P6

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

Wind
Speed

Alstom Winds development strategy


High

ECO 122

Reduced CoE
Capacity
Factor
Yield

ECO 110

Design to cost
Supply chain excellence
Logistic & site optimisation
Design to reliability
O&M optimisation

ECO 100
Low
High

Lifetime Cost
WTG cost - O&M cost

Low

Reducing the cost of energy of wind power


P7

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

ECO 100 Platform


Rotor
diameter
(m)

Most proven 3MW-class platform in the industry


>460 000 operating hours accumulated since 2008
>350MW installed or under construction
>97% availability demonstrated

122

ECO 122
110

ECO 110
100

ECO 100
m/s

Class III

Class II

Class I

New generation of wind turbines optimising yield in all wind sites


P8

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

Turbine selection criteria todays approach

Traditional industry approach to project


turbine selection
One size fits all traditional approach; one
turbine size/configuration applied to the
entire site
Commodity-type mentality

Traditional approach does not optimise the site wind resource


P9

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

Case study

P 10

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

Case study Project characteristics

90 MW project size target (transmission constrained)


100 square kilometer project area

Mean wind speed for project area is 8.4 m/s


Max wind speed for project area is 9.7 m/s
Objectives of design:

Maximize energy production


+
Minimize BOP costs

Minimize Cost of Energy


P 11

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

Case study 90MWOne size fits all traditional approach


Wind turbine choice based on:
Energy production
Suitability
Most productive areas in the site
require Class I technology
Result
Wind turbines closely positioned high wake effect
Some wind turbines located in wind
speed below class I technology
underutilised

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
P 12 relied
on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is

provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

Simulation
45 x 2MW layout

Case study Traditional layout


45 x 2MW Turbines

P 13

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

Case study 90 MW 3MW layout


~15% lower BOP cost
Fewer turbines leading to fewer
foundations and platforms
Less roads and cabling

Simulation
30 x 3MW layout

Up to 10% higher capacity factor


Lower wake losses
Larger rotor area
Improved wind turbine positioning

3MW turbine results in less wind turbines


P 14

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

Case study 3MW layout


30 x 3MW Turbines

P 15

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

What is POWEROF3 ?

POWEROF3 =

MW
range

Rotor
size

Wind
class

Getting away from the one size fits all traditional approach
P 16

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

POWEROF3
Case study 90MW POWEROF3 layout
Combination of 3 rotor diameters

Simulation
POWEROF3 layout

More efficient use of the wind


resource
Up to 10% higher capacity factor
Increased capacity factor at each
wind turbine position
Applicability across 3 wind classes

Maximum energy production in all available wind classes


P 17

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

POWEROF3
Case study POWEROF3 layout
31 x 2.7-3.0MW Turbines

P 18

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

POWEROF3
Case study 90MW - Summary
45 x 2MW layout

30 x 3MW layout

+10% CF
-15% BOP

P 19

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

POWEROF3 layout

+20% CF
-15% BOP

POWEROF3
ECO 100 Platform: one product and 3 rotor diameters

Standardised components,
leaner production processes
Common spare parts, O&M
trainings and procedures
Reduced cost of energy

POWEROF3 optimises wind farm CoE


P 20

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

POWEROF3
Video

P 21

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

Teekkr ederim !!

P 22

ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited.

www.alstom.com

You might also like