Construction of Sewerage System and WWTP in Velipoja Area - Phase 3

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ID

WBS

Task Name
1 Commencement Order

Duration
1 day

Start
Mon 10/03/14

Finish
Jan '14
Mon 10/03/14

6 days

Tue 11/03/14

Tue 18/03/14

10 days

Wed 19/03/14

Tue 01/04/14

503 days

Wed 02/04/14

Fri 04/03/16

503 days

Wed 02/04/14

Fri 04/03/16

2 Produce contract insurances

3 Site mobilization

4.1

4.1.1

Procurement of materials (Pipes / Manholes / .)

400 days

Wed 02/04/14

Tue 13/10/15

4.1.2

Catchment Area (CA PS3) L=11,909.50m 259manholes

210 days

Wed 02/04/14

Tue 20/01/15

4.1.2.1

160 days

Wed 02/04/14

Tue 11/11/14

4.1.2.1.1

Construct Sewer in Zone A PS5 (including pipe, manholes,testing, etc)

160 days

Wed 02/04/14

Tue 11/11/14

10

4.1.2.1.2

HC Zone A PS5

150 days

Wed 16/04/14

Tue 11/11/14

CONSTRUCTION OF SEWERAGE SYSTEM AND


WWTP IN VELIPOJA AREA - PHASE 3
Construction of Networks in Velipoja (Phase 3)

Zone A (PS5) L=5,703.00m, 126 manholes

11

4.1.2.2

125 days

Wed 02/04/14

Tue 23/09/14

12

4.1.2.2.1

Construct Sewer in Zone B PS4 (including pipe, manholes,testing, etc)

125 days

Wed 02/04/14

Tue 23/09/14

13

4.1.2.2.2

HC Zone B PS4

115 days

Wed 16/04/14

Tue 23/09/14

14

4.1.2.3

50 days

Wed 12/11/14

Tue 20/01/15

15

4.1.2.3.1

Construct Sewer in Zone C PS3 (including pipe, manholes,testing, etc)

50 days

Wed 12/11/14

Tue 20/01/15

16

4.1.2.3.2

HC Zone C PS3

40 days

Wed 26/11/14

Tue 20/01/15

17

4.1.3

Complete Area CA PS3

1 day

Wed 21/01/15

Wed 21/01/15

18

4.1.4

Catchment Area (CA PS2) L=3,049m 67manholes

85 days

Wed 24/09/14

Tue 20/01/15

19

4.1.4.1

Construct Sewer in Zone PS2 (including pipe, manholes,testing, etc)

85 days

Wed 24/09/14

Tue 20/01/15

20

4.1.4.2

HC Zone PS2

75 days

Wed 08/10/14

Tue 20/01/15

21

1 day

Wed 21/01/15

Wed 21/01/15

100 days

Wed 21/01/15

Tue 09/06/15

60 days

Wed 21/01/15

Tue 14/04/15

Zone B (PS4) L=4,491.00m, 99 manholes

Zone C (PS3)

L=1,715.50m, 34 manholes

4.1.5

Complete Area CA PS2

22

4.1.6

Catchment Area (CA FPS) L=4,554m, 90manholes

23

4.1.6.1

24

4.1.6.1.1

Construct Sewer in Zone A FPS (including pipe, manholes,testing, etc)

60 days

Wed 21/01/15

Tue 14/04/15

25

4.1.6.1.2

HC Zone A FPS

50 days

Wed 04/02/15

Tue 14/04/15

26

4.1.6.2

100 days

Wed 21/01/15

Tue 09/06/15

27

4.1.6.2.1

Construct Sewer in Zone B FPS (including pipe, manholes,testing, etc)

100 days

Wed 21/01/15

Tue 09/06/15

28

4.1.6.2.2

HC Zone B FPS

90 days

Wed 04/02/15

Tue 09/06/15

29

4.1.7

Complete Area CA FPS

1 day

Wed 10/06/15

Wed 10/06/15

30

4.1.8

Catchment Area (PSV4) L=2,543m, 54manholes

71 days

Wed 15/04/15

Wed 22/07/15

31

4.1.8.1

Construct Sewer in Zone PSV4 (including pipe, manholes,testing, etc)

71 days

Wed 15/04/15

Wed 22/07/15

32

4.1.8.2

HC Zone PSV4

61 days

Wed 29/04/15

Wed 22/07/15

33

4.1.9

1 day

Thu 23/07/15

Thu 23/07/15

34

4.1.10

56 days

Wed 10/06/15

Wed 26/08/15

35

4.1.10.1

Construct Sewer in Zone PSV3 (including pipe, manholes,testing, etc)

56 days

Wed 10/06/15

Wed 26/08/15

36

4.1.10.2

HC Zone PSV3

46 days

Wed 24/06/15

Wed 26/08/15

37

4.1.11

Complete Area CA (PSV3)

1 day

Thu 27/08/15

Thu 27/08/15

38

4.1.12

Catchment Area (PSV1) L=5,408m, 122manholes

132 days

Thu 23/07/15

Fri 22/01/16

39

4.1.12.1

107 days

Thu 27/08/15

Fri 22/01/16

40

4.1.12.1.1

Construct Sewer in Zone A PSV1 (including pipe, manholes,testing, etc)

107 days

Thu 27/08/15

Fri 22/01/16

41

4.1.12.1.2

HC Zone A PSV1

97 days

Thu 10/09/15

Fri 22/01/16

Zone A (FPS) L=2,191.50m, 45 manholes

Zone B (FPS) L=2,362.50m, 54 manholes

Complete Area CA PSV4


Catchment Area (PSV3) 1,338.50m, 30manholes

Zone A (PSV1) L=2,557.50m, 59manholes

42

4.1.12.2

80 days

Thu 23/07/15

Wed 11/11/15

43

4.1.12.2.1

Construct Sewer in Zone B PSV1 (including pipe, manholes,testing, etc)

80 days

Thu 23/07/15

Wed 11/11/15

44

4.1.12.2.2

HC Zone B PSV1

70 days

Thu 06/08/15

Wed 11/11/15

45

4.1.13

Complete Area CA (PSV1)

1 day

Mon 25/01/16

Mon 25/01/16

46

4.1.14

Catchment Area (PSV2) L=1,234m, 26manholes

35 days

Thu 12/11/15

Wed 30/12/15

47

4.1.14.1

Construct Sewer in Zone PSV2 (including pipe, manholes,testing, etc)

35 days

Thu 12/11/15

Wed 30/12/15

48

4.1.14.2

HC Zone PSV2

25 days

Thu 26/11/15

Wed 30/12/15

49

4.1.15

Complete Area CA (PSV2)

1 day

Thu 31/12/15

Thu 31/12/15

50

4.1.16

Transmission main pipe PSV1-WWTP L=1,445m

30 days

Mon 25/01/16

Fri 04/03/16

51

4.2

421 days

Wed 02/04/14

Wed 11/11/15

52

4.2.1

Procurement of materials (E/M equipments / Pipes / Fittings / )

300 days

Wed 02/04/14

Tue 26/05/15

53

4.2.2

Construction of PS 5

110 days

Wed 16/04/14

Tue 16/09/14

54

4.2.2.1

Reinforced concrete chamber

60 days

Wed 16/04/14

Tue 08/07/14

55

4.2.2.2

Service rooms and site works

60 days

Wed 23/04/14

Tue 15/07/14

56

4.2.2.3

Install mechanical equipment and pipework

10 days

Wed 16/07/14

Tue 29/07/14

57

4.2.2.4

Install electrical equipment

10 days

Wed 30/07/14

Tue 12/08/14

58

4.2.2.5

Permanent power connection

5 days

Wed 13/08/14

Tue 19/08/14

59

4.2.2.6

Tests of equipment PS 5

20 days

Wed 20/08/14

Tue 16/09/14

60

4.2.3

Complete PSV 5

1 day

Wed 17/09/14

Wed 17/09/14

61

4.2.4

Construction of PSV3

105 days

Wed 09/07/14

Tue 02/12/14

62

4.2.4.1

Reinforced concrete chamber

60 days

Wed 09/07/14

Tue 30/09/14

63

4.2.4.2

Install mechanical equipment and pipework

10 days

Wed 01/10/14

Tue 14/10/14

64

4.2.4.3

Install electrical equipment

10 days

Wed 15/10/14

Tue 28/10/14

65

4.2.4.4

Permanent power connection

5 days

Wed 29/10/14

Tue 04/11/14

66

4.2.4.5

Tests of equipment PSV3

20 days

Wed 05/11/14

Tue 02/12/14

67

4.2.5

Complete PSV3

1 day

Wed 03/12/14

Wed 03/12/14

68

4.2.6

Construction of PSV2

110 days

Wed 01/10/14

Tue 03/03/15

69

4.2.6.1

Reinforced concrete chamber

60 days

Wed 01/10/14

Tue 23/12/14

70

4.2.6.2

Service rooms and site works

60 days

Wed 08/10/14

Tue 30/12/14

71

4.2.6.3

Install mechanical equipment and pipework

10 days

Wed 31/12/14

Tue 13/01/15

72

4.2.6.4

Install electrical equipment

10 days

Wed 14/01/15

Tue 27/01/15

73

4.2.6.5

Permanent power connection

74

4.2.6.6

Tests of equipment PSV2

75

4.2.7

76

4.2.8

77

4.2.8.1

78

Zone B (PSV1) L=2,850.50, 63manholes

Construction of Pumping Station in Velipoja (Phase 3)

5 days

Wed 28/01/15

Tue 03/02/15

20 days

Wed 04/02/15

Tue 03/03/15

1 day

Wed 04/03/15

Wed 04/03/15

105 days

Wed 24/12/14

Tue 19/05/15

Reinforced concrete chamber

60 days

Wed 24/12/14

Tue 17/03/15

4.2.8.2

Install mechanical equipment and pipework

10 days

Wed 18/03/15

Tue 31/03/15

79

4.2.8.3

Install electrical equipment

10 days

Wed 01/04/15

Tue 14/04/15

80

4.2.8.4

Permanent power connection

5 days

Wed 15/04/15

Tue 21/04/15

81

4.2.8.5

Tests of equipment PS 4

20 days

Wed 22/04/15

Tue 19/05/15

82

4.2.9

1 day

Wed 20/05/15

Wed 20/05/15

Complete PSV2
Construction of PS 4

Complete PS 4

83

4.2.10

105 days

Wed 18/03/15

Tue 11/08/15

84

4.2.10.1

Reinforced concrete chamber

60 days

Wed 18/03/15

Tue 09/06/15

85

4.2.10.2

Install mechanical equipment and pipework

10 days

Wed 10/06/15

Tue 23/06/15

86

4.2.10.3

Install electrical equipment

10 days

Wed 24/06/15

Tue 07/07/15

87

4.2.10.4

Permanent power connection

5 days

Wed 08/07/15

Tue 14/07/15

88

4.2.10.5

Tests of equipment PSV4

20 days

Wed 15/07/15

Tue 11/08/15

89

4.2.11

Complete PSV4

1 day

Wed 12/08/15

Wed 12/08/15

90

4.2.12

Construction of PSV1

110 days

Wed 10/06/15

Tue 10/11/15

91

4.2.12.1

Reinforced concrete chamber

60 days

Wed 10/06/15

Tue 01/09/15

92

4.2.12.2

Service rooms and site works

60 days

Wed 17/06/15

Tue 08/09/15

93

4.2.12.3

Install mechanical equipment and pipework

10 days

Wed 09/09/15

Tue 22/09/15

94

4.2.12.4

Install electrical equipment

10 days

Wed 23/09/15

Tue 06/10/15

95

4.2.12.5

Permanent power connection

5 days

Wed 07/10/15

Tue 13/10/15

96

4.2.12.6

Tests of equipment PSV1

20 days

Wed 14/10/15

Tue 10/11/15

97

4.2.13

1 day

Wed 11/11/15

Wed 11/11/15

100 days

Mon 19/10/15

Fri 04/03/16

98
Project: WP Sewer REV1
Date: Thu 06/03/14

Construction of PSV4

Complete PSV1

5 Prepare deliverables for Provisional Acceptance (As-built, O&M Manuals, etc)


Task

Split

Progress

Milestone

Apr '14

Jul '14

Oct '14

Jan '15

Apr '15

Jul '15

Oct '15

Jan '16

10/03

PIPEWORK Team 2;PIPEWORK Team 1;PIPEWORK Team 5

PIPEWORK Team 3;PIPEWORK Team 4;PIPEWORK Team 5

PIPEWORK Team 1;PIPEWORK Team 2;PIPEWORK Team 5

21/01
PIPEWORK Team 5;PIPEWORK Team 3;PIPEWORK Team 4

21/01

PIPEWORK Team 3;PIPEWORK Team 4;PIPEWORK Team 5

PIPEWORK Team 1;PIPEWORK Team 2

10/06
PIPEWORK Team 3;PIPEWORK Team 4;PIPEWORK Team 5

23/07
PIPEWORK Team 1;PIPEWORK Team 2

27/08

PIPEWORK Team 1;PIPEWORK

PIPEWORK Team 5;PIPEWORK Team 3;PIPEWORK Team 4

25/01
PIPEWORK Team 5;PIPEWORK Team 3;PIP

31/12
PIPEWORK

CONCRETE Team;BUILDING Team;E/M Team

17/09
CONCRETE Team;E/M Team

03/12
CONCRETE Team;BUILDING Team;E/M Team

04/03
CONCRETE Team;E/M Team

20/05
CONCRETE Team;E/M Team

12/08
CONCRETE Team;BUILDING Team;E/M Team

11/11

Summary

Project Summary

External Tasks
Page 1

External Milestone