Bausch + Strbel Installation and Operational Qualification
Table of Contents
2.
Alarm Tests
2.1 Test Procedure for Alarm Tests
2.2 Alarm Tests
3.
2.2.1
2.2.2
Functional Tests
3.1 Test Procedure for Functional Tests
3.2 Functional Tests
4.
3.2.1
3.2.2
4.2.2
OQ_AT_01
FAW 1005, 52554
Alarm Tests
2.
Alarm Tests
2.1
Page 1 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
2.2
Alarm Tests
2.2.1
Page
Alarm Message
10
11
12
13
14
15
16
17
18
19
20
21
22
OQ_AT_01
FAW 1005, 52554
Alarm Tests
Page
Alarm Message
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
Page 3 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
Page
Alarm Message
43
44
45
46
9122 Systemfehler /
System fault
Page 4 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
2.2.2
The Alarm Test protocols are completely described and done according to Bausch+Strbel
Qualification standard.
The alarm tests were performed with program version (PLC program)
P52554
The alarm tests were performed with program version (operating panel)
B52554
Page 5 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
1010
Schutzschalter ausgelst /
Protection switch triggered
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
Y
e
s
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
j j
j j
N
o
Date:
( YES / NO *)
Signature:
Page 6 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
1010
Schutzschalter ausgelst /
Protection switch triggered
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
Y
e
s
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
j j
j j
N
o
Date:
( YES / NO *)
Signature:
Page 7 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
1010
Schutzschalter ausgelst /
Protection switch triggered
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
Y
e
s
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
j j
j j
N
o
Date:
( YES / NO *)
Signature:
Page 8 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
1010
Schutzschalter ausgelst /
Protection switch triggered
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
Y
e
s
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
j j
j j
N
o
Date:
( YES / NO *)
Signature:
Page 9 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
1010
Schutzschalter ausgelst /
Protection switch triggered
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
Y
e
s
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
j j
j j
N
o
Date:
( YES / NO *)
Signature:
Page 10 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
1010
Schutzschalter ausgelst /
Protection switch triggered
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
Y
e
s
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
j j
j j
N
o
Date:
( YES / NO *)
Signature:
Page 11 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
1010
Schutzschalter ausgelst /
Protection switch triggered
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
Y
e
s
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
j j
j j
N
o
Date:
( YES / NO *)
Signature:
Page 12 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
1010
Schutzschalter ausgelst /
Protection switch triggered
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
Y
e
s
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
j j
j j
N
o
Date:
( YES / NO *)
Signature:
Page 13 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
1110
berlast Hauptantrieb /
Overload main drive
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
Y
e
s
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
j j
j j
N
o
Date:
( YES / NO *)
Signature:
Page 14 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
1130
berlast Verkleidung /
Overload machine guard
References:
Internal Order
Prerequisites:
Action:
Y
e
s
j j
j j
j j
j j
Action:
Acknowledgement:
j j
j j
N
o
Date:
( YES / NO *)
Signature:
Page 15 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
1465
Strung Hauptantrieb /
Fault: main drive
Y
e
s
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
j j
j j
N
o
Date:
( YES / NO *)
Signature:
Page 16 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
3000
NOT-AUS bettigt /
Emergency stop button pressed
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
Y
e
s
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
j j
j j
N
o
Date:
( YES / NO *)
Signature:
y<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<yyyyyyyyyy<<qqa<aaaa
Page 17 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
3050
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
N
o
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
Clear fault
j j
j j
Y
e
s
Date:
( YES / NO *)
Signature:
Page 18 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
3050
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
N
o
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
Clear fault
j j
j j
Y
e
s
Date:
( YES / NO *)
Signature:
Page 19 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
3060
berlast Einschieber /
Overload infeed pusher
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
Y
e
s
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
Clear fault
j j
j j
N
o
Date:
( YES / NO *)
Signature:
Page 20 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
3300
Verkleidung offen /
Guard open
References:
Internal Order
Prerequisites:
Action:
Y
e
s
j j
j j
Action:
Close guard
Acknowledgement:
j j
Remarks:
Date:
( YES / NO *)
Signature:
Page 21 of 46
j j
j j
N
o
OQ_AT_01
FAW 1005, 52554
Alarm Tests
3601
Positionierzeit abgelaufen /
Positioning time exceeded
Y
e
s
References:
Internal Order
Prerequisites:
Action:
j j
j j
Acknowledgement:
Clear fault
j j
Remarks:
Date:
( YES / NO *)
Signature:
Page 22 of 46
j j
j j
N
o
OQ_AT_01
FAW 1005, 52554
Alarm Tests
3670
Schaltgetriebe entriegelt /
Gear shift unlocked
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
Y
e
s
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
Automatically
j j
j j
N
o
Date:
( YES / NO *)
Signature:
Page 23 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
3671
References:
Internal Order
Prerequisites:
Action:
Y
e
s
j j
j j
Action:
Compare the size datas at the operating panel with the size datas at the machine. Both size datas must be the same.
Acknowledgement:
Clear fault
j j
Remarks:
Date:
( YES / NO *)
Signature:
Page 24 of 46
j j
j j
N
o
OQ_AT_01
FAW 1005, 52554
Alarm Tests
3730
Y
e
s
N
o
References:
Internal Order
Prerequisites:
1) Machine in operation
j j
j j
Action:
j j
Action:
Acknowledgement:
Clear fault
j j
j j
Date:
( YES / NO *)
Signature:
Page 25 of 46
j j
OQ_AT_01
FAW 1005, 52554
Alarm Tests
3731
Y
e
s
N
o
References:
Internal Order
Prerequisites:
1) Machine in operation
j j
j j
Action:
j j
Action:
Acknowledgement:
Clear fault
j j
j j
Date:
( YES / NO *)
Signature:
Page 26 of 46
j j
OQ_AT_01
FAW 1005, 52554
Alarm Tests
3821
Einlaufschnecke ausgerastet /
Infeed scroll disengaged
Y
e
s
N
o
References:
Internal Order
Prerequisites:
1) Machine in operation
j j
j j
Action:
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
Clear fault
j j
j j
Date:
( YES / NO *)
Signature:
Page 27 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
4851
Y
e
s
N
o
References:
Internal Order
Prerequisites:
1) Machine in operation
j j
j j
Action:
Empty UST
Or move float switch 42S2 UST or lowest end stop (attention
hot water !)
Action:
j j
2) Machine stops
j j
j j
j j
Fill UST
Or release float switch
Acknowledgement:
Clear fault
j j
j j
Date:
( YES / NO *)
Signature:
Page 28 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
4870
References:
Internal Order
Prerequisites:
Action:
N
o
j j
j j
2) Machine stops
j j
j j
Action:
Dont stop the pressure supply for M1 compressed air any longer
Acknowledgement:
Clear fault
j j
j j
Y
e
s
Date:
( YES / NO *)
Signature:
Page 29 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
4871
References:
Internal Order
Prerequisites:
Action:
N
o
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
Clear fault
j j
j j
Y
e
s
Date:
( YES / NO *)
Signature:
Page 30 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
4875
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
N
o
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
Clear fault
j j
j j
Y
e
s
Date:
( YES / NO *)
Signature:
Page 31 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
4882
References:
Internal Order
Prerequisites:
Action:
N
o
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
Clear fault
j j
j j
Y
e
s
Date:
( YES / NO *)
Signature:
Page 32 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
4900
Maschinenleistung zu hoch /
Machine speed too high
Y
e
s
N
o
References:
Internal Order
Prerequisites:
1) Machine in operation
j j
j j
Action:
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
Clear fault
j j
j j
Date:
( YES / NO *)
Signature:
Page 33 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
5207
References:
Internal Order
Prerequisites:
Action:
Y
e
s
j j
j j
2) Machine stops
j j
j j
Action:
Remove cover
Acknowledgement:
Clear fault
j j
j j
N
o
Date:
( YES / NO *)
Signature:
Page 34 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
5284
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
N
o
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
Clear fault
j j
j j
Y
e
s
Date:
( YES / NO *)
Signature:
Page 35 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
5285
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
N
o
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
Clear fault
j j
j j
Y
e
s
Date:
( YES / NO *)
Signature:
Page 36 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
5286
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
N
o
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
Clear fault
j j
j j
Y
e
s
Date:
( YES / NO *)
Signature:
Page 37 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
5324
Strung PROFIBUS /
Fault PROFIBUS
Y
e
s
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
j j
j j
2) Machine stops
j j
j j
Action:
None
Acknowledgement:
j j
j j
N
o
Date:
( YES / NO *)
Signature:
Page 38 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
5324
Strung PROFIBUS /
Fault PROFIBUS
Y
e
s
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
N
o
j j
Acceptance Criteria: 1) Message appears (in window M883 the faulty slave is shown, j j
here: 00000 00000 00000 10000 )
2) Machine stops
j j
j j
Action:
Acknowledgement:
j j
j j
Date:
( YES / NO *)
Signature:
Page 39 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
5324
Strung PROFIBUS /
Fault PROFIBUS
Y
e
s
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
N
o
j j
Acceptance Criteria: 1) Message appears (in window M883 the faulty slave is shown, j j
here: 00000 00000 00001 00000 )
2) Machine stops
j j
j j
Action:
Acknowledgement:
j j
j j
Date:
( YES / NO *)
Signature:
Page 40 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
5413
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
N
o
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
Clear fault
j j
j j
Y
e
s
Date:
( YES / NO *)
Signature:
Page 41 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
7500
Objektmangel Einlauf /
Too few containers at infeed
Y
e
s
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
j j
j j
2) Machine stops
j j
Action:
Acknowledgement:
Automatically
j j
j j
Date:
( YES / NO *)
Signature:
Page 42 of 46
N
o
OQ_AT_01
FAW 1005, 52554
Alarm Tests
7650
Stau Tunnel /
Too many containers at tunnel
Y
e
s
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
j j
j j
2) Machine stops
j j
Action:
Acknowledgement:
Automatically
j j
j j
Date:
( YES / NO *)
Signature:
Page 43 of 46
N
o
OQ_AT_01
FAW 1005, 52554
Alarm Tests
7721
Y
e
s
N
o
References:
Internal Order
Prerequisites:
1) Machine in operation
j j
2) DHT in operation
j j
Action:
j j
2) Machine stops
Action:
Acknowledgement:
Clear fault
j j
j j
j j
Date:
( YES / NO *)
Signature:
Page 44 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
9000
Steuerspannung aus /
Control voltage off
Y
e
s
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
j j
j j
2) Machine stops
j j
j j
Action:
Acknowledgement:
j j
j j
N
o
Date:
( YES / NO *)
Signature:
Page 45 of 46
OQ_AT_01
FAW 1005, 52554
Alarm Tests
9122
Systemfehler /
System fault
Y
e
s
References:
Internal Order
Prerequisites:
Action:
j j
j j
Action:
Acknowledgement:
j j
Remarks:
Date:
( YES / NO *)
Signature:
11
Page 46 of 46
j j
j j
N
o
OQ_FT_01
FAW 1005, 52554
Functional Tests
3.
Functional Tests
3.1
Page 1 of 13
OQ_FT_01
FAW 1005, 52554
Functional Tests
3.2
Functional Tests
3.2.1
Page
Test Description
Acceptance Criteria
Loss of power
Main Drive
The main drive can be started and stopped at the operating panel and can be
adjusted between 10% 100%
Infeed Belt
The infeed belt can be started and stopped at the operating panel and can be
adjusted between 10% 100%
10
11
12+
13
Page 2 of 13
OQ_FT_01
FAW 1005, 52554
Functional Tests
3.2.2
The Functional Test protocols are completely described and done according to
Bausch+Strbel Qualification standard.
The functional tests were performed with program version (PLC program)
P52554
The functional tests were performed with program version (operating panel)
B52554
Page 3 of 13
OQ_FT_01
FAW 1005, 52554
Functional Tests
Loss of power
Y
e
s
References:
Internal Order
Prerequisites:
1) Machine in operation
Action:
N
o
j j
j j
j j
j j
j j
j j
Date:
( YES / NO *)
Signature:
Page 4 of 13
OQ_FT_01
FAW 1005, 52554
Functional Tests
Internal Order
Prerequisites:
1) Machine in operation
Action:
During a test run with container no. 1 (2R vials 16x35 mm) all
containers must be processed without any troubles:
Y
e
s
N
o
j j
1) No fallen containers
2) No broken glass
3) No jammed or scratched containers
4) Not too few containers at infeed or too many containers at
discharge caused by defects
Acceptance Criteria: All containers must be processed during a test run without any
troubles (no fallen containers, no broken glass, and no jammed
or scratched containers, not too few containers at infeed or too
many containers at discharge caused by defects)
5) from the transport belt into the transport grippers
j j
j j
j j
Date:
( YES / NO *)
Signature:
Page 5 of 13
OQ_FT_01
FAW 1005, 52554
Functional Tests
Internal Order
Prerequisites:
1) Machine in operation
Action:
During a test run with container no. 2 (10R vials 24x45 mm) all
containers must be processed without any troubles:
Y
e
s
N
o
j j
1) No fallen containers
2) No broken glass
3) No jammed or scratched containers
4) Not too few containers at infeed or too many containers at
discharge caused by defects
Acceptance Criteria: All containers must be processed during a test run without any
troubles (no fallen containers, no broken glass, and no jammed
or scratched containers, not too few containers at infeed or too
many containers at discharge caused by defects)
5) from the transport belt into the transport grippers
j j
j j
j j
Date:
( YES / NO *)
Signature:
Page 6 of 13
OQ_FT_01
FAW 1005, 52554
Functional Tests
Internal Order
Prerequisites:
1) Machine in operation
Action:
During a test run with container no. 3 (50H vials 42,5x73 mm)
all containers must be processed without any troubles:
Y
e
s
N
o
j j
1) No fallen containers
2) No broken glass
3) No jammed or scratched containers
4) Not too few containers at infeed or too many containers at
discharge caused by defects
Acceptance Criteria: All containers must be processed during a test run without any
troubles (no fallen containers, no broken glass, and no jammed
or scratched containers, not too few containers at infeed or too
many containers at discharge caused by defects)
5) from the transport belt into the transport grippers
j j
j j
j j
Date:
( YES / NO *)
Signature:
Page 7 of 13
OQ_FT_01
FAW 1005, 52554
Functional Tests
Main drive
Y
e
s
References:
Internal Order
Prerequisites:
Action:
Start the main drive through pushing the start button at the operating panel
Change the speed for the main drive at the operating panel between 10% and 100%
Stop the main drive through pushing the stop button at the operating panel
N
o
j j
j j
j j
Date:
( YES / NO *)
Signature:
Page 8 of 13
OQ_FT_01
FAW 1005, 52554
Functional Tests
Infeed belt
Y
e
s
References:
Internal Order
Prerequisites:
Action:
Start the infeed belt through pushing the start button at the operating panel
Change the speed for the infeed belt at the operating panel between 10% and 100%
Stop the infeed belt through pushing the stop button at the operating panel
N
o
j j
j j
j j
Date:
( YES / NO *)
Signature:
Page 9 of 13
OQ_FT_01
FAW 1005, 52554
Functional Tests
Y
e
s
References:
Internal Order
Prerequisites:
Action:
N
o
j j
Acceptance Criteria: The machine guard can be opened and closed at the operating
panel:
1) The machine guard is opening while activating the select
switch at the operating panel (turn right side)
j j
j j
3) The message 3300 Guard open will shown at the operating panel
j j
j j
5) The machine guard goes lower and stops after reaching the
bottom limit
j j
Date:
( YES / NO *)
Signature:
Page 10 of 13
OQ_FT_01
FAW 1005, 52554
Functional Tests
Y
e
s
References:
Internal Order
Prerequisites:
Action:
N
o
j j
Acceptance Criteria: Following functions, which were assigned to the switching points
of the float switch in the UST, are executed:
1) When the level falls under the lowest end of the float switch,
the pump is switched off and the media valve V4.3 must be
opened and WFI water is filled into the UST
j j
j j
j j
j j
j j
6) When the highest end of the float switch is reached, the media valve V4.3 is closed
j j
Date:
( YES / NO *)
Signature:
Page 11 of 13
OQ_FT_01
FAW 1005, 52554
Functional Tests
Y
e
s
N
o
References:
Internal Order
Prerequisites:
1) Machine in operation
j j
j j
j j
Action:
Page 12 of 13
OQ_FT_01
FAW 1005, 52554
Functional Tests
Y
e
s
Acceptance Criteria: 1) The calculated sum and the shown value at the resettable
counter must be equal with the total amount of processed
Vials
2) The difference of the two counter values (from the non resettable counter) must be equal with the total amount of processed vials
Date:
( YES / NO *)
Signature:
12
Page 13 of 13
N
o
j j
j j
OQ_BT_01
FAW 1005, 52554
Functional Tests of the Operating Panel
4.
4.1
Test Procedure
Aims:
This test ensures that the operating panel functions as described in chapter 4 of
the instruction manual. The contents and functions of all the windows are also
checked to ensure that they are conform.
Procedure:
The functional testing of the operating panel is carried out according to chapter 4
of the instruction manual for the FAW 1005, serial no. 52554.
Tests which have been carried out and have passed are signed by the tester.
Each point signed by the tester confirms that the test was carried out and that the
function complies with the description in the instruction manual.
In the event of a failed test, the testers will fill out the corresponding deviation
sheet(s) and place the deviation sheet(s) in Volume 1, Chapter 5: Deviation
sheets. Before repeating the test, the functions on which it is based are checked
and any necessary corrections are made to the instruction manual.
Function keys: Every function key is activated. It is verified that the action is as the
operating panel test declared specification. For function keys which are security
controlled, access is tried for every security group. It is verified that access is possible as specified in the operating panel test.
Screens: Every screen is compared with the screens specified in the operating
panel test. The screens must be corresponded in all elements.
Entry fields: For every numeric entry field a number equalling 0, 50 and 100% of
the full scale is entered. A value below respectively above allowed range is entered
and it is verified, that the appropriated value does not change. For entry fields
which are security controlled, access is tried for every security group. It is verified
that access is possible as specified in the operating panel test.
Page 1 of 6
OQ_BT_01
FAW 1005, 52554
Functional Tests of the Operating Panel
4.2
Page 2 of 6
OQ_BT_01
FAW 1005, 52554
Functional Tests of the Operating Panel
4.2.1
Page 3 of 6
OQ_BT_01
FAW 1005, 52554
Functional Tests of the Operating Panel
Internal Order
Prerequisites:
Y
e
s
N
o
j j
B52554D______
Check:
Acceptance Criteria: 1. The following action of all function keys are as the test document declared specification
j j
2. All limits of the entry fields are as the test document declared
specification
j j
j j
j j
j j
( YES / NO *)
Date:
Signature:
Page 4 of 6
OQ_BT_01
FAW 1005, 52554
Functional Tests of the Operating Panel
4.2.2
Page 5 of 6
OQ_BT_01
FAW 1005, 52554
Functional Tests of the Operating Panel
Y
e
s
N
o
References:
Internal Order
Prerequisites:
j j
2. The test document developed out of the chapter 4 of the english instruction manual is available
j j
Action:
B52554E______
Check:
Acceptance Criteria: 1. The following action of all function keys are as the test document declared specification
j j
2. All limits of the entry fields are as the test document declared
specification
j j
j j
j j
j j
( YES / NO *)
Date:
Signature:
13
Page 6 of 6