Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Todai Page 1 of 4

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 4

TODAI Page 1 of 4

B. T. TODAI
C-202, Keshavkunj-3, Sector-14, Plot-9, Sanpada, Navi Mumbai, INDIA-400705
Cell: +919769530795, +919892530795 Email: todai@rediffmail.com, bttodai@gmail.com

CONSTRUCTION MANAGER - Offshore / Onshore

Proven general construction expertise with aligned planning & meeting the targets of the project within the contractual
milestones by coordinating with Engineering, Procurement, Mechanical Completion & Pre-Commissioning; and interface with
Hook-up & Offshore commissioning team.
Extensive business minded internationally in profit & business growth, in multicultural environments.

Highly motivated and results driven Mechanical Engineer with more than 24 years of continuous experience. Aggressive at
identifying and resolving inefficient procedures. Adept at completing demanding projects within crucial timelines. Thorough,
detail and process oriented, strong follow-through skills. Known for analyzing a situation, and quickly implementing
innovative resolutions. Demonstrating excellent interpersonal skills across all levels including the effective exchange of
complex technical. Flexibility with respect to long and variable hours of work.

14 years Onshore experience oil & gas industry * 6.1/2 years on Offshore platforms * Excellent work ethic’s * Works independently or as part of team and shows initiative *
Trustworthy and will inspire confidence * Outgoing and enjoys new challenges and experiences

PROFESSIONAL EXPERIENCE

Shell Pearl GTL Project, CCIC / TCC – JV


From October, 2008 – May 2009
Client / Owner: SHELL, KBR, QATAR PETROLEUM
Project: Gas to Liquid project

Construction Coordinator (Project Engineer)


_______________________________________________________________________________________________
Coordinating with technical team resources and meetings.
Field technical interface with design engineering.
Report to Construction Manager, for day-to-day activities.
Maintain Site queries log, and document/distribute requests and replies; interface with document control.
Review technical changes requested by field engineers and determine the routing Design Engineer.
Familiar with the contract, plans, and specifications.
Prepare mark-ups for, and review, as-builts.
Audit construction control sets and interface with field Document Control.
Review of documentation - and follow through to completion – of all engineering change notifications.
Provide engineering input to QA/QC.
Generate on-site engineering change notifications as required for the field & ensure that they are implemented.
Perform additional assignments as directed by the Construction Manager or Project Engineering Manager.
Prepare 5-Week Look-Ahead Material Request(s) & prepare requisitions for Procurement.
Review requisitions for material purchases prepared by other Field Engineers.
Assist the Project Engineering Manager with Plant Performance Testing.
Provide documentation for change order requests.
Responsible for generation of mechanical punch lists.

Punj Lloyd Limited, Mumbai


From December, 2007 – Sept 2008
Client: ONGC, Mumbai High Offshore
Project: Heera Re-Development project

Construction Manager Offshore


_______________________________________________________________________________________________
Monitor the progress of onshore/offshore construction works of 6 numbers of Platforms modifications & fabrication of 4 wellhead platforms.
Manage / supervise subcontractors and assist in maintaining safety and quality requirements. Maintaining the work schedule. Field
engineering in accordance with project execution plan to provide construction engineering and technical support to the construction
operations.
TODAI Page 2 of 4

J. Ray McDermott, JebelAli, Dubai, U.A.E. and MCCI-Baku, Azerbaijan


From October, 2002 - June 2007
Client: Total-Fina, Murphy Exploration and AIOC (BP)
Project/s: New construction of Offshore Platforms AMENAM-TOTAL ELF FINA, WEST-AZERI, EAST-AZERI, DUQ TOPSIDES, (AIOC) &
Spar, FRONT RUNNER

Senior Professional - Piping Fabrication / Piping Engineer / Estimation Engineer


_______________________________________________________________________________________________
Provide engineering assistance to superintendents, direct assigned personnel in meeting cost and time schedules, verify materials,
equipment, workmanship and assure results meet design requirements.
Perform assigned activities in one discipline, interfacing with other disciplines in all areas of the job.
Coordinating all related discipline activities and interfacing with all other areas/disciplines on the job.
Communicate, record and issue design changes and revised pipe-work fabrication isometrics to the project
team with i.e. Contract Change Notices, Site Engineering Queries, Field Change Notices, Site Instructions, etc.
Ensuring that changes are communicated and closed out in a timely manner.
Prepare all associated lists, i.e. Specialty items, Piping tie-ins etc.
Coordinates the activities of workers engaged in analyzing blueprint specifications, proposals, and other documentation to prepare time, cost,
and labor procedures and operating methods.
Review data and determine material, equipment, and labor requirements and prepares itemized lists.
Consulting with client/s, vendors, and others to discuss and formulate estimates and resolve issues.
Conferring with design engineering personnel to discuss design issues.
Issue written or oral instructions.
Resolve work problems and assists workers in solving work problems.
Confer with other supervisors to coordinate activities of individual departments.
Reviewing contract requirements for project execution.
Identify requirements and scope of work
Reviewing Piping Material Specifications (PMS), Piping and Instrumentation Diagrams (PandID’s), Plot plans, General Arrangement (GA)
drawings, Review Philosophies, Area Classification Drawings, Fire and Gas Detector Layout Drawings and other relevant documents.

Al-Hassan Engineering Company, Oman-Muscat


Period: June 2002 to August 2002
Client: Enelpower-Hitachizosen joint venture
Project/s: Power plant, Berka

Sr. Piping Engineer / Deputy Site Manager


_______________________________________________________________________________________________
Represent Contractor in co-ordination with Company disc. Project team for monitoring of Company Standards Plan, prioritize and manage
complex
projects under aggressive timelines.
Creative problem-solving and analytical talents.
Establish and maintain good relationship and communication with the client.
Follow up on people and resources in the project.
Develop and administrate project procedures that meet contractual and revised client requirements
Provide engineering support when spooling pipe and mobilizing.
Provide recommendations for all field order changes (design related).

Mideast Constructors, Doha-Qatar (MECON)


Period:March 2001 to May 2002
Client: Snamprogetti-Hyundai joint venture
Project/s: NGL4, Recycling Gas plant (live plant)

Shift In-Charge (Piping Construction)


_______________________________________________________________________________________________
Review, understand and apply the contract specifications, project procedures, relevant codes and standards
in the execution of piping production engineering.
Review and understand the scope of work as described in the Contract.
To liaise with the Piping Superintendent, Mechanical Engineer, Planning Engineer and Forman.
Understand the scope of work and liaise with the fabrication Engineering Manager.
Compiling and ensuring timely issue of detailed Pipe-work Work-packs containing, Work-scope description,
Pipe-work fabrication isometrics and Material Issue Notes.
Communicate, record and issue design changes and revised pipe-work fabrication isometrics to the project
team in a timely manner and in accordance with the project procedures; ie Contract Change Notices, Site
Engineering Queries, Field Change Notices, Site Instructions, etc
Ensuring that changes are communicated and closed out in a timely manner.
TODAI Page 3 of 4

Al-Hammam Company, Rastanura, Saudi Arabia


Period: October 1999 to October 2000
Client: SAUDI ARAMCO
Project/s: Bulk plant Piping Modifications (live plant) in Riyadh, Qassim

Site Engineer (Piping)


_______________________________________________________________________________________________
Provide technical assistance to the Piping Superintendent and crafts.
Perform inspections and documentation of all piping work in progress on a continuing basis, and completes the final Piping and Instrument
Diagrams checks prior to turnover.
Assists supervision and project controls in preparation of short-term schedules.
Execute field take offs from "Issued For Construction" drawings, provides input to the quantity tracking
applications and reporting weekly installed quantities.
Prepare material requisitions for permanent and temporary piping materials.
Trouble-shoot engineering design, resolving issues with engineering and/or fabricator.

Toyo Engineering India Limited, Chambal, Kota


Period: August 1998 to July 1999
Client: CHAMBAL FERTILISERS
Project/s: 1350 TPD Ammonia 2 x 1175 TPD Urea Phase 2

Senior Piping Engineer


_______________________________________________________________________________________________
Review project piping specifications and ensure design compliance.
Coordinate the piping engineering aspects of the project to ensure the technical objectives are met within the approved scope, budget and
schedule.
Provide timely review of piping layout, 3D model design.
Provide technical support to the project procurement and construction activities.

Al-Kulaib International, Kuwait


Period: April 1998 to July 1998
Client: Mitsubishi Heavy Industries
Project/s: Ammonia plant, EPC
Senior Piping Engineer
_______________________________________________________________________________________________
Ensuring adequate flexibility in critical piping systems.
Technical coordination with all disciplines related to engineering effort.
Prepare material requisitions for piping commodities and piping specialty items.
Prepare all associated lists, i.e. Specialty items, Piping tie-ins

Dolphin Offshore India Limited


Period: December 1996 to January 1998
Client: ONGC (offshore) and Garden Reach Shipbuilders
Project/s: Installation / Hook-up of 82 Offshore platform piping and piping modifications, New Warships Piping Construction (Site-Incharge),
Shutdown Tie-ins (live offshore process platforms)

Project Engineer (Offshore)


_______________________________________________________________________________________________
Lead several groups of skilled workers and deploying them effectively in projects.
Supervise outfitting works onboard and fabrication works in the workshop.
Assign and plan work schedule and manpower.
Ensure regulations and safety procedures are followed.
Encourage improvement of work methods and quality of work

Patel Engineering Works


Period: March 1988 to April 1989 and March 1992 to July 1996
Client: ONGC (Bombay High - Offshore)
Project/s: Installation / Hook-up (Piping and Structural) Offshore platform piping & piping modifications shutdown Tie-ins (live offshore process
platforms). Maintenance and piping modifications work in Offshore supply vessels

Offshore Supervisor / Senior Piping Engineer


_______________________________________________________________________________________________
Working with multi-discipline teams to develop optimum piping and equipment layout in accordance with client’s and other established
standards.
TODAI Page 4 of 4
Checking piping deliverables including: General arrangement and detail drawings, P andIDs,
Isometrics and sketches in accordance with established quality procedures.
Preparing MTO, drawings lists, line lists and valve lists.
Essar Projects Limited, Hazira, Surat, Gujarat
Period: May 1989 to January 1992
Client: ESSAR Steel Limited
Project/s: Sponge Iron Project

Junior Project Engineer (Civil, Piping and Structural)


_______________________________________________________________________________________________
Assist the management team to ensure compliance with Safety objectives throughout the life of the project.
Review and approval of design engineering documents and drawings.
Review and approval of construction procedures.
Follow up site engineering queries during construction.
Standard Metal Works Limited
Period: March 1981 to May 1987
Client: About 42 clients’ allover India
Project/s: Piping, Tankages, Structures

Site Supervisor (Tanks, Piping and Structural)


_______________________________________________________________________________________________
Review plot plans, P&ID’S, piping/equipment specifications and layouts, and detailed engineering drawings.
Hook-up existing Tank Farm with new Tank Farm and with Oil Export
Actively involved with Contractor and Maintenance groups to complete shutdowns.
Managed and directed multi-disciplinary teams.

Competence Courses
Basic Offshore Safety Induction and Emergency Training, Offshore Lifeboat Rescue Training, Emergency Response Training and First Aid,
Training, H2S Rescue Training by Qatar Petroleum, Breathing Apparatus System Training, Helicopter Under Rescue Training, PTW Training

Referees 1) Mr. KB Trivedi (President Director)


PT Essar Indonesia
Email: trivedi@essar.co.id
URL: http://www.essar.co.id/ab-mission.php
Contact No.: (62-21) 8980152

2) Mr. Willem Keij


SHELL GLOBAL
Civil / Project Engineer at Shell Pearl project
Email-Id: Willem.Keij@shell.com
Website: http://www.shell.com/
Contact No.: +9745827453

3) Mr. George Mercer


Company Email thiconsup@petrofac.com
Personal Email: g_mercer69@hotmail.com
Phone 01224578478
Position. Thistle Offshore Construction Supervisor.
PETROFAC – NORTH SEA.

Last Salary May 2009 (Gross): USD 6300/month

Remuneration Expected (Gross): USD 7000/month for Onshore & USD 12000 for Offfshore

Time for Joining: 1 week

You might also like