Curriculum Vitae: Mhardolkar Sumeet Anil
Curriculum Vitae: Mhardolkar Sumeet Anil
Curriculum Vitae: Mhardolkar Sumeet Anil
MHARDOLKAR SUMEET
ANIL
PERSONAL DETAILS
Marital Status
TECHNICAL SKILLS
CAREER SUMMARY
WORK PROFILE
Current Profile:
GAS ARABIAN SERVICES Co. Ltd. Saudi Arabia (Feb 2013 – Till date)
S is a leading total solutions provider in the entire Kingdom of Saudi Arabia, in the fields of integrated
services for oil, petrochemical, chemical and other allied industries. GAS is also a well-
sought supplier of world-class products from its international partner corporations. Piping
and statics division represents some of the ARAMCO and SABIC principals viz, Weir Valves
and Controls, UK/USA/KOREA/INDIA/FRANCE, Ratnamani Metals and Tubes – India,
PROSAVE – Korea, Daekyung Machineries and Engineering - Korea and other manufacturers
like Precision equipments India,
sponsibilities:
1. Meeting end users like SABIC, SIPCHEM, Gulfarabi, and other Refinery
and petrochemical plants. Meeting their maintenance departments to
know the difficulties, problems in their existing systems, and propose
solution as per our principal support.
2. Generating spares business for already supplied valves.
3. Meeting technical queries, from clients / customers, and jointly with the
principal, search for solutions and appropriately propose it to end
users.
4. Generating RFQs, and getting allied Quotations from Principals, sending
them to our proposals team for costing and offer preparation and then
submitting to the client.
5. Order Conversions and execution; follow ups from principals on order
status, documentations, NMRs, etc.
6. Tracking New EPC projects with reference to our principal base.
7. Also, activities like developing new Principals and customers,
maintaining projects list, payment follow ups etc are included in weekly
curriculum.
st Experience:
SPONSIBILITY:
1. Generating business leads / enquiries.
2. Meeting end users for generation of replacement and spares business.
3. Meeting EPC and contractors for Project enquiries.
4. Submission of on time quotations, follow ups, order conversions.
5. Executing technical meetings and solving Technical queries.
6. Timely follow ups on factory for timely order execution.
7. Keeping watch on competitors market.
8. Payment collections and documents traversal at times.
RESPONSIBILITIES: (For Mumbai Division) Sales of piping & Valve packages, Flanges and
spares, Hoses, OCTG, Casing-Tubings, etc. Generating New Customers, tracking the old
ones, increasing sales and expanding the reach. Receiving enquiries, giving quotes,
competing for the Purchase order,
Tracking Material Delivery, Sourcing the required Material in case it is not available in stock,
generating weekly visit reports, etc.
PROJECT INVOVED:
SAUDI-KAYAN PETROCHEMICAL PROJECT,
SABIC, JUBAIL ,K.S.A.
RESPONSIBILITIES:
Reviewing the project structural drawings , isometrics of piping,
vessels, and P&Ids.
Reviewing the status of material requirement of the projects.
Preparing the material request for material issue from stores.
Co-ordinating with civil & HVACs engineers and clients at different
stages of project.
Planning the work on daily, weekly and monthly basis and
executing the same as per standards and specifications.
Preparing the cutting plan for materials such as pipes, plates,
steel gratings and structures prior to execution of work.
Preparing and getting work permit such as hot work, confined
space work permit from client safety officers.
Was area in-charge while erecting the piping spools and supports
as per piping isometric drawings and plan drawings.
Preparation of fit-up reports for QC inspection.
Preparing weekly and monthly progress reports.
Supervising piping foremen and its crew during execution of the
work getting the work done more efficiently.
Raising technical queries to the clients when necessitated.
Reviewing of hydro test packages and releasing for punch listing.
Profiled as a team leader for an Engineer’s team while working out
Material Take-Off.
WORK EXECUTED:
Did basic designing & cost estimation of FRP Pressure vessels and tanks.
Had hands on experience in AUTOCAD-2007 and acquainted with CEASER-II.
ACADEMICS
PROJECTS
Study of Hydraulic power generation system in Airbus 310 {Air India}, which covered a brief
study of Hydraulic systems in airplanes, its different components, including the key component i.e.
Hydraulic pump.
CONTACT
DATE: (MHARDOLKAR
SUMEET A.)