August 2013 DMHI Presentation
August 2013 DMHI Presentation
August 2013 DMHI Presentation
Content
1.
2.
3.
4.
5.
General Overview
Quality and HSE Management System
DMHIs ERP System
Facilities and Capacities
Performance Record
1. General Overview
Location
E87
E87
Mangalia
Harbor
History
DMHI,-Most Competitive
Heavy Industry in Europe
Daewoo Brand
2 Mai Mangalia
Shipyard
Joint Venture
1997
1974
INTEGRATION
2008
EARLY
STAGE
1974-1978 Construction of
shipyards site, Dry Dock No. 1 & 2
1976-1997 Construction of various
newbuilding projects such as
Bulkcarrier 65,000 TDW / 100,000
TDW, Crude Oil Tankers of 89,000
TDW, as well as Offshore Jackets and
the hull of the Frigate Marasesti
1985 Start operating the 3rd and
largest dry dock used for shiprepair
business
MODERNIZATION
INNOVATION
Present
Shareholder Structure
ROMANIAN
GOVERNMENT
2 Mai Mangalia
Shipyard
49%
FACILITY (US$ 50.9 mil)
DSME (Korea)
Daewoo Shipbuilding
& Marine Engineering
51%
CASH (US$ 53.0 mil)
and
KNOW-HOW
BOARD OF DIRECTORS
PRESIDENT & CEO
CORPORATE
INNOVATION OFFICE
VICE PRESIDENT
HSE
OFFICE
MANAGEMENT UNIT
PRODUCTION UNIT
MANAGEMENT PLANNING
DIVISION
PRODUCTION CONTROL
DIVISION
DESIGN
DIVISION
INDOOR
DIVISION
QUALITY MANAGEMENT
DIVISION
PREOUTFITTING
DIVISION
MATERIALS
DIVISION
OUTDOOR HULL
DIVISION
OUTDOOR OUTFITTING
DIVISION
SUBSIDIARIES
752 employees
PRODUCTION
(Workers and Foremen)
1,882 employees
INTERNAL
SUBCONTRACTORS
2,944 employees
As of 1 August 2013
DMHI
Subsidiaries
2,525 employees
752 employees
Subcontractors
2,944 employees
TOTAL
6,221 employees
Business Concept
DESIGN
DSME Marketing
Engineering
Tendering &
Concept Design
SUPPLY CHAIN
PRODUCTION
DSME / DSEC(*)
Detail Engineering
(Class Approved
Drawing)
DSME Initial
& Basic Design
(R&D, Model Test)
DMHI Purchase
Bulk Material
(Plate / Profile / Paint)
DSME
Know-How
Method / Machine
DMHI
Production
Design
DMHI Production
Engineering Support
DMHI Production
Planning
(through ERP System)
DMHI
Entirely In House
Production
DMHI
HSE Strong Policy
DMHI Quality
Control at DSME
Standard
10
ISO 14001:2008
11
OHSAS 18001:2007
Safety First
Health & Safety
Policy
Rewards
Customer
Satisfaction
And
Recognition
12
Punishments
Disrespect to the
instruction
Absentee on HSE education
Violation of safety rules
Default, protection device
wearing
HSE Indicators
Indicator
2008
2009
2010
2011
2012
TRIR
1,20
0,91
1,15
0,95
0,74
DART
1,35
1,21
0,98
0,86
0,55
LTIR
0,24
0,30
0,44
0,45
0,23
Pollutions
Total Recordable Incident Rate (TRIR)= (no. of Total Recordable Case) x 200,000
Total Working Hours
Days Away, Restricted or Transferred (DART) = (no. of Days Away Case+ no. of Restricted Case) x 200,000
Total Working Hours
Lost Time Incident Rate (LTIR) = (no. of Lost Time Incident) x 200,000
Total Working Hours
Pollutions no. of pollutions
13
14
MAGICS
Basic Information
PML
Basic Information
Basic Information
Hull BOM
Material Delivery
Production Design
Logistics
Outfitting BOM
Material Arrival
Production Plan
Production Analysis
PO Request
Inventory/Closing
Purchase Order
Block Control
Salary Calculation
Job Evaluation
Basic Information
Inspection Plan
Basic Information
Drawing Plan
Inspection Request
Inspection Schedule
Drawing Results
Drawing Analysis
Inspection Results
Quality Problem
Document Control
Quality Analysis
15
Production Planning
System
Production Planning
System
- Short Term -
Design Management
System
Logistics
(Steel Mat./Outfit.Fab./Block/Pieces)
Material Management
System
Quality Management
System
16
Human Resource
Management
Financing
&
Accounting
* DMHI controls drawing planning, drawing issuing status, drawing revision status, design
M/H consumption through MAGICS.
17
Scanned drawings
can be printed
18
19
20
21
22
23
:
:
:
:
:
:
:
:
No. 1
8 ~ 11 m
0.2 m
Null
Null
3 m above MSL (quay)
12.4 C
2325 C
Moderate Dry
Length
Width
Depth
302M
48M
9M
Cranes
G 2 x 480T
J 2 x 120T
Dry
Docks
No. 2
320M
48M
18M
J 1 x 50T
J 2 x 16T
No. 3
360M
60M
13M
G 1 x 1,000T
J 2 x 50T
J 2 x 16T
24
Site Area
980,000 m2
Outfitting Quay
Covered Shop
Storage Area
Steel Stock
:
:
:
:
Steel Cutting
Pre-Erection Platform
:
:
1,590 m
95,960 m2
6,500 m2 (Covered)
13,800 m2
35,000 Ton
15,000 Ton/month
20,000 m2
25
Facilities
Concept / Remarks
Capacity (Lane):
Max. Breadth & Length:
Cutting
(CAS/CSS/PBS)
Marshalling systematization
(DSME know-how);
Automatic beveling
Equipments:
Area:
Automatic T-Bar Line:
1,836 m2
Edge preparation
Automatic Weld, Straightening
Indoor:
Outdoor:
Cranes:
3,504 m2 , 3 bays
2,880 m2, 2 bays
2 x 50 ton, 2 x 5 ton, 1 x 3.2 ton
Bending
(CAS)
T-Bar Fabrication
(CMS)
Hatch Cover
Fabrication
(OHS / HCS)
26
Facilities
Concept / Remarks
Pipe Fabrication
(OHS)
Bays:
Bending M/C:
Pipe Rotators:
3
5
10
Steel Outfitting
Fabrication (OHS)
Bays:
Blasting & Painting:
2
Separate shops inside shipyard
Galvanizing
(UGS)
Area (bays):
Treatment Baths:
Galvanizing Baths:
Automatic control of
temperature and
environmental friendly
27
Facilities
Concept / Remarks
2 (296 m x 36 m x 25 m)
1 (296 m x 36 m x 14 m)
6 (60 m x 24 m x 10 m)
Panel Lines
(CAS/PBS)
2 (296 m x 36 m x 25 m)
1 (296 m x 36 m x 14 m)
1 (300 m x 32 m x 36.3 m)
Curved Assembly
(CAS/NGA)
1 (296 m x 36 m x 25 m)
1 (296 m x 36 m x 14 m)
1 x 250 ton / 4 x 30 ton
Grand Assembly
(NGA/PBS)
28
Facilities
Concept / Remarks
Area:
Cranes:
General
Pre-outfitting Shop
Accommodation
Pre-Outfitting (APS)
Dimensions:
Cranes:
34 m x 18 m x 10 m, 2 bays
1 x 3.2 ton O/H
Unit Module
Fabrication
(UGS)
29
Facilities
Concept / Remarks
No. of Cells:
Blasting Nozzles:
Block Painting
Cells / Shelters (PTC)
No. of Cells:
Painting Shop:
Shelter:
New Block
Blasting Cells (BPC)
No. of Cells:
Blasting Nozzles:
2 (32.5mx31mx18.5m)
12 sets
New Block
Painting Cells (BPC)
No. of Cells:
2 (32.5mx31mx18.5m )
Environmentally friendly
Steel Outfitting
Blasting Cells (SBC)
No. of Cells:
30
Facilities
Concept / Remarks
Pre-erection Platform
For Dock no. 1 & 2
(PEP/1DK/2DK)
Area:
Cranes (Working in Tandem):
Jib Cranes:
20,000 m2
2 x 480 ton (850 ton)
2 x 120 ton, 2 x 50 ton, 2 x 15 ton
Pre-erection Platform
For Dock no.3
(3DK)
Total Area:
Goliath Crane:
Jib Cranes:
16,800 m2
1 x 1,000 ton
2 x 50 ton, 2 x 15 ton
Heavy Transporters:
1 x 500 ton
2 x 450 ton
1 x 330 ton
1 x 138 ton
Transportation
31
Facilities
Concept / Remarks
Sea Level
32
Facilities
Quay A
(QAP)
Quay B
(QBP)
Quay C
(QCP)
33
Concept / Remarks
5. Performance Record
34
Commercial
Vessels
Tankers:
Capesize: 7
Kamsarmax: 6
Handysize: 13
Coaster: 30
Coaster Combi
Freighter: 6
Containerships:
Post Panamax: 13
Panamax: 10
Feeder: 43
Total: 138
Floating Docks
Total: 3
AHT: 2
Total: 6
Barges: 5
Barges
PSV: 3
Pontoon Barges: 46
Total: 51
35
LxBxDxd
228.0 x 32.2 x 19.8 x 12.2 (m)
Class
American Bureau of Shipping
Units built
3 (HNs. 5003 / 04 / 05)
Buyer / Actual Owner LMZ Greece / ELETSON Corporation - Greece
36
LxBxDxd
Class
Units built
Buyer
LxBxDxd
Class
Units built
Buyer
38
39
LxBxDxd
Class
Units built
Buyer
LxBxDxd
Class
Units built
Buyer
41
42
43
44
DMHIs Orderbook
TYPE
CAPACITY
NUMBER
OWNER
COUNTRY
Containership
8,600 TEU
Zodiac
UK
Pure Car
Truck Carrier
6,500 Units
Ocean Yield AS
Norway
Product Carrier
112,000
TDW
Eastern Mediterranean
Maritime
Greece
Containership
9,100 TEU
Capital Ship
Greece
Bergen Group
BMV AS
Norway
Bergen Group
Fosen AS
45
Norway
DAEWOO-MANGALIA
HEAVY INDUSTRIES
46