DEC OSS Business Introduction
DEC OSS Business Introduction
DEC OSS Business Introduction
Table of contents
6
1
All incidents are preventable. There will be no compromise of an individuals safety and health in
anything we do. The implementation of actions to help our employees for realizing a healthy, injury-free environment is a leadership responsibility. Persistent support of this efforts is the responsibility of everyone. We will lead the Mecatec BG to ensure protecting the safety of each member is our first priority. We have achieved top tier international Quality & HSE certificates in our business areas such as AISC, ISO series, OHSAS and series of ASME stamps including ASME Nuclear stamp, and from ExxonMobil, Petronas, BP, Chevron, Saudi Aramco, Petrobras, Inpex and Shell.
AISC
Table of contents
6
3
Equipment
Systems
6) 7)
Construction
8)
3)
9)
10)
1)
12)
1) Casting & Forging 2) Forging Shell 3) Bulk material handling equipment 4) Hydrocracking Reactor 5) Crankshaft 6) Steam & Gas Turbine 7) Generator 8) Power plant (inclduing IGCC, IPP) 9) Nuclear Reactor 10) Nuclear Power Plant 11) HRSG 12) Wind power system 4
Doosan Corp
$3.9B
$9.0B
Doosan Infracore
$7.6B
Skid steer loader/ Compact track loader global No.1 Excavator No.1 in China Portable air compressor global No.1 Machine tools No.4 in US; global No. 5 Housing/Civil E&C Domestic Top tier CPE1 Global Top Tier On/Offshore Module HRSG3 global No.2 2-stroke low speed marine engine global No.2
Doosan E&C
$2.2B
Doosan Engine
$1.3B
Note: 1) CPE: Chemical Process Equipment, 2) OSS: Offshore Structures & Subsea 3) HRSG : Heat Recovery Steam Generator 5
Infrastructure BG
Building/Housing BG
HRSG BG
Mecatec BG
Doosan VINA
CPE Business
OSS Business
Controller OSS Sales & Marketing OSS Proposal QA/QC OSS Engineering OSS PMT Materials Management GTM
Facilities Management
6
Table of contents
6
7
Jackets
Desalination Module
Based on its strong fabrication experiences and Integrated EPC management capacity
Steel Structures
Bridges, Jetty & Dolphin Jackets for WHP & Wind farm Jack-up Structures Deck Machineries (Reel etc.) Material Handling System Offshore Structures
Modular Plants
Modular Plants - Modularized Gen-Sets - Offshore Topside Modules - Onshore Modules (incl. PAU/PAR) - Oil sands (Pre-assembly )
Table of contents
6
9
Plant No. 2
Doosan E&C Moscow Representative office Doosan E&C HQ (Seoul) Plant #1~#2 (Changwon) Fabrication Yard(Changwon) Available Yard (Geoje) Vina Plant (Doosan Vina) Vina Plant* Doosan E&C America (Houston)
Fabrication Yard*
10
11
12
B
Doosan Port (Quay 168m)
13
&
at Fabrication Yard
Airview
Total Area : 33,000 m2 Quay Length: 1,300 m (Quay of Masan Pier #5) Water depth: 11 m Bearing Force: 20 ton/m2 Paint Shop ( ): 30m(L) x 18m(W) x 12m(H) x 3 sets
Total Area : 177,000 m2 Quay Length: 168 m Water depth: 11 m Bearing Force: 50 ton/m2 Assembly Area: 385m(L) x 460m(W)
14
Floating Crane
THK : Max. 150mm/ 5.9 in.(COLD) THK : Max. 300mm/ 11.8 in.(HOT) Width : 4,000mm
Power source : 3,000A Strip cladding head : 30~120mm (1.1~4.7 in.) Magnetic device control Process : ESW, SAW Min. diameter : 300mm (11.8 in.)
SAMHO4000 - 110m X 48.7m X 7.5m - Lifting Capa : 3,600 tons - Angle : 62~30 - Lifting Height : 97~45m
Furnace
Temporary Furnace
Radiographic Test
Multi Transporter
Size : 7m(W) x 7m(H) x 17m(L) [Temporary] 12m(W) x 12m(H) x 20m(L) Max PWHT temp. : 900 15 , AUTO Temp. Control Weight Limit : Max. 400 Ton
Size : 20m(W) x 35m(L) x 16m(H) Door size : 20m(W) x 13m(H) Total 6 Rooms
Size : 16.4m(W) x 20m(H) x 33m(L) Capacity: Gamma Ray-MAX. 100mm X Ray-MAX. 30mm
SEBANG Kamag - 30 tons per axle - Total Axle : 168 axles - Total Lifting Capacity : 5,040 tons
15
Da Nang
Ho Chi Minh
16
14 12 42 4 15 2 16
SMAW FCAW
GTAW
SAW
172
135
-
5
-
90
-
Total
2,074
2,328
105
4,402
17
Mechanical Part (Design & Stress Analysis) Stationary Equipment(Tower, P/V, H/E)
1) Design & Strength Calculation : Compress, PV-Elite, Aspen B-JAC, Finglow Visual Vessel Design, HTRI Xchanger Suite, Aspen HTFS Tasc & Fran, Rules, Tosca-TW, ANSYS 2) Fluid Flow Analysis : Ansys CFD-Flo
18
19
Carbon Steel
SA516-70, SA266 CI4 High Tensile Strength Steel SA517-E, SA508-4N, SA302-B,C, SA204-B
20
Table of contents
6
21
Busan Metropolitan City Suspension Bridge (24,400 ton) Hyundai Bouygues JV Cable Stayed Bridge (16,740 ton)
22
Pemex Refinacion / UOP Module(15), PV(17), HE(5) Mexico National Oil Distri Module(8) bution / SK Total / US Filter
Qurayyah Add- Saudi ElectricityCo mpany on CCPP Shuwaikh RO Shuweihat S2 Ministry of Elec-tricit y and Water Abu Dhabi Water & Electricity Authority
23
ASU Plant / Korea Western Power Co. Ltd. / Taean, Korea / EPC Pigment Plant / Hubei Chemical Group / Hubei, China / EPS Paint Plant / ChucokuSamhwa Paint / Kimhae, Korea / EPC PTMEG Plant / Hyosung / Anyang, Korea / EPC
24
SKPC Tank Farm Project / Kayan(Sabic Group) Chemical / Jubail, KSA / EPC
LPG Tankage Project / SOPET Gas JV Co. / Dong Nai, Vietnam / EPC
Crude Oil Tankage / Petrovietnam / Dong Quat, Vietnam / EPC
25
26
Contact points
Mr. Dave Hwang / VP, Business Development OSS & Plant E-mail: dave.hwang@doosan.com Tel.: + 82-2-510-3266 / Fax: +82-2-510-3567 Mob.: +82-10-7455-8896
Mr. Byounggon Kim/ General Manager, OSS Sales & Marketing Team E-mail: kdwknk@doosan.com Tel.: + 82-55-279-5709 / Fax: +82-55-279-5801 Mob.: +82-10-8512-7874
Doosan Group website : www.doosan.com/en/ Doosan E&C website : www.doosanenc.com/en/ Doosan VINA website : www.doosan-vina.com