BOPPressureTestProcedure
GeneralPressureTestRequirement
AllBOPequipmentpressuretestsshouldbeconductedinaccordancewithfollowingguidelines:
1)TestfrequencyBOPequipmentshouldbepressuretestedasfollow:
Wheninstalled.
Beforedrillingouteachstringofcasing.
FollowingdisconnectionorrepairanywellborepressuresealintheWellhead/BOPstack(limitedtotheaffected
componentsonly).
Note:whenramsarechanged,thecasing/tubingrams(andannularpreventer)shouldbetestedtolesserorthehigh
pressuretestoronehalftherateworkingpressure.pressuretestedwithtestplugandcasing/tubingjointto80%ofpipe
burstratingofthecasingorratedworkingpressureofBOP(whicheverisless).
AllBOPtestmaximumofevery21days.
2)Allpressuretestsshouldbeperformedusingclearwater.
3)CheckandRecordthenitrogenprechargepressureofeachaccumulatorbottle.
4)KeeptherelevantwellheadsideoutletvalvesopenwhileusingtestplugforallBOPpressuretest.
5)TestPressure
ThelowpressuretestofeachpieceofBOPequipmentshouldbeconductedatapressureof200350psi.
Highpressuretestshouldbeconductedatratedworkingpressureoftheweakestcomponent.
Option1:pressuretestedwithtestplug.
Highpressureshouldbe70%ratedworkpressureofannularPreventerand100%ratedworkpressureoframspreventerand100%rated
workpressureofwellhead(whicheverisless).
Option2:pressuretestedwithcuptypetester
Highpressureshouldbe70%ratedworkpressureofannularPreventerand100%ratedworkpressureofwellheadand80%ofpipeburst
ratingofthecasing(whicheverisless).
6)Lowpressuretestshouldbeperformedfirst.Donottesttothehighpressureandbleeddowntothelowpressure.
7)Allthehighpressuretestsmustbeheldto7Mpafor5minutes,thenmaximumtestingpressurefor10minutes,theobservable
pressuredeclineshouldbeinallowedrange.Allpressuretesttoberecordedandchartedifavailable.
8)Chokemanifoldandkillmanifoldshouldbetestedseparatelysimultaneouslywithnormalrigoperationsifatestportisavailable.
9)Remotecontrolpanel(musthavetwooneonrigfloorandotherorgroundeasyaccessiblearea)shouldbeoperatedforallBOP
pressuretest.NoBOPopeningafterBOPtestshouldbedonebeforecheckingtheReleaseofthepressureandtheoperatingshouldbe
donebyauthorizedperson
10)Onlyauthorizedpersonnelshallgointestareatoinspectforleakswhenequipmentisunderpressure.
11)Allthepressuretestshouldbeconductedwithatestpump,rigpumpsorthecementunits(thecostofthecementunitwillbepaidby
therigasresultofnotestpumpprovidebytherig).
http://www.drillingdoc.com/boptestprocedure/
1/7
5/19/2015
BOPtestprocedureDrilling|MudDocs&Jobs
12)Alltestresultsshouldbedocumentedonapressurerecordwithfollowinginformation:
Dateoftest
Wellname
Driller
ToolpusherorDrillingEngineer
DrillingSupervisor
Functiontesting
Thefunctiontestshouldbecarriedoutoneachroundtripbutnotmorethanonceperday.Thetestshouldbeconductedwhiletripping
thedrillpipewiththebitinsidecasing.
BeforeapplyingpressuretestingtoPreventers,performthefollowing:
(1)EachRemotecontrolpanelshouldbeusedtooperatetheBOP&valves.
(2)Closeandopenallpreventers,Annularpreventermustneverbeclosedinanemptyhole.
(3)Blindramshouldbeoperatedforfunctiontestwhilestringisoutofhole.
(4)Piperamsmustbeclosedagainstcorrectsizeofpipeinthewell.
(5)Annularpreventersshouldnotbeoperatedoneachroundtrip.Theyshould,however,befunctiontestedonceaweek.
(6)Operationsofshearram,ifavailableinthestack,shouldbekepttobareminimum.
(7)ThevalvesonBOPstack,wellheadandchoke/killmanifold(excludingthehydraulicandadjustablechokeswhicharefunctiontested
oneachroundtrip)shouldbefunctiontestedatleastonceaweek.
CasingpressureTest:
AcasingtestisgenerallyconductedfortestingDVandfloatequipment,alongwiththescheduledBOPtest.
Toconductthepressuretest,performthefollowing:
Connectpressuresourcetothekilllineandopenkilllinevalve#1and#2.
Openallvalvesandchokesonmanifold,closevalveJ2a(seefigure2)
Closecasingheadvalves.
Closeblindrams(orpiperamsifpipeinthehole).
Pumpintothewellthroughkillline.Monitorandrecordthetestpressure.Forallthecasingstringsotherthandrive
pipeorstructuralcasingconductthetestto80%oftheminimuminternalyield(orburst)ofcasingorwellheadsor
BOPsratedworkingpressurelimits(whicheverisless).
Bleedoffpressureatchokeline.(closeJ1,openJ2a,thenopenJ1tobleedoff)
http://www.drillingdoc.com/boptestprocedure/
2/7
5/19/2015
BOPtestprocedureDrilling|MudDocs&Jobs
PressureTestingofInsideBOPs,KellyCocks,TDS,SwivelandRotaryHoses
Whilecarryingoutpressuretestingofaboveitemsalso,itisrecommendedthattestpressureshouldbeappliedfromthedirectionin
whichtheywouldexperiencepressureduringactualwellkicksituation.
1)PickupKelly/TDS.
2)MakeupFullOpeningSafetyValve(FOSV)onbottomoflowerKellycock.
3)MakeupInsideBOPonthebottomofFOSV.
4)MakeupadaptersubonbottomofinsideBOPandcompleteconnectionoftestlinefromcementingunitortestpumptoadaptersub.
5)Applytestpressurefirstupto200350psiandthenraisetoratedworkingpressureofinsideBOP.Holdpressure5minutes.
6)ReleasepressureanddisconnectadaptersubfrominsideBOP,disconnectinsideBOPandconnectadaptersubtoFOSVwithtest
lines.
7)CloseFOSVandapplytestpressureupto200350psi.Watchforanyleakage.Ifnoleakage,increasetestpressuretoratedworking
pressureofFOSVandholdpressurefor5minutes.Aftertestisoverreleasepressure.
8)TestlowerKellycock,upperKellycock,swivel/TDS,rotaryhoseandstandpipevalvesonebyone.Appliedtestpressureshouldnot
exceedratedworkingpressureoftheitembeingtestedortheworkingpressureoftheweakestmemberexposedtotestpressure,
whicheverisless.
Note:MakesurethatKelly/TDS,standpipeetc.arefullwithwater(testfluid)andairisnottrappedinit.
PressureTestProcedure
1.211/4BOPStack(171/2holesection):
1.1HCR(Valve#4)andPiperamstest
Pickuptopdrive,connecttestplugonthebottomof51/2DP,runtestplugandseatinwellhead.
Connectpressuresourcetothekilllineandopenkilllinevalve#1and#2,valve#3,andkeepHCR(valve#4)close.
Closepiperams.
Pumpintothewellthroughkillline.Monitorandrecordthetestpressure.Conductlowpressuretestandhighpressure
testasabovetestrequirement.
Bleedoffpressureatchokeline(closeJ1,open#4,thenopenJ1tobleedoff).Openpiperams.
http://www.drillingdoc.com/boptestprocedure/
3/7
5/19/2015
BOPtestprocedureDrilling|MudDocs&Jobs
1.2Valve#3andAnnularPreventerTest
Closeannularpreventeronthesame51/2DP.closevalve#3(seefigure1.2)
Pumpintothewellthroughkillline.Monitorandrecordthetestpressure.
Conductlowpressuretestandhighpressuretestasmentionedabove.
Bleedoffpressureatchokeline(closeJ1,openvalve#3,thenopenJ1tobleedoff).Openannularpreventer.
1.3Blindramstesting
UnscrewDrillPipefromTestPlugandlaydown.
Closeblindrams.closej2a(seefigure1.3)
Pumpintothewellthroughkillline.Monitorandrecordthetestpressure.
Conductlowpressuretestandhighpressuretestasmentionedabove.
Bleedoffpressureatchokeline(closej1,openj2a,thenopenj1tobleedoff).Openblindrams.
http://www.drillingdoc.com/boptestprocedure/
4/7
5/19/2015
BOPtestprocedureDrilling|MudDocs&Jobs
1.4ChokemanifoldvalvesTesting
Note:Chokemanifoldshouldbetestedseparatelysimultaneouslywithnormalrigoperationsifatestportisavailableat
chokemanifold.
Connecttestpumptochokemanifold.
KeepValve#3close,Openallmanifoldvalves,closetheoutermostvalvesJ8,J9,J10(seefigure1.4a).
Pumpintochokemanifold.Monitorandrecordthetestpressureattestpump.
Conductlowpressuretestandhighpressuretestaselaboratedabove.
OpenoutermostchokemanifoldvalvesJ8,J9,J10.ClosevalvesJ5,J6b,J7a(seefigure1.4b).
Pumpintochokemanifold.Monitorandrecordthetestpressure.
Conductlowpressuretestandhighpressuretestaselaboratedabove.
http://www.drillingdoc.com/boptestprocedure/
5/7
5/19/2015
BOPtestprocedureDrilling|MudDocs&Jobs
ChinaVacuumValve
LeadingChinavacuumvalvesupplierHighvacuum&ultrahighvalveseries
LeaveaComment
Youremailaddresswillnotbepublished.Requiredfieldsaremarked*
Name*
Email*
Website
Comment
YoumayusetheseHTMLtagsandattributes: <ahref=""title=""><abbrtitle=""><acronymtitle=""><b><blockquotecite="">
<cite><code><deldatetime=""><em><i><qcite=""><strike><strong>
PostComment
Postnavigation
CompletionPacker
SwabandSurgePressure
Searchfor:
Search
RecentPosts
MudSchoolTest
AuditFormForRigSite
ShaleGas
NewDrillingRigs
HydrogenSulfideH2S
RecentComments
Archives
April2015
March2015
http://www.drillingdoc.com/boptestprocedure/
6/7
5/19/2015
BOPtestprocedureDrilling|MudDocs&Jobs
June2014
April2014
March2014
February2014
Categories
Chemicalsuppliers
Drilling
Job
Mud
Ok
Meta
Login
EntriesRSS
CommentsRSS
WordPress.org
Categories
SelectCategory
2015Drilling|MudDocs&JobsDesignedbyThemes&Co
Backtotop
http://www.drillingdoc.com/boptestprocedure/
7/7