Level Control
Level Control
This report covers three equipment on which experiments were performed. The list contains:
Level Control Trainer
Flow Control Trainer
Double Pipe Heat Exchanger
Apparatus:
The equipment being handled was GUNT Level Control Trainer.
Procedure:
Procedure was followed step by step as explained in the equipment manual.
Start Up:
1. Ensured at start that drain valves are closed and the water level in the tank is sufficient.
2. Ensured the positioning of air and water inlet valves.
3. Turned on the equipment from the main supply button.
Appendix:
Equipment:
The equipment is GUNT Flow Control Trainer.
Procedure:
Procedure was followed step by step as explained in the equipment manual.
Start Up:
1. Ensured at start that drain valves are closed and the water level in the tank is sufficient.
2. Ensured the positioning of valves.
3. Turned on the equipment from the main supply button.
4. Waited for few seconds to make the system come to equilibrium.
5. The software also detected the respective equipment and main window appeared.
Typical Settings:
1. Completely opened the hand valve, HV1
2. Set HV2 to 30 opening
3. Set controller mode to Step, Automatic mode
4. Set value of Kp (Gain) / (Xp = 1/Kp) to 5.0 / 0.2
5. Set Tn (Reset Time ) to 0.05 min
6. Set Tv (Rate Time) to 0.0 min
7. Put value of w1 (set point 1) to 600 Ltr/min
After putting these values, carried on the experiment by:
8. Switched on pump.
9. Set w1 to 600 ltr/h and waited until the value of flow rate has reached a state of stability.
10. After stability changed the value to 1000 ltr/h to get new set of data and observed the
action of controller.
11. Changed the value of flow rate to different flow rate value to observe the control action.
12. Noted the data and observed the change in flow rate and its control by the controller
action.
Shut Down:
1. Closed the water flow by turning off the pump.
2. Set the valve positions back to zero.
3. Turned off the main power supply.
4. Exit the software.
TRAINER
W
l/h
600.6175
600.2500
600.8625
600.4950
600.1023
600.0041
1004.5375
1004.6600
1003.4350
1003.8025
1002.3125
1001.0055
1000.0023
1000.0021
Y
l/h
600.0000
600.0000
600.0000
600.0000
600.0000
600.0000
1000.0000
1000.0000
1000.0000
1000.0000
1000.0000
1000.0000
1000.0000
1000.0000
KP
75.8623
44.1164
54.1171
51.6301
19.4621
41.8835
26.3702
37.5774
49.4129
38.3236
48.1240
51.3912
16.3535
43.6480
TN
min
5.0000
5.0000
5.0000
5.0000
5.0000
5.0000
5.0000
5.0000
5.0000
5.0000
5.0000
5.0000
5.0000
5.0000
TV
min
0.0500
0.0500
0.0500
0.0500
0.0500
0.0500
0.0500
0.0500
0.0500
0.0500
0.0500
0.0500
0.0500
0.0500
1200
1000
800
600
400
200
0
9:29:31
9:30:14
9:30:58
9:31:41
9:32:24
9:33:07
9:33:50
9:34:34
9:35:17
Apparatus:
Apparatus is GUNT WL 110 Heat Exchanger with service unit.
Base plate
Couplings
Connecting block
Bolts
Tank cover
(V2)
Figure above shows the WL 110.01 Tubular Heat Exchanger with base plate.
The tubular heat exchanger consists of two double tubes.
In the double tubes, the transparent outer tube allows the stainless steel inner tube to be
seen.
Two separate areas are created, the tube area (inside the inner tube) and the shell
(between the inner tube and the outer tube).
Both the tube areas and the shells of the two double tubes are connected in series.
Cold and hot water flow along the inner tubes either in the same direction (parallel flow)
or in opposite directions (counter flow).
Procedure:
Start Up:
Attached the tubular heat exchanger on the service unit.
Connected the plug for the hot water temperature (TI2).
Operation:
Turned on the power supply switch.
Checked the water level in the hot water tank.
Opened the regulator valve for cold water V2 and the regulator valve for hot water V1.
Started the pump.
Set the desired hot water set point SP(T7 ) on the controller to 70 C.
Set the desired cold water flow rate using the regulator valve V2 and the desired hot
water flow rate using the regulator valve V1.
Turned on the heater.
Recorded the data values until equilibrium.
The water temperature T7 is no longer rising.
The measured values only change slightly.
The heat flow values Qh and Qc are similar.
Repeated the process for both counter and parallel flow arrangements.
Shut Down:
When the experiment is complete, first turn off the heater.
Then stopped the pump.
Closed the valves V1 and V2.
Values of km was noted down from measured values from the software.
ln( )
and = 3 4 , = 1 6
Experiment
Run
Flow
Direction
Ltr/min
SP
(T7)
o
km
kW/(m2K)
kW
T1
T3
T4
T6
PF
1.4
70
65
50.3
9.2
21.9
1.30
1.29
CF
1.4
70
68
1.28
1.25
Appendix:
Counter Flow Profile:
Temperature
60
50
Hot Fluid
40
Cold Fluid
30
20
10
0
Parallel Flow
70
60
Temperature
50
40
Hot Fluid
30
Cold Fluid
20
10
0