Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Muhammad Rizal Bin Othman

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 8

MUHAMMAD RIZAL BIN OTHMAN

LOT 149/A,
Kampung Sungai Ular Darat,
26080 Sungai Ular,
Kuantan Pahang Darul Makmur.
Telephone No. : 014-8004885 / 014Email : mrizal210@gmail.com/

5974938.
muhammadrizalothman@yahoo.com

JOB : ELECTRICAL INSTRUMENT

SUPV OR TECH.

PERSONAL PARTICULARS
NRIC
Date of birth
Age
Sex
Marital Status
Race
Religion
Height
Weight
Nationality
Present Health
Expected Salary
Permanent

: 790119-14-5741
: 19-Jan-1979
: 36 Years Old
: Male
: Married
: Malay
: Islam
: 160 cm
: 60 kg
: Malaysian
: Excellent
: (Negotiable)
: Lot 149/A Kg Sungai Ular Darat,
26080 Sg Ular,
Kuantan Pahang Darul Makmur.
ACADEMIC QUALIFICATION

Obtained a combined Safety Opito Course from SMTC


Obtained a Offshore PETRONAS safety Passport ( OSP CARD )
Obtained a Course from Petronas Carigali ( PTW )
Obtained a LPS ( Exxon Mobil )
Obtained a Niosh Card ( OGSP LEVEL 2 )
Sijil Pelajaran Malaysia ( SPM )
Diploma Kejuruteraan Elektronik ( Kawalan )
Diploma Industrial Electronics GMI ( Process Instrumentation & control )
Sijil Kemahiran Malaysia ( Tahap 1,2 )
Sijil Penyertaan Process Instrumentation & Calibration Course.

PROFESIONAL
Personality:

Open minded, easy to work with the truly and fully negotiable person, really self confidence and always react in
a positive and innovative way.
Work attitude:
Ready to accept any criticism, can handle any task with the full of commitment even if under pressure, punctual
and willing to accept any challenge and responsibility.
WORKING EXPERIANCE
Client
Employer
Position
Project
Responsibility
Dated

: Exxon Mobil Sdn. Bhd.


: Infrakomas Sdn Bhd.
: Tester Relay
: Tapis C and Telok platform
: Project
: 14 March 2015 28 March 2015

Client
Employer
Position
Project
Responsibility
Dated

: Murphy Oil Sdn. Bhd.


: Tabung Haji Heavy Sdn Bhd.
: E&I Supervisor
: Permas and South Acis project
: Hukup
: 01nd May 2014 30th Dec 2014

Client
Employer
Position
Project
Responsibility
Dated

: Petronas Carigali Sdn. Bhd.


: Carimin Engneering Services Sdn Bhd.
: E&I Supervisor
: Baram project
: Hukup
: 22nd Jan 2013 30th Feb 2014

Client
Employer
Position
Project
Responsibility
Dated

: Petronas Carigali Sdn. Bhd.


: Carimin Engneering Services Sdn Bhd.
: E&I Supervisor
: Samarang project
: Pre commissioning
: 01nd Sept 2013 30th Oct 2014

Client
Employer
Position
Project
Responsibility
Dated

: Petronas Carigali Sdn. Bhd.


: Tabung Haji Heavy Sdn Bhd.
: E&I Supervisor
: Kinabalu project
: Hukup Site Visit
: 22nd Jan 2014 30th Feb 2014

Client
Employer
Position
Project
Responsibility
Dated

: Carigalihess Sdn. Bhd.


: RA Power Sdn Bhd.
: E&I Technician
: Relay and Calibration Services.
: Puteri Cakerawala
: 22nd Sept 2014 30th Oct 2014

Client
Employer
Position
Project
Responsibility
Dated

: Petronas Carigali HESS


: Kencana Pirewell
: Instrument Fitter
: CTOC Platform
: Major Shutdown
: 19th June 18th July 2013

Client
Employer
Position
Project
Responsibility
Dated

: Petronas Carigali Sdn Bhd.


: Rites Sdn Bhd
: Supervisor
: Dulang and Resak Platform .
: to install new paga system.
: 23/01/12- 08/08/13.

Client
Employer
Position
Project
Responsibility
Dated

: Petronas carigali sdn. Bhd.


: Multitrada Alam
: Supervisor
: Bekok C Platform
: Electrical and instrument jobs
: 01rd Feb 2011 -31th Feb 2012

Client
Employer
Position
Project
Responsibility
Dated

: Petronas Carigali Sdn Bhd


: RITES
: Supervisor
: Dulang Platform
: Electrical and Instrument jobs
: 01th March 26th March 2012

Client
Employer
Position
Project
Responsibility
Dated

: Petronas carigali sdn. Bhd.


: Multi Trada Alam.
: Supervisor
: Tiong Platform
: Electrical and instrument jobs
: 30rd March -14th April 2012

Client
Employer
Position
Project
Responsibility
Dated

: Petronas Carigali
: Emerson.
: Workleader PTW
: Baram B Miri Sarawak Platform
: To Laying tubing and Termination Instrument Cable for transmitter.
: 23/12/10- 31/01/11

Client
Employer
Position
Project
Responsibility
Dated

: Petronas Carigali
: Emerson.
: Workleader PTW
: Baram B Miri Sarawak Platform
: To Laying tubing and Termination Instrument Cable for transmitter.
: 23/12/10- 31/01/11

Client
Employer
Position
Project
Responsibility
Dated

: Petronas Carigali
: Makarmas Tenaga Sdn Bhd
: PTW & Elect.
: Angsi Platform motor waterpump.
: Electrical Punch List
: 11/02/11- 20/02/11

Client
Employer
Position
Project
Responsibility
Dated

: New Field Penisular Malaysia.


: BPE Eng Sdn Bhd.
: Supervaisor.
: Belumut A and Cermingat A.
: VPS service and battery bank load test.
: 11/08/10- 17/08/10

Client
Employer
Position
Project
Responsibility
Dated

: Petronas Carigali
.
: Juraxis.
: Inst.Fitter
: BARAM miri Sarawak.
: To Laying tubing and Termination Instrument Cable for transmitter.
: 06/03/10- 20/04/10.

Client
Employer
Position
Project
Responsibility
Dated

: Talisman Energy.
: Kencana Pirewell
: Electrician.
: Bunga Raya.
: Major Shutdown
: 19th June 18th July 2009

Client
Employer
Position
Project
Responsibility
Dated

: Petronas Carigali
: Local Eng Sdn Bhd.
: Electrician cam Work leader
: Pulai A
: To Upgrade Flare Ignition, Upgrade ESDV Partial Stroke and Upgrade Gas Detector .
: 01/02/08 - 24/02/08

Client
Employer
Position
Project
Responsibility
Dated

: Petronas carigali sdn bhd


: Local Eng Sdn Bhd
: Instrument Fitter
: Duyung Platform
: Electrical and instrument jobs
: 23rd Sept -07th Oct 2008

Client
Employer
Position
Project
Responsibility
Dated

: Petronas carigali sdn. Bhd.


: RHS
: Instrument Fitter
: Duyung Platform
: Electrical and instrument jobs
: 23rd Sept -07th Oct 2007

Client
Employer
Position
Project
Responsibility
Dated

: Petronas Carigali HESS


: ABB
: Electrician.
: CTOC Platform
: Major Shutdown
: 19th June 18th July 2007

Client
Employer
Position
Project
Responsibility
Dated

: Petronas carigali sdn bhd


: RHS
: Instrument Fitter
: Duyung Platform
: Electrical and instrument jobs
: 23rd Sept -07th Oct 2007

Client
Employer
Position
Project
Responsibility
Dated

: Petronas Carigali HESS


: Kencana Pirewell
: Instrument Fitter
: CTOC Platform
: Major Shutdown
: 19th June 18th July 2007

Client
Employer
Position
Project
Responsibility
Dated

: Perwaja Steel
: Nekad Development Eng. Sdn. Bhd.
: Electric Fitter
: PERWAJA STEEL KEMAMAN
: Tubing and transmitter
: April 2007 May 2007

Client
Employer
Position
Project
Responsibility
Dated

: Petronas Gas Sdn. Bhd.


: Fonco Engineering Sdn.Bhd
: Electrical Fitter
: Petronas Penapisan, Kerteh
: Services and set up cable tray
: Feb 2007 March 2007

Client
Employer
Position
Project
Responsibility
Dated

: Hunstman
: Anz Sdn. Bhd
: Electrical fitter
: Major shutdown
: Setup electrical cable
: Nov 2006 Jan 2007

Client
Employer
Position
Project
Responsibility
Dated

: Petronas Carigali Sdn. Bhd.


: Baxtech Resources Sdn. Bhd.
: Electrcian.
: Asian Supply Base Labuan
: Service and maintenance
: July 2006 Aug 2006

Client
Employer
Position
Project
Responsibility
Dated

: Petronas Carigali Sdn. Bhd.


: Baxtech Resources Sdn. Bhd.
: Electrician
: Baram B Platform
: Dismantle Generator set & remove electrical cable
: 30th may 12th June

Client
Employer
Position
Project
Responsibility
Dated

: Petronas Carigali Sdn. Bhd.


: Vastalux Sdn. Bhd.
: Electrician
: Bekok
: Servicing of diverter valves and related installations
: 5th Apr 2006 30th Apr 2006

Client
Employer
Position
Project
Responsibility
Dated

: Petronas Gas Berhad


: Shapadu Energy & Engineering Sdn. Bhd.
: Technician
: PRR Project
: Installation and painting round bar for pipe
: 8th Aug 2005 16th Oct 2005

Client
Employer
Position
Project
Responsibility
Dated

: BP Chemical (M) Sdn. Bhd.


: Shapadu Energy & Engineering Sdn. Bhd.
: Rigger
: Shutdown
:E&I
: 4th May 2004 30th June 2004

Client
Employer
Position
Project
Responsibility
Dated

: BASF Petronas Chemicals Sdn. Bhd.


: Boccard
: Technician
: Shutdown
: Mechanical & Rigging job
: 12th March 2004 13th Apr 2004

Client
Employer
Position
Project
Responsibility
Dated

: BASF Petronas Chemicals Sdn. Bhd.


: Boccard
: Technician
: Shutdown
: Mechanical & Rigging job
: 12th March 2004 13thApr 2004

Client
Employer
Position
Project
Responsibility
Dated

: Huntsman Tioxide Sdn. Bhd.


: ANZ sdn. Bhd.
: Technician
: Shutdown
: Mechanical & rigging job
: 22nd Nov 2003 30th Dec 2003

Responsibilities:
To perform maintenance, preventative and corrective, safe-guarding, testing, servicing and
overhaul plant electrical air conditioning system.
Trouble shooting and maintenance for repair motor, machine, wiring single phase & tree phase,
Air-condition and power tool.
Carry-out plant modification job of instrument control and additional equipment.
To lay cable, cable tray and ladder laying and termination of power and lighting cable.
To assist testing and pre-commissioning of function test of electrical and instrument equipment.
To assist site visit and data collection, material take-off and detail design preparation.

SKILLS / STRENGHTS
o
o
o
o
o

Experience in plant maintenance and engineering of petrocamical plant.


Experience in plant construction, installation and commissioning.
Have multi skill experience (electrical, instrument and mechanical).
Knowledge in DCS, control and PLC.
Able to read schematic diagram and assembly drawing (PNID)

o
o
o
o
o

Willing to work in rotating shift. (Onshore and offshore).


Proficient in Microsoft Office ( Microsoft Word, PowerPoint, Excel )
Can work under pressure and with minimum supervision.
Middle in speaking and written Bahasa Melayu and English
Full clean driving license ( B2,D & GDL )

OTHER INFORMATION
o I enjoy traveling and learn new experience and posses license and own transport.
o Punctual and willing to accept any challenge and responsibility.
o Open minded and team player.

REFERENCE

Will be available upon request.

You might also like