Co-ordination Drawing
(ME 105)
Ng Wan Yuen
email : ngwanyuen@live.com.sg
Course Content
Principles of Co-ordination works
Methods of Co-ordination
FPS
HVAC
Mechanical
Architectural
Electrical
Structural
Constrains
Layout
Ceiling
space
Access
requirement
Maintenance
& servicing
Regulation
Methods of Co-ordination
Sequential Design
Is a multi-disciplinary effort with input from many
people and requires many revisions
Arch &
Structure
Layout
Elect &
Others
Sanitary
Layout
FPS
Piping
Duct
Work
HVAC
Piping
Less Clashes
- Each designer is fully aware
of other services which may
otherwise clash
Time Consuming
- Need longer time to complete
the services design
Overlay method
Is an iterative process of sequentially overlaying
multi drawings of various trades
400x 800
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
2400
2400
2400
25
5400
5400
100
5400
100
300 x 500
300 x 500
80
STRUCTURAL PLAN
2400
1100x300RAD
FIRE SPRINKLER
LAYOUT PLAN
2400
LAYOUT PLAN
500mmCABLETRAY
1100x300 RAD
VCD
450x300 SAD
200x300 SAD
300x300 SAD
5400
500mmCABLETRAY
500mmCABLETRAY
1000x300 RAD
ELECTRICAL & LI
GHTING PLAN
5400
ARCHITECTURAL
25
25
400 x 800
25
25
25
25
25
2400
1100x300 RAD
500mmCABLE TRAY
25
500mmCABLE TRAY
300 x 500
25
25
80
1000x300 RAD
25
25
200x300 SAD
100
300 x 500
300x300 SAD
450x300 SAD
25
25
TRAY
RAD
1100x300
800mm CABLE
VCD
25
25
25
5400
100
500mmCABLE TRAY
Save Time
- It allows for design of each
service to proceed concurrently
Major Clashes
- May require major revamp of
the services routing
Scale Model
By constructing of a scale model to visual the
actual installation space requirement
Mock up
- In project which have standard
layout for every storey
Costly
- It could be costly and time
consuming
Consideration during
Preparation of drawing
Top Layer
MV/AC duct
Chilled water pipes
Condenser water pipe
Layer 2
Communication cable
Power cable
Domestic water and Gas
pipes
Layer 3
Exposed sprinklers
Light fittings
Smoke / Heat detector
Speakers
Layer 4
Bottom Layer
Design Criteria
Apply design knowledge to assure that the systems satisfy
performance requirement and comply to standards
Support
System
Insulation
Gradient
Clearance
High
Low
Space reserved
for standard
support systems
for components
Gravity driven
lines e.g. plumbing
and sanitary lines
Clearance to
prevent heat
exchange and
mitigate vibration
concerns, etc
Construction
Apply construction knowledge to assure feasible designs
and increase the efficiency for building systems
Installation
Space
Installation
Sequence
Lead Time
A
B
C
Component A and B
should be installed before
component C
C
Component Cs lead time
is greater than component
A and B, therefore it
should be located below
them
Access Space
Access Frequency
A
B
Component B has greater access
frequency requirements then component
A and therefore should be located below
component A
W/H<5
W
Getting start
Step 1 (approx. 5 mins)
o transfer structure plan onto Arch plan
o Indicate the dimension and color them
Step 2 (approx. 30 ~ 40 mins)
o Identify clashes area and prepare sectional view drawing
o Indicate the level and relative position of services, label and
dimension of services
Step 3 (approx. 10 mins)
o Transfer sprinkler plan onto Arch plan
o Indicate the size (dia) and color them
Step 4 (approx. 20 mins)
o Transfer ACMV plan onto Arch plan
o Indicate duct, pipe size and color them
Step 5 (approx. 10 mins)
o Transfer electrical & lighting plan onto Arch plan
o Indicate the size of cable tray and color them
Step 6 (approx. 5 mins)
o Written question (consideration for the above changes)
200
250
300
400
500
600
800
1000
1200
1400
1600
1800
2000
100
109
133
152
168
183
207
227
150
200
133
152
164
189
189
219
210
244
229
266
261
305
287
337
310
365
250
168
210
246
273
299
343
381
414
470
300
183
229
266
299
328
378
420
457
520
574
400
207
260
305
343
378
437
488
531
609
674
731
500
600
227
287
310
337
365
381
414
420
457
488
531
547
598
598
656
687
755
762
840
827
914
886
980
1041
414
470
520
609
687
755
875
976
1066
1146
1219
1286
517
574
674
762
840
976
1093
1196
1289
1373
1451
1523
620
731
781
827
886
914
980
1066
1146
1196
1289
1312
1416
1416
1530
1511
1635
1598
1732
1680
1822
939
1041
1219
1373
1511
1635
1749
1854
1952
1096
1286
1451
1598
1732
1854
1968
2073
1523
1680
1822
1952
2073
2186
800
1000
1200
1400
1600
1800
2000