Analysis of Rates (Nh-15 Barmer - Sanchor)
Analysis of Rates (Nh-15 Barmer - Sanchor)
Analysis of Rates (Nh-15 Barmer - Sanchor)
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Structural Steel
Hume Pipe 1000mm
Hume Pipe 1200mm
Rs.
Rs.
Rs.
160.332 Km.
80.166 Km.
10.00 Km.
90.00 (BSR)
475.00 (BSR)
450.00 (BSR)
375.00 (BSR)
350.00 (BSR)
38,010.00 ( Koyali Refinary)
37,210.00 ( Koyali Refinary)
37,660.00 ( Koyali Refinary)
31,710.00 (Panipat Refinary)
8%
20%
10%
55000.00 (Market Rate)
4,800.00 (Market Rate)
6,000.00 (Market Rate)
BSR-Jodhpur 2012
As on July 1, 2013
As on July 1, 2013
As on July 1, 2013
As on July 1, 2013
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor Gujrat Border in the State of Rajasthan
Details of Labour
Unit
per day
246.00
Mazdoor ( Skilled)
per day
328.00
Mate
per day
297.00
Blacksmith
per day
361.00
Blaster
per day
328.00
per day
361.00
Fitter
per day
361.00
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
Hire Charges/ Usage Rate of Machinery
Data
Sl. No. Book
Ref No
Name of Equipment
Unit
Rates as per
Data Book for
year (2001-2002)
13
per hour
206.00
330.00
20
per hour
8930.00
14,288.00
per hour
1200.00
1,920.00
31a)
per hour
1440.00
2,304.00
per hour
M.R.
4,000.00
per hour
M.R.
12,000.00
28
per hour
128.00
205.00
16
per hour
692.00
1,108.00
37
per hour
150.00
240.00
10
33
per hour
165.00
264.00
11
34 c) Crane 3 tonnes
per hour
230.00
368.00
12
34 b) Crane 35 tonnes
per hour
550.00
880.00
13
34 a) Crane 80 tonnes
per hour
825.00
1,320.00
14
Dozer D-80 -A 12
per hour
2400.00
3,840.00
15
Dozer D-50 -A 12 #
per hour
1423.00
2,277.00
16
17
per hour
516.00
826.00
per hour
240.00
384.00
per hour
M.R.
540.00
per hour
450.00
720.00
17
18
19
20
per hour
M.R.
750.00
21
per hour
M.R.
1,250.00
22
per hour
520.00
832.00
23
per hour
M.R.
300.00
24
per hour
840.00
1,344.00
25
40
per hour
11760.00
18,816.00
26
36
per hour
200.00
320.00
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
Hire Charges/ Usage Rate of Machinery
Data
Sl. No. Book
Ref No
Name of Equipment
Unit
Rates as per
Data Book for
year (2001-2002)
27
30
Mastic Cooker
per hour
40.00
64.00
28
15
Mechanical Broom
per hour
230.00
368.00
29
Motor Grader
per hour
1545.00
2,472.00
30
per hour
M.R.
1,500.00
31
23
per hour
629.00
1,007.00
32
22
per hour
1725.00
2,760.00
33
38
per hour
3525.00
5,640.00
34
per hour
M.R.
50.00
35
26
Pneumatic roller
per hour
802.00
1,284.00
36
41
per hour
83.00
133.00
37
per hour
M.R.
306.00
38
per hour
297.00
476.00
39
per hour
M.R.
15,000.00
40
25
Tandem roller #
per hour
738.00
1,181.00
41
10
Tractor trolley
per hour
234.00
375.00
per hour
252.00
404.00
per hour
600.00
960.00
1.74
2.78
42
10+12 Ripper
43
32
Transit mixer
44
t.km
45
per hour
200.00
320.00
46
per hour
994.00
1,591.00
47
Water tanker
per hour
M.R.
125.00
48
14
per hour
777.00
1,244.00
49
41
per hour
83.00
133.00
50
per hour
M.R.
125.00
51
per hour
M.R.
50.00
52
per hour
M.R.
600.00
53
Tipper -5 cum
per hour
200.00
320.00
54
Truck
per hour
M.R.
450.00
55
24
per hour
1700.00
2,720.00
Market Rate
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
Description
Unit
Material Rates
Applicable Rates
of BSRfor Year 2013Jodhpur (20122014
13)
m
Sqm
Kg
tonne
Kg
No.
T
Cum
Kg
Cum
Litre
35.00
5,500.00
60.00
55.00
3.50
Finished Rate
30.00
49.00
100.00
90.00
37.00
5,775.00
63.00
62,076.00
57.75
4.00
6,305.00
32.00
52.00
105.00
95.00
Each
425.00
447.00
Each
Cum
Kg
Kg
m
Tonne
5.00
M.R.
55.00
60.00
200.00
60,000.00
6.00
250.00
58.00
63.00
210.00
63,000.00
Litre
74X2.1
164.00
Sqm
Nos.
t
Litre
Litre
Kg
Litre
m
m
Nos.
Kl
Cum
470.00
20.00
60,000.00
240.00
M.R.
60.00
185.00
40.00
9,000.00
15.00
60.00
425.00
494.00
21.00
63,000.00
252.00
100.00
63.00
195.00
42.00
9,450.00
16.00
63.00
447.00
Finished Rate
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
Lead Chart for Borrow Area Locations for NH-15 (Barmer - Sanchor - Gujarat Border) in the State of Rajasthan
Borrow Area
K
No: 2
m
Chainage:
162+300
Side: R/S
: Contact Person
Punma Ram
Mob:
9649739810
: Type of Land
Pvt. Land
Area: 15 acres
Location: Khurja
.Depth: 10 ft
0.2
Km
Borrow
Area No: 10
Chainage:
208+100
Side: R/S
Contact
: Person
Kirta Ram
Mob:
9680979894
Type of
: Land
Pvt. Land
Area: 11
acres
: Location
Samiya ki
beri (Balaser)
.Depth: 10 ft
Chainage:
K
224+200
Borrow Area
m Side: R/S
No: 11
Contact
Chainage:
: Person
214+400
Megha Ram
Side: R/S
Contact Person: Mob:
94145300421
Gulabji
:Type of Land
Mob:
9660208217
Type of Land: Pvt. Land
Area: 8 acres
Pvt. Land
Area: 12 acres Location:
Location: Dillo ki Dhorimania
.Depth: 8 ft
Basti
.Depth: 15 ft
K
m
Borrow Area
No: 13
Chainage:
231+600
Side: R/S
Contact
Person:
S.R. Bishnoi
Mob:
9660208217
Type of Land:
Pvt. Land
Area: 8 acres
Location:
Sutaaberri
Depth: 7 ft.
0.9
Km
Borrow Area
1.3
Km
Borrow Area
No: 14
No: 15
Chainage:
Chainage:
238+100
245+500
Side: R/S
Side: R/S
Contact
Contact
: Person
: Person
Babu Lal
Channa Ram
Mob:
9828138027 Mob:
: Type of Land 9783268607
:Type of Land
Pvt. Land
Area: 10 acres
Location: Bair Pvt. Land
Area: 7 acres
Gaon
.Depth: 8 ft : Location
Ramji ka
Ghur
.Depth: 11 ft
3
K
m
2.3
K
m
0.
2
Borrow
K No:
Area
m
18
Chainage:
Borrow
Borrow Area Area No: 17 265+000
Side: R/S
Chainage:
No: 16
Contact
259+600
Chainage:
: Person
Side: R/S
255+400
Harish
Contact
Side: R/S
Mob:
: Person
Contact
967205557
Ruppa
: Person
0
Mob:
Jai Kissan
9828219908 Type of
Mob:
:
Land
8696575528 :Type of Land
Pvt. Land
:Type of Land
Area: 11
Pvt. Land
acres
Area: 9 acres
Pvt. Land
: Location
Area: 10 acres : Location
Meethaa
Charneem
Beri
(Devas)
Location:
.Depth: 10 ft .Depth: 7 ft
Keria
.Depth: 12 ft
0.
6
Borrow
K Area
No:m19
Chainage:
276+400
Side: R/S
Contact
: Person
Hukma Ram
Mob:
9571954145
:Type of Land
Pvt. Land
Area: 6 acres
: Location
Gandhav
.Depth: 6 ft
297.738
L/S
293.000
288.000
Borrow Area
No: 20
Chainage:
287+700
Side: L/S
Contact
Person: Sahi
2
Ram
K
Mob:
m
9667334810
Type of Land:
Pvt. Land
Area: 10 acres
Location:
Sanchor
.Depth: 11 ft
283.000
278.000
273.000
268.000
263.000
258.000
253.000
248.000
3
.
5
243.000
0.
2
Borrow Area K
No: 12
m
238.000
2
.
4
223.000
1.
1
K
m
233.000
Borrow
Area No: 8
Chainage:
198+200
Side: R/S
Contact
: Person
Majha Ram
Borrow Area
Mob:
No: 7
9460818295
Chainage:
Type of
191+000
: Land
Side: R/S
:Contact Person Pvt. Land
Area: 6 acres
Mahesh
Chaudhari
Location:
Mob:
Mangta
9414981403
: Type of Land .Depth: 8 ft
Pvt. Land
Area: 9 acres
Location: Jakro
ki dhani
Pusaniya ka(
)Tala
.Depth: 9 ft
203.000
198.000
193.000
188.000
4.
4
K
m
B
a
h
a
r
g
o
r
a
228.000
Chainage:
173+100
Side: R/S
: Contact Person
Bhawra Ram
Mob:
8290860980
: Type of Land
Pvt. Land
Area: 10 acres
Location: Lorti
Hait
.Depth: 8 ft
183.000
178.000
0.2
K
Borrow Area
No: 4 m
Borrow Area
No: 9
Chainage:
201+400
Side: L/S
Contact Person:
Nagli Ram
2
Mob:
9540120564
Type of Land:K
Pvt. Land m
Area: 12 acres
Location:
Mangta
.Depth: 12 ft
218.000
0.3 Km
173.000
71.6)
(00
Borrow Area
No: 6
Chainage:
183+900
Side: L/S
Contact Person:
Rattanlal
2
Mob: .
8890852228
Type of 4Land:
Pvt. Land
K acres
Area: 20
m
Location:
Sanawda
.Depth: 12 ft
213.000
3
.
5
168.000
163.000
158.000
153.000
START OF
PROJECT
ROAD
R/S
208.000
Gujarat Border
Barmer
2.1
Km
R/S
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
S.No
Chainage of
Proposed
Alignment
(km)
Side
Location / Village
Name
Lead from
Proposed
Alignment
(km)
Total Lead
1
1
153.00
155.50
(a)
LHS
Mahabaar (Barmer )
(a)
(b)
22.78
(5+(155.5-153)/2)*(155.5153)
(5+(162.3155.5)/4)*(162.3155.5/2)
17.68
13.40625
(3.5+(162.3155.5)/4)*(162.3-155.5/2)
(3.5+(167.8162.3)/4)*(167.8162.3/2)
4.60625
4.30625
(0.3+(167.8162.3)/4)*(167.8-162.3/2)
(0.3+(173.1167.8)/4)*(173.1167.8/2)
3.23125
(0.2+(173.1167.8)/4)*(173.1-167.8/2)
(0.2+(177.8173.1)/4)*(177.8173.1/2)
9.34125
13.19125
(2.8+(177.8173.1)/4)*(177.8-173.1/2)
(2.8+(183.9177.8)/4)*(183.9177.8/2)
11.97125
14.82125
(2.4+(183.9(2.4+(191177.8)/4)*(183.9-177.8/2) 183.9)/4)*(191-183.9/2)
21.92125
22.32
(4.4+(191-183.9)/4)*(191(4.4+(198.2183.9/2)
191)/4)*(198.2-191/2)
5
15.625
162.30
167.80
173.10
RHS
RHS
RHS
Khurja
Mahabarro
Lorti Hait
3.5
0.3
0.2
4.04125
177.80
183.90
191.00
198.20
LHS
LHS
RHS
RHS
Mehrampur Hathitala
Sanawda
2.8
2.4
4.4
mangta
0.2
1.6
(0.2+(198.2191)/4)*(198.2-191/2)
(0.2+(201.4198.2)/4)*(201.4198.2/2)
12.31125
(2+(201.4198.2)/4)*(201.4-198.2/2)
(2+(208.1201.4)/4)*(208.1201.4/2)
8.42625
(1.1+(208.1201.4)/4)*(208.1-201.4/2)
(1.1+(214.4208.1)/4)*(214.4208.1/2)
23.765
(2.4+(214.4208.1)/4)*(214.4-208.1/2)
(2.4+(224.2214.4)/4)*(224.2214.4/2)
7.585
(0.2+(224.2214.4)/4)*(224.2-214.4/2)
(0.2+(231.6224.2)/4)*(231.6224.2/2)
5.60625
(0.1+(231.6224.2)/4)*(231.6-224.2/2)
(0.1+(238.1231.6)/4)*(238.1231.6/2)
10.175
(0.9+(238.1231.6)/4)*(238.1-231.6/2)
(0.9+(245.5238.1)/4)*(245.5238.1/2)
11.655
18.68625
(1.3+(245.5238.1)/4)*(245.5-238.1/2)
(1.3+(255.4245.5)/4)*(255.4245.5/2)
27.10125
8.505
(3+(255.4245.5)/4)*(255.4-245.5/2)
(3+(259.6255.4)/4)*(259.6255.4/2)
7.035
9.855
(2.3+(259.6(2.3+(265255.4)/4)*(259.6-255.4/2) 259.6)/4)*(265-259.6/2)
4.185
17.385
(0.2+(265-259.6)/4)*(265(0.2+(276.4259.6/2)
265)/4)*(276.4-265/2)
7.2
9
201.40
LHS
mangta
2
4.48
10
208.10
RHS
1.1
9.29625
11
214.40
RHS
Dillo ki Basti
2.4
12.52125
12
224.20
RHS
Dhorimania
0.2
12.985
13
231.60
RHS
Sutaaberri
0.1
7.215
14
238.10
RHS
Bair Gaon
0.9
8.20625
15
16
17
18
245.50
255.40
259.60
265.00
RHS
RHS
RHS
RHS
Ramji Ka Ghur
Keria
Charneem(Devas)
Meethaa Beri
(b)
1.3
2.3
0.2
Lead Formulation
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
S.No
Chainage of
Proposed
Alignment
(km)
Side
Location / Village
Name
Lead from
Proposed
Alignment
(km)
Total Lead
19
276.40
RHS
Gandhav
19.35125
(0.6+(276.4265)/4)*(276.4-265/2)
(0.6+(287.7276.4)/4)*(287.7276.4/2)
16.30125
(2+(287.7276.4)/4)*(287.7-276.4/2)
(2+(295.8287.7)/4)*(295.8287.7/2)
16.70625
5.947722
(2.1+(295.8287.7)/4)*(295.8-287.7/2)
(2.1+(297.738295.8)/2)*(297.738295.8)
260.69875
259.556472
0.6
19.665
20
287.70
LHS
Sanchor
2
27.26125
21
295.80
RHS
Gardali
Lead Formulation
2.1
297.74
Total
Av. Lead (520.26/(297.738-153)
3.59 Km.
Say Rs
4.00 Km.
520.26
#REF!
Sindru Quarry
00.00 Km.
(2+54/2)*54 =
1,566.00
(2+75.12/2)*75.12 =
2,971.75
2 km.
169+000
75.00 km.
4,537.75
60.50
Say
61.00 Km.
#REF!
75.00 Km.
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
Lead Chart for Aggregate Quarry Locations for NH-15 (Barmer - Sanchor - Gujarat Border) in the State of Rajasthan
R/S
13
14 Km
Km
Quarry No: 2
Quarry No: 1
Chainage: 156+000
Chainage: 156+000
Side : R/S
Side : R/S
Source: Marudi (Barmer)Quarry
Source: Marudi (Barmer)
: Contact Person
Quarry
Viratra Stone Crusher
: Contact Person
)Ven Singh(
Shiv Shakti Stone Crusher
(13.5+(202.200-156)/4
)*(202.200-156)/2
Mobile:
8875004262 578.655
Mohan Singh
Raj Purohit
Quarry
1
45
: Qty. (approx.) (sq.m)
(13+(156-153.00)/2)*(156-153.00)
Mobile: 9414108699
Lead: 14 Km from CH 156+000
: Qty. (approx.) (sq.m)
x 300 300
Lead: 13 Km from CH
, Aggregate Size: 40 mm273.735
156+000
(.3+(202.200-156)/4)*(202.200-156)/2
Quarry3
mm, 10 mm, Dust 20
x 400 400
4592.42
(.3+(297.738-200.200)/2)*(297.738-202.200
No. of Bags - 5
, Aggregate Size:
40 mm
Total
5489.81
mm, 10 mm, Dust 20
No. of Bags - 33
297.738
293.000
288.000
283.000
278.000
273.000
268.000
263.000
258.000
253.000
248.000
243.000
238.000
233.000
228.000
223.000
Gujarat
BorderL/S
218.000
213.000
208.000
202.200
198.000
188.000
183.000
178.000
173.000
168.000
163.000
156.000
153.000
L/S
193.000
Barmer
Quarry No: 3
Chainage: 202+200
Side : L/S
Source: Mangta Quarry
: Contact Person
Shyam
Singh
0.3 Km
Mobile: 9636750055
: Qty. (approx.) (sq.m)
Lead: 0.3 Km from CH 202+200
x 300 250
Aggregate Size: Boulder
No. of Bags - 1
R/S
Average Lead
Total Lead
5489.81
= ________________________________________
Total Project length
Average Lead
38 Km
Say
144.738
37.93
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
Loading, Unloading & Carriage Rates as per Analysed
Total Lead =
38.00 Km.
Cum/
Km
Km.
4.16
3.65
3.14
9.00
10.00
18.00
in (Rs.)
37.44
36.50
56.52
cum
64.00 /Cum
194.00
Sub Total
M013
M017
M022
G.S.B. Material
Description
Unit
53-9.5
mm.
9.5-2.36
2.36 mm. Below
mm
m3
150.00
120.00
90.00
m3
194.00
194.00
194.00
17.20
15.70
14.20
361.00
330.00
298.00
m3
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of Rajasthan
Total Lead
38.0 Km.
x
x
x
Km.
9.00
10.00
18.00
Rs.
37.44
36.50
56.52
cum
64.00
Sub Total
Say
194.46
194.00
Rates of Aggregates as per Basic Schedule of Rates for PWD Circle, Jodhpur
M003
M002
M049
M046
M031
Unit
Boulder
minimum
size of 300
mm.
Quarry
Spall
m3
350.00
250.00
400.00
475.00
350.00
m3
194.00
194.00
194.00
194.00
27.20
22.20
29.70
571.00
466.00
624.00
Description
m3
M044
M040
M055
M053
M051
M030
10-5 mm.
40 mm.
20 mm.
10 mm.
Stone Dust
(below 5.6
mm)
475.00
140.00
375.00
450.00
475.00
90.00
194.00
194.00
194.00
194.00
194.00
194.00
194.00
33.45
27.20
33.45
16.70
28.45
32.20
33.45
14.20
702.00
571.00
702.00
351.00
597.00
676.00
702.00
298.00
10
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
Lead Chart for Sand Sources for NH-15 (Barmer - Sanchor - Gujarat Border) in the State of Rajasthan
297.738
293.000
288.000
283.000
278.000
268.000
263.000
258.000
253.000
248.000
243.000
238.000
233.000
L/S
228.000
223.000
218.000
213.000
208.000
203.000
198.000
193.000
178.000
173.000
168.000
163.000
158.000
188.000
71.6)
(00
82 Km from CH 153+000
183.000
153.000
START
OF PROJECT
ROAD
L/S
Gujarat Border
B
a
h
a
r
g
o
r
a
273.000
Barmer
R/S
R/S
Lead OF Quarry From 153 =
Half Project Length
=
82
72
say
155 Km.
11
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
Loading, Unloading & Carriage Rates as per Analysed
Total Lead
155.0 Km.
9.00
10.00
135.00
Rs.
37.44
36.50
423.90
Sub Total
Total Say Rs
64.00
561.84
562.00 /Cum
64.00
Coarse
Sand
m3
300.00
m3
562.00
43.10
m3
905.00
Description
Bricks
12
Rs.
4.00
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
Total Lead (144.738 /2 )
72.0 Km.
Rs
Lead for Surfaced Road
(t/Km)
Cartage 2nd Km to 10 th Km
2.74
Cartage 10 th Km to 20 th Km
2.40
Lead Beyond 20 km
2.05
Add 5% Escalation for Year 2013-14
Loading & Unloading
Loading & Unloading of material by Mannual means
(As per Analysed)
Km
9.00
10.00
52.00
tone
Sub Total
Total Say Rs
Unit
Cement (Rs.)
Market Rate
M.T.
6000.00
M.T.
305.00
M.T.
6305.00
13
In (Rs)
24.66
24.00
106.60
7.76
142.00
305.02
305.00 Rs/T
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
Loading, Unloading & Carriage Rates as per Analysed
Total Lead (144.738 /2 )
72.0 Km.
Rs
(t/Km)
2.74
Km
9.00
10.00
52.00
2.4
2.05
142.00 /t
tone
Total
Say Rs
Steel from Market Rate (SAIL) March 2013
Description
in Rs.
24.66
24.00
106.60
7.76
Unit
Steel (Rs.)
Market Rate
M.T.
49,025.00
M.T.
M.T.
305.00
49,330.00
14
305.02
305.00 /t
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
BITUMEN
Source Refinery from Koyali
Koyali to Sanchor
Half project length
Total Lead
354.0 Km.
72.4 Km.
426.37 Km.
EMULSION
Source Refinery from Panipat
Panipat to Barmer
Half of Project Road Length
Total Lead
795.0 Km.
72.37 Km.
867.37 Km.
Carriage Rates as per Analysed
2.74
2.4
2.05
9.00
10.00
406.37
Total
Emulsion source from Panipat refinery
Cartage 2nd Km to 10 th Km
Cartage 10 th Km to 20 th Km
Lead Beyond 20 km
Add 5% Escalation for Year 2013-14
Total Cartage from Panipat refinery
2.74
2.4
2.05
9.00
10.00
847.37
Total
15
Rs.
24.66
24.00
833.06
44.09
925.80
926.00
Rs.
24.66
24.00
1,737.11
89.29
1,875.05
1,875.00
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
Basic Rates from as per IOC Applicable from : Sept 1, 2013
Excise duty
CST
(a+b)*2 % =
14.42% *(a)
(c.)
= (b)
Entry Tax
Cartage
(d)
Rate at Site
DESCRIPTION
Unit
Basic Rates
(a)
PMB-40
M.T.
50,380.00
7,264.80
1,152.90
926.00
2,351.91
62,076.00
Rs/Tonne
CRMB-60
M.T.
40,350.00
5,818.47
923.37
926.00
1,883.67
49,902.00
Rs/Tonne
VG-30
M.T.
41,180.00
5,938.16
942.36
926.00
1,922.42
50,909.00
Rs/Tonne
Emulsion
(Medium)
M.T.
34,180.00
4,928.76
782.18
1,875.00
1,595.64
43,362.00
Rs/Tonne
VG-10
M.T.
40,380.00
5,822.80
924.06
926.00
1,885.07
49,938.00
Rs/Tonne
16
(a+b+c) *4% =
(a+b+c+d+e)
(e)
(Rs.)
koyali
koyali
Panipat
koyali
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
NH-15, (Km. 153.00 to Km. 297.738)
Rate for Hume pipe
Total Lead (144.738 /2 )
Lead for Metalled Road (per Pipe)
Diameter of Pipe (NP4)
72.0 Km.
1000
1200
Thickness of pipe
0.115
0.120
0.403
0.498
2.5
2.5
1.007
1.244
Weight / Pipe in T
2.417
2.986
142.00
142.00
59.60
58.01
257.65
375.26
73.63
71.66
318.28
463.57
Length of Pipe
KM
t/Km
9.0
10.0
2.74
2.40
2.05
52.0
Cost /Pipe
Unit
Size
1000 mm
1200 mm.
per pipe
12,000.00
15,000.00
per pipe
343.21
423.98
17
Haulage Cost
t.km
375.26
463.57
635.92
794.38
per pipe
13,354.00
16,682.00
per Metre
5,342.00
6,673.00
18
Consultancy services for the preparation of detailed Project Report for NH-15 Barm
Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-01 A
Cartage And Loading Unloading
Sl.
No.
a)
Ref.
MoRT
H
Spec.
Description
Unit Quantity
Loading and Unloading of Cement or Steel By manual means
and stacking
Placing tipper at loading point, loading with front end loader,
dumping, turning for return trip, excluding time for haulage
and return trip
a)
b)
Unit = tonne
Taking output = 10 tonnes
Labour
Mate
Mazdoor for loading and unloading
Machinery
Truck 10 tonne capacity
Cost for10 Tonnes = a+b+c+d
Rate per Tonnes= (a+b+c+d)/ 10
18
day
day
0.08
2.00
hour
2.00
8)
297.00
246.00
23.76
492.00
450.00
900.00
1415.76
Say Rs 142.00 /T
19
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-1
SITE CLEARANCE AND DISMANTLING
Ref.
Sl. MoRTH
No. Spec.
Description
Unit Quantity
hour
0.02
297.00
5.94
0.60
246.00
147.60
153.54
0.10
375.00
37.50
15.28
20.63
226.96
227.00 each
114.00 each
hour
0.04
297.00
11.88
0.90
246.00
221.40
233.28
0.30
375.00
112.50
27.66
37.34
410.79
Say Rs
Say
411.00 each
205.50 each
hour
0.08
297.00
23.76
2.00
246.00
492.00
515.76
0.40
375.00
150.00
53.26
71.90
790.92
19
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-1
SITE CLEARANCE AND DISMANTLING
Ref.
Sl. MoRTH
No. Spec.
Description
Unit Quantity
day
0.16
297.00
47.52
4.00
246.00
984.00
1031.52
0.60
375.00
225.00
b) Machinery
Tractor-trolley
c)
hour
100.52
135.70
Say Rs
1492.75
1493.00 each
Say
745.00 each
day
day
0.16
4.00
297.00
246.00
47.52
984.00
1031.52
hour
10.00
3840.00
38400.00
hour
1.00
375.00
375.00
3184.52
4299.10
47290.15
47290.00 per hect
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-1
SITE CLEARANCE AND DISMANTLING
Ref.
Sl. MoRTH
No. Spec.
Description
Unit Quantity
day
day
0.060
1.50
297.00
246.00
17.82
369.00
386.82
hour
0.38
375.00
142.50
42.35
57.17
628.83
629.00 / Cum
b)
Labour
Mate
Mazdoor for dismantling, loading and
unloading
Machinery
Tractor-trolley
day
day
0.04
1.00
297.00
246.00
11.88
246.00
257.88
hour
0.33
375.00
123.75
c)
30.53
d)
41.22
453.38
453.00 / Cum
Unit = Cum
Taking output = 1.25 cum
I)
(A)
c)
Machinery
Tractor-trolley
Overhead @ 8%On (a+b)
day
day
0.03
0.75
297.00
246.00
8.91
184.50
193.41
hour
0.27
375.00
101.25
23.57
21
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-1
SITE CLEARANCE AND DISMANTLING
Ref.
Sl. MoRTH
No. Spec.
d)
Description
Contractors Profit @ 10%On (a+b+c)
Unit Quantity
350.06
Machinery
Tractor-trolley
day
day
0.014
0.35
297.00
246.00
4.16
86.10
90.26
hour
0.27
375.00
101.25
c)
15.32
d)
20.68
227.51
c)
Machinery
Air compressor 250 cfm with 2 leads of pneumatic
breaker @ 1.5 cum per hour
Tractor - trolley
Overhead @ 8%On (a+b)
d)
0.02
0.25
0.25
297.00
246.00
246.00
5.94
61.50
61.50
128.94
hour
0.67
330.00
221.10
hour
0.27
375.00
101.25
36.10
48.74
Say Rs
Prestressed / reinforced cement concrete grade
M-20 and above
a)
Labour
Mate
Mazdoor with pneumatic breaker
Blacksmith
Mazdoor for loading and unloading
b)
182.01
182.00 / Cum
day
day
day
280.04
280.00 / Cum
536.13
428.91
429.00 / Cum
day
day
day
day
0.05
0.66
0.25
0.25
297.00
246.00
361.00
246.00
14.85
162.36
90.25
61.50
328.96
Machinery
Air compressor 250 cfm with 2 leads of pneumatic
breaker @ 1.0 cum per hour
hour
1.00
330.00
330.00
Tractor - trolley
hour
0.27
375.00
101.25
431.25
22
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-1
SITE CLEARANCE AND DISMANTLING
Ref.
Sl. MoRTH
No. Spec.
Description
Unit Quantity
c)
60.82
d)
82.10
903.13
Machinery
Tractor - trolley
day
day
0.03
0.75
297.00
246.00
8.91
184.50
193.41
hour
0.27
375.00
101.25
c)
23.57
d)
31.82
722.50
723.00 / Cum
350.06
280.04
280.00 / Cum
day
day
0.016
0.40
297.00
246.00
4.75
98.40
103.15
hour
0.27
375.00
101.25
16.35
22.08
242.83
194.26
194.00 / Cum
b)
Say Rs
IV)
_A)
day
day
0.02
0.52
297.00
246.00
b)
10.71
c)
14.46
5.94
127.92
133.86
159.03
159.00 / m
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-1
SITE CLEARANCE AND DISMANTLING
Ref.
Sl. MoRTH
No. Spec.
Description
a)
Unit Quantity
Labour
Mate
Mazdoor
day
day
0.03
0.70
8.91
172.20
181.11
b)
14.49
c)
19.56
day
day
0.05
1.20
297.00
246.00
215.16
215.00 / m
14.85
295.20
310.05
b)
49.61
c)
35.97
24
395.62
396.00 / m
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-2
EARTH WORK
Ref.
MoRTH
Sl. No. Spec.
Description
2.00 EARTH WORK
2.01
301
i)
For ordinary soil
Excavation for roadway in soil by mechanical means including
cutting and pushing the earth to site of embankment upto a distance
of 100 metres (average lead 50 metres), including trimming bottom
and side slopes in accordance with requirement of lines, grades and
cross sections.
Unit = cum
Taking output = 360 cum
a) Labour
Mate
Mazdoor
Unit
Quantity
Rate (Rs.)
day
day
0.08
2.00
297.00
246.00
23.76
492.00
515.76
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 60 cum per houhour
Tipper 5.5 cum capacity, 4 trips per hour.
c) Overhead @ 8%On (a+b)
d) Contractors Profit @ 10%On (a+b+c)
Cost for 180 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
hour
1344.00
16
320.00
Say Rs
301
8064.00
5120.00
1095.98
1479.57
16275.31
45.21
46.00 /cum
ii)
For ordinary rock
Excavation for roadway in ordinary rock by deploying a dozer, 80 HP
including cutting and pushing the cut earth to site of embankment
upto a distance of 100 metres ( average lead 50 metres), trimming
bottom and side slopes in accordance with the requirement of lines,
grades and cross sections.
Unit = cum
Taking output = 108 cum
a)
Labour
Mate
Mazdoor
b)
Machinery
Dozer, 80 HP @ 30 cum per hour
c)
Overhead @ 8%On (a+b)
d)
Contractors Profit @ 10%On (a+b+c)
Cost for 108 cum = a+b+c+d
Rate per cum = (a+b+c+d)/108
day
day
0.12
3.00
297.00
246.00
hour
6.00
1344.00
Say Rs
35.64
738
8064
707.01
954.47
10499.12
97.21
97.00 /cum
24
day
day
day
day
0.22
3.00
2.00
0.25
297.00
246.00
328.00
328.00
65.34
738.00
656.00
82.00
hour
hour
hour
hour
6.00
6.00
6.00
11.25
1344.00
330.00
832.00
320.00
8064.00
1980.00
4992.00
3600.00
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-2
EARTH WORK
Ref.
MoRTH
Sl. No. Spec.
d)
Description
Materials
Gelatine 80 per cent
Electric Detonators @ detonator for 2-gelatine
sticks of 125 gms each
Credit for excavated rock found suitable for use
@ 50 per cent of excavated quantity
Overhead @ 8%On (a+b+c)
e)
c)
Unit
Quantity
Rate (Rs.)
kg
Each
63
252
63.00
6.00
3969.00
1512.00
90.0
105.00
-9450.00
cum
1296.67
1750.50
19255.51
Say Rs
106.98
107.00 /cum
Mechanised
Unit = cum
Taking output = 36 cum
a) Labour
Mate
Mazdoor for trimming slopes including manual
b)
Machinery
Hydraulic excavator with rock breaker
attachment @ 6cum per hour
Tipper 5.5 cum capacity, 1 trip per hour.
Credit for excavated rock found suitable for use
@ 50 per cent of excavated quantity
day
day
0.4
10.0
297.00
246.00
118.80
2460.00
hour
6.0
1344.00
8064.00
hour
cum
6.5
18.0
320.00
105.00
2080.00
-1890.00
866.62
1169.94
12869.37
357.48
d)
Overhead @ 8%On (a+b)
e)
Contractors Profit @ 10%On (a+b+c)
Cost for 36 cum = a+b+c+d
Rate per cum = (a+b+c+d)/36
Say Rs
2.02
305
357.00 /cum
25
day
day
0.04
1.00
297.00
246.00
11.88
246.00
257.88
hour
1.67
1344.00
2244.48
t.km
160X4
2.784
1781.76
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-2
EARTH WORK
Ref.
MoRTH
Sl. No. Spec.
Description
Add 10% of cost of carriage to cover cost of
loading and unloading
Dozer 80 HP for spreading @ 200 cum per hour
Motor grader for grading @ 100 cum per hour
Water tanker 6 KL capacity
Vibratory roller 8-10 tonnes @ 100 cum per hour
c)
Material
Cost of water
Compensation for earth taken from private land
Unit
Quantity
hour
hour
hour
hour
0.50
1.00
4.00
1.00
KL
cum
24
100
Rate (Rs.)
3840.00
2472.00
125.00
1,591.00
63.00
32.00
305
day
day
0.02
0.50
297.00
246.00
5.94
123.00
128.94
hour
hour
hour
hour
0.50
1.00
4.00
1.00
3840.00
2472.00
125.00
1591.00
1920.00
2472.00
500.00
1591.00
6483.00
KL
24
63.00
c)
Say Rs
2.04
305
1512.00
649.92
877.39
9651.00
96.51
97.00 /cum
26
day
day
0.04
1.00
297.00
246.00
11.88
246.00
257.88
hour
1.67
1344.00
2244.48
t.km
175X4
2.784
1948.80
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-2
EARTH WORK
Ref.
MoRTH
Sl. No. Spec.
Description
loading and unloading
Dozer 80 HP for spreading @ 200 cum per hour
Motor grader for grading @ 50 cum per hour
Water tanker 6 KL capacity
Vibratory roller 8-10 tonnes @ 100 cum per hour
c)
Material
Cost of water
Compensation for earth taken from private land
Unit
Quantity
hour
hour
hour
hour
0.50
2.00
4.00
1.25
KL
cum
24
100
Rate (Rs.)
3840.00
2472.00
125.00
1,591.00
63.00
32.00
407
day
day
0.24
6.00
297.00
246.00
71.28
1476.00
1547.28
hour
hour
6.00
1.00
50.00
125.00
300.00
125.00
425.00
KL
6.00
63.00
c)
Say Rs
2.06
305.3.4
378.00
188.02
253.83
2792.13
132.96
133.00 /cum
day
day
0.12
3.00
297.00
246.00
35.64
738.00
773.64
b) Machinery
Tractor with ripper attachment
Motor grader for grading
Water tanker 6 KL capacity
Vibratory roller 8-10 tonne @ 80 cum/ hour
hour
hour
hour
hour
9.00
6.00
4.00
7.50
779.00
2472.00
125.00
1591.00
7011.00
14832.00
500.00
11932.50
34275.50
KL
24.00
63.00
c)
Material
Cost of water
d) Overhead @ 8%On (a+b+c)
e) Contractors Profit @ 10%On (a+b+c+d)
Cost for 600 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/600
Say Rs
27
1512.00
2924.89
3948.60
43434.63
72.39
72.00 /cum
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-2
EARTH WORK
Ref.
MoRTH
Sl. No. Spec.
2.07 307
Description
Furnishing and laying of the live sods of perennial turf forming grass
on embankement slope, verges or other locations shown on the
drawing or as directed by the Engineer including preparation of
ground, fetching of sods and watering
Unit = 1 Sqm
Taking output = 100 Sqm
a) Labour
Mate
Mazdoor for preparation of ground and
fetching of sods
b) Machinery
Water tanker including watering for 3 months
Tractor-trolley
Material
Farmyard manure @ 0.18 cum per 100 sqm at
site of work
Cost of water
d) Overhead @ 8%On (a+b+c)
e) Contractors Profit @ 10%On (a+b+c+d)
Cost for 100 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/100
Unit
Quantity
Rate (Rs.)
day
0.12
297.00
35.64
day
3.00
246.00
738.00
773.64
hour
hour
2.00
1.00
125.00
375.00
250.00
375.00
625.00
cum
0.18
250.00
45.00
KL
12.00
63.00
c)
Say Rs
28
756.00
175.97
237.56
2613.17
26.13
26.00 /sqm
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-3
SUB BASE AND BASE COURSES
Ref.
Sl. MoRTH
No. Spec.
Description
Unit
3.00 SUBBASE AND BASE COURSE
By Mix In Place Method
3.01a) 401
Construction of granular sub-base by providing close graded
material, mixing in a mechanical mix plant at OMC carriage of
mixed material to work site, spreading in uniform layers with motor
grader on prepared surface and compacting with vibratory power
roller to achieve the desire density, complete as per clause 401
Unit = cum
Taking out put=300 cum
a) Labour
Mate
Mazdoor skilled
Mazdoor
b) Machinery
Water tanker 6 KL capacity 5 km lead with one
trip per hour
Rotavator / Farm Tractor loading and unloading
Motor grader 110 HP
Vibratory roller 8-10 t
c) Material
Close graded granular sub-base material as per
Table 400-1
For Grading I material
53 mm to 9.5 mm @ 50 per cent
9.5mm to 2.36 mm @ 20 per cent
2.36 mm below @ 30 per cent
Cost of water
d) Overhead @ 8%On (a+b)
e) Contractors Profit @ 10%On (a+b+c)
Cost for 300 cum = a+b+c+d+e
Rate per cum=(a+b+c+d+e)/300
day
day
day
0.48
2.00
10.00
297.00
328.00
246.00
142.56
656.00
2,460.00
hour
3.00
125.00
375.00
hour
hour
hour
12.00
6.00
6.00
306.00
2,472.00
1,591.00
cum
cum
cum
KL
192.00
76.00
115.20
18.00
361.00
330.00
298.00
63.00
SAY RS
3.01b) 401
Cost (Rs.)
3672.00
14832.00
9546.00
69312.00
25080.00
34329.60
1,134.00
12,923.13
17,446.23
191908.52
639.70
640.00 /Cum
29
day
day
day
0.40
2.00
8.00
297.00
328.00
246.00
118.80
656.00
1,968.00
2,742.80
hour
hour
hour
hour
t.km
6.00
6.00
4.50
6.00
450X10
1,244.00
750.00
125.00
832.00
2.784
7,464.00
4500.00
562.50
4992.00
12528.00
1252.80
hour
hour
6.00
6.00
2,472.00
1,591.00
Remarks
14832.00
9546.00
55677.30
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-3
SUB BASE AND BASE COURSES
Ref.
Sl. MoRTH
No. Spec.
Description
c) Material
Close graded granular sub-base material as per
Table 400-1
For Grading I material
53 mm to 9.5 mm @ 50 per cent
9.5mm to 2.36 mm @ 20 per cent
2.36 mm below @ 30 per cent
Cost of water
Unit
cum
cum
cum
KL
144.00
57.00
86.40
27.00
361.00
330.00
298.00
63.00
406
Cost (Rs.)
Remarks
51,984.00
18,810.00
25,747.20
1,701.00
98,242.20
12,532.98
16,919.53
186114.81
827.18
827.00 /Cum
day
day
day
b) Machinery
Wet mix plant of 75 tonne hourly capacity
Electric generating set, 125 KVA
Front end loader 1 cum bucket capacity
Paver finisher
Vibratory roller 8-10 tonne
Water tanker
Tipper
L
10
Add 10 per cent of cost of carriage to cover
loading and unloading
hour
hour
hour
hour
hour
hour
t.km
0.48
2.00
10.00
297.00
328.00
246.00
6.60
1,244.00
6.00
750.00
6.00
832.00
6.00
1,007.00
6.0x0.65 1591.00
3.00
125.00
495X10
2.784
142.56
656.00
2,460.00
3,258.56
8210.40
4500.00
4992.00
6042.00
6204.90
375.00
13780.80
1378.08
45483.18
c) Material
Material as per Table 400-11
For grading material
45 mm to 22.4 mm @ 30 per cent
22.40mm to 2.36 mm @ 40 per cent
2.36 mm to 75 micron @ 30 per cent
Cost of water
cum
cum
cum
KL
89.10
118.80
89.10
18.00
624.00
571.00
298.00
63.00
30
55,598.40
67,834.80
26,551.80
1,134.00
151,119.00
15,988.86
21,584.96
237434.56
1055.26
1055.00 /Cum
Sr No
Cutting of trees ,including cutting
of Trunks ,Branches and Removal
1.01
227.00
411.00
790.00
1493.00
47290.0
2.00
Excavation In Soil
Embankment From Borrow Area
Embankment From Roadway Cutting
Subgrade From Borrow
46
186.00
97
222
3.00
GSB Mix in Place
GSB plant Mix
WMM
640
827
1055
4.00
Prime Coat
Tack Coat
B.M
DBM
B.C
SDBC
5.00
33
12
6055
7788
11418
8192
Excavation In Foundation(Soil)
Excavation In Foundation(Ordinary Rock)
Excavation In Foundation(Hard Rock)
PCC M-15 (Foundation)
PCC M-20 (Foundation)
RCC M-20 (Foundation)
50.00
63.00
372.00
4224.00
4697.00
4751.00
PCC M-20
RCC M-20
(Substructure)
(Substructure)
4967.00
5026.00
RCC M-25
RCC M-40
(Superstructure)
(Superstructure)
5950.00
6252.00
1520.00
750.00
65694.00
150.00
1172.00
1172
898.00
94.00
1457.00
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-4
BITUMINOUS / CEMENT CONCRETE COURSES
Sl.
No.
Ref.
MoRTH
Spec.
4.00
4.01
502
Description
Unit
Quantity
Rate (Rs.)
Labour
Mate
Mazdoor
day
day
0.08
2.00
297.00
246.00
23.76
492.00
515.76
Machinery
Mechanical broom @ 1250 sqm per hour
Air compressor 250 cfm
Bitumen pressure distributor @ 1750 sqm per hour
Water tanker 6 KL capacity @ 1 trip per hour
hour
hour
hour
hour
2.80
2.80
2.00
1.00
368.00
330.00
1108.00
125.00
1030.40
924.00
2216.00
125.00
4295.40
Material
Bitumen emulsion @ 0.6 kg per sqm
Cost of water
tonne
KL
2.10
6.00
43362.00
63.00
91060.20
378.00
91438.20
Prime Coat
Providing and applying primer coat with bitumen emulsionon prepared surface
of granular base including cleaning ofroad surface and spraying primer at the
rate of 0.6 kg/sqm using mechanical means.
Unit = Sqm
Taking unit = 3500sqm
a)
b)
c)
d)
e)
7699.95
10394.93
114344.24
4.02
Note :
Bitumen primer has been provided @ 0.60 kg per sqm as per Clause 502.8.
Payment shall be made with adjustment, plus or minus, for variation
betweenthis quantity and the actual quantity approved bythe Enginneer.
503
Providing and applying tack coat with bitumen emulsion using emulsion
pressurre distributor at the rate of 0.20 kg per sqm on the prepared
bituminous/granular surface cleaned with mechanical broom
On Bituminous Surface
Unit = Sqm
Taking unit = 3500sqm
a) Labour
Mate
Mazdoor
b)
c)
32.67
33.00 /Sqm
day
day
0.08
2.00
297.00
246.00
23.76
492.00
515.76
Machinery
Mechanical broom @ 1250 sqm per hour
Air compressor 250 cfm
Emulsion pressure distributor @ 1750 sqm per hour
hour
hour
hour
2.80
2.80
2.00
368.00
330.00
826.00
1030.40
924.00
1652.00
3606.40
Material
Bitumen emulsion @ 0.2 kg per sqm
tonne
0.70
43362.00
30353.40
d)
2758.04
e)
3723.36
40956.97
11.70
31
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-4
BITUMINOUS / CEMENT CONCRETE COURSES
Sl.
No.
Ref.
MoRTH
Spec.
Description
Unit
Quantity
day
day
0.08
2.00
297.00
246.00
23.76
492.00
515.76
Machinery
Mechanical broom @ 1250 sqm per hour
Air compressor 250 cfm
Emulsion pressure distributor @ 1750 sqm per hour
hour
hour
hour
2.80
2.80
2.00
368.00
330.00
826.00
1030.40
924.00
1652.00
3606.40
Material
Bitumen emulsion @ 0.25 kg per sqm
tonne
0.88
43362.00
37941.75
On Granular Surface
Unit = Sqm
Taking unit = 3500sqm
a) Labour
Mate
Mazdoor
b)
c)
Rate (Rs.)
SAY RS
d)
3365.11
e)
4542.90
49971.93
14.28
15.00 /Sqm
Bituminious Macadam
Providing and laying bituminious macadam with 100-120 TPH Hot mix plant
producing an average output of 75 tonnes per hour Using Crushed aggregate of
specified grading premix with bituminous binder ,transported to siteTechnical
Specifications Clause 501 & 504
Unit = cum
Taking output =205 cum (450 tonnes)
a)
b)
Labour
Mate
day
0.84
297.00
249.48
day
16.00
246.00
3936.00
day
5.00
328.00
1640.00
5825.48
Machinery
Batch mix HMP @ 75 tonne per hour
Mechanical broom hydraulic @1250 sqm per hour
Air Compressor 250 cfm
Paver finisher hydrouatatic with sensor control @ 75 cum per hour
Generator 250 KVA
Front end Loader 1 cum bucket capacity
Tipper 10 tone Capacity
L
10
hour
hour
hour
hour
hour
hour
t.km
6.00
2.20
2.20
6.00
6.00
6.00
450X10
14288.00
368.00
330.00
2760.00
1250.00
832.00
2.784
85728.00
809.60
726.00
16560.00
7500.00
4992.00
12528.00
hour
6.00 x 0.65
476.00
1252.80
1856.40
hour
hour
6.00 x 0.65
6.00 x 0.65
1591.00
1181.00
32
6204.90
4605.90
142763.60
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-4
BITUMINOUS / CEMENT CONCRETE COURSES
Sl.
No.
Ref.
MoRTH
Spec.
Description
c)
Material
i)
ii)
d)
e)
Unit
Quantity
Rate (Rs.)
tonne
14.85
50909.00
755998.65
cum
cum
cum
cum
43.51
130.55
72.53
43.51
624.00
571.00
351.00
298.00
27150.24
74544.05
25458.03
12965.98
896116.95
83576.48
112828.25
1241110.76
6054.20
6055.00 /Cum
Labour
Mate
Mazdoor working with HMP, mechanical broom
paver, roller, asphalt cutter and assistance for
setting out lines,levels and layout of construction
Skilled mazdoor for checking line and levels
b)
Machinery
Batch mix HMP @ 75 tonne per hour
Pave finisher hydrostatic with sensor control
@ 75 cum per hour
Generator 250 KVA
Front end loader 1 cum bucket capacity
Tipper 10 tonne capacity
L=
10
Add 10 per cent cost of carriage to cover cost of
loading and unloading
Smooth wheeled roller 8-10 tonne for initial
break down rolling
Vibratory roller 8 tonne for intermediate rolling
33
day
0.84
297.00
249.48
day
16.00
246.00
3936.00
day
5.00
328.00
1640.00
5825.48
hour
hour
6.00
6.00
14288.00
2760.00
85728.00
16560.00
hour
hour
t.km
6.00
6.00
450X10
1250.00
832.00
2.784
7500.00
4992.00
12528.00
hour
6.00 x 0.65
476.00
1252.80
1856.40
hour
6.00 x 0.65
1591.00
6204.90
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-4
BITUMINOUS / CEMENT CONCRETE COURSES
Sl.
No.
Ref.
MoRTH
Spec.
Description
Finish rolling with 6-8 tonne smooth wheeled
tandem roller
c)
i)
ii)
Material
Bitumen grade CRMB-60
Bitumen @ 4.25 per cent of weight of mix
Unit
hour
Quantity
6.00 x 0.65
Rate (Rs.)
1181.00
tonne
19.13
49902.00
954375.75
cum
cum
cum
cum
tonne
63.195
37.343
54.578
126.390
8.620
624.00
702.00
351.00
298.00
6305.00
39433.68
26214.44
19156.70
37664.22
54349.10
1131193.89
Aggregate
Total weight of mix = 450 tonne
Weight of bitumen = 19.125
Weight of aggregate = 450-19.125 = 430.87 tonne
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 287.25 cum
Grading - I 40 mm (Nominal Size)
37.5 - 25 mm
22 per cent
25-10 mm
13 per cent
10 - 4.75 mm
19 per cent
4.75 mm and below
44 per cent
Filler @ 2 per cent of weight of aggregates
d)
102259.79
e)
138050.72
1518557.87
7787.48
7788.00 /Cum
Bituminious Concrete
Providing and laying bituminous concrete with 100-120TPH batch type hotmix
plant producing an average outputof 75 tonne per hour using crushedaggregates
of specifiedgrading, premixed with PMB-40 bituminous binder @ 5.40
to5.60per cent of mix and filter, transporting the hor mix to work site,
layingwith a hydrostatic paver finisher with sensor control to the required
grade,level and alignment rolling with smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction as per MORT&H Specifications .
Unit = cum
Taking output =191 cum (450 tonnes)
a)
b)
Labour
Mate
day
0.84
297.00
249.48
day
16.00
246.00
3936.00
day
5.00
328.00
1640.00
5825.48
Machinery
Batch mix HMP @ 75 tonne per hour
hour
6.00
14288.00
85728.00
hour
6.00
2760.00
16560.00
hour
6.00
1250.00
7500.00
hour
6.00
832.00
4992.00
t.km
450X10
2.784
12528.00
1252.80
34
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-4
BITUMINOUS / CEMENT CONCRETE COURSES
Sl.
No.
Ref.
MoRTH
Spec.
Description
c)
Unit
Quantity
Rate (Rs.)
hour
6.00 x 0.65
476.00
1856.40
hour
6.00 x 0.65
1591.00
6204.90
hour
6.00 x 0.65
1181.00
4605.90
141228.00
tonne
24.30
62076.00
1508446.80
cum
cum
cum
tonne
99.33
65.27
113.52
8.51
702.00
351.00
298.00
6305.00
69729.66
22911.17
33828.96
53680.77
1688597.36
Material
Bitumen grade PMB-40
i)
Bitumen @ 5.4 per cent of weight of mix
ii)
Aggregate
Total weight of mix = 450 tonne
Weight of bitumen = 24.30
Weight of aggregate = 450-24.30 = 425.70 tonne
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 283.80 cum
35 per cent
23 per cent
40 per cent
d)
146852.07
e)
198250.29
2180753.20
11417.56
11418.00 /Cum
b)
Labour
Mate
day
0.84
297.00
249.48
day
16.00
246.00
3936.00
day
5.00
328.00
1640.00
Machinery
Batch mix HMP @ 75 tonne per hour
hour
6.00
14288.00
85728.00
hour
6.00
2760.00
16560.00
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-4
BITUMINOUS / CEMENT CONCRETE COURSES
Sl.
No.
Ref.
MoRTH
Spec.
c)
Description
Generator 250 KVA
Unit
hour
Quantity
6.00
Rate (Rs.)
1250
hour
6.00
832.00
4992.00
t.km
450X10
2.784
12528.00
hour
6.00 x 0.65
476.00
1856.40
hour
6.00 x 0.65
1591.00
6204.90
hour
6.00 x 0.65
1181.00
4605.90
tonne
22.50
49,902.00
cum
cum
cum
tonne
99.75
65.55
114.00
8.55
702.00
351.00
298.00
6305.00
1252.80
Material
i)
ii)
35 per cent
23 per cent
40 per cent
70024.50
23008.05
33972.00
53907.75
d)
116060.86
e)
156682.16
1723503.81
1122795.00
Aggregate
Total weight of mix = 450 tonne
Weight of bitumen = 22.50
Weight of aggregate = 450-22.50 = 427.50 tonne
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 285 cum
4.08
SAY RS
9023.58
9024.00
b)
Labour
Mate
Mazdoor working with HMP, road sweeper paver and roller
Skilled mazdoor for checking line and levels
Machinery
i) Batch type HMP 75 tonne per hour
36
day
day
day
0.84
16.00
5.00
297.00
246.00
328.00
249.48
3936.00
1640.00
hour
14288.00
85728.00
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-4
BITUMINOUS / CEMENT CONCRETE COURSES
Sl.
No.
Ref.
MoRTH
Spec.
Description
ii) Electric generator set 250 KVA
iii) Front end loader 1 cum bucket capacity
iv) Tipper 10 tonne per capacity
L
10.00
Add 10 per cent of cost of carriage to cover cost of loading and unloading
Unit
hour
hour
hour
Quantity
6
6
450X10
Rate (Rs.)
1250.00
832.00
2.78
1252.80
hour
hour
6.00
6.00
2760.00
476.00
16560.00
2856.00
Material
Bitumen VG-30 @ 14.60 kg per 10 sqm
tonne
14.97
50909.0
762107.73
cum
276.75
702.00
194278.50
d)
Overhead @ 8%On (a+b)
e)
Contractors Profit @ 10%On (a+b+c)
Cost for 10250 sqm= a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/10250
SAY RS
4.09
504
87490.28
109362.85
1290481.64
125.90
126.00 /Sqm
b)
Labour
Mate
Mazdoor working with HMP, mechanical broom, paver roller
asphalt cutter and assistance for setting out lines, levels and
layout of construction
Skilled mazdoor for checking line and levels
day
day
0.84
16
297.00
246
249.48
3936
day
5.00
328.00
1640
Machinery
Batch mix HMP 100-120 TPH @ 75 tonne per hour
actual output
hour
6.00
14288
85728
hour
2.20
368.00
809.6
hour
2.20
330.00
726
hour
6.00
2760.00
16560
hour
6.00
1250.00
7500
hour
6.00
832.00
4992
t.km
450X10
2.78
37
12528.00
1252.80
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-4
BITUMINOUS / CEMENT CONCRETE COURSES
Sl.
No.
Ref.
MoRTH
Spec.
Description
Unit
Quantity
Rate (Rs.)
hour
6.00 x 0.65
476.00
1856.40
hour
6.00 x 0.65
1591
6204.90
hour
6.00 x 0.65
1181
4605.90
tonne
14.85
50909
755998.65
cum
cum
cum
cum
43.51
130.55
72.53
43.51
624.00
702.00
351.00
298.00
27150.24
91646.10
25458.03
12965.98
c)
Material
i)
ii)
Aggregate
Total weight of mix = 450 tonnes
Wieght of bitumen = 14.85 tonnes
Weight of aggregate = 450-14.85 = 435.15 tonnes
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 290.10 cum
15 per cent
45 per cent
25 per cent
15 per cent
d)
e)
84944.65
114675.27
1261428.00
4.07
508
6153.31
Say Rs.6150 /cum
Unit = sqm
Taking output = 10250 sqm (205 cum)
a)
b)
Labour
Mate
Mazdoor working with HMP, road sweeper, paver and roller
Skilled mazdoor for checking line and levels
Machinery
i) HMP of appropricate capacity
ii) Electric Generator Set 250 KVA
iii) Front end loader 1 cum bucket capacity
38
day
day
day
0.84
16.00
5.00
297.00
246.00
328.00
249.48
3936
1640
hour
hour
hour
6.00
6.00
6.00
14288.00
1250.00
832.00
85728
7500
4992
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-4
BITUMINOUS / CEMENT CONCRETE COURSES
Sl.
No.
Ref.
MoRTH
Spec.
Description
iv) Tipper 10 tonne capacity
L
10
Add 10 per cent of cost of carriage to cover cost of loading and unloading
v) Paver finisher hydrostatic with sensor attachment
vi) Smooth wheeled 8-10 tonne weight
c)
Material
Bitumen @ 22 kg per 10 sqm
Stone crushed aggregates 11.2 mm to 0.09 @ 0.27 cum per 10 sqm
Unit
t.km
Quantity
450X10
Rate (Rs.)
2.78
hour
hour
6.00
6.00
2760.00
476.00
16560
2856
tonne
cum
22.50
276.75
50909.00
351.00
1145452.5
97139.25
d)
110286.50
e)
148886.77
1637754.50
601
c)
Machinery
Front end loader 1 cum bucket capacity
Cement concrete batch mix plant @ 55 cum per hour
Electric generator 100 KVA
Paver with electric sensor
Vibratory roller 8-10 capacity
Water tanker 6 KL capacity
Tipper
L
10
Add 10 per cent of cost of carruage to cover cost of loading
and unloading
159.78
160.00
day
day
day
1.12
6.00
22.00
297.00
328.00
246.00
332.64
1968.00
5412.00
7712.64
hour
hour
hour
hour
hour
hour
t.km
6.00
6.00
6.00
6.00
8.00
8.00
990X10
832.00
4000.00
720.00
2760.00
1591.00
125.00
2.784
4992.00
24000.00
4320.00
16560.00
12728.00
1000.00
27561.60
2756.16
93917.76
Material
Crushed stone coarse aggregate of 25 mm and 12.5 mm
nominal sizes graded as per Table 600-1 @ 0.90 cum/cum of
concrete comforming to Clause 602.2.4
Coarse sand as per IS : 383 @0.45 cum/cum of concrete
Cement @ 150kg/cum of concrete
Cost of water
Separation Membrane
cum
cum
tonne
KL
sqm
405.00
203.00
67.50
48.00
3000.00
676.00
905.00
6305.00
63.00
15.00
273780.00
183715.00
425587.50
3024.00
45000.00
931106.50
d)
e)
82618.95
111535.59
1226891.44
39
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-4
BITUMINOUS / CEMENT CONCRETE COURSES
Sl.
No.
Ref.
MoRTH
Spec.
Description
Rate per cum = (a+b+c+d+e)/450
Unit
Quantity
Rate (Rs.)
SAY RS
40
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-4
BITUMINOUS / CEMENT CONCRETE COURSES
Sl.
No.
Ref.
MoRTH
Spec.
4.08
602
Description
Unit
Cement concrete Pavement
Providing pavement quality concrete M-40 grade including cost of dowel bars,
the bars, joint sealant with primer, separator membrane curing compound
admixtures complete as per Drawing and Technical Specifications 602
Unit = cum
Taking output = 1050 cum (2415 tonne)
a) Labour
Mate
Mazdoor skilled
Mazdoor
b)
Machinery
Road sweeper @ 1250 sqm, per hour
Front end loader 1 cum bucket capacity
Cement concrete batch mix plant @ 175 cum per hour
(effective output)
Electric generator 250 KVA
Slip form paver with electronic sensor
Water tanker
Transit truck against agitator 5 cum capacity
L
10
Add 10 per cent of cost of carriage to cover cost of loading
and unloading
Concrete joint cutting machine
Texturing machine
c)
Material
Crushed stone coarse aggregate of 25 mm and 12.5 mm
nominal sizes @ 0.90 cum/cum of
concrete comforming to Clause 602.2.4
Coarse sand as per IS : 383 and conforming to Clause 602.2.4
@ 0.45 cum/cum of concrete
Cement 43 grade @ 400kg/cum of concrete
32 mm mild steel dowel bars fo grade S 250
12mm deformed steel tie bars of grade S 415
Pre-moulded joint filler, 25 mm thick for expansion joint
Joint sealant
Sealant primer
Plastic sheath, 1.25 mm thick for dowel bars
Curing compound
Super plasticizer admixture IS marked as per 9103-1999
@ 0.5per cent by weight of cement
Separation Membrane 125 micron thick
Quantity
Rate (Rs.)
day
day
day
2.00
15.00
35.00
297.00
328.00
246.00
594.00
4920.00
8610.00
14124.00
hour
2.80
368.00
1030.40
hour
18.00
832.00
14976.00
hour
hour
hour
hour
t.km
6.00
6.00
6.00
36.00
2415X10
12000.00
1250.00
15000.00
125.00
2.784
72000.00
7500.00
90000.00
4500.00
67233.60
6723.36
hour
hour
12.00
12.00
200.00
200.00
2400.00
2400.00
268763.36
cum
cum
945.00
473.00
676.00
905.00
638820.00
428065.00
tonne
tonne
tonne
sqm
kg
kg
sqm
litre
kg
420.00
9.45
1.17
16.33
875.00
116.67
46.67
1850.00
2070.00
6305.00
49330.00
49330.00
494.00
275.00
550.00
15.00
95.00
100.00
2648100.00
466168.50
57716.10
8067.02
240625.00
64168.50
700.05
175750.00
207000.00
sqm
3281.25
15.00
216.00
63.00
49218.75
4984398.92
13608.00
d)
Cost of water
KL
Add 1 % of material for cost of miscellaneous materials like tarpauline, Hessian
cloth, metal cap, cotton/compressible sponge and cradle for dowel bars, work
bridges for men to approach concrete surface without walking over it, cuttting
blades and bites, minor equipments like scabbling machine, threads, ropes, quide
wires and any other unforeseen items
Overhead @ 8%On (a+b+c)
e)
49980.07
426469.95
575734.43
6333078.73
6031.50
6032.00 /Cum
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-4
BITUMINOUS / CEMENT CONCRETE COURSES
Sl.
No.
Ref.
MoRTH
Spec.
4.09
Description
Unit
Transition Section between Rigid and Flexible Pavement
Construction of M-40 grade reinforced cement concrete transition slab at joint
of rigid and flexible pavement including the cost of reinforcement. Providing of
contraction joint, expansion joint, longitudinal joint, construction joint, joint
sealing compound
Unit = Cum
i)
ii)
iii)
iv)
v)
Rate (Rs.)
16.31
6252.00
101970.12
1.445
65694.00
94927.83
0.114
65694.00
7489.116
0.011
65694.00
722.634
17.64
0.018
65694.00
1182.492
18.52
0.019
65694.00
1248.186
Lm
14.25
205.00
2921.25
14.50 x 3.0 x
Cum
(0.275+0.225)/2
+14.50 x 2.50 x 0.15
16.31
388.51
398.71
323.76
334.4
1445.37
11.12
Total Cost
Cost per cum
5.21
522
(i)
=
=
Say Rs
210461.63
12903.84
12904.00 /Cum
5.21
113.58
Quantity
(ii)
day
day
0.24
6.00
297.00
246.00
71.28
1476
hour
hour
hour
hour
hour
6.00
6.00
6.00
6.00
6.00
368.00
330.00
1108.00
2,720.00
476
2208
1980
6648
16320
2856
tonne
cum
9.45
105.00
49,902.00
298.00
Say Rs
471573.9
31290
42753.8544
53442.318
60.06 /Sqm
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER-4
BITUMINOUS / CEMENT CONCRETE COURSES
Sl.
No.
Ref.
MoRTH
Spec.
Description
Providing and laying of a stress absorbing membrane over a cracked road
surface, with crack width 6 to 9 mm after cleaning with a mechanical broom,
using modified binder complying with clause 521, sprayed at the rate of 11 kg
per 10 sqm and spreading 11.2 mm crushed stone aggregates @ 0.12 cum per
10 sqm, sweeping the surface for uniform spread of aggregates and surface
finished to conform to clause 902.
Unit = sqm
Taking output = 10500 sqm
a)
Labour
Mate
Mazdoor
b)
Machinery
Mechanical broom @ 1250 sqm per hour
Air compressor 250 cfm
Bitumen pressure distributor @ 1750 sqm per hour
Hydraulic Chip spreader
Smooth wheeled road roller 8-10 tonne
c)
Material
Modified binder
Crushed stone aggregates 5.6 mm size
d)
Overhead @ 8%On (a+b+c)
e)
Contractors Profit @ 10%On (a+b+c+d)
Unit
Quantity
Rate (Rs.)
day
day
0.24
6.00
297.00
246.00
71.28
1476
hour
hour
hour
hour
hour
6.00
6.00
6.00
6.00
6.00
368.00
330.00
1108.00
2,720.00
476
2208
1980
6648
16320
2856
tonne
cum
11.55
105.00
49,902.00
702.00
Say Rs
576368.1
73710
54530.9904
68163.738
76.60 /Sqm
day
day
0.24
6.00
297
246
71.28
1476
hour
hour
hour
hour
hour
6.00
6.00
6.00
6.00
6.00
368
330
1108
2720
476
2208
1980
6648
16320
2856
tonne
cum
15.75
126.00
49902
702.00
Say Rs
43
785956.5
88452
72477.4224
90596.778
101.81 /Sqm
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
5.00
5.01
Description
CULVERTS
Clauses Earthwork in excavation of foundation of structures as per drawing
304,309 & and Technical Specification, including setting out constructions of
2903
shoring and bracing, removal of stumps and other deleterious
mattter,dressing of sides and bottom, backfilling the excavation
earth to the extend required and utilising the remaining earth
locally for road work.
I)
Ordinary Soil
Unit = cum
Taking output = 240 cum
B.
Mechanical means
i)
Depth upto 3.0 m
a)
Labour
Mate
Mazdoor
Machinery
Hydraulic excavator 1.0 cum bucket capacity
c)
Overhead @ 8%On (a+b)
d)
Contractors Profit @ 10%On (a+b+c)
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Unit
Quantity
Rate (Rs.)
day
day
0.32
8.00
297.00
246.00
hour
6.00
1344.00
95.04
1968.00
2063.04
b)
Say Rs.
Depth upto 3.0-6.0 m
Unit=Cum
Taking Output=210cum
a)
Labour
Mate
Mazdoor
b)
Machinery
Hydraulic excavator 1.0 cum bucket capacity
c)
Overhead @ 8%On (a+b)
d)
Contractors Profit @ 10%On (a+b+c)
Cost for 210 cum = a+b+c+d
Rate per cum = (a+b+c+d)/210
8064.00
810.16
1093.72
12030.92
50.13
50.00 /cum
i)
day
day
0.32
8.00
297.00
246.00
hour
6.00
1344.00
Say Rs.
Depth Above 6m
Unit=Cum
Taking Output=180cum
a)
Labour
Mate
Mazdoor
b)
Machinery
Hydraulic excavator 1.0 cum bucket capacity
c)
Overhead @ 8%On (a+b)
d)
Contractors Profit @ 10%On (a+b+c)
Cost for 180 cum = a+b+c+d
Rate per cum = (a+b+c+d)/180
95.04
1968.00
8064.00
810.16
1093.72
12030.92
57.29
57.00 /cum
i)
day
day
0.40
10.00
297.00
246.00
hour
6.00
1344.00
Say Rs.
40
118.80
2460.00
8064.00
851.42
1149.42
12643.65
70.24
70.00 /cum
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
II)
Description
Ordinary rock
Unit = cum
Taking output = 180 cum
B.
Mechanical means
a)
Labour
Mate
Mazdoor
b)
Machinery
Hydraulic excavator 1.0 cum bucket capacity
c)
Overhead @ 8%On (a+b)
d)
Contractors Profit @ 10%On (a+b+c)
Cost for 180 cum = a+b+c+d
Rate per cum = (a+b+c+d)/180
Unit
Quantity
Rate (Rs.)
day
day
0.24
6.00
297.00
246.00
hour
6.00
1344.00
Say Rs.
III)
71.28
1476.00
8064.00
768.90
1038.02
11418.20
63.43
63.00 /cum
b)
c)
Labour
Mate
Driller
Blaster
Mazdoor
Machinery
Air compressor 250 cfm with 2 jack hammer
@ 15 cum per hour
Material
Blasting material
Detonator electric
day
day
day
day
0.35
0.5
0.25
8.00
297.00
361.00
361.00
246.00
103.95
180.50
90.25
1968.00
hour
330.00
330.00
kg
nos
3.5
14
90.00
10.00
315.00
140.00
d)
250.22
e)
337.79
3715.71
371.57
372.00 /cum
710.1.4 of Back filling behind abutments, wing wall and return wall complete
IRC:78 as per drawing and Technical Specifications.
&2200
Unit = cum
Taking output = 10cum
305
Sandy material
a) Labour
Mate
Mazdoor
b) Material
Sand
c) Machinery
Plate Compactor/power rammer
Water Tanker
day
day
0.28
7.00
297.00
246.00
83.16
1722.00
1805.16
Cum
12.00
905.00
10860.00
hour
hour
2.50
0.05
50.00
125.00
125.00
6.25
131.25
1023.71
1382.01
15202.14
1520.21
1520.00 /cum
41
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
5.03
710.1.4 of
IRC:78
305,2504
&2200
Description
Providing ans laying of Filter media with granular materials/stone
crushed aggregates satisfying the requirements laid down in
Clause2504.2.2 of MoRT&H Specifiactions to a thickness of not
less than 600 mm with smaller size towards the soil and bigger
sizetowardsthe wall and provided over the entire surface wall to
theful height compacted to a firm condition complete as per
drawingand Technical Specifications
Unit = cu.m.
Taking output = 10 cum
a) Labour
Mate
Mazdoor for filling, watering , ramming , etc
Mazdoor skilled
b) Material
Filter material of stone aggregate conforming to
a Clause 2504.2.2 of MoRT&H Specifications
c)
Machinery
Water tanker of 6 KL capacity
Unit
Quantity
Rate (Rs.)
day
day
day
0.32
7.00
1.00
297.00
246.00
361.00
95.04
1722.00
361.00
2178.04
Cum
12.00
344.00
4128.00
hour
0.06
125.00
7.50
c)
505.08
681.86
7500.49
750.05
750.00 /cum
70.20
35.10
238.40
344.00
Cum.
Cum.
tonne
KL
13.50
6.75
3.45
18.00
597.00
905.00
6305.00
20.00
8059.50
6108.75
21752.25
360.00
36280.50
Labour
Mate
Mason
Mazdoor
day
day
day
0.64
1.00
15.00
297.00
361.00
246.00
190.08
361.00
3690.00
4241.08
Machinery
Concrete mixer 0.4/0.28 cum
33 KVA genarator set
Water tanker 6 KL capacity
hour
hour
hour
6.00
6.00
2.00
240.00
384.00
125.00
d)
Overhead @ 8%On (a+b+c)
e)
Contractors Profit @ 10%On (a+b+c+d)
Cost for 15 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/15
Say Rs
42
1440.00
2304.00
250.00
3994.00
3561.25
4807.68
52884.51
3525.63
3526.00 / Cum
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
Description
PCC M-15 grade in foundation
Unit = cum
Taking output = 15 cum
a) Material
Cement
Coarse Sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
Unit
Quantity
Rate (Rs.)
1.
b) Labour
Mate
Mason
Mazdoor
c)
Machinery
Concrete mixer 0.4/0.28 cum capacity
Genarator 63 KVA
MT
Cum.
Cum.
Cum.
Cum.
4.13
6.75
8.10
4.05
1.35
6305.00
905.00
624.00
676.00
702.00
26039.65
6108.75
5054.40
2737.80
947.70
40888.30
day
day
day
0.86
1.50
20.00
297.00
361.00
246.00
255.42
541.50
4920.00
5716.92
hour
hour
6.00
6.00
240.00
540.00
d) Formwork @ 4%on(a+b+c)
e) Overhead @ 8%On (a+b+c+d)
f) Contractors Profit @ 10%On (a+b+c+d+e)
Cost for 15 cum = a+b+c+d+e+f
Rate per cum = (a+b+c+d+e+f)/15
4%
Say Rs
2.
1440.00
3240.00
4680.00
2051.41
4266.93
5760.36
63363.92
4224.26
4224.00 /cum
Machinery
Concrete mixer 0.40/0.28 cum capacity
Generator 33 KVA
d) Formwork @ 4%on(a+b+c)
MT
Cum.
Cum.
Cum.
Cum.
5.16
6.75
5.40
5.40
2.70
6305.00
905.00
624.00
676.00
702.00
32533.80
6108.75
3369.60
3650.40
1895.40
47557.95
day
day
day
0.86
1.50
20.00
297.00
361.00
246.00
255.42
541.50
4920.00
5716.92
hour
hour
6.00
6.00
240.00
384.00
1440.00
2304.00
3744.00
4%
2280.75
e)
4743.97
f)
6404.36
70447.95
43
4696.53
4697.00 /cum
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
3.
Description
RCC M 20 grade in foundation
Using Concrete Mixer
Unit = cum
Taking output = 15 cum
a) Material
Cement
Coarse Sand
20 mm aggregate
10 mm aggregate
Unit
b) Labour
Mate
Mason
Mazdoor
c)
Machinery
Concrete mixer 0.40/0.28 cum capacity
Generator 33 KVA
Quantity
Rate (Rs.)
MT
Cum.
Cum.
Cum.
5.21
6.75
8.10
5.40
6305.00
905.00
676.00
702.00
32849.05
6108.75
5475.60
3790.80
48224.20
day
day
day
0.86
1.50
20.00
297.00
361.00
246.00
255.42
541.50
4920.00
5716.92
hour
hour
6.00
6.00
240.00
384.00
1440.00
2304.00
3744.00
2307.40
4799.40
6479.19
71271.12
4%
4751.41
4751.00 /cum
b)
c)
Material
Cement
Coarse Sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
MT
Cum.
Cum.
Cum.
Cum.
5.99
6.75
5.40
5.40
2.70
6305.00
905.00
624.00
676.00
702.00
37766.95
6108.75
3369.60
3650.40
1895.40
Labour
Mate
Mason
Mazdoor
day
day
day
0.86
1.50
20.00
297.00
297.00
246.00
255.42
445.50
4920.00
Machinery
Concrete mixer 0.40/0.28 cum capacity
Generator 33 KVA
hour
hour
6.00
6.00
240.00
384.00
1440.00
2304.00
4%
2486.24
d)
Formwork @ 4%on(a+b+c)
e)
5171.38
f)
6981.36
76795.01
5119.67
5120.00 o.k
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
Description
Unit
Quantity
Rate (Rs.)
Unit = cum
Taking output = 15 cum
a)
b)
c)
Material
Cement
Coarse Sand
20 mm aggregate
10 mm aggregate
MT
Cum.
Cum.
Cum.
6.05
6.75
8.10
5.40
6305.00
905.00
676.00
702.00
38145.25
6108.75
5475.60
3790.80
Labour
Mate
Mason
Mazdoor
day
day
day
0.86
1.50
20.00
297.00
297.00
246.00
255.42
445.50
4920.00
Machinery
Concrete mixer 0.40/0.28 cum capacity
Generator 33 KVA
hour
hour
6.00
6.00
240.00
384.00
1440.00
2304.00
4%
2515.41
d)
Formwork @ 4%on(a+b+c)
e)
5232.06
f)
7063.28
77696.07
5179.74
5180.00 o.k
b)
c)
Material
Cement
Coarse Sand
20 mm aggregate
10 mm aggregate
MT
Cum.
Cum.
Cum.
6.10
6.75
8.10
5.40
6305.00
905.00
676.00
702.00
38460.50
6108.75
5475.60
3790.80
Labour
Mate
Mason
Mazdoor
day
day
day
0.86
1.50
20.00
297.00
361.00
246.00
255.42
541.50
4920.00
Machinery
Concrete mixer 0.40/0.28 cum capacity
Generator 33 KVA
hour
hour
6.00
6.00
240.00
384.00
1440.00
2304.00
4%
2531.86
d)
Formwork @ 4%on(a+b+c)
e)
5266.27
f)
7109.47
45
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
Description
Cost for 15 cum = a+b+c+d+e+f
Unit
Quantity
Rate (Rs.)
b)
c)
Material
Cement
Coarse Sand
20 mm aggregate
10 mm aggregate
MT
Cum.
Cum.
Cum.
6.33
6.75
8.10
5.40
6305.00
905.00
676.00
702.00
39910.65
6108.75
5475.60
3790.80
Labour
Mate
Mason
Mazdoor
day
day
day
0.86
1.50
20.00
297.00
361.00
246.00
255.42
541.50
4920.00
Machinery
Concrete mixer 0.40/0.28 cum capacity
Generator 33 KVA
hour
hour
6.00
6.00
240.00
384.00
1440.00
2304.00
4%
2589.87
d)
Formwork @ 4%on(a+b+c)
e)
5386.93
f)
7272.35
79995.87
5333.06
5330.00 o.k
Machinery
Concrete mixer 0.40/0.28 cum capacity
Generator 33 KVA
d) Formwork @ 10%on(a+b+c)
e) Overhead @ 8%On (a+b+c+d)
f) Contractors Profit @ 10%On (a+b+c+d+e)
MT
Cum.
Cum.
Cum.
Cum.
5.16
6.75
5.40
5.40
2.70
6305.00
905.00
624.00
676.00
702.00
32533.80
6108.75
3369.60
3650.40
1895.40
47557.95
day
day
day
0.86
1.50
20.00
297.00
361.00
246.00
255.42
541.50
4920.00
5716.92
hour
hour
6.00
6.00
240.00
384.00
1440.00
2304.00
3744.00
5701.89
5017.66
6773.84
10%
46
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
Description
Cost for 15 cum = a+b+c+d+e+f
Unit
47
Quantity
Rate (Rs.)
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
Description
Rate per cum = (a+b+c+d+e+f)/15
3.
Unit
Quantity
Rate (Rs.)
a) Material
Cement
Coarse Sand
20 mm aggregate
10 mm aggregate
b) Labour
Mate
Mason
Mazdoor
c)
Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
MT
Cum.
Cum.
Cum.
5.21
6.75
8.10
5.40
6305.00
905.00
676.00
702.00
32849.05
6108.75
5475.60
3790.80
48224.20
day
day
day
0.86
1.50
20.00
297.00
361.00
246.00
255.42
541.50
4920.00
5716.92
hour
hour
6.00
6.00
240.00
384.00
1440.00
2304.00
3744.00
10%
5768.51
d) Formwork @ 10%on(a+b+c)
e)
5076.29
f)
6852.99
75382.91
b)
c)
d)
e)
f)
5025.53
5026.00 /cum
MT
Cum.
Cum.
Cum.
6.05
6.75
8.10
5.40
6305.00
905.00
676.00
702.00
38145.25
6108.75
5475.60
3790.80
53520.40
Labour
Mate
Mason
Mazdoor
day
day
day
0.86
1.50
20.00
297.00
361.00
246.00
255.42
541.50
4920.00
5716.92
Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
hour
hour
6.00
6.00
240.00
384.00
1440.00
2304.00
3744.00
6298.13
5542.36
7482.18
Formwork @ 10%on(a+b+c)
Overhead @ 8%On (a+b+c+d)
Contractors Profit @ 10%On (a+b+c+d+e)
10%
82303.99
5486.93
5487.00 /cum
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
Description
5.
Unit
Quantity
Rate (Rs.)
b)
c)
d)
Material
Cement
Coarse Sand
20 mm aggregate
10 mm aggregate
Cost of water
MT
Cum.
Cum.
Cum.
KL
6.10
6.75
8.10
5.40
18.00
6305.00
905.00
676.00
702.00
0.00
38460.50
6108.75
5475.60
3790.80
0.00
53835.65
Labour
Mate
Mason
Mazdoor
day
day
day
0.86
1.50
20.00
297.00
361.00
246.00
255.42
541.50
4920.00
5716.92
Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
Water tanker 6 KL capacity
hour
hour
hour
6.00
6.00
2.00
240.00
384.00
0.00
1440.00
2304.00
0.00
3744.00
6329.66
e)
5570.10
f)
7519.63
82715.96
5.
5514.40
Say Rs. 5510 /cum
b)
c)
d)
Material
Cement
Coarse Sand
20 mm aggregate
10 mm aggregate
MT
Cum.
Cum.
Cum.
6.10
6.75
8.10
5.40
6305.00
905.00
676.00
702.00
38460.50
6108.75
5475.60
3790.80
Labour
Mate
Mason
Mazdoor
day
day
day
0.86
1.50
20.00
297.00
361.00
246.00
255.42
541.50
4920.00
Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
hour
hour
6.00
6.00
240.00
384.00
1440.00
2304.00
10%
6329.66
Formwork @ 10%on(a+b+c)
49
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
e)
Description
Overhead @ 8%On (a+b+c+d)
Unit
f)
Quantity
Rate (Rs.)
7519.63
82715.96
5.06
5514.40
5510.00 o.k
Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
MT
Cum.
Cum.
Cum.
5.99
6.75
8.10
5.40
6305.00
905.00
676.00
702.00
37766.95
6108.75
5475.60
3790.80
53142.10
day
day
day
0.86
1.50
20.00
297.00
361.00
246.00
255.42
541.50
4920.00
5716.92
hour
hour
6.00
6.00
240.00
384.00
d) Formwork @ 20%on(a+b+c)
e) Overhead @ 8%On (a+b+c+d)
f) Contractors Profit @ 10%On (a+b+c+d+e)
Cost for 15 cum = a+b+c+d+e+f
Rate per cum = (a+b+c+d+e+f)/15
20%
Say Rs
RCC M 30 GRADE IN SUPER STRUCTURE
Unit = cum
Taking output = 15 cum
(A)For solid super structure
a) Material
Cement
Coarse Sand
20 mm aggregate
10 mm aggregate
b) Labour
Mate
Mason
Mazdoor
1440.00
2304.00
3744.00
12520.60
6009.89
8113.35
89246.87
5949.79
5950.00 /cum
c)
Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
d) Formwork @ 20%on(a+b+c)
e)
MT
Cum.
Cum.
Cum.
6.10
6.75
8.10
5.40
6305.00
905.00
676.00
702.00
38460.50
6108.75
5475.60
3790.80
day
day
day
0.90
1.50
21.00
297.00
361.00
246.00
267.30
541.50
5166.00
hour
hour
6.00
6.00
240.00
384.00
1440.00
2304.00
20%
12710.89
6101.23
50
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
Description
Unit
51
Quantity
Rate (Rs.)
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
f)
Description
Contractors Profit @ 10%On (a+b+c+d+e)
Unit
Quantity
Rate (Rs.)
6040.21
6040.00 /cum
3.
b) Labour
Mate
Mason
Mazdoor
c)
Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
MT
Cum.
Cum.
Cum.
6.33
6.75
8.10
5.40
6305.00
905.00
676.00
702.00
39910.65
6108.75
5475.60
3790.80
day
day
day
0.90
1.50
21.00
297.00
361.00
246.00
267.30
541.50
5166.00
hour
hour
6.00
6.00
240.00
384.00
1440.00
2304.00
20%
13000.92
d) Formwork @ 20%on(a+b+c)
e)
6240.44
f)
8424.60
92670.56
6178.04
6178.00 /cum
b) Labour
Mate
Mason
Mazdoor
c)
Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
d) Formwork @ 20%on(a+b+c)
e) Overhead @ 8%On (a+b+c+d)
f) Contractors Profit @ 10%On (a+b+c+d+e)
MT
Cum.
Cum.
Cum.
6.45
6.75
8.10
5.40
6305.00
905.00
676.00
624.00
40667.25
6108.75
5475.60
3369.60
55621.20
day
day
day
0.96
2.00
22.00
297.00
361.00
246.00
285.12
722.00
5412.00
6419.12
hour
hour
6.00
6.00
240.00
384.00
1440.00
2304.00
3744.00
13156.86
6315.29
8525.65
20%
52
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
5.07
1600
Description
Cost for 15 cum = a+b+c+d+e+f
Rate per cum = (a+b+c+d+e+f)/15
Unit
Quantity
Rate (Rs.)
MT
Kg.
1.05
8.00
49330.00
40.00
51796.50
320.00
52116.50
day
day
day
0.44
3.00
8.00
297.00
361.00
246.00
130.68
1083.00
1968.00
3181.68
c)
4423.85
5972.20
2505
65694.24
65694.00 per tonne
Cum
b)
Material
Stone
Stone spalls
cum
0.33
4399.00
1451.67
cum
cum
1.00
0.20
571.00
466.00
571.00
93.20
664.20
Labour
Mate
Mason
Mazdoor ( for laying stones, filling of quarry spalls)
21.16
day
day
day
0.08
0.50
1.50
297.00
361.00
246.00
d)
Overhead @ 8%On (a+b+c)
e)
Contractors Profit @ 10%On (a+b+c+d)
Rate per cum = (a+b+c+d+e)
Say Rs
Sub-analysis
Cement mortar 1:3 (1 cement : 3 sand)
Unit = 1 cum
Taking output = 1 cum
a)
Materials
Cement
Sand
b)
Labour
MT
cum
53
0.51
1.05
6305.00
905.00
23.76
180.50
369.00
573.26
216.82
234.17
3161.28
3161.00 /Cum
3215.55
950.25
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
Description
Unit
day
Mate
54
Quantity
0.04
Rate (Rs.)
297.00
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
5.09
2605
Description
Mazdoor
Total material and Labour = (a+b)
Unit
day
Quantity
0.90
Rate (Rs.)
246.00
day
day
day
0.01
0.2
0.1
297.00
246.00
328.00
2.97
49.20
32.80
84.97
sqm
3.60
494.00
1778.40
149.07
201.24
2213.68
Section
2500
5.11
2503
184.47
180.00 /m
3526.00 /cum
4224.00 /cum
cum
cum
1.00
0.20
571.00
466.00
571.00
93.20
664.20
b) Labour
Mate
Mason
Mazdoor
day
day
day
0.04
0.35
0.75
297.00
361.00
246.00
11.88
126.35
184.50
322.73
c)
78.95
106.59
55
1172.47
1172.00 /cum
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
5.12
2503
Description
Providing and laying pitching on slopes laid over prepared filter
media including boulder apron laid dry in front of toe of
embankment complete as per drawing and Technical Specifications
Unit = cum
Taking output = 1 cum
a)
Material
Stone weighing not less than 40 kg
Stone spalls of minimum 25 mm size
b) Labour
Mate
Mason
Mazdoor for laying stones, filling of quarry
Unit
Quantity
Rate (Rs.)
cum
cum
1.00
0.20
571.00
466.00
day
day
day
0.04
0.35
0.75
297.00
361.00
246.00
2504
11.88
126.35
184.50
322.73
78.954
106.59
1172.47
1172.00 /cum
cum
1.20
344.00
412.80
day
day
day
0.05
0.25
1.00
297.00
328.00
246.00
14.85
82.00
246.00
342.85
60.45
81.61
897.71
898.00 /cum
571.00
93.20
664.20
5.14
70.20
35.10
238.40
344.00
Nos.
Nos.
Cum
30.00
10.00
0.05
21.00
10.00
4399.00
630.00
100.00
219.95
2115.45
b) Labour
Mason
Mate
Mazdoor
Day
Day
Day
0.50
0.03
0.25
361.00
297.00
246.00
180.50
8.91 'B'
61.50
250.91
189.31
255.57
2811.24
93.71
Rm.
31.50
37.00
1165.50
'A'
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
Description
Unit
57
Quantity
Rate (Rs.)
Cost (Rs.) Remarks
Say Rs
94.00 /Nr
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
5.15
Clause
2904
Description
Sub-analysis
Cement mortar 1:3 (1 cement : 3 sand)
Unit = 1 cum
Taking output = 1 cum
a)
Materials
Cement
Sand
b) Labour
Mate
Mazdoor
Total Material and Labour = (a+b)
Unit
Quantity
Rate (Rs.)
MT
cum
0.51
1.05
6305.00
905.00
3215.55
950.25
day
day
0.04
0.90
297.00
246.00
11.88
221.40
4399.00
Cum
1.20
781.80
938.16
Each
Each
Each
1.00
0.05
0.10
246.00
246.00
297.00
246.00
12.30
29.70
288.00
c)
98.09
132.43
2900
1456.68
1457.00 / cum
b)
Material
Sand at site
Cement at site
RCC pipe NP-4/presstressed concrete
day
day
day
0.28
1.00
6.00
297.00
361.00
246.00
83.16
361.00
1476.00
1920.16
cum
tonne
mtr
0.09
0.07
12.50
905.00
6305.00
6673.00
81.45
441.35
83412.50
83935.30
85855.46
58
6868.44
6870.00 /m
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
Description
Unit
Quantity
Rate (Rs.)
5.17
Unit = Nr.
Earthwork in excavation of foundation for structures
complete as per drawing and Technical Specification
Clause 304 in all types of soil excluding hard rock.
i)
0.7 x 0.40 x 0.45 = 0.126
Rate as per sub-analysis
ii) Lean concrete M-15
0.7 x 0.45 x 0.6 = 0.19 Cum
Deduct 0.150 x 0.150 x 0.45 = 0.01 Cum
= 0.18 Cum
Rate as per item No. 5.04 (a)
iii) Cement concrete M-20
0.15 x 0.15 x 0.075 = 0.02
Rate as per item No. 5.05 (1)
Cum
0.126
147.00
18.52
Cum
0.18
4224.00
760.32
Cum
0.02
4967.00
99.34
Kg.
2.69
65.69
176.72
100.00
1154.90
1155.00 /Nr
Sub-analysis
Excavation for roadway in soil using manual means
including loading in truck for carrying of cut earth to
embankment site with all lifts and leads up to 1000metres.
i)
Unit = Cum
(Taking output 120 cum)
(a) Labour
Mate
Mazdoor
day
day
1.80
45.00
(b) Machinery
Truck 5.5 cum capacity
hour
10.00
c)
297.00
246.00
320.00
534.60
11070.00
11604.60
3200.00
1184.37
1598.90
17587.86
Section
1900
Say Rs
146.57
147.00 /cum
Say Rs
200 / Nr.
59
Market Rat
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
5.19
5.20
1400 &
2200
Description
Unit
Quantity
Rate (Rs.)
Nr.
Market Rat
Cum
1.00
571.00
571.00
No
cum
7.00
0.33
15.00
4399.00
105.00
1451.67
day
day
day
0.10
1.20
1.20
297.00
361.00
246.00
29.70
433.20
295.20
Say Rs
500 / Nr.
c)
230.86
311.66
3428.29
3430.00 per cum
Hand-railing (cast-in-situ)
M-40 grade railing for bridges
Details of cost for 10.0 m
Concrete M 40 grade for R.C.C.
Rate as Item no 5.06 (2)
HYSD Bar reinforcement (as per item no.5.07)
cum
0.848
6252.00
5301.70
Tonne
0.091
65694.00
5978.15
563.99
11843.84
Rate per m =
Say Rs
Sub-analysis
Railing length = 10m
No. of posts = 6
Cement concrete M-40
Rails = 2 nos.
Length of each rail = 10 - 2 x 0.235 - 4 x 0.140 = 8.97 m
Quantity = 2 x 8.97 x 0.165 x 0.175 = 0.518 m
Deduct for chamfer = 4 x 1/2 x 0.01 x 0.01 x 8.97 = 0.002 m
1184.38
1184.00 /m
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
Description
Unit Quantity
= 0.114 m
Central posts = 4 nos.
Quantity = 4 [(0.845 x 0.260 x 0.265) - 2(0.165 x 0.089 x 0.095) 2 (0.165 x 0.125 x 0.025)]
= 0.218 m
Total quantity of cement concrete M-30 = 0.516 + 0.114 + 0.218 = 0.848 m
Rate (Rs.)
Steel reinforcement
Posts = 6 nos.
12 mm dia. bars
No. of bars = 4
Length = 845 + 12 x 12 - 25 = 964 mm = 0.964 m
Length of 4 bars = 4 x 0.964
Total length of 12 mm dia. bars for 6 posts = 6 x 4 x 0.964 = 23.136 m
8 mm dia. bars for stirrups
No. of bars = 8
Length = 6 x 8 (149 x 2 + 144 x 2 + 24 x 8) = 37344 mm = 37.344 m
Rails = 2
10 mm dia. bars
No. of bars = 4
Length = 2 x 4 (8.97 + 5 x 0.05 ) = 73.76 m
8 mm dia. bars for stirrups
No. of bars = 60
Length = 60 (59 x 2 + 49x 2 + 24 x 8) = 24480 mm = 24.48 m
8 mm dia. bars
Length = 37.344 + 24.48 = 61.824 m
Weight = 61.824 x 0.395 = 24.42 Kg
10 mm dia. bars
Length = 73.76 m
Weight = 73.76 x 0.617= 45.51Kg
12 mm dia. bars
Length =23.136m
Weight = 23.136 x 0.888 = 20.54 Kg
Total = 24.42 + 45.51 + 20.54 = 90.47 Kg , Say 91 Kg
5.22
1300
c)
d)
Labour
Mate
Mason
Mazdoor
Nos.
cum
2500.00
1.20
4.00
4399.00
10000.00
5278.80
15278.80
day
day
day
0.48
4.00
8.00
297.00
361.00
246.00
142.56
1444.00
1968.00
3554.56
1506.67
2034.00
22374.03
4474.81
4475.00 /cum
Overheads @ 8% on (a+b)
Contractor's profit @ 10% on (a+b+c)
Cost for 5 cum
Rate per cum = (a+b+c+d)/5
Say Rs.
61
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
Description
Sub-analysis
Cement mortar 1:3 (1 cement : 3 sand)
Unit
Quantity
Rate (Rs.)
Unit = 1 cum
Taking output = 1 cum
a)
b)
Materials
Cement
Sand
MT
cum
0.51
1.05
6305.00
905.00
3215.55
950.25
4165.80
Labour
Mate
Mazdoor
day
day
0.04
0.90
297.00
246.00
11.88
221.40
233.28
1300 &
2200
Say Rs.
4399.00 /cum
a)
Mate
rial
b)
Mate
Labo Mason
ur
Mazdoor
c)
cum
0.03
4399.00
131.97
day
day
day
0.04
0.50
0.50
297.00
361.00
246.00
11.88
180.50
123.00
315.38
Overheads @ 8% on (a+b)
35.79
48.31
2)
Say Rs.
531.45
531.00
53.00 /Sqm
Unit = 1 sqm.
Details of cost for 10 sqm
a)
b)
Materials
Flat stones
Sand
Cement
Sqm.
Cum
Bag
10.00
0.15
1.40
120.00
905.00
6305.00
1200.00
135.75
8827.00
10162.75
Labour
Mason
Mazdoor
Bhisti
Each
Each
Each
1.00
2.00
0.50
361.00
246.00
246.00
361.00
492.00
123.00
976.00
Sundries at 0.5%
55.69
c)
891.1
d)
1202.99
13288.53
1328.85
1329.00 /sqm
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-5
CULVERTS
Sl. No. Ref.
MoRTH
Spec.
5.24
Description
Unit
Quantity
Rate (Rs.)
Cum
0.144
4399.00
633.46
b) Labour
Mate
Mason
Mazdoor
Each
Each
Each
0.04
0.50
0.50
297.00
361.00
246.00
11.88
180.50
123.00
c)
75.9
1500,
1600, 1700
& Clause
b)
2704
102.47
1127.22
112.72 62.00
113.00 /Sqm
a) Material
Cement Concrete RCC M-30 Grade
Rate as per item no. 5.06 -(2)
b) HYSD bar reinforcement
As per Item no. 5.07
Cum
1.00
6040.00
6040.00
MT
0.08
65694.00
5255.52
11296.00
Say Rs
63
11296.00 / Cum
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-6
BRIDGES/STRUCTURES
Ref.
MoRTH
Sl.
Spec.
No.
Description
Unit Quantity
Rate (Rs.)
Cost (Rs.)
Remark
6.00 BRIDGES/STRUCTURES
6.01
Clauses
304
a)
b) Machinery
Hydraulic excavator 1.0 cum bucket capacity
c)
day
day
0.32
8.00
297.00
246.00
95.04
1968.00
2063.04
hour
6.00
1344.00
8064.00
2025.41
1215.24
13367.69
55.70
56.00 /Cum
a)
Labour
Mate
Mazdoor
b) Machinery
Hydraulic excavator 1.0 cum bucket capacity
c) Overhead @ 20%On (a+b)
d) Contractors Profit @ 10%On (a+b+c)
Cost for 210 cum =a+b+c+d
Rate per cum = (a+b+c+d)/210
day
day
0.32
8.00
297.00
246.00
hour
6.00
1344.00
Say Rs
1c)
a)
b) Machinery
Hydraulic excavator 1.0 cum bucket capacity
c) Overhead @ 20%On (a+b)
d) Contractors Profit @ 10%On (a+b+c)
Cost for 180 cum =a+b+c+d
8064.00
2025.41
1215.24
13367.69
63.66
64.00 /Cum
day
day
0.32
8.00
297.00
246.00
95.04
1968.00
2063.04
hour
6.00
1344.00
8064.00
2025.41
1215.24
13367.69
95.04
1968.00
2063.04
74.26
74.00 /Cum
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-6
BRIDGES/STRUCTURES
Ref.
MoRTH
Sl.
Spec.
No.
Description
2.
a)
Unit Quantity
Machinery
b) Hydraulic Excavator
Rate (Rs.)
day
day
0.24
6.00
297.00
246.00
71.28
1476.00
1547.28
hour
6.00
1344.00
8064.00
9611.28
2231.71
1339.03
14729.30
c)
day
day
day
day
Machinery
Air compressor 250 cfm with 2 jack hammer for
drilling
hour
Material
Blasting material
kg
Detonator electric
Nos.
297.00
361.00
361.00
246.00
103.95
180.50
90.25
1968.00
2342.70
330.00
330.00
3.5
14
57.75
6.00
202.13
84.00
286.13
d)
591.77
e)
355.06
Say Rs
Hard rock ( blasting prohibited)
Unit = cum
Taking output = 10 cum
a)
Labour
Mate
Mazdoor
Machinery
Air compressor 250 cfm with 2 leads of
pneumatic beaker
c)
Overhead @ 20%On (a+b)
d)
Contractors Profit @ 10%On (a+b+c+d)
Cost for 10 cum = a+b+c+d
Rate per cum =(a+b+c+d)/10
Remark
81.83
82.00 /Cum
0.35
0.5
0.25
8.00
d)
Cost (Rs.)
3905.65
390.56
391.00 /Cum
day
day
0.2
5.00
297.00
246.00
59.40
1230.00
1289.40
hour
330.00
1980.00
Say Rs
653.88
392.33
4315.61
431.56
432.00 /Cum
b)
58
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-6
BRIDGES/STRUCTURES
Ref.
MoRTH
Sl.
Spec.
No.
6.02
Clause
1207
Description
Unit Quantity
Rate (Rs.)
cum
1.20
905.00
1086.00
day
day
0.01
0.30
297.00
246.00
2.97
73.80
76.77
232.55
279.06
1674.39
1674.00 /cum
Unit = cum
Taking output = 10cum
Sandy material
Labour
Mate
Mazdoor
b) Material
Sand
c) Machinery
Plate Compactor/power rammer
Water Tanker
day
day
0.28
7.00
297.00
246.00
83.16
1722.00
1805.16
Cum
12.00
905.00
10860.00
hour
hour
2.50
0.05
50.00
125.00
125.00
6.25
131.25
2559.28
1535.57
16891.26
1689.13
1689.00 /cum
Remark
6.03
Cost (Rs.)
a)
Unit = cum.
Taking output = 10 cum
Labour
Mate
Mazdoor for filling, watering , ramming , etc
Mazdoor skilled
b) Material
Filter material of stone aggregate conforming to a
Clause 2504.2.2 of MoRT&H Specifications
c) Machinery
Water tanker of 6 KL capacity
d) Overhead @ 20%On (a+b+c)
e)
day
day
day
0.32
7.00
1.00
297.00
246.00
328.00
95.04
1722.00
328.00
2145.04
Cum
12.00
344.00
4128.00
hour
0.06
125.00
7.50
1256.11
753.66
8290.31
829.03
830.00 /cum
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-6
BRIDGES/STRUCTURES
Ref.
MoRTH
Sl.
Spec.
No.
Description
Unit Quantity
Sub Analysis
11.2mm @ 10%
5.6mm @ 10%
2.8mm@ 80%
6.05
Rate (Rs.)
Cost (Rs.)
Remark
70.20
35.10
238.40
344.00
a)
b) Labour
Mate
Mason
Mazdoor
c)
Machinery
Concrete mixer 0.4/0.28 cum capacity
Genarator 63 KVA
MT
Cum.
Cum.
Cum.
Cum.
4.13
6.75
8.10
4.05
1.35
6305.00
905.00
624.00
676.00
702.00
26039.65
6108.75
5054.40
2737.80
947.70
40888.30
day
day
day
0.86
1.50
20.00
297.00
361.00
246.00
255.42
541.50
4920.00
5716.92
hour
hour
6.00
6.00
240.00
540.00
1440.00
3240.00
4680.00
a)
b)
c)
d)
e)
f)
MT
Cum.
Cum.
Cum.
Cum.
5.16
6.75
5.40
5.40
2.70
6305.00
905.00
624.00
676.00
702.00
32533.80
6108.75
3369.60
3650.40
1895.40
day
day
day
0.86
1.50
20.00
297.00
361.00
246.00
255.42
541.50
4920.00
hour
hour
6.00
6.00
240.00
540.00
1440.00
3240.00
Say Rs
60
2051.41
10667.33
6400.40
70404.35
4693.62
4694.00 /cum
1159.10
11590.97
7070.49
77775.44
5185.03
5185.00 /cum
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-6
BRIDGES/STRUCTURES
Ref.
MoRTH
Sl.
Spec.
No.
Description
3.
Unit Quantity
Rate (Rs.)
Cost (Rs.)
Remark
b)
c)
d)
Material
Cement
Coarse Sand
20 mm aggregate
10 mm aggregate
MT
Cum.
Cum.
Cum.
41.66
54.00
64.80
43.20
6305.00
905.00
676.00
702.00
262666.30
48870.00
43804.80
30326.40
Labour
Mate
Mason
Mazdoor
day
day
day
0.84
3.00
18.00
297.00
361.00
246.00
249.48
1083.00
4428.00
Machinery
Batching plant @ 20 cum/hr
Generator 100 KVA
Loader 1 cum capacity
Transit mixer 4.0 cum capacity lead upto 1km
L
10
Concrete pump
hour
hour
hour
hour
t.km
hour
6.00
6.00
6.00
15.00
300X10
6.00
1920.00
720.00
832.00
960.00
2.784
264.00
11520.00
4320.00
4992.00
14400.00
8352.00
1584.00
8731.92
e)
89065.58
f)
53439.35
587832.83
4898.61
4899.00per cum
b)
c)
Material
Cement
Coarse Sand
20 mm aggregate
10 mm aggregate
MT
Cum.
Cum.
Cum.
48.38
54.00
64.80
43.20
6305.00
905.00
676.00
702.00
305035.90
48870.00
43804.80
30326.40
Labour
Mate
Mason
Mazdoor
day
day
day
0.84
3.00
18.00
297.00
361.00
246.00
249.48
1083.00
4428.00
Machinery
Batching plant @ 20 cum/hr
Generator 100 KVA
Loader 1 cum capacity
Transit mixer 4.0 cum capacity lead upto 1km
hour
hour
hour
hour
6.00
6.00
6.00
15.00
1920.00
720.00
832.00
960.00
11520.00
4320.00
4992.00
14400.00
61
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-6
BRIDGES/STRUCTURES
Ref.
MoRTH
Sl.
Spec.
No.
Description
Unit Quantity
L
10
Concrete pump
t.km
hour
62
300X10
6.00
Rate (Rs.)
2.784
264.00
Cost (Rs.)
8352.00
1584.00
Remark
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-6
BRIDGES/STRUCTURES
Ref.
MoRTH
Sl.
Spec.
No.
Description
d)
Unit Quantity
Rate (Rs.)
e)
97708.98
f)
58625.39
644879.26
5373.99
5374.00per cum
MT
Cum.
Cum.
Cum.
48.80
54.00
64.80
43.20
6305.00
905.00
676.00
702.00
307684.00
48870.00
43804.80
30326.40
430685.20
day
day
day
0.84
3.00
18.00
297.00
361.00
246.00
249.48
1083.00
4428.00
5760.48
hour
hour
hour
hour
t.km
hour
6.00
6.00
6.00
15.00
300X10
6.00
1920.00
720.00
832.00
960.00
2.784
264.00
11520.00
4320.00
4992.00
14400.00
8352.00
1584.00
45168.00
16856.48
99694.03
59816.42
657980.61
5483.17
5483.00 /cum
Remark
9579.31
c)
Cost (Rs.)
Material
Cement
Coarse Sand
20 mm aggregate
10 mm aggregate
b) Labour
Mate
Mason
Mazdoor
63
MT
Cum.
Cum.
Cum.
41.66
54.00
64.80
43.20
6305.00
905.00
676.00
702.00
262666.30
48870.00
43804.80
30326.40
385667.50
day
day
day
0.84
3.00
18.00
297.00
361.00
246.00
249.48
1083.00
4428.00
5760.48
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-6
BRIDGES/STRUCTURES
Ref.
MoRTH
Sl.
Spec.
No.
Description
c)
Unit Quantity
Machinery
Batching plant @ 20 cum/hr
Generator 100 KVA
Loader 1 cum capacity
Transit mixer 4.0 cum capacity lead upto 1km
Lead Beyon 10
Concrete pump
hour
hour
hour
hour
t.km
hour
6.00
6.00
6.00
15.00
300X10
6.00
Rate (Rs.)
1920.00
720.00
832.00
960.00
2.78
240.00
Cost (Rs.)
11520.00
4320.00
4992.00
14400.00
8352.00
1440.00
45024.00
43645.20
e)
96019.44
f)
57611.66
633728.27
a)
Material
Cement
Coarse Sand
20 mm aggregate
10 mm aggregate
b) Labour
Mate
Mason
Mazdoor
c)
Machinery
Batching plant @ 20 cum/hr
Generator 100 KVA
Loader 1 cum capacity
Transit mixer 4.0 cum capacity lead upto 1km
Lead Beyon 10
Concrete pump
MT
Cum.
Cum.
Cum.
48.38
54.00
64.80
43.20
6305.00
905.00
676.00
702.00
305035.90
48870.00
43804.80
30326.40
428037.10
day
day
day
0.84
3.00
18.00
297.00
361.00
246.00
249.48
1083.00
4428.00
5760.48
hour
hour
hour
hour
t.km
hour
6.00
6.00
6.00
15.00
300X10
6.00
1920.00
720.00
832.00
960.00
2.78
264.00
11520.00
4320.00
4992.00
14400.00
8352.00
1584.00
45168.00
f)
5281.07
5281.00
47896.56
105372.43
63223.46
695458.02
5795.48
5800.00
Remark
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-6
BRIDGES/STRUCTURES
Ref.
MoRTH
Sl.
Spec.
No.
Description
a)
Unit Quantity
Material
Cement
Coarse Sand
20 mm aggregate
10 mm aggregate
b) Labour
Mate
Mason
Mazdoor
c)
Machinery
Batching plant @ 20 cum/hr
Generator 100 KVA
Loader 1 cum capacity
Transit mixer 4.0 cum capacity lead upto 1km
Lead Beyon
L= 10
Concrete pump
Rate (Rs.)
MT
Cum.
Cum.
Cum.
48.80
54.00
64.80
43.20
6305.00
905.00
676.00
702.00
307684.00
48870.00
43804.80
30326.40
430685.20
day
day
day
0.84
3.00
18.00
297.00
361.00
246.00
249.48
1083.00
4428.00
5760.48
hour
hour
hour
hour
t.km
hour
6.00
6.00
6.00
15.00
300X10
6.00
1920.00
720.00
832.00
960.00
2.78
264.00
11520.00
4320.00
4992.00
14400.00
8352.00
1584.00
45168.00
65
Cost (Rs.)
Remark
48161.37
105955.01
63573.01
699303.06
5827.53
5828.00 /cum
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-6
BRIDGES/STRUCTURES
Ref.
MoRTH
Sl.
Spec.
No.
6.07
Description
Unit Quantity
Rate (Rs.)
Cost (Rs.)
Remark
Machinery
Batching plant @ 20 cum/hr
Generator 100 KVA
Loader 1 cum capacity
Transit mixer 4.0 cum capacity lead upto 1km
Lead beyond
L= 10
Concrete pump
MT
Cum.
Cum.
Cum.
48.79
54.60
64.80
43.20
6305.00
905.00
676.00
702.00
307620.95
49413.00
43804.80
30326.40
431165.15
day
day
day
0.88
3.00
19.00
297.00
361.00
246.00
261.36
1083.00
4674.00
6018.36
hour
hour
hour
hour
t.km
hour
6.00
6.00
6.00
15.00
300X10
6.00
1920.00
720.00
832.00
960.00
2.78
264.00
11520.00
4320.00
4992.00
14400.00
8352.00
1584.00
45168.00
b) Labour
Mate
Mason
Mazdoor
c)
Machinery
Batching plant @ 20 cum/hr
Generator 100 KVA
Loader 1 cum capacity
Transit mixer 4.0 cum capacity lead upto 1km
Lead beyond 10
Concrete pump
96470.30
115764.36
69458.62
764044.79
6367.04
6370.00 /cum
MT
Cum.
Cum.
Cum.
48.79
54.60
64.80
43.20
6305.00
905.00
676.00
702.00
307620.95
49413.00
43804.80
30326.40
431165.15
day
day
day
0.88
3.00
19.00
297.00
361.00
246.00
261.36
1083.00
4674.00
6018.36
hour
hour
hour
hour
t.km
hour
6.00
6.00
6.00
15.00
300X10
6.00
1920.00
720.00
832.00
960.00
2.78
264.00
11520.00
4320.00
4992.00
14400.00
8352.00
1584.00
45168.00
120587.88
120587.88
66
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-6
BRIDGES/STRUCTURES
Ref.
MoRTH
Sl.
Spec.
No.
Description
f)
Unit Quantity
Rate (Rs.)
Machinery
Batching plant @ 20 cum/hr
Generator 100 KVA
Loader 1 cum capacity
Transit mixer 4.0 cum capacity lead upto 1km
Lead beyond 10
Concrete pump
50.64
54.00
64.80
43.20
6305.00
905.00
676.00
702.00
319285.20
48870.00
43804.80
30326.40
442286.40
day
day
day
0.88
3.00
19.00
297.00
361.00
246.00
261.36
1083.00
4674.00
6018.36
hour
hour
hour
hour
t.km
hour
6.00
6.00
6.00
15.00
300X10
6.00
1920.00
720.00
832.00
960.00
2.78
264.00
11520.00
4320.00
4992.00
14400.00
8352.00
1584.00
45168.00
Say Rs
b) Labour
Mate
Mason
Mazdoor
c)
Machinery
Batching plant @ 20 cum/hr
Generator 100 KVA
Loader 1 cum capacity
Transit mixer 4.0 cum capacity lead upto 1km
Lead beyond 10
Concrete pump
50.64
54.00
64.80
43.20
6305.00
905.00
676.00
702.00
319285.20
48870.00
43804.80
30326.40
442286.40
day
day
day
0.88
3.00
19.00
297.00
361.00
246.00
261.36
1083.00
4674.00
6018.36
hour
hour
hour
hour
t.km
hour
6.00
6.00
6.00
15.00
300X10
6.00
1920.00
720.00
832.00
960.00
2.78
264.00
11520.00
4320.00
4992.00
14400.00
8352.00
1584.00
45168.00
Say Rs
67
88825.10
116459.57
69875.74
768633.17
6405.28
6406.00 /cum
MT
Cum.
Cum.
Cum.
Remark
72352.73
795879.99
6632.33
6633.00 /cum
MT
Cum.
Cum.
Cum.
Cost (Rs.)
113498.73
121394.30
72836.58
801202.37
6676.69
6677.00 /cum
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-6
BRIDGES/STRUCTURES
Ref.
MoRTH
Sl.
Spec.
No.
Description
(C)
a)
Unit Quantity
Material
Cement
Coarse Sand
20 mm aggregate
10 mm aggregate
Machinery
Batching plant @ 20 cum/hr
Generator 100 KVA
Loader 1 cum capacity
Transit mixer 4.0 cum capacity lead upto 1km
Lead beyond 1 km.
Concrete pump
MT
Cum.
Cum.
Cum.
50.64
54.00
64.80
43.20
6305.00
905.00
676.00
702.00
319285.20
48870.00
43804.80
30326.40
442286.40
day
day
day
0.88
3.00
19.00
297.00
361.00
246.00
261.36
1083.00
4674.00
6018.36
6.00
6.00
6.00
15.00
300X10
6.00
1920.00
720.00
832.00
960.00
2.78
264.00
11520.00
4320.00
4992.00
14400.00
8352.00
1584.00
45168.00
hour
hour
hour
hour
10 t.km
hour
Cost (Rs.)
Remark
b) Labour
Mate
Mason
Mazdoor
c)
Rate (Rs.)
Machinery
Batching plant @ 20 cum/hr
Generator 100 KVA
Loader 1 cum capacity
Transit mixer 4.0 cum capacity lead upto 1km
Lead beyond 1 km.
Concrete pump
MT
Cum.
Cum.
Cum.
Kg
51.60
54.00
64.80
43.20
206.40
6305.00
905.00
676.00
702.00
40.00
325338.00
48870.00
43804.80
30326.40
8256.00
456595.20
day
day
day
0.94
3.50
20.00
297.00
361.00
246.00
279.18
1263.50
4920.00
6462.68
6.00
6.00
6.00
15.00
300X10
6.00
1920.00
720.00
832.00
960.00
2.78
264.00
hour
hour
hour
hour
10 t.km
hour
d) For formwork
e) Overhead @ 20%On (a+b+c+d)
f) Contractors Profit @ 10%On (a+b+c+d+e)
Cost for 15 cum = a+b+c+d+e+f
Rate per cum = (a+b+c+d+e+f)/120
Say Rs
68
187519.65
136198.48
81719.09
898909.98
7490.92
7491.00 /cum
11520.00
4320.00
4992.00
14400.00
8352.00
1584.00
45168.00
193125.83
140270.34
84162.21
925784.26
7714.87
7710.00 /cum
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-6
BRIDGES/STRUCTURES
Ref.
MoRTH
Sl.
Spec.
No.
Description
(B)
a)
Unit Quantity
b) Labour
Mate
Mason
Mazdoor
c)
Machinery
Batching plant @ 20 cum/hr
Generator 100 KVA
Loader 1 cum capacity
Transit mixer 4.0 cum capacity lead upto 1km
Lead beyond 1 km.
Concrete pump
51.60
54.00
64.80
43.20
206.40
6305.00
905.00
676.00
702.00
40.00
325338.00
48870.00
43804.80
30326.40
8256.00
456595.20
day
day
day
0.94
3.50
20.00
297.00
361.00
246.00
279.18
1263.50
4920.00
6462.68
6.00
6.00
6.00
15.00
300X10
6.00
1920.00
720.00
832.00
960.00
2.78
264.00
Say Rs
a)
b)
c)
d)
e)
f)
55.80
54.00
64.80
43.20
223.20
6305.00
905.00
676.00
702.00
40.00
351819.00
48870.00
43804.80
30326.40
8928.00
483748.20
day
day
day
0.94
3.50
20.00
297.00
361.00
246.00
279.18
1263.50
4920.00
6462.68
hour
hour
hour
6.00
6.00
6.00
1920.00
720.00
832.00
11520.00
4320.00
4992.00
15.00
300X10
6.00
960.00
2.78
264.00
Remark
11520.00
4320.00
4992.00
14400.00
8352.00
1584.00
45168.00
91480.66
119941.31
71964.78
791612.63
6596.77
6597.00 /cum
tonne
cum
cum
cum
kg
hour
tonne.k
m
hour
69
Cost (Rs.)
MT
Cum.
Cum.
Cum.
Kg
hour
hour
hour
hour
10 t.km
hour
d) For formwork
e) Overhead @ 20%On (a+b+c+d)
f) Contractors Profit @ 10%On (a+b+c+d+e)
Cost for 15 cum = a+b+c+d+e+f
Rate per cum = (a+b+c+d+e+f)/120
Rate (Rs.)
14400.00
8352.00
1584.00
45168.00
246274.28
156330.63
93798.38
1031782.18
8598.18
8598.00 /cum
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-6
BRIDGES/STRUCTURES
Ref.
MoRTH
Sl.
Spec.
No.
Description
6.
Unit Quantity
Rate (Rs.)
tonne
cum
cum
cum
kg
58.80
54.00
64.80
43.20
235.20
6305.00
905.00
676.00
702.00
40.00
370734.00
48870.00
43804.80
30326.40
9408.00
day
day
day
0.94
3.50
20.00
297.00
361.00
246.00
279.18
1263.50
4920.00
hour
hour
hour
6.00
6.00
6.00
1920.00
720.00
832.00
11520.00
4320.00
4992.00
hour
15.00
tonne.k 300X10
m
hour
6.00
for 120 cum
960.00
2.78
264.00
Say Rs
6.08
(a)
1800
Cost (Rs.)
14400.00
8352.00
1584.00
554774.00
305125.70
171979.94
103187.96
1135067.60
9458.8967
9460.00 /cum
a)
Unit = 1 MT
Taking output = 0.377 MT
Details of cost for 12T13 strand 40m long
cable (weight=0.377 MT)
Material :
H.T. Strand @ 9.42 kg/m including 2 per cent
for wastage and extra length for jacking
Sheathing duct ID 66mm alongwith 5% extra
length 40 x 1.05 = 42 m
Tube anchorage set complete with bearing
Nos. plate, permanent wedges, etc
Cement for grouting including 3% wastage @
3.00kg/m = 3 x 1.03 x 40 =123.60 kg (say 125 kg)
Add 0.50 per cent cost of materials for spacers, insulation
tape and miscelleneous items
b) Labour
For making and fixing cables, anchorges
Mate
Blacksmith
Mazdoor
ii)
For Prestressing
Mate/Supervisor
Prestressing operator/Fitter
Mazdoor
iii)
For grouting
Mate/Supervisor
Mason
Mazdoor
MT
0.385
63000.00
24255.00
42.00
45.00
1890.00
Nos.
2.00
1600.00
3200.00
MT
0.125
6305.00
788.13
150.67
30283.79
i)
c)
Machinery
Stressing Jack with pump
70
Remark
day
day
day
0.16
1.00
3.00
297.00
361.00
246.00
47.52
361.00
738.00
day
day
day
0.05
0.25
1.00
297.00
361.00
246.00
14.85
90.25
246.00
day
day
day
0.05
0.25
1.00
297.00
361.00
246.00
14.85
90.25
246.00
1848.72
hour
2.50
133.00
332.50
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-6
BRIDGES/STRUCTURES
Ref.
MoRTH
Sl.
Spec.
No.
Description
Unit Quantity
e)
hour
hour
1.00
3.50
Rate (Rs.)
125.00
384.00
6.08
(b)
1600
Remark
125.00
1344.00
1801.50
6786.80
4072.08
44792.89
118814.04
118814.00 /MT
a)
b)
c)
d)
Unit = 1 MT
Taking output = 1MT
Materials
HYSD bars including 5% for laps and wastage
Binding wire
MT
Kg.
1.05
8.00
49330
40.00
51796.50
320.00
52116.50
day
day
day
0.44
3.00
8.00
297.00
361.00
246.00
130.68
1083.00
1968.00
3181.68
11059.64
6635.78
72993.60
72994.00 /MT
6.10
Cost (Rs.)
Cum
6068.00
(b) Labour
Mazdoor (for cleaning deck slab concrete surface)
day
0.15
246.00
36.90
7.38
4.43
6116.71
6117.00 /cum
Sub Analysis
M-40 GRADE
Unit = cum
Taking output = 120 cum
a)
Material
Cement
Coarse Sand
20 mm aggregate
10 mm aggregate
Admixture @0.4% of cement
b) Labour
Mate
71
MT
Cum.
Cum.
Cum.
Kg
51.60
54.00
64.80
43.20
206.40
6305.00
905.00
676.00
702.00
40.00
325338.00
48870.00
43804.80
30326.40
8256.00
456595.20
day
0.94
297.00
279.18
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-6
BRIDGES/STRUCTURES
Ref.
MoRTH
Sl.
Spec.
No.
Description
c)
6.09
515 &
2702
Unit Quantity
Rate (Rs.)
Cost (Rs.)
Mason
Mazdoor
day
day
3.50
20.00
361.00
246.00
1263.50
4920.00
6462.68
Machinery
Batching plant @ 20 cum/hr
Generator 100 KVA
Loader 1 cum capacity
Transit mixer 4.0 cum capacity lead upto 1km
Lead beyond 10
Concrete pump
hour
hour
hour
hour
t.km
hour
6.00
6.00
6.00
15.00
300X62
6.00
1920.00
720.00
832.00
960.00
2.78
264.00
11520.00
4320.00
4992.00
14400.00
51782.40
1584.00
88598.40
Remark
110331.26
e)
Say Rs
66198.75
728186.29
6068.22
6068.00 /Sqm
11418.00
Total
413.01
456.72
870.00 /Sqm
(P-493)
I) Mastic Asphalt 15mm thick
II) Bituminous Concrete 50mm thick
(As Given in Chapter 4)
Rate per sqm
515&
2702
Sqm
0.04
Labour
Mate
Mazdoor
Mazdoor skilled
b) Machinery
Mechanical broom @ 1250 sqm per hour
Air compressor 250 cfm
Mastic cooker 1 tonne capacity
Bitumen boiler 1500 litres capactity
Tractor for towing and positioning of mastic
cooker and bitumen boiler
c)
day
day
day
0.49
11.00
1.25
297.00
246.00
328.00
145.53
2706.00
410.00
3261.53
hour
hour
hour
hour
hour
0.06
0.06
6.00
6.00
1.00
368.00
330.00
64.00
205.00
375.00
22.08
19.80
384.00
1230.00
375.00
2030.88
tonne
0.204
Material
Base Mastic (without coarse aggregates) = 60 per cent
Coarse aggregate (335 mm to 9.5 mm) = 40 per cent
Proportion of material required for mastic asphalt with
coarse aggregates ( based on mix design done by CRRI for a
specific case)
i)
49938.00
10187.35
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-6
BRIDGES/STRUCTURES
Ref.
MoRTH
Sl.
Spec.
No.
Description
Unit Quantity
Rate (Rs.)
cum
0.39
298.00
116.22
MT
0.36
6305.00
2269.80
cum
0.55
351.00
193.05
v)
cum
0.036
702.00
25.27
kg
1.05
50.91
53.45
12845.15
3627.51
e)
2176.51
2705
Remark
23941.58
330.41
6.10
Cost (Rs.)
(260.70x15/12)
Say Rs
413.01
413.00 /Sqm
b) Labour
For fabrication
Mason
Skilled (Blacksmith, welder etc.)
Mazdoor
For fixing in position
Mate
Mason
Mazdoor
kg
m
Nos.
Nos.
4.00
1.00
6.00
2.00
52.00
210.00
5.00
21.00
208.00
210.00
30.00
42.00
490.00
day
day
day
0.02
0.02
0.02
361.00
361.00
246.00
7.22
7.22
4.92
day
day
day
0.01
0.01
2.00
297.00
361.00
246.00
2.97
3.61
492.00
517.94
50.40
568.34
211.67
127.00
1397.00
1398.00 /Nr.
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the
State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-6
BRIDGES/STRUCTURES
Ref.
MoRTH
Sl.
Spec.
No.
6.11
6.12
Section
2000
2605
Description
Unit Quantity
Rate (Rs.)
i) Elastomeric bearing
ii) Tar paper bearing
iii) Pot cum PTEF/Hybride
Cu. cm.
Sqm.
a)
b)
c)
d)
e)
Tonne
Tonne
Tonne
Tonne
Tonne
Pot fixed
Pot guided
Pot free
Pot pin
Guided
M.R.
M.R.
1.00 /CuCm
150.00 /Sqm
Say Rs
Say Rs
Say Rs
Say Rs
Say Rs
150.00 /Ton
170.00 /Ton
160.00 /Ton
920.00 /Ton
842.00 /Ton
b) Material
Premoulded joint filler 12 m long,
20mm thick and 300mm deep
c) Overhead @ 20%On (a+b)
d) Contractors Profit @ 10%On (a+b+c)
Cost for 12 m = a+b+c+d
Rate per metre = (a+b+c+d)/12
day
day
day
0.01
0.2
0.1
297.00
246.00
328.00
2.97
49.20
32.80
84.97
sqm
3.60
494.00
1778.40
Say Rs
2607
Remark
b)
Cost (Rs.)
372.67
223.60
2459.65
204.97
205.00 /Lm
Labour
Mate
Mazdoor
Mazdoor (skilled)
day
day
day
0.05
1.00
0.25
297.00
246.00
328.00
b) Material
Supply of complete assembly of strip seal expansion joint comp RM
12
9450.00
Add 5% of cost of material for anchorage reinforcment, welding and other incidentals
c) Overhead @ 20%On (a+b)
d) Contractors Profit @ 10%On (a+b+c)
Cost for 12 m = a+b+c+d
Rate per metre = (a+b+c+d)/12
Say Rs
6.13
a)
Clauses
2703 &
809
0.848
5828.00
14.85
246.00
82.00
342.85
113400.00
5670.00
119070.00
23882.57
14329.54
157624.96
13135.41
13135.00 /Lm
4942.14
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER - 7
DRAINS AND RETAINING WALLS
Ref.
MoRT
Sl. No. H Spec.
Description
Unit
Cost (Rs.)
Remarks
Cum
Say Rs
50.00
50.00 /Cum
7.02
1.
a)
b)
c)
P.C.C.M-10 grade
Unit = cum
Output=15 cum
Material
Cement
Coarse Sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
MT
Cum.
Cum.
Cum.
Cum.
3.45
6.75
8.10
4.05
1.35
6305.00
905.00
624.00
676.00
702.00
21752.25
6108.75
5054.40
2737.80
947.70
36600.90
Labour
Mate
Mason
Mazdoor
day
day
day
0.64
1.00
15.00
297.00
361.00
246.00
190.08
361.00
3690.00
4241.08
Machinery
Concrete mixer 0.4/0.28 cum
33 KVA genarator set
hour
hour
6.00
6.00
240.00
384.00
1440.00
2304.00
3744.00
d)
3566.88
e)
4815.29
(3)
RCC M-20
Rate as per item no.5.04 (3)
HYSD
Rate as per item no.5.07
Say Rs
52968.14
3531.21
3531.00 /Cum
Say Rs
4751.00
4751.00 /Cum
Cum
Tonne
Say Rs
(4)
(5)
Filter Material
Rate as per item no. 5.13
Weep Holes
Rate as per item no. 5.14
65694.00
65694.00 /MT
Cum
Say Rs
898.00 /Cum
No.
Say Rs
94.00 /Nr.
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER - 7
DRAINS AND RETAINING WALLS
Ref.
MoRT
Sl. No. H Spec.
Description
Unit
Cost (Rs.)
Remarks
Material
Sand at site
Cement at site
RCC pipe NP-4/presstressed concrete
pipe including collar at site
Granular material passing 5-6 mm sieve
for class bedding
0.28
1.00
6.00
297.00
361.00
246.00
83.16
361.00
1476.00
1920.16
cum
tonne
mtr
0.09
0.07
12.50
905.00
6305.00
6673.00
81.45
441.35
83412.50
cum
5.00
298.00
1490.00
b)
600 mm dia
Labour
Mate
Mason
Mazdoor
Material
Sand at site
Cement at site
RCC pipe NP-4/presstressed concrete
pipe including collar at site
Granular material passing 5-6 mm sieve
for class bedding
85425.30
6987.64
9433.31
103766.41
8301.31
8301.00 /m
day
day
day
0.14
0.50
3.00
297.00
361.00
246.00
41.58
180.50
738.00
960.08
cum
tonne
mtr
0.05
0.04
12.50
905.00
6305.00
6673.00
45.25
252.20
83412.50
cum
2.50
298.00
745.00
84454.95
6833.20
9224.82
101473.06
8117.84
8120.00 /m
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER - 7
DRAINS AND RETAINING WALLS
Ref.
MoRT
Sl. No. H Spec.
Description
Unit
Cost (Rs.)
Remarks
1.00
121.83
121.83
0.005
4399.00
22.00
Sqm
1.00
219.95
219.95
Sqm
1.00
100.65
Say Rs
100.65
464.42
464.00 /sqm
809
b)
c)
Labour
Mate
Blacksmith
Mazdoor
day
day
day
0.06
0.50
1.00
297.00
361.00
246.00
17.82
180.50
246.00
Machinery
Tractor- trolley
hour
0.10
375.00
37.50
41.21
90.00
3708.90
88.56
55.00
4870.80
16.24
20.00
55.00
0.00
892.98
0.00
Material
Corrugated sheet, 3 mm thick, Single metal "W" beam
section railing, 4.5 m in length
kg
Channel post 150 x 75 x 5 mm 1.80 m long,
3 Nos. @ 16.4 kg per mtr
kg
Spacer 150 x 75x 5 mm channel 0.33 m long,
3 Nos. @ 16.4 kg per mtr
kg
Nuts and Bolts
kg
Add 25% of material for fabrication
2368.17
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor Gujrat Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER - 7
DRAINS AND RETAINING WALLS
Ref.
MoRT
Sl. No. H Spec.
Description
Unit
Cost (Rs.)
Remarks
Cum
Cum
0.17
0.17
50.00
4751.00
6.67
855.51
e)
Overheads @ 8 % on (a+b+c)
1054.79
f)
1423.96
15663.60
3480.80
Say
3481.00
/'m
b)
c)
Labour
Mate
Blacksmith
Mazdoor
day
day
day
0.06
0.50
1.00
297.00
361.00
246.00
14.7
122.5
238
Machinery
Tractor- trolley
hour
0.10
375.00
44.00
82.42
90.00
4121
34.44
20.00
55.00
63.00
1894.2
2320
3572.1
0.17
0.17
50.00
4751.00
6.669
855.513
Material
Corrugated sheet, 3 mm thick, Double metal "W" beam
section railing, 4.5 m in length
For 2 Nos..
(2 x 41.21 )
kg
Channel post 150 x 75 x 5 mm 2.20 m long,
3 Nos. @ 16.4 kg per mtr
(2.2x16.4x3) =73.73
Spacer 150 x 75x 5 mm channel 0.7m long,
3 Nos. @ 16.4 kg per mtr
kg
Nuts and Bolts
kg
Add 25% of material for fabrication
Cum
Cum
e)
Overheads @ 8 % on (a+b+c)
1055.09
f)
1424.38
15668.15
3481.81
Say
3482.00
/'m
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER -8
Ref.
Sl. MoRTH
No. Spec.
Description
8.00
8.01
408
Unit
Quantity
day
day
day
0.72
2.00
16.00
297.00
361.00
246.00
213.84
722.00
3936.00
4871.84
hour
hour
hour
6.00
12.00
5.00
320.00
240.00
360.00
1920.00
2880.00
1800.00
6600.00
cum
cum
tonne
KL
21.79
10.90
5.70
30.00
676.00
905.00
6305.0
63.00
14730.04
9864.50
35938.50
1890.00
62423.04
Remarks
b) Machinery
Kerb casting machine @ 60 metre/hour
Concrete mixer 0.48/0.28 cum capacity
Water tanker 6 KL capacity
c) Material
Crushed stone aggregate 20 mm nominal size 59%
Coarse sand 30%
Cement 10%
Cost of water
d) Overheads @ 8% on (a+b+c)
5911.59
7980.65
87787.12
Say Rs
102
243.85
240.00 /m
4083.00 /Cum
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER -8
Ref.
Sl. MoRTH
No. Spec.
8.02
408
Description
Unit
Quantity
day
day
day
0.72
2.00
16.00
297.00
361.00
246.00
213.84
722.00
3936.00
4871.84
hour
hour
hour
6.00
16.00
6.00
320.00
240.00
125.00
1920.00
3840.00
750.00
6510.00
cum
cum
tonne
KL
36.59
18.30
9.01
36.00
676.00
905.00
6305.0
63.00
24734.84
16561.50
56808.05
2268.00
100372.39
Remarks
b) Machinery
Kerb casting machine @ 60 metre/hour
Concrete mixer 0.48/0.28 cum capacity
Water tanker 6 KL capacity
c) Material
Crushed stone aggregate 20 mm nominal size 59%
Coarse sand 30%
Cement 10%
Cost of water
d) Overheads @ 8% on (a+b+c)
8940.34
12069.46
132764.03
803
368.79
369.00 /m
Sqm
640.00 MR
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER -8
Ref.
Sl. MoRTH
No. Spec.
Description
Unit
other markings
104
Quantity
Remarks
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER -8
Ref.
Sl. MoRTH
No. Spec.
Description
b)
8.04
801
Unit
Quantity
Remarks
100.00 MR
b) Material
Mild steel angle iron 75 x 75 x 6 mm
0.216
50.00
10.80
cum
sqm
0.120
0.430
4224.00
150.00
506.88
64.50
582.18
day
day
0.01
0.25
297.00
246.00
2.97
61.50
64.47
kg
19.00
55.00
1045.00
c)
90 cm equilateral triangle
Machinery
Tractor-trolley
20.90
sqm
0.35 7150.00
hour
0.01
375.00
2502.50
3568.40
3.75
d)
290.93
e)
392.75
105
4902.48
4902.00 / Nr
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER -8
Ref.
Sl. MoRTH
No. Spec.
8.05
801
Description
Unit
Quantity
Remarks
0.216
0.120
0.430
50.00
4224.00
150.00
10.80
506.88
64.50
582.18
day
day
0.01
0.25
297.00
246.00
2.97
61.50
64.47
kg
19.00
55.00
1045.00
sqm
0.90
5775.00
5197.50
b) Material
Mild steel angle iron 75 x 75 x 6 mm,
2.38 metres long
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size 0.9 sqm,
Add 2 per cent of cost of angle iron towards cost
of drilling holes, nuts, bolts fabrication etc,
c)
Machinery
Tractor-trolley
20.90
6263.40
hour
0.02
375.00
7.50
506.83
e)
684.22
8108.60
9009.56
9010.00 / Sqm
0.48
9010.0
4325 / Nr
0.48
9010.0
4325 / Nr
0.48
9010.0
4325 / Nr
106
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER -8
Ref.
Sl. MoRTH
No. Spec.
Description
Unit
9.07
805
801
Remarks
0.36
9010.0
3244 / Nr
0.672
9010.0
6055 / Nr
0.35
9010.0
3154 / Nr
0.35
9010.0
3154 / Nr
8.06
Quantity
Delineators
Nr.
160.00
MR
b)
Nr.
3825.00
MR
cum
cum
sqm
0.430
0.240
0.860
50.00
4224.00
150.00
21.50
1013.76
129.00
1164.26
a)
day
day
0.01
0.30
297.00
246.00
2.97
73.80
76.77
kg
38.00
55.00
2090.00
sqm
1.50
7150.00
10725.00
b)
Material
Mild steel angle iron 75 x 75 x 6 mm,
2.85 metres long, 2 nos
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting
Add 2 per cent of cost of angle iron towards cost
of drilling holes, nuts, bolts fabrication etc,
107
41.80
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER -8
Ref.
Sl. MoRTH
No. Spec.
Description
Unit
Quantity
108
Remarks
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER -8
Ref.
Sl. MoRTH
No. Spec.
Description
c)
Machinery
Tractor-trolley
Unit
Quantity
hour
0.02
375.00
9.08
7.50
d)
1035.29
e)
1397.64
Remarks
16538.25
11025.50
11030.00 / Sqm
b)
c)
d)
Earthwork in excavation
0 x 550 x 0.550 x 0.65 = 0.20
(Rate as per item no.5.01)
Plain cement concrete M-10 in foundation
0.55 x 0.55 x 0.65 - 3.14 x 0.25 x 0.25/4 x 0.5
=
0.17
(Rate as per item no. 5.04 '1')
Cement concrete M-20 for reinforced concrete
in sub-structure
3.14 x 0.25 x 0.25/4 x 1.25 = 0.06
(Rate as per item no.5.04 '3')
HYSD/MS reinforcement including carriage and
(Rate as per item no.5.08)
cum
0.20
50.00
10.00
cum
0.17
3525.63
599.36
cum
0.06
5030.00
301.80
kg
6.10
65.69
400.73
109
1311.89
1312.00 /Nr
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER -8
Ref.
Sl. MoRTH
No. Spec.
9.09
802
Description
Unit
Quantity
day
day
day
0.24
2.00
4.00
297.00
297.00
246.00
71.28
594.00
984.00
1649.28
1.05
50000.00
52500.00
Remarks
Overheads Signs
Providing and erecting overhead signs with a corrosion
resistant 2 mm thick aluminium alloy sheet with high
intensity grade retro-reflective sheeting of encapsulated
lens type with vertical and lateral clearance given in
Clauses 802.2 and 802.3 and installed as per Clause
802.7 over a designed supprot system of aluminium
alloy or galvanised steel trestles and trusses of sections
asn type as per structural design requirements and
approved plans
A. Truss and Vertical Support
Unit = tonne
Taking output = 1 tonne
a)
Labour
Mate
Blacksmith
Mazdoor including for handling and fixing at site
b)
c)
Material
Aluminium alloy/galvanised steel including 5 per tonne
wastage
Add 1 per cent on cost of material for fabrication of
trusses as per approved design
Add 15 per cent on cost of material for fabrication of
trusses as per approved design
Machinery
Crane 3 tonne capacity
hour
Truck
hour
Excavation for foundation
Cement concrete M 15 grade
cum
cum
525.00
7875.00
60900.00
3.00
0.50
368.00
250.00
2.00
1.00
50.00
4224.00
1104.00
125.00
1229.00
100.00
4224.00
4324.00
d)
i)
ii)
e)
5102.26
f)
6888.05
80092.60
80000.00 /MT
b)
Labour
Mate
Blacksmith
Mazdoor including for handling and fixing at site
Material
Aluminium alloy plate, 2 mm thick, fixed with hi
intensity grade sheeting vide Clause 801.30
110
day
day
day
0.02
0.10
0.15
297.00
297.00
246.00
5.94
29.70
36.90
72.54
sqm
1.00
7150
7150
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER -8
Ref.
Sl. MoRTH
No. Spec.
Description
Unit
Quantity
Miscellaneous
Add 1 per cent of cost of labour for lifting arrangement, like
ladders, pulleys, ropes etc.
0.7254
7150.7254
c)
577.86
d)
780.11
9.10
8581.24
8580.00 /sqm
809
b)
c)
Labour
Mate
Blacksmith
Mazdoor
day
day
day
0.06
0.50
1.00
297.00
361.00
246.00
17.82
180.50
246.00
Machinery
Tractor- trolley
hour
0.10
375.00
37.50
Material
Corrugated sheet, 3 mm thick, Single metal "W" beam
section railing, 4.5 m in length
kg
41.21
90.00
3708.90
kg
88.56
55.00
4870.80
kg
kg
16.24
20.00
55.00
63.00
892.98
1260.00
2683.17
(d)
(i)
(ii)
e)
Overheads @ 8 % on (a+b+c)
1180.79
f)
1594.06
17534.70
3896.60
111
Cum
Cum
Remarks
0.17
0.17
50.00
4751.00
6.67
855.51
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat
Border in the State of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
ANALYSIS OF RATES
CHAPTER -8
Ref.
Sl. MoRTH
No. Spec.
Description
Unit
Quantity
3897.00
Remarks
/'m
b)
c)
Labour
Mate
Blacksmith
Mazdoor
day
day
day
0.06
0.50
1.00
297.00
361.00
246.00
14.7
122.5
238
Machinery
Tractor- trolley
hour
0.10
375.00
44.00
82.42
90.00
4121
kg
108.24
55.00
5953.2
kg
kg
34.44
20.00
55.00
63.00
1894.2
2320
Material
Corrugated sheet, 3 mm thick, Double metal "W" beam
section railing, 4.5 m in length
For 2 Nos..
(2 x 41.21 )
kg
Channel post 150 x 75 x 5 mm 2.20 m long,
3 Nos. @ 16.4 kg per mtr
(2.2x16.4x3) =73.73
Spacer 150 x 75x 5 mm channel 0.7m long,
3 Nos. @ 16.4 kg per mtr
Nuts and Bolts
Add 25% of material for fabrication
3572.1
(d)
(i)
(ii)
e)
Overheads @ 8 % on (a+b+c)
1531.35
f)
2067.32
22740.56
5053.46
Cum
Cum
0.17
0.17
50.00
4751.00
Say
112
6.669
855.513
5053.00
/'m
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State
of Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
CHAPTER-9
Sno
Description
9.01
Unit
Length
Width
Depth
Quantiy
Rate
Amount
Unit = No
1
Cum
1
3
2
Cum
6.30
0.90
2.50
0.23
0.90
0.23
0.50
1.00
0.50
0.72
2.43
0.58
3.73
50.00
186.48
6.00
2.50
0.20
3.00
4224.00
12672.00
Cum
0.90
0.90
0.20
0.49
4224.00
2052.86
Cum
3
3
1
0.30
2.50
6.30
0.45
0.30
2.50
2.70
0.30
0.10
1.09
0.68
1.58
3.34
4751.00
15884.97
0.33
65694.00
21964.79
0.45
0.559
4475.00
2501.08
0.45
2.43
62.00
150.66
2.00
2000.00
4000.00
Tonne
3.34 x 100/1000
Cum
Sqm
No.
Sqm
6.30
2.50
15.75
150.00
2362.50
Sqm
6.30
2.50
15.75
1329.00
20931.75
10
11
2.70
2.70
0.23
Ls.
Total
Say Rs
Say Rs
110
200.00
82907.08
83000.00
83000.00
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
ANALYSIS OF RATES
CHAPTER-10
MISCELLANEOUS
Sl. Reference
No. of MoRT&H
Specification
Description
Unit
Quantity
Rate
(Rs.)
Cost
(Rs.)
Remarks
10.00 MISCELLANEOUS
10.01 Providing and maintaining vehicles for the Engineer and the employer including
providing of driver, POL etc. as per Technical Specifications Clause 124.
a)
Veh-month
60000.00
b)
Veh-month
50000.00
10.02 Supply of colour record photographs with negatives and two colour prints there from
mounted in album as per Technical Specifications Clause 125.
Nr.
50.00 /Nr
Nr.
10.00 /Nr
10.04 Supplying colour video cassette & CD ROM records before the construction, during
construction stage & after construction, consisting of each set of edited master
cassettes & C.D. with 4 copies each of cassettes & CD ROMs complete as per
Technical Specification
10.05 Supplying of colour video CD records during construction as per Technical
Specifications Clause 126.
Set
Market Rate
5000.00
Set
Market Rate
10000.00
Nr
10000.00
Nr months
2000.00
10.07 Cast -in -situ cement concrete M20 kerb Construction of plain cement concrete kerb
M20 grade complete as per drawing and Technical Specification
Cum
4697.00
10.08 stones including excavation, foundation concrete in M-10 grade and reinforcement
including all inscriptions etc. complete as per drawings and Technical Specificaitons
Section 800.
Unit = 1Nr.
a) Boundary Stones
i)
ii)
iii)
iv)
Earthwork in excavations
0.500 x 0.500 x 0.750 = 0.19
Rate as per item no.5.01
Providing plain cement correct M-15
grade in foundation
0.500 x 0.500 x 0.750 - /4 x (0.20+0.185)/2 x 0.60
= 0.17
Rate as per item no. 5.04 (1)
Providing reinforced cement concrete
M-20 grade
/4(0.2 + 0.15)/2 x 0.9
0.022
Rate as per item no. 5.05 (3)
Reinforcement 6mm dia bars
Rate as per item no. 5.07
Cum
0.19
39.00
Cum
0.17
4224.00
718.08
Cum
0.022
4751.00
104.52
Kg
1.40
51.82
Say Rs
111
7.33
72.55
902.48
902.00 /Nr
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
ANALYSIS OF RATES
CHAPTER-10
MISCELLANEOUS
Sl. Reference
No. of MoRT&H
Specification
Description
Unit
Quantity
Rate
(Rs.)
Cost
(Rs.)
Remarks
Cum
0.0420
39.00
Cum
0.0375
4224.00
158.40
Cum
0.0098
4751.00
46.56
Kg
1.0800
51.82
55.97
b) Hectometre Stones
Unit = Nr.
i)
Earthwork in excavation
0.30 x 0.350 x 0.400 = 0.042
Rate as per item no. 5.01
ii)
iii)
iv)
v)
LS
Say Rs
1.64
50.00
312.56
313.00 /Nr
c) Kilometre Stones
Unit = Nr.
i)
ii)
iii)
iv)
Earthwork in excavation
0.550 x 0.650 x 0.60 = 0.215
Rate as per item no. 5.01
Providing plain cement concrete
in foundation M-15 grade
0.650 x 0.550 x 0.600 - 0.370 x 0.270 x 0.450
= 0.215 - 0.0449 = 0.170
Rate as per item no. 5.04 (1)
Providing plain cement concrete
M-20 grade
0.37 x 0.27 x 0.550 + 0.350 x 0.250 x 0.385
+ /2 x 0.35/4 x 0.25
= 0.055 + 0.034 + 0.012
= 0.101
Rate as per item no. 5.04 (3)
Cum
0.215
39.00
Cum
0.170
4224.00
718.08
Cum
0.101
4697.00
474.40
LS
Say Rs.
112
8.39
350.00
1550.86
1551.00 /Nr
Cum
0.264
39.00
10.30
Cum
0.201
4224.00
849.02
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
ANALYSIS OF RATES
CHAPTER-10
MISCELLANEOUS
Sl. Reference
No. of MoRT&H
Specification
iii)
Description
iv)
Unit
Quantity
Rate
(Rs.)
Cum
0.193
4697.00
LS
Say Rs.
10.09
408
Cost
(Rs.)
Remarks
906.52
350.00
2115.84
2116.00 /Nr
Cum
0.049
4967.00
L.S.
Say Rs.
b)
Channel kerb
Unit : Lm.
i)
Cement concrete M-20
1x [ (0.55x0.215)+(0.175+0.3)/2 x 0.225]
= 0.172
Rate as per item no. 5.05 (2)
ii)
Machine charges for laying
Cum
0.172
4967.00
L.S.
Say Rs.
c)
100.00
343.38
343.00 /m
854.32
100.00
954.32
954.00 /m
Kerb Foundation
Unit = Lm.
Cement concrete M-15
1x0.55 x 0.300 = 0.165
Rate as per item no. 5.04(1)
Cum
0.165
0.00
L.S
Say Rs.
10.10
243.38
0.00
50.00
50.00
50.00 /m
('i)
(ii)
cum
0.54
0.00
0.00
cum
0.54
0.00
0.00
113
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
ANALYSIS OF RATES
CHAPTER-10
MISCELLANEOUS
Sl. Reference
No. of MoRT&H
Specification
Description
a)
b)
Unit
Labour
Mate
Blacksmith
Mazdoor
Material
Barbed wire 335 metres length @ 9.38 kg per 100 metres
MS angle iron 40 mm x 40mm x 6 mm, 23 metres in length @
3.5 kg per metre
Quantity
Rate
(Rs.)
Cost
(Rs.)
day
day
day
0.090
0.250
2.000
297.00
361.00
246.00
26.73
90.25
492.00
608.98
kg
31.420
50.000
1571.00
kg
80.500
40.000
3220.00
Remarks
4791.00
Add for GI staple binding wire, drilling holes etc. @ 2 per cent
of the cost of material
95.82
4886.82
c)
sqm
2.11
90.00
d)
454.86
e)
614.06
6754.61
10.11
(A)
189.90
225.15
225.00
day
day
1.20
12.00
297.00
246.00
356.40
2952.00
3308.40
b) Machinery
Water tanker 6 KL capacity
hour
6.00
360.00
2160.00
c) Material
Plants
Shurbs
Manure sludge/farmyard manure
Pesticide
Cost of water
each
each
cum
kg
KL
200.00
800.00
63.64
0.5
36.0
100.00
30.00
250.00
25.00
63.00
20000.00
24000.00
15910.00
12.50
2268.00
62190.50
5412.71
7307.16
Total
(64656.54/3000)
Say Rs.
114
80378.77
26.79
27.00
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
ANALYSIS OF RATES
CHAPTER-10
MISCELLANEOUS
Sl. Reference
No. of MoRT&H
Specification
(B)
Description
Unit
Quantity
Rate
(Rs.)
Cost
(Rs.)
Remarks
a) Labour
Mate
Mazdoor
day
day
36.00
365.00
297.00
246.00
10692.00
89790.00
100482.00
b) Machinery
Water tanker 6 KL capacity
hour
90.00
360.00
32400.00
cum
KL
10.00
180.00
250.00
63.00
2500.00
11340.00
each
each
kg
20.00
80.00
1.50
100.00
30.00
25.00
2000.00
2400.00
37.50
18277.50
Maintenance of flowering plants and shurbs in central verge for one year
Unit = Sqm
Details of cost for 1 km length
c) Material
Manure sludge/farmyard manure
Cost of water
Replacement of casualties @10 per cent
Plants
Shurbs
Pesticide
12092.76
16325.23
Total
(89723.57/3000)
Say Rs.
59.86
60.00
87.00
Say Rs.
115
179577.49
87.00
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
ANALYSIS OF RATES
CHAPTER-10
MISCELLANEOUS
Sl. Reference
No. of MoRT&H
Specification
10.12
Description
Unit
Quantity
Rate
(Rs.)
Cost
(Rs.)
Remarks
23.55
3.25
17.73
kg
kg
kg
horizontal -3x1.0x3.5 =
10.5
kg
0.59
55.62
kg
kg
55.62 x 50.00
2781.10
695.28
(55.62x 50.00)
Add for febricating 25%
Add for 2 coats of paint over one coat of primer 4sqm @ 60/sqm
240.0
3716.38
297.31
4013.69
401.37
Total cost
Say Rs.
10.13
4415.06
4415.00
Site development for office and residential block including but not limited to
infrastructure facilities such as water supply, septic tank,overhead reservoir,
high mast illumination, lamp posts, parking areas, internal roads,
landscaping, litter bins andwaste disposal system, boundary walls and gates
etc. to the satisfaction of the Engineer
Unit = 1sqm
Taking area 100 m x 100 m = 10000 sqm
(i)
Cum
10000.00
46.00
460000.00
400.00
1077.00
430800.00
Cum
765.00
50.00
38250.00
Cum
51.00
0.00
0.00
Cum
189.85
5490.00
1042276.50
17.09
65690.00
1122642.10
(ii) Drainage
Length of drain = 4 x 100 = 400 m
116
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
ANALYSIS OF RATES
CHAPTER-10
MISCELLANEOUS
Sl. Reference
No. of MoRT&H
Specification
Description
(iv)
(v)
(vi)
(vii)
10.07
Unit
Quantity
Rate
(Rs.)
Cost
(Rs.)
Remarks
m
L.S.
L.S.
sqm.
400.00
1184.00
76000.00
50.00
3800000.00
473600.00
10000.00
10000.00
10000.00
15.00
150000.00
3737568.60
3737568.60 /10000
373.76
Say Rs. Rs. 374 /sqm
1.00
2.00
Cum
3x5000 = 15000
15000.00
600.00
9000000.00
km
1100.00
40000.00
44000000.00
Nr.
4400
120.00
528000.00
End plug 40 mm
Nr.
4400
40.00
176000.00
Nr.
100.00
800.00
Nr.
3600.00
28800.00
Nr.
16
300.00
4800.00
Nr.
8000.00
32000.00
4.00
Nr.
400
200.00
80000.00
5.00
Nr.
1000
1000.00
1000000.00
6.00
100.00
5000.00
500000.00
59150400.00
3.00
Cost of 100 Km
Cost per km
591504.00
Say Rs. Say Rs. 6.25 lacs/km
117
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
ANALYSIS OF RATES
CHAPTER-10
MISCELLANEOUS
Sl. Reference
No. of MoRT&H
Specification
Description
Unit
Quantity
Rate
(Rs.)
Cost
(Rs.)
Remarks
10.07 Providing temporary diversion to various roads complete as per MOST Technical
Specification Clause 112.3 excluding provision of RCC hume pipes
i)
a)
b)
c)
d)
e)
Earthwork
300 x (12+13.9)/2 x 0.5= 1942.50cum
GSB
300 x 7.45 x 0.2 = 447cum
WMM
300 x 7.0 x 0.225 =472.50cum
MSS
300 x 7.0 = 2100 sqm
Add for Hume Pipe 1000mm Dia. of 16.0m length
1 nos
cum
1942.50
46.00
89355
cum
447.00
827.00
369669
cum
472.50
1055.00
498487.5
sqm
2100.00
16.00
125.90 264391.36076
5342.00
Rate /m
Say Rs.
ii)
85472
1307374.8608
4357.916
4358.00 /m
a)
b)
c)
d)
e)
cum
1177.5
46.00
54165
cum
263.25
827.00
217707.75
cum
236.25
1055.00
249243.75
sqm
1575.00
7.25
125.90 198293.52057
5342.00
Rate /m
Say Rs.
iii)
a)
b)
c)
38729.5
758139.52057
2527.132
2527.000 /m
cum
526.5
46.00
24219
cum
159.75
827.00
132113.25
cum
146.25
1055.00
Rate /m
Say Rs.
118
154293.75
310626
1035.42
1035.00 /m
Consultancy services for the preparation of detailed Project Report for NH-15 Barmer -Sanchor - Gujrat Border in the State of
Rajasthan
NH-15, (Km. 153.00 to Km. 297.738)
Sno
Description
RE WALL
Unit = Rm
1) Facia Panel
2) Back Filling behind wall
3) Crash barrier including Friction Slab
[(0.175+0.225)/2 x 0.35 + (0.225+0.4)/2 x 0.3+
(0.4 x 0.2) + (0.05 x 0.20) + (0.55+0.95)/2 x 0.375
+ (2.2 x 0.25) - (0.23 x 0.3)]
= 1.016
4) HYSD
Unit
Length
Width
Sqm
Cum
Cum
1
1
1
5
1.016
Depth
Quantiy
4
4
4.00
20.00
1.02
1.02 x120/1000
Rate
Amount
4194.00
1520.00
6252.00
16776.00
30400.00
6352.03
65694.00
8009.41
61537.44
Say Rs
Sub Analysis
Providing reinforced earth as per Technical
Specifications Clause 3100 with precast concrete
plain facia panel in cruciform shape ( grade ofconcrete
M-35 , thickness 180mm), including soilreinforcing
HAR strips ( hot dip galvanised, 40 x 5mm section)
with all fixtures and accessories complete as per
approved design and drawing of specialised firm.
(i)
i)
a)
b)
c)
Mate
Mazdoor
Mazdoor skilled
day
day
day
0.18
3.00
2.00
297.00
246.00
328.00
53.46
738.00
656.00
1447.46
Machinery
Light crane with lifting capacity upto 3 tonne
hour
6.00
368.00
2208.00
Material
Pre-cast RCC M-35 facing elements of size as per desig cum
13.50
6178.00
83403.00
0.75
65694.00
49270.50
132673.50
tonne
d)
Overheads @ 8% on (a+b)
e)
kg
20 x 75
50.00
75000
Total =
214,055.54
17416.88
23147.24
Say Rs
118
254619.66
3394.93
3395.00 /Sqm
500.00
60.00
239.00
4194.00 /Sqm
1520.00 /cum
61538 /m