Tutorial 3
Tutorial 3
Autumn 2015
N umber of resources
Activity time
(1)
3. Time through an empty worker paced process= Sum of all the activity times.
4. Time to finish X units starting with an empty system- It is given asT ime to f inish X units starting with an empty system = T ime through an empty process+
X 1 units
F low rate
(2)
5. Time to finish X units starting with an empty system in continuous flow process- It is
given asX units
F low rate
(3)
T ime to f inish X units starting with a continuous f low process = T ime through an empty process+
1
F low rate
(4)
8. Idle time for a single worker where every activity is staffed with exactly one worker is given asIdle time = cycle time Activity time of the single worker
1
(5)
9. Average labor utilization of labourers used in the process is given asAverage labor utilization =
Labor Content
labor content + Idle time
(6)
Practice questions-
Q-1 Consider the same table as we have discussed in previous tutorial question number 1, and assume that
the wage rate is 10$ per hour. Assume that there is unlimited demand for the product.
a How long does it take the process to produce 100 units starting with an empty system?
b What is the average labor content ?
c What is the average labor utilization ?
d What is the cost of direct labor?
Q-2 Consider the following six tasks that must be assigned to four workers on a conveyor-paced assembly
line. Each worker must perform atleast one task.
Tasks
1
2
3
4
5
6
The current conveyor paced assembly line configuration assigns the workers in the following way:
Worker 1: task 1
Worker 2: task 2
Worker 3: tasks 3,4
worker 4: tasks 5,6
a What is the capacity of current line ?
b Now assume that tasks are allocated to maximize capacity of the line, subject to the following
conditions:(1) a worker can only perform two adjacent operations
(2) all tasks need to be done in numerical order.
c Now assume that tasks are allocated to maximize capacity of line and that tasks can be performed
in any order. What maximum capacity can be achieved ?