Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

2G Telecom and SCFT Kihara Red Hill

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 41

Site Data & Test Report-Node B New Site

Circle
Strategic Partner
Date of Installation
Date of Integration
Date of Commissioning

AIRTEL KENYA
NOKIA
DD-MM-YY
DD-MM-YY
DD-MM-YY

Site Name
Airtel 2G Site ID
Airtel 3G Site ID
Tower company Site ID
SACFA ID
Site Lat/Long
UMTS Band for Node B

KIHARA_RED_HILL_ROAD
KBU065

Type (GBT/RTT/RTP/IBS)
Type of Node B (HSPA / MIMO )

GBT
N/A

Name of Infra Provider (Tower Company)


Anchor Operator
Sharing Opco 1
Sharing Opco 2

N/A
N/A
N/A
N/A

Sharing Opco 3

N/A

Sharing Opco 4

N/A

N/A
N/A
900/2100

Infra Shared(Tower / DG / Shelter / AC / AC Mains / DC Btys etc) N/A


Sites Layout Attached
Acceptance KPI Attached
Standared Node AT Documents attached
Site Photographs for RF & EMF Attached
EMF Compliance Format Attached
Site Address

N/A

City
Site Owner Details
Name
Address
Mobile Numbers :
Landline Number (R) :
Landline Number (O) :

Nairobi

N/A
N/A
N/A
N/A
N/A
N/A
Signoff :

Project Manager ( Airtel )

Project Manager (SP)

Mob Number

Mob Number

Sign

Sign

Name

Name

Date :

Date :

281625691.xlsx

Node B

S.No
1

Site ID:

KBU065

SITE ID

Planned
KBU065

SITE ID

Actual
KBU065

Site Name:

KIHARA_RED_HILL_ROAD

SITE NAME

KIHARA_RED_HILL_ROAD

SITE NAME

KIHARA_RED_HILL_ROAD

BTS B Product Type (Configuration) - Indoor/Outdoor/Split Type


BTS B Hardware Details
Base Unit (Model No)
Tower Unit (Model No)

Activity

Site Address:

Region and Circle:


Latitude :
Longitude :

Remarks

OUTDOOR
FLEXI MR
N/A
N/A
N/A
AIRTEL KENYA
-1.21944
36.77855

Feeder Cable Type

-1.21944 NOT SHIFTED


36.77855 NOT SHIFTED

Sector 1

Fiber

Sector 2

Fiber

Sector 3

Fiber

Sector 1
9

Feeder Cable Length

Sector 2

10

Power Output

11

BTS Material Check List Attached

12

Telecom Material Check List verified against planned Material (Please attach
PAT ATTACHED
the List )

15

Test Handset Details

Sector 3
Sector 1
Sector 2
Sector 3

16

PAT ATTACHED

Model
FILL

Service Test

Serial Number
PASS

GPRS service test

PASS

EDGE service test

PASS

SMS Service test

SIM Number

PASS

Item List

17

Phone Number
FILL

FILL

Voice call

Planned
Andrew
DBXLH-6565B-VTM
1
57.5
0
0
2

GSM Antenna Type


Antenna Type ( Part Code )
Antenna Quantity
Antenna Height (AGL)
Azimuth
Electrical Downtilt
Mechanical Downtilt
TMA
BCCH SCAN

Antenna System Details


Sector 1
Sector 2
Actual
Planned
Actual
Andrew
Andrew
Andrew
DBXLH-6565B-VTM
DBXLH-6565B-VTM
DBXLH-6565B-VTM
1
1
1
57.5
57.5
57.5
0
120
120
0
0
0
2
2
2

BCCH

BCCH

Sector 3
Planned
Actual
Andrew
Andrew
DBXLH-6565B-VTM DBXLH-6565B-VTM
1
1
57.5
57.5
240
240
0
0
2
2

Sector 4
Planned

BCCH

TX Power ( On Top of BTS Cabinet )

18

GSM Cable Return loss, Cable Loss & VSWR


Measurements :

19

Labelling done for All GSM and TX equipments


Installed

20

Earthing check for 2G equipment

21

EMF Testing

22

Wiring Diagram Enclosed

Sector/ Cell
Sector 1
Sector 2
Sector 3
Sector 4

Feeder Type
N/A
N/A
N/A
N/A

Feeder Length (m)


N/A
N/A
N/A
N/A

Measured VSWR
Test Pass / Fail
N/A
N/A
N/A
N/A
Mention Yes / No
PAT ATTACHED

For Node B Cabinet

PAT ATTACHED

For all Cables & Accessories

PAT ATTACHED

PAT ATTACHED

PAT ATTACHED
PAT ATTACHED

For UMTS Antenns


For TMA's
For Indoor Unit
For Outdoor Unit
To be checked on IGB and
OGB
Method Adopted
To be checked on IGB and
OGB
Compliance (Yes/No)
Yes/No

PAT ATTACHED
PAT ATTACHED
PAT ATTACHED
PAT ATTACHED

PAT ATTACHED
PAT ATTACHED
PAT ATTACHED
PAT ATTACHED

PAT ATTACHED
PAT ATTACHED
PAT ATTACHED
PAT ATTACHED

N/A

N/A
N/A
Critical Alarms
To be filled
To be filled
To be filled
To be filled
To be filled
To be filled
To be filled
TMA Alarm

Yes/No
PAT ATTACHED
PAT ATTACHED
PAT ATTACHED
PAT ATTACHED
PAT ATTACHED
PAT ATTACHED
PAT ATTACHED

Yes/No
PAT ATTACHED
PAT ATTACHED
PAT ATTACHED
PAT ATTACHED
PAT ATTACHED
PAT ATTACHED
PAT ATTACHED

23

GSM Alarm Verification

24

Attach Prediction Plots (Annexure 1)

Yes/No

N/A

25

Attach Drive Test Plots and Stats -

Yes/No

YES

26

Attach Walk Test Report for IBS

Yes/No

N/A ONLY FOR IBS

27

Coverage Certified to be in line with


Prediction( Cluster Level)

Yes/No

N/A

28

Cell Design Data

Yes/No

YES

29

Drive Test Report (SCFT Checklist Completed)

Yes/No

YES

30

Parameter discrepancy Audit Report

Yes/No

AVAILABLE IF REQUIRED

31

Drive Test Log Files

Yes/No

AVAILABLE IF REQUIRED

32

Passive/Active AT Report

Yes/No

YES

33

2G>3G Neighbor Definition Audit Report

Yes/No

N/A

34

Core Side Snapshot for LAC/RAC Definition

Yes/No

NO

35

Complete BTS Configuration Snapshot

Yes/No

36

COCO/IP Information(Ethernet Backhaul) with


TXM BW Details

Yes/No

N/A

37

GSM ND report verified for KPIs checks

Yes/No

YES

Yes/No
PAT ATTACHED
PAT ATTACHED
PAT ATTACHED
PAT ATTACHED
PAT ATTACHED
PAT ATTACHED
PAT ATTACHED

Signoff :

Project Manager ( Airtel )


Date :
Mobile Number:

Project Manager (SP)


Mobile Number:
281625691.xlsx

79
Site ID:
New Site:

1465

Others:

Site Name:
Site Connected to RNC:

KIHARA_RED_HILL_ROAD
yes

Cell ID:

11465, 21465, 31465

Last Drive Performed:


No.

Idle

Voice
Nearest point testing

Data
Handover

Activity/Process
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

MNC
MCC
LAC
RAC
SDCCH
CCCH
BCCH
TCH
EDGE Enabeld
GPRS
Voice Call Setup Success rate (MO & MT)
Nearest Dst for testing
RX level at above point
Rx Qual at above point
GPRS throughput
EDGE throguput
Handover Function
Intra site handover
Inter celll handover
Latency
Packet drop

MS1

Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y

MS2

Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y

MS3
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y

Dongle

Y
Y
y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y

cell 1

cell 2

cell 3

result

plan
3
639
70
245

Check
03
639
70
245

plan
03
639
70
245

Check
03
639
70
245

plan
03
639
70
245

Check
03
639
70
245

108

108

121

121

118

118

Y
Y

Y
Y
100
78
-68
-2
44
78.3 Kbps
Y
Y
Y
502 ms
N

Y
Y

Y
Y
100
63
-64
-3
35
76.1 Kbps
Y
Y
Y
491 ms
N

Y
Y

Y
Y
100
107
-70
-3
47
78.7 Kbps
Y
Y
Y
556 ms
N

Remarks (Comments):

SP Signature

Bharti Signature:

Date:

Remarks

Rx-level Coverage Map per Site


Idle-ServRxLevIdle (dBm)
Below -105 (0) 0.0%

>= -105 to < -95 (0) 0.0%

>= -95 to < -85 (10) 1.3%

>= -85 to < -75 (66) 8.4%

>= -75 to < -65 (140) 17.9%

Above -65 (567) 72.4%

drive map

C/I PLOT

drive map

Idle-ServC2I (N/A)

Below 5.000000 (4) 0.5%

>= 5.000000 to < 8.000000 (15) 2.0%

>= 8.000000 to < 12.000000 (32) 4.2%

>= 12.000000 to < 18.000000 (110) 14.5%

Above 18.000000 (600) 78.8%

drive map
QUAL PLOT

Longcall-ServRxQualSub (RxQual)

Below 4 (521) 87.1%

>= 4 to < 6 (65) 10.9%

>= 6 to < 7 (12) 2.0%

drive map

Longcall-ServRxQualSub (RxQual)

drive map

BCCH coverage map per site

Below 4 (521) 87.1%

>= 4 to < 6 (65) 10.9%

>= 6 to < 7 (12) 2.0%

drive map

Idle-ServBCCH (ARFCN)

drive map

Data RLC through put plot

108 (356) 44.7%

118 (68) 8.5%

121 (281) 35.3%

112 (29) 3.6%

124 (62) 7.8%

drive map

Data-RLC_Throughput_DL (kbps)

EVENT HANDOVER

Below 16.00 (207) 32.2%

>=16.00 to <32.00 (50) 7.8%

>=32.00 to <64.00 (72) 11.2%

>=64.00 to <100.00 (66) 10.3%

>=100.00 to <150.00 (155) 24.1%

Above 150.00 (92) 14.3%

Longcall-EventHandoverOK (EVENT)

EVENT CELL RESLECTION

1 (7) 1.1%

Dual Mode-Uu_CellReselection (EVENT)

2G TO 3G n 3G TO 2G CELL RELECTION

1 (11) 2.1%

Dual Mode-Uu_IRAT_Reselection3G2G (EVENT)


3G-2G Reselection (1) 0.2%
Dual Mode-Uu_IRAT_Reselection2G3G (EVENT)

Remarks (Comments):
NSN Signature:

3G-2G Reselection (2) 0.4%

RSCP Coverage check till first handover or coverage dies out (whichever happens earlier)
Bharti Signature:

Date:

PRE
KPI
TRAFFIC
RxQual (0-4)
RxQual DL (0-4)
RxQual UL (0-4)
SD Blocking
TCH Blocking
TCH Drop
SD Drop
HOSR
Handover Incoming
Handover Outgoing
TASR
Hard Blocking
Soft Blocking
RASR
Data Volume
TBF Drop
Edge Throughput

NSN Signature:

Type
+/- 10%

Site
XX

Cell
xxx

23-Nov

24-Nov

25-Nov

POST
26-Nov

27-Nov

29-Nov

30-Nov

1-Dec

Monitoring
Monitoring

Monitoring
Monitoring

Monitoring
+/- 20%

Bharti Signature:

Date:

2-Dec

3-Dec

1.1 Short Call


Event

#[No. of
samples]

%
Measurement

Blocked Call
Call Attempt

0
62

0.00%
100%

Call Setup

62

100.00%

Dropped Call
Call Success

0
62

0.00%
100%

Voice Call Drop Rate

0.00%

100.00%

100%

Range

% of Meas.

No. of
Samples/Coun
t

Total Samples

0-4
4-6
>6
0-5
5-8
8-12
1218
>18
7
0
7
100.00%

87.1%
10.9%
2.0%
0.50%
2.00%
4.20%
14.50%
78.80%
n/a
n/a
n/a
n/a

521
65
12
4
15
32
110
600
7
0
7
100%

598
598
598
1651
1651
1651
1651
1651
n/a
n/a
n/a
n/a

yes

n/a

n/a

n/a

RX Level (Dbm)

Sample

Percentage
(%)

0 to -65
-65 to -75
-75 to -85
-85 to -95

567
140
66
10

72.4%
17.9%
8.4%
1.3%

-95 to -105

0.0%

<-105

0.0%

Rx qual(db)

Sample

Percentage
(%)

0-4
4-6
6-7

521
65
12

87.1%
10.9%
2.0%

Call setup Success Rate

1.2 Long Call


Information Element

Rx Qual sub
Rx Qual sub
Rx Qual sub
C-I
C-I
C-I
C-I
C-I
Handover
Handover Failure
Handover Success
Handover Success Rate
2G to 3G Reselection

1.3 Event Statistic

NSN Signature:

EDGE Throughput

Sample

Percentage
(%)

<16
16-32
32-64
64-100
100-150

252
138
75
47
32

40.8%
22.3%
12.1%
7.6%
5.2%

>150

74

12.0%

Bharti Signature:

Date:

Handover DT Summary
Cell-Log File Count
Draw handovers tested:
Sector 1 to 2
Sector 2 to 3
Sector 3 to 1
Sector 1 to 3
Sector 3 to 2
Sector 2 to 1
Handover to 1st order Neighbor

Cell1-4

Cell2-6

Cell3-2

Y
Y
Y

Y
Y
Y

Y
Y
Y

Y
Y

Y
Y

Y
Y

Neighbor Cell
ID

Neighbor Cell NCC


BCCH

HANDOVER to Tier 1(2G-2G)Neighbor Cells, Voice


Serving Cell ID
11465
21431
11465
21465
34916

NSN Signature:

21431
11465
21465
34916
21465

112
108
118
109
118

Bharti Signature:

BCC

Incoming Outgoing
HO 1-Tier HO 1-Tier

2
2

3Y
0

2
0
2

6
5
6Y

Remarks
ATTEMPT
ATTEMPT
ATTEMPT
ATTEMPT

Y
Y
Y

Date:

1 Call Setup Testing for Each Sector


1) Voice call for each sector
The purpose of this test is to verify that each sector is radiating and is able to complete a call
request from a test UE.
Sector ID

BCCH

No of
calls

Drop Call
Rate

Call Setup Pass /


time
Fail

11465
21465

108
121

22
20

0
0

2.7 Pass
2.5 Pass

31465

118

20

2.8 Pass

2) GPRS for each sector


The purpose of this test is to verify that each sector is able to complete
a video call request from a test UE.
Sector ID

BCCH

No of
calls

Success

Success
rate

Pass /
Fail

11465
21465

108
121

10
10

10
10

100% Pass
100% Pass

31465

118

10

10

100% Pass

3) EDGE download for each sector


The purpose of this test is to verify that a cell is able to complete a PS (Data)
download using R99. This test is carried out on each sector of the site.
Sector ID

BCCH

File size Mean


No of
Throughput Calls

Success Latency
rate

11465
21465

108 1 MB
121 1 MB

78.3 Kbp/s
76.1 Kbp/s

10
10

100% 502 ms
100% 491 ms

31465

118 1 MB

78.7 Kbp/s

10

100% 556 ms

NSN Signature:

Bharti Signature:

Date:

plete a call

Date:

Panaromic Photos
0

30

60

90

120

150

Panaromic Photos
180

210

240

270

300

330

Sector Photos
Sector1

Sector 2-

Sector 3

Tower Photo

B1 photo

NSN Signature:

B2 photo

B3 photo

B4 photo

Bharti Signature:

Date:

You might also like