Weekly Report # 11
Weekly Report # 11
Weekly Report # 11
PROJECT TITLE
CONTRACT NO.
WEATHER
PROJECT COMPLETION
CONTRACT
100%
PREVIOUS
BASIS / REFERENCES
1 Progress accomplishments percentages will be based on Over all Project Time Schedule (Civil Works Only)
2 Progress accomplishments percentage (Plan and Actual) as of July 27, 2015 ( to be Referred to detail Project schedule and Monitoring)
3 Detailed Construction schedule will be based on Al Fahd Contracting Co. Schedule.
SCHEDULE REFERENCES AT BUILDINGS :
Suspended Slab and Beam Done
PARTICULAR
Plan
Start
1.0
Finish
Pla
Start
2.0
Actual
Finish
Start
.
2 Aug 20015
.
on going
26 July 2015
26 July 2015
.
2nd Half Area (screed laying completed)
.
2.20
26 July 2015
3.0
4.0
26tJuly 2015
.
05 August 2015
10 August 2015
NOTES : DATE FINISHED PLAN & ACTUAL ON SUSPENDED SLABS AND BEAMS TO BE BASED ON DATE CONCRETED.
OPEN , ONGOING AND SCHEDULE ACTIVITIES AS FOLLOWS :
PARTICULARS
1.10
1.20
PLAN
Start
Excavation
Backfilling/Leveling and Compaction
Testing (FDT)
Lean Concrete
Installation of Water Proofing Membrane
Concrete Screed
Shuttering for Raft Foundation
Rebar Fixing for Raft/Columns/Wall
FDT testing on isolated footing area
21-Jul-15
21-Jul-15
21-Jul-15
27-Jul-15
4-Aug-15
5-Aug-15
8-Aug-15
Excavation
Backfilling/Leveling and Compaction
FDT testing on raft foundation bed
Lean Concrete
Installation of Water Proofing Membrane
Concrete Screed
23-Jun-15
20-Jul-15
21-Jul-15
25-Jul-15
1-Aug-15
6-Aug-15
1.2.7
1.2.8
1.30
1.40
20-Jul-15
20-Jul-15
1-Aug-15
1-Aug-15
5-Aug-15
12-Aug-15
1.50
Excavation
Backfilling/Leveling and Compaction
Testing (FDT)
Lean Concrete
Installation of Water Proofing membrane
Concrete Screed
Excavation
Backfilling/Leveling and Compaction
Testing (FDT)
Lean Concrete
Installation of Water Proofing membrane
Concrete Screed
Shuttering for Raft Foundation
Rebar Fixing for Raft/Columns/Wall
20-Jul-15
21-Jul-15
25-Jul-15
1-Aug-15
5-Aug-15
12-Aug-15
CABLE TUNNELS
1.5.1
1.5.2
1.5.3
1.5.4
1.5.5
1.5.6
Excavation
Backfilling/Leveling and Compaction
Testing (FDT)
Lean Concrete
Installation of Water Proofing membrane
Concrete Screed
25-Jun-15
RECOMMENDATION /ACTION
MANPOWERS
A In Direct Labor
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Project Manager
Project Engineer
Site Manager
Site Civil Engineer
Site Electrical Engineer
QA/QC Engineer (Electrical)
Safety Engineer
Safety Officer
Driver
Foreman Electrician
Electrician
Tea Boy
Helper
Fencing Contractor
Sub Total
Sub Contractor(Al-Fahd)
4
0
0
0
1
1
1
1
1
1
1
1
1
0
3
12
5
1
0
1
1
1
1
1
1
2
2
1
1
2
3
18
6
1
0
1
1
1
1
1
1
1
2
1
1
2
0
14
FRIDAY
Contractor (Almashariq)
1
2
3
4
Project Manager
Civil Engineer
Safety Engineer
Office Boy
Sub Total
Total Manpower (Indirect Labor )
4
0
1
1
0
2
5
1
1
1
1
4
6
1
1
1
1
4
14
22
18
4
1
1
5
0
0
6
1
1
1
5
0
5
3
5
4
25
0
9
0
5
2
2
4
22
0
7
0
5
2
9
4
29
25
39
22
44
29
47
0
0
0
1
0
1
3
5
1
1
0
1
1
1
5
10
0
1
0
1
1
1
3
7
10
FRIDAY
Sub Contractor(Al-Fahd)
B Direct Labor
Surveyor/Assistant Surveyor
Instrument Man
Foremen/Leadman
Driver / Operator
Steel Fixer
Carpenter
Mason
Labor
Waterproofing Installer
Sub Total
Total Manpower (direct labor)
GRAND TOTAL (DIRECT + INDIRECT LABOR)
EQUIPTMENTS
A
Sub Contractor (Al Fahd)
1
2
3
4
5
6
7
Excavator
Roller Compactor
Payloader
Grader
Bulldozer
Water Tanker
Dump Truck
SubTotal
Total Equipments
FRIDAY
1
2
3
4
5
6
7
8
9
FRIDAY
PHOTOS
380 kV BU
132 kV B
13.8 k
CON
OTHER W
SIT
I N T E R N AT I O N A L
PREPARED BY :
FRANCISCO SUMCAD, JR.
CIVIL ENGINEER
Saudi Engineering group International
OUS
ALMASHRIQ
AL - FAHD Company
PRAINSA
THIS WEEK
SCHEDULE
Precast install
Plan
Actual
Finish
Start
Finish
BALANCE
TO DATE
ACCOMPLISHMENT
Finish
Start
Finish
23-Jul-15
21-Jul-15
21-Jul-15
3-Aug-15
4-Aug-15
6-Aug-15
13-Aug-15
29-Jun-15
21-Jul-15
22-Jul-15
22-Jul-15
29-Jul-15
2-Aug-15
6-Aug-15
8-Aug-15
28-Jul-15
20-Jul-15
23-Jul-15
22-Jul-15
22-Jul-15
1-Aug-15
2-Aug-15
23-Jun-15
20-Jul-15
22-Jul-15
26-Jul-15
2-Aug-15
8-Aug-15
5-Jul-15
21-Jul-15
21-Jul-15
25-Jul-15
6-Aug-15
6-Aug-15
ACTUAL
PLAN
Previous
This Period
To Date
0%
0%
0%
0%
0%
0%
50%
30%
0%
100% Completed
100% Completed
100% Completed
3-Aug-15
100%
100%
100%
100%
100%
100%
0%
0%
50%
20-Jul-15
21-Jul-15
22-Jul-15
26-Jul-15
6-Aug-15
8-Aug-15
100%
100%
100%
100%
50%
0%
0%
0%
0%
0%
50%
100%
100% Completed
100% Completed
100% Completed
100% Completed
100% Completed
100% Completed
100% Completed
100% Completed
100% Completed
50% On-going
30% On-going
50% Yet to complete
0%
0%
0%
0%
27-Jul-15
30-Jul-15
1-Aug-15
1-Aug-15
12-Aug-15
12-Aug-15
20-Jul-15
20-Jul-15
27-Jul-15
1-Aug-15
20-Jul-15
22-Jul-15
25-Jul-15
1-Aug-15
20-Jul-15
21-Jul-15
28-Jul-15
30-Jul-15
20-Jul-15
23-Jul-15
28-Jul-15
30-Jul-15
12-Aug-15
12-Aug-15
6-Aug-15
10-Aug-15
8-Aug-15
10-Aug-15
5-Jul-15
1-Jul-15
9-Jul-15
100%
90%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
100%
100%
0%
0%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100% Completed
90% to be Completed
0% Awaits schedule of FDT
0% To Follow
0% To Follow
0% To Follow
100% Completed
100% Completed
100% Completed
100% Completed
100% Completed
100% Completed
0% To Follow
0% To Follow
100% Completed
0% Not Yet Started
0% To Follow
0% To Follow
0% To Follow
0% To Follow
o Security Personnel Deployed, Barricade installed on Excavated Areas still not as per SEC Standard
have not submitted. Approved works schedule,Organization chart of the contractor M/S Al Mashriq,copies of approve
e.
QC issues and findings& observations need urgent attention and action.Instructed again Contractor to deploy skilled
r the scheduled/plan activities especially the coming Concreting of 380 kV Raft Foundation. Likewise to closely supe
15
15
8
1
1
1
1
1
1
1
1
1
2
1
1
2
0
15
9
1
0
1
1
1
1
1
1
1
2
1
1
3
2
17
10
1
1
1
1
1
1
1
1
1
2
1
1
2
6
21
Remarks
Remarks
8
1
1
1
1
4
9
1
1
1
1
4
10
0
2
1
1
4
19
21
25
8
0
0
9
1
1
10
1
1
0
8
8
4
4
7
0
31
0
8
8
4
4
6
0
32
2
9
18
4
1
7
0
43
31
50
32
53
43
68
10
0
0
1
1
1
1
3
7
0
0
0
1
1
1
3
6
0
1
0
1
1
1
3
7
15
15
Remarks
Remarks
Remarks
0, 2015. Shuttering and Fixing of Bottom Steel Reinforcements for Raft Foundation.
pleted Installation of 1st & 2nd Layer of Waterproofing Membrane and Screed Concrete Pouring.
itumin Painting, Installation of 1st & 2nd Layer Waterproofing Membrane and Screed Concrete Pouring.
. Continue Backfilling, Grading and Compaction of the Proposed Road inside Substation.
ntinue Perimeter Fence Installation and Provisions of Two (2) Units PC at Consultant's Office,
REMARKS
pleted
pleted
pleted
pleted
pleted
pleted
going
going
o complete
pleted
pleted
pleted
pleted
pleted
pleted
REMARKS
pleted
e Completed
its schedule of FDT
ollow
ollow
ollow
pleted
pleted
pleted
pleted
pleted
pleted
ollow
ollow
pleted
Yet Started
ollow
ollow
ollow
ollow
ARKS
ARKS
DETAILED CONSTRU
Contractor
Subcontractor (Civil works)
Subcontractor 9Precast)
Work Discription
Duration
2.2
2.3
2.4
2.5
2.1.1 Earthworks
2.1.2 Basement (Raft Fdn/Base Slab)
2.1.2.1
Lean Concrete-Grid Line 1-22/A-C
2.1.2.2
Waterproofing System for basement -Grid Line 1-12/A-C
2.1.2.3
Waterproofing System for basement -Grid Line 13-1-22/AC
2.1.2.4
RC base slab and raft fdn Grid Line 1-8/A-C
2.1.2.5
RC base slab and raft fdn Grid Line 9-12/AC
2.1.2.6
RC base slab and raft fdn Grid Line 13-17/A-C
2.1.2.7
RC base slab and raft fdn Grid Line 18-22/A-C
2.1.3 Basement (RC Walls and Collum)
2.1.3.1
Grid Line 22 / A-C
2.1.3.2
Grid Line 1-22 / B
2.1.3.3
Grid Line 1 / A-C
2.1.3.4
Grid Line 1-22 / C
2.1.4 Basement ( Suspended slab and beams)
2.1.4.1
RC works Top slab Grid Line1-12
2.1.4.2
RC works Top slab Grid Line 13-23
2.1.5 Waterproofing works (Retaining walls)
2.1.5.1
GL Along A-C/18 ( along 380 kv Tunnel )
2.1.5.2
GL Along A-C/18 ( along 380 kv Tunnel )
2.1.5.3
Grid Line Along GL 1/A-C
2.1.5.4
Grid Line Along GL 18/A-C
2.1.6 Backfiling and Compaction works
2.1.6.1
Along A-C/1-8 (along 380 kv Tunnel)
2.1.6.2
Along A-C/14-22 (along 380 kv Tunnel)
2.1.6.3
Along GL 1/A-C
2.1.6.4
Along GL 18/A-C
Foundations works (isolated)
2.2.1 Footing
2.2.2 Column Neck/Plinth
Grade beam
Grade slab
2.4.1 Grid Line 1-13 A/C
2.4.2 Grid Line 14-22 A/C
380kv 5m Cable tannel
2.5.1 Earthworks
2.5.2 Basement (Raft Fdn/Base Slab)
2.5.2.1
Lean Concrete
2.5.2.2
Waterproofing System for basement -Grid Line 1-12/A-C
2.5.2.3
Waterproofing System for basement -Grid Line 13-1-22/AC
2.5.2.4
RC base slab and raft fdn Grid Line 1-8/ E-F
2.5.2.5
RC base slab and raft fdn Grid Line 9-12/ E-F
2.5.2.6
RC base slab and raft fdn Grid Line 13-17/ E-F
2.5.2.7
RC base slab and raft fdn Grid Line 18-23/E-F
2.5.3 Basement (RC Walls and Collum)
2.5.3.1
Grid Line 1-8/A-C
2.5.3.2
Grid Line 9-12/AC
87
4
32
1
5
7
9
9
8
9
31
10
10
10
10
50
7
37
27
5
7
7
5
27
5
5
5
5
23
11
13
12
29
17
17
85
4
32
1
5
7
9
9
8
9
27
11
10
Planned
Start
Oct 25'14
Oct 25'14
Oct 25'14
Oct 29'14
Oct 29'14
Oct 30'14
Nov 1'14
Nov 5'14
Nov 12'14
Nov 19'14
Nov 25'14
Nov16 '14
Nov 16 '14
Nov 23 '14
Dec 4' 14
Dec 10 '14
Dec 2' 14
Dec 2 '14
Dec 17'14
Dec 28'14
Dec 28'14
Jan 13'15
Jan 18'15
Jan 22'15
Jan 3 '15
Jan 3'15
Jan 21'15
Jan 26'15
Jan 28'15
Nov16 '14
Nov 16 '14
Nov 27'14
Jan 19 '15
Jan 13 '15
Jan 13'15
Jan 27'15
Oct 29'14
Oct 29'14
Nov 3 '14
No 3'14
Nov 4'14
Nov 5'14
Nov 10'14
Nov 17'14
Nov 24'14
Nov 30'14
Nov20 '14
Nov 20'14
Nov 27'14
Finish
Apr 12'14
Feb 2 '15
Oct 28 '14
Dec 4 '14
Oct 29'14
Nov 4'14
Nov 8'14
Nov 15'14
Nov22'14
Nov 27'14
Dec 4 '14
Dec 21'14
Nov 26 '14
Dec 3 '14
Dec 14 ' 14
Dec 21 ' 14
Jan 28 '15
Jan 4 ' 14
Jan 28'14
Jan 27 '15
Jan 1'14
Jan 20'15
Jan 25'15
Jan 27 '15
Feb 2 '15
Jan 7'15
Jan 26'15
Jan 31'15
Feb 2'15
Dec11 '14
Nov 27'14
Dec 11'14
Feb 1'15
Feb 15'15
Feb 1'15
Feb 15'15
Feb 4'15
Nov 2 '14
Dec 9 '14
Nov 3'14
Nov 9'14
Nov 12'14
Nov 19'14
Nov 26 '14
Dec 2'14
Dec 9 '14
Dec 21'14
Dec 2'14
Dec 8'14
Schedule
Actual
Start
Finish
Oct 25'14
Oct 25'14
Oct 25'14
Oct 28'14
Nov 9'14
Nov13'14
Nov12'14
Nov 9'14
Nov 24'14
Nov 24'14
Nov30 '14
Dec 10 '14
Dec 20'14
Jan 12'15
Jan 9'15
Feb 1'15
Feb 5'15
Feb 10'15
Jan '15
Jan 27,15
Jan 18'15
Oct 25'14
Nov 10'14
Nov 11'14
Nov 11'14
Nov 15'14
Nov 29'14
Dec 8'14
Dec 20'14
Dec 28'14
Feb 10'15
2.5
2.5.3
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.5.3.3
Grid Line 13-17/A-C
2.5.3.4
Grid Line 18-22/A-C
2.5.4 Basement ( Suspended slab and beams)
2.5.4.1
RC works Top slab Grid Line1-12
2.5.4.2
RC works Top slab Grid Line 13-23
2.5.5 Waterproofing works (Retaining walls)
2.5.5.1
GL Along A-C/18 ( along 5 m wide Tunnel )
2.5.5.2
GL Along A-C/18 ( along 5 m wide Tunnel )
2.5.5.3
Grid Line Along GL 1/A-C
2.5.5.4
Grid Line Along GL 18/A-C
2.5.6 Backfiling and Compaction works
2.5.6.1
Along A-C/1-8 (along 5 m wide Tunnel)
2.5.6.2
Along A-C/14-22 (along 5 m wide Tunnel)
2.5.6.3
Along GL 1/A-C
2.5.6.4
Along GL 18/A-C
Precast works (by Others)
Roof water proofing sytem and roof finishes
Reinforced concrete shear wall
2.8.1 Grid Line (A/1-2)(E/1-4)(2Nos)
2.8.2 Grid Line (A/20-22)(E/20-22)(2Nos)
Reinforced concrete stair
2.9.1 Stair # 1
2.9.2 Stair # 2
Painting works
Finishing of basement of 280 kv Tunnel
Specialties
10
10
46
29
37
25
5
7
8
6
25
5
5
5
5
30
30
24
24
24
14
7
7
43
24
15
Dec 4' 14
Dec 10 '14
Dec 7'14
Dec 7'14
Dec 17'14
Jan 1 '15
Jan 1'15
Jan 13'15
Jan 18'15
Jan 24'15
Jan 7 '15
Jan 7 '15
Jan 21'15
Jan 27'15
Jan 31'15
Feb 1 '15
Mar 8 '15
Feb11'15
Feb11'15
Feb 11'15
Mar 7 '15
Mar 7 '15
Mar 15'15
Feb22 '15
Jan 29'15
Feb 22'15
Dec 15'14
Dec21'14
Jan 28 '15
Jan 8'15
Jan 28'15
Jan 29 '15
Jan 6 '15
Jan 20'15
Jan 26'15
Jan 29 '15
Feb 4'15
Jan 12'15
Jan 26'15
Feb 1'15
Feb 4'15
Mar 7 '15
Apr 11'14
Mar10 '15
Feb 19'15
Mar 10'15
Mar22 '15
Mar 14'15
Mar 22'15
Apr 12'14
Feb25 '15
Mar 10'15
Dec 28'14
Feb 10'15
Feb 9'15
Feb 12'15
Feb 12'15
Feb 24'15
Jan 14'15
Jan 25'15
Feb 14'15
113
4
38
2
5
7
10
10
9
8
29
14
15
14
13
47
35
36
31
9
9
9
7
30
6
6
6
6
13
8
6
14
6
32
25
33
33
24
14
7
7
28
28
22
103
4
23
2
5
5
16
5
23
17
14
13
12
38
13
4
10
24
78
34
Oct 25'14
Oct 25'14
Oct 25'14
Oct 29'14
Oct 29'14
Nov 6'14
Nov 8'14
Nov12'14
Nov 19'14
Nov 26'14
Dec 03'14
Nov 26'14
Nov 26'14
Dec 3'14
Dec 10 '14
Dec 15'14
Dec 17'14
Dec 17'14
Dec 30'14
Jan 19'15
Jan 19'15
Feb 2'15
Feb 9'15
Feb 16'15
Jan 29'15
Jan 29'15
Feb 12'15
Feb 19'15
Feb 26'15
Mar 5'15
Mar 5'15
Mar 14'15
Feb 7'15
Feb 5'15
Jan25'15
Mar 3'15
Feb9'15
Feb 9'15
Feb 9'15
Mar 4'15
Mar 4'15
Mar 12'15
Mar 8 '15
Feb 3'15
Mar 3'15
Nov 29'14
Dec 3'14
Nov 29'14
Dec 3'14
Dec 3'14
Dec 6'14
Dec 7'14
Dec 11'14
Dec 23'14
Dec 30'14
Dec 30'14
Jan 10'15
Jan 19'15
Feb 3'15
Feb 17'15
Mar 21'15
Mar 21'15
Mar 24'15
Mar 25'15
Jan 24'15
Jan 24'15
Apr 8'15
Mar 4'15
Oct 28 '14
Dec 11'14
Oct 30'14
Nov 11'14
Nov 15'14
Nov 23'14
Nov 30'14
Dec 6'14
Dec11 '14
Dec 29'14
Dec 09'14
Dec 17'14
Dec 23'14
Dec 27'14
Feb 9'15
Jan 10'15
Jan 24'15
Feb 23'15
Jan 28'15
Feb 11'15
Feb 18'15
Feb 23'15
Mar 4'15
Feb 4'15
Feb 18'15
Feb 25'15
Mar 4'15
Mar 19'15
Mar 14'15
Mar 19'15
Feb 22'15
Feb11'15
Mar 2'15
Mar 31'15
Mar 18'15
Mar 18'15
Mar 8'15
Mar 19'15
Mar 11'15
Mar 19'15
Apr 8'15
Mar7'15
Mar 28'15
Jul 1'15
Apr 1'15
Dec 2'15
Dec 29'14
Dec 4 '14
Dec 10'14
Dec 11'14
Dec 29'14
Dec 28'14
Feb 16'15
Jan 18'15
Jan 25'15
Feb 2'15
Feb 16'15
Apr 1'15
Apr 4'15
Mar 24'15
Apr 4'15
Apr 21'15
Apr 23'15
Mar 3'15
Oct 25'14
Oct 25'14
Oct 25'14
Oct 28'14
Nov 5,14
Nov 11'14
Nov 10'14
Nov 5,14
Nov 19'14
Nov 15'14
Nov 17'14
Dec 4 '14
Dec 6'14
Dec 20'14
Dec 21'14
Jan 3'15
Dec 25'14
Jan 21,15
Jan 27,15
Feb 2,15
Jan10'15
Jan 20'15
Jan 31'15
Nov 9'14
Nov 9'14
Nov 19;14
Nov20'14
Nov 22'14
Nov 24'14
Dec 2 '14
Dec 21'14
Jan 13'15
Jan 14'15
Jan 22'15
Jan 24'15
Feb 1,15
Feb 2'15
Dec 16'14
4.2
4.3
4.4
4.6
4.7
4.8
4.9
Masonry Works
Painting works
Finshing Works for basement
Specialties
35
46
21
27
16
41
41
16
10
10
10
Jan 25'15
Jan 26'15
Mar 31'15
Mar 21'15
Apr 21'15
Mar 17'15
Apr20'15
Mar17'15
Mar 17'15
Mar 24'15
Apr8'15
Mar 5'15
Mar 19'15
Apr 23'15
Apr 20'15
May 9'15
May 3'15
Jan 6'15
Apr 4'15
Mar 28'15
Apr 4'15
Apr 9'15
18
53
26
25
11
May 12'15
Feb 28'15
Jun 2'15
Apr 2'15
May 4'15
Dec 28'14
Dec 29'14
Dec 29'14
Dec 30'14
Dec 30'14
Dec 31'14
Jan 1'14
Jan 5'15
Jan 10'15
Jan 12'15
Jan 12'15
Jan 25'15
Jan 25'15
Jan 25'15
Feb 7'15
Feb 24'15
Feb 24'15
Mar 9'15
Mar 3'15
Mar 1'15
Apr 26'15
Mar 24'15
Mar 24'15
Apr 6'15
Mar 24'15
Mar 31'15
Jun 1,15
Apr 29'15
Jul 1'15
Apr 30'15
May 16'15
May 17'15
Mar 23'15
Dec29'14
Jan 15'15
Dec 30'14
Jan 4 ' 15
Jan 5'15
Jan 11'15
Jan 15'15
Feb 3'15
Jan 21'15
Feb 3'15
Feb 28'15
Feb15'15
Feb28'15
Mar 7 '15
Mar 2'15
Mar 15'15
Mar 19'15
Apr 25'15
May 17'15
Mar 30'15
Mar 29'15
May 9'15
Apr 8'15
May 12'15
73
1
15
1
4
4
6
6
22
11
11
50
39
39
17
6
6
15
48
19
6
5
20
14
37
Dec 16'14
Nov 13'14
Nov 13'14
Nov 24'14
Nov 24'14
Nov 20'14
Nov 24'14
Nov 29'14
Dec 8'14
Jan 4'15
Jan 22'15
Feb1'15
Feb 23'15
6.2
6.3
6.4
6.5
6.6
6.1.1 Earthworks
6.1.2 Basement (Raft Fdn/Base Slab)
6.1.2.1
Lean Concrete
6.1.2.2
Waterproofing System for basement
6.1.2.3
RCBase slab and Raft foundation
6.1.3 Basement (RC Walls and Collum)
6.1.4 Basement ( Suspended slab and beams)
6.1.5 Waterproofing works (Retaining walls)
6.1.6 Backfiling and Compaction works
RC Tannel From132kv To SGT Transformer - 4
6.2.1 Earthworks
6.2.2 Basement (Raft Fdn/Base Slab)
6.2.2.1
Lean Concrete
6.2.2.2
Waterproofing System for basement
6.2.2.3
RCBase slab and Raft foundation
6.2.3 Basement (RC Walls and Collum)
6.2.4 Basement ( Suspended slab and beams)
6.2.5 Waterproofing works (Retaining walls)
6.2.6 Backfiling and Compaction works
RC Tannel From132kv To SGT Transformer - 3
6.3.1 Earthworks
6.3.2 Basement (Raft Fdn/Base Slab)
6.3.2.1
Lean Concrete
6.3.2.2
Waterproofing System for basement
6.3.2.3
RCBase slab and Raft foundation
6.3.3 Basement (RC Walls and Collum)
6.3.4 Basement ( Suspended slab and beams)
6.3.5 Waterproofing works (Retaining walls)
6.3.6 Backfiling and Compaction works
RC Tannel From132kv To SGT Transformer - 2
6.4.1 Earthworks
6.4.2 Basement (Raft Fdn/Base Slab)
6.4.2.1
Lean Concrete
6.4.2.2
Waterproofing System for basement
6.4.2.3
RCBase slab and Raft foundation
6.4.3 Basement (RC Walls and Collum)
6.4.4 Basement ( Suspended slab and beams)
6.4.5 Waterproofing works (Retaining walls)
6.4.6 Backfiling and Compaction works
RC Tannel From 380kv To Control Building
6.5.1 Earthworks
6.5.2 Basement (Raft Fdn/Base Slab)
6.5.2.1
Lean Concrete
6.5.2.2
Waterproofing System for basement -Phase 1
6.5.2.3
Waterproofing System for basement -Phase 2
6.5.2.4
RC base slab and raft fdn Sequence 1
6.5.2.5
RC base slab and raft fdn Sequence 2
6.5.3 Basement (RC Walls and Collum)
6.5.3.1
Sequence-1
6.5.3.2
Sequence-2
6.5.4 Basement ( Suspended slab and beams)
6.5.4.1
RC Works Top Slab Phase 1
6.5.4.2
RC Works Top Slab Phase 2
6.5.5 Waterproofing works (Retaining walls)
6.5.5.1
Sequence-1
6.5.5.2
Sequence-2
6.5.6 Backfiling and Compaction works
6.5.6.1
Right Wing
6.5.6.2
Left Wing
RC Tannel From 380kv To Boundary Wall East (GL 2-5)
6.6.1 Earthworks
6.6.2 Basement (Raft Fdn/Base Slab)
6.6.2.1
Lean Concrete
6.6.2.2
Waterproofing System for basement -Phase 1
71
6
16
1
4
10
11
38
6
2
71
5
18
1
4
9
12
31
6
2
68
6
14
1
4
9
12
31
6
2
68
6
14
1
4
9
12
31
6
2
92
13
22
1
5
5
8
8
17
9
9
48
33
32
10
5
5
15
10
10
97
7
36
1
4
Jan 11'15
Jan11'15
Jan 11'15
Jan 18'15
Jan 18'15
Jan 19'15
Jan 25'15
Feb 5'15
Feb 18'15
Mar 23'15
Mar30'15
Jan 18'15
Jan 18'15
Jan 24'15
Jan 24'15
Jan 25'15
Feb 3'15
Feb 14'15
Feb 28'15
Apr 1'15
Apr 8'15
Jan 20'15
Jan 20'15
Jan 27'15
Jan 27'15
Jan 28'15
Feb 2'15
Feb12'15
Feb 26'15
Mar 31'15
Apr 7'15
Jan 20'15
Jan 20'15
Jan 27'15
Jan 27'15
Jan 28'15
Feb 2'15
Feb 2'15
Feb 26'15
Mar 31'15
Apr 7'15
Jan 18'15
Jan 18'15
Feb 2'15
Feb 2'15
Feb 3'15
Feb 4'15
Feb 9'15
Feb 18'15
Feb 18'15
Feb 18'15
Feb 28'15
Mar 10'15
Mar 10'15
Mar 29'15
Apr 6'15
Apr 6'15
Apr 12'15
Apr 12'15
Apr 12'15
Apr 18'15
Jul 9'15
Jul 9'15
Jul 18'15
Jul 18'15
Jul 19'15
Nov29'15
Apr 2'15
Jan 17'15
Feb 4'15
Jan 18'15
Jan 22'15
Feb 4'15
Feb 17'15
Apr 2'15
Mar 29'15
Mar 31'15
Apr 9'15
Jan 22'15
Feb 12'15
Jan 24'15
Jan 28'15
Feb 12'15
Feb 26'15
Apr 4'15
Apr 7'15
Apr 9'15
Apr 8'15
Jan 26'15
Feb 15'15
Jan 27'15
Feb 1 '15
Feb 11'15
Feb 25'15
Apr 2'15
Apr 6'15
Apr 8'15
Apr 8'15
Jan 26'15
Apr 2'15
Jan 27'15
Feb 1'15
Feb 11'15
Feb 25'15
Apr 2'15
Apr 6'15
Apr 8'15
May 4'15
Feb 1'15
Feb 26'15
Feb 15'15
Feb 8'15
Feb 9'15
Feb 17'15
Feb 26'15
Mar 9'15
Feb 28'15
Mar 9'15
May 4'15
Apr 16'15
May 4'15
Apr 16'15
Apr 11'14
Apr 16'15
Apr 28'15
Apr 22'15
Apr 28'15
Oct29'15
Jul16'15
Aug 27'15
Jul 18'15
Jul 22'15
Nov 19'14
Nov 19'14
Jan 8'15
Feb 4'15
Feb 3'15
Feb 9,15
Dec 8'14
Dec 8'14
Dec 18'14
Dec 18'14
Dec 24'14
Jan 8'15
Feb 3'15
Dec 2'14
Dec 2'14
Dec 18'14
Dec 18'14
Dec 24'14
Jan 6'15
Feb 4'15
Nov 27'14
Nov 27'14
Dec 18'14
Dec 18'14
Dec 24'14
Jan 4'15
Jan 5'15
Jan 5'15
Feb 23'15
6.6
6.6.2
6.6.3
6.6.4
6.6.5
6.6.6
6.6.2.3
Waterproofing System for basement -Phase 2
6.6.2.4
RC base slab and raft fdn Sequence 1
6.6.2.5
RC base slab and raft fdn Sequence 2
6.6.2.6
RC base slab and raft fdn Sequence 3
6.6.2.7
RC base slab and raft fdn Sequence 4
Basement (RC Walls and Collum)
6.6.3.1
Sequence 1
6.6.3.2
Sequence 2
6.6.3.3
Sequence 3
6.6.3.4
Sequence 4
Basement ( Suspended slab and beams)
6.6.4.1
RC Works Top Slab Phase 1
6.6.4.2
RC Works Top Slab Phase 2
Waterproofing works (Retaining walls)
6.6.5.1
Sequence 1
6.6.5.2
Sequence 2
6.6.5.3
Sequence 3
6.6.5.4
Sequence 4
Backfiling and Compaction works
6.6.6.1
Right Wing
6.6.6.2
Left Wing
4
8
8
7
8
33
9
9
9
9
57
42
42
31
5
5
5
6
25
10
10
Jul 20'15
Jul 23'15
Aug 2'15
Aug 11'15
Aug 19'15
Aug 2'15
Aug 2'15
Aug 12'15
Aug 19'15
Aug 30'15
Aug 23'15
Aug 23'15
Sep 9'15
Sep 24'15
Sep 24'15
Oct 12'15
Oct 18'15
Oct 24'15
Sep 30'15
Sep 30'15
Oct 18'15
Jul 23'15
Aug 1'15
Aug 10'15
Aug 18'15
Aug 27'15
Sep 8'15
Aug 11'15
Aug 22'15
Aug 29'15
Sep 8'15
Oct 27'15
Oct 10'15
Oct 27'15
Oct 29'15
Sep 29'15
Oct 17'15
Oct 22'15
Oct 29'15
Oct 28 '15
Oct 11'15
Oct 28'15
92
7
21
1
4
5
8
8
18
9
9
54
42
45
17
5
5
22
10
10
109
8
38
2
7
5
9
9
8
9
35
10
10
10
10
59
44
44
33
6
6
6
6
27
12
12
99
85
8
27
3
6
20
22
11
11
40
6
2
75
7
27
3
6
20
22
Jul 18'15
Jul 18'15
Jul 26'15
Jul 26'15
Jul 27'15
Jul 28'15
Aug 1'15
Aug 10'15
Aug 19'15
Aug 19'15
Aug 30'15
Aug 30'15
Aug 30'15
Sep 9'15
Oct 1 '15
Oct 1'15
Oct 15'15
Oct 7'15
\\oct 7'15
Oct 21'15
Jul 26'15
Jul 26'15
Aug 4'15
Aug 4'15
Aug 6'15
Aug 8'15
Aug 15'15
Aug 23'15
Aug 31'15
Sep 7'15
Aug 25'15
Aug 25'15
Sep 6'15
Sep 12'15
Sep 23'15
Sep 17'15
Sep 17'15
Oct 5'15
Oct 22'15
Oct 22'15
Nov 9'15
Nov16'15
Nov 23'15
Oct 29'15
Oct 29'15
Nov 16'15
Jul 27'15
Jul 27'15
Jul 27'15
Aug 5'15
Aug 5'15
Aug 6'15
Aug 13'15
Sep 5'15
Sep 5'15
Sep 17'15
Sep 17'15
Oct 22'15
Oct 29'15
Aug 5'15
Aug 5'15
Aug 13'15
Aug 13'15
Aug 15'15
Aug 22'15
Sep 2'15
Nov 1'15
Jul 25'15
Aug 18'15
Jul 26'15
Jul 30'15
Aug 2'15
Aug 9'15
Aug 18'15
Sep 8'15
Aug 29'15
Sep 8'15
Oct 31'15
Oct 17'15
Oct 31'15
Oct 20'15
Oct 6'15
Oct 20'15
Nov 1'15
Oct 18'15
Nov 1'15
Nov 29'15
Aug 3'15
Sep 16'15
Aug 5'15
Aug 13'15
Aug 12'15
Aug 24'15
Sep 1'15
Sep 8'15
Sep 16'15
Oct 4'15
Sep 5'15
Sep 16'15
Sep 22'15
Oct 4'15
Nov 24'15
Nov 7'15
Nov 24'15
Nov 29'15
Oct 28'15
Nov 15'15
Nov 22'15
Nov 26'15
Nov 29'15
Nov 11'15
Nov 29'15
Nov 18'15
Nov 2'15
Aug 4'15
Sep 5'15
Aug 8'15
Aug 12'15
Sep 5'15
Sep 29'15
Sep 16'15
Sep 29'15
Nov 2'15
Oct 28'15
Oct 31'15
Oct 31'15
Aug 12'15
Sep 13'15
Aug 16'15
Aug 20'15
Sep 13'15
Sep 27'15
Jan 7'15
Jan 7'15
6.9.2
6.9.2.3
6.9.2.3.1
Wall and Column 1-20 meters
6.9.2.3.2
Wall and Column 2-20 meters
6.9.2.4
Basement ( Suspended slab and beams)
6.9.2.5
Waterproofing works (Retaining walls)
6.9.2.6
Backfiling and Compaction works
6.9.3 Sequence 3 (60 meters) - Twin Tunnel
6.9.3.1
Earthworks
6.9.3.2 Basement (Raft Fdn/Base Slab)
6.9.3.2.1
Lean Concrete
6.9.3.2.2
Waterproofing System for basement
6.9.3.2.3
RCBase slab and Raft foundation
6.9.3.3 Basement (RC Walls and Collum) 3 Walls
6.9.3.3.1
Wall and Column 1-20 meters
6.9.3.3.2
Wall and Column 2-20 meters
6.9.3.4
Basement ( Suspended slab and beams)
6.9.3.5
Waterproofing works (Retaining walls)
6.9.3.6
Backfiling and Compaction works
7.0 Transformer 500 MVA T-1 & Firewall
7.1 Earthworks
7.2 Reinforced Concrete Works
7.2.1 Lean Concrete
7.2.2 RC Raft Foundation
7.2.3 RC Wall -1
7.2.4 RC Wall -2
7.3 WaterProofing Retaining Wall Works
7.4 Backfilling and Compaction
7.5 Finishing Works
7.6 Specialties
8.0 Transformer 500 MVA T-2 & Firewall
8.1 Earthworks
8.2 Reinforced Concrete Works
8.2.1 Lean Concrete
8.2.2 RC Raft Foundation
8.2.3 RC Wall -1
8.2.4 RC Wall -2
8.3 WaterProofing Retaining Wall Works
8.4 Backfilling and Compaction
8.5 Finishing Works
8.6 Specialties
9.0 Transformer 500 MVA T-3 & Firewall
9.1 Earthworks
9.2 Reinforced Concrete Works
9.2.1 Lean Concrete
9.2.2 RC Raft Foundation
9.2.3 RC Wall -1
9.2.4 RC Wall -2
9.3 WaterProofing Retaining Wall Works
9.4 Backfilling and Compaction
9.5 Finishing Works
9.6 Specialties
11
11
40
6
2
84
8
27
3
6
18
22
11
11
40
6
2
3
41
2
17
17
5
4
4
4
6
2
2
4
17
16
2
4
4
6
2
6
4
17
16
2
4
4
6
Sep 2'15
Sep 15'15
Sep 15'15
Oct 20'15
Oct 27'15
Aug 13'15
Aug 13'15
Aug 23'15
Aug 23'15
Aug 24'15
Aug 31'15
Sep 21'15
Sep 21'15
Oct 4'15
Oct 4'15
Nov8'15
Nov 15'15
Mar 23'15
Mar 24'15
Mar 28'15
Mar 28'15
Mar 30'15
Apr 19'15
May 9'15
May 14'15
May 19'15
May 14'15
May 19'15
mar 22'15
Mar 23'15
53 Mar 29'15
Mar 29'15
Apr 16'15
Apr 21'15
May 11'15
May 30'15
Jun 1'15
May 30'15
Jun 3'15
Mar 22'15
Mar 23'15
39 Mar 25'15
Mar 25'15
Mar 28'15
Apr 1'15
Apr 21'15
May 10'15
May 12'15
May 10'15
May 14'15
Sep 14'15
Sep 27'15
Oct 31'15
Oct 26'15
Oct 28'15
Nov 18'15
Aug 22'15
Sep 20'15
Aug 25'15
Aug 30'15
Sep 20'15
Oct 15'15
Oct 31'15
Oct 15'15
Nov 18'15
Nov14'15
Nov16'15
May 25'15
Mar 26'15
May 13'15
Mar 29'15
Apr 18'15
May 7'15
May 13'15
May 18'15
May 23'15
May 18'15
May 25'15
Jun 9'15
Mar 24'15
May 28'15
Mar 30'15
Apr 20'15
May 10'15
May 28'15
May 31'15
Jun 4'15
Jun 2'15
Jun 9'15
May 20'15
Mar 24'15
May 9'15
Mar 26'15
Mar 31'15
Apr 20'15
May 9'15
May 11'15
May 16'15
May 13'15
May 20'15
Nov 29'14
Nov 30'14
Nov 27'14
Nov 29'14
Nov 25'14
Nov 27'14
1
31
5
3
10
16
2
2
2
4
1
30
5
3
9
16
2
2
2
4
1
32
2
4
10
16
2
2
2
4
1
14
2
3
9
5
2
2
2
4
1
14
2
3
4
5
2
2
2
4
1
14
2
3
4
5
2
2
2
4
May 13'15
May 14'15
May 16'15
May 16'15
May 18'15
May 21'15
Jun 2'15
Jun 21'15
Jun 23'15
Jun 21'15
Jun 23'15
May 30'15
May 31'15
Jun 1'15
Jun 1'15
Jun 3'15
Jun 7'15
Jun 17'15
Jul 6'15
Jul 8'15
Jul 6'15
Jul 8'15
May 9'15
May 10'15
May 11'15
May 11'15
May 13'15
May 18'15
May 30'15
Jun 17'15
Jun 20'15
Jun 17'15
Jun 20'15
Jun 20'15
Jun 21'15
Jun 22'15
Jun 22'15
Jun 24'15
Jun 28'15
Jul 2'15
Jul 8'15
Jul 11'15
Jul 8'15
Jul 11'15
Jul 6'15
Jul 7'15
Jul 8'15
Jul 8'15
Jul 11'15
Jul 14'15
Jul 19'15
Jul 25'15
Jul 27'15
Jul 25'15
Jul 27'15
Jun16'15
Jun 17'15
Jun 18'15
Jun 18'15
Jun 21'15
Jun 24'15
Jun 29'15
Jul 5'15
Jul 7'15
Jul 5'15
Jul 7'15
Jun 27'15
May 14'15
Jun 20'15
May 17'15
May 20'15
Jun 1'15
Jun 20'15
Jun 22'15
Jun 24'15
Jun 22'15
Jun 27'15
Jul 12'15
May 31'15
Jul 5'15
Jun 2'15
Jun 6'15
Jun 16'15
Jul b5'15
Ju 7'15
Jul 9'15
Jul 7'15
Jul 12'15
Jun 23'15
May 10'15
Jun 16'15
May 12'15
May 17'15
May 28'15
Jun 16'15
Jun 18'15
Jun 21'15
Jun 18'15
Jun 23'15
Jul 14'15
Jun 21'15
Jul 7'15
Jun 23'15
Jun 27'15
Jul 1'15
Jul 7'15
Jul 9'15
Jul 12'15
Jul 9'15
Jul 14'15
Jul 30'15
Jul 7'15
Jul 23'15
Jul 9'15
Jul 13 '15
Jul 18'15
Jul 23'15
Hul 26'15
Jul 28'15
Jul 26'15
Jul 30'15
Jul 11'15
Jun 17'15
Jul 4'15
Jun 20'15
Jun 23'15
Jun 28'15
Jul 4'15
Jul 6'15
Jul 8'15
Jul 6'15
Jul 11'15
28
3
3
4
7
2
4
36
4
4
7
11
2
5
60
8
4
16
25
3
10
Jun 11'15
Jun 13'15
Jun 13'15
Jun 16'15
Jun 20'15
Jul 1'15
Jul 9'15
Jul 12'15
Jun 16'15
Jun 16'15
Jun 21'15
Jun 25'15
Jul 7'15
Jul 20'15
Jul 22;15
Jun 21'15
Jun 21'15
Jun 30'15
Jul 5'15
Jul 16'15
Aug 15'15
Aug 18'15
Aug 29'15
Jul 15'15
Jun 15'15
Jun 18'15
Jun 23'15
Jul 18'15
Jul 11'15
Jul 15'15
Jul 27'15
Jun 20'15
Jun 24'15
Jul 2'15
Jul 19'15
Jul 21'15
Jul 27'15
Aug 29'15
Jun 29'15
Jul 4'15
Jul 22'15
Aug 13'15
Aug 17'15
Aug 29'15
38
6
3
12
15
2
2
28
4
2
6
9
1
2
51
3
3
38
3
4
36
5
3
23
2
3
37
3
3
28
1
2
120
7
2
107
2
2
30
Jun 17'15
Jun 18'15
Jun 18'15
Jun 25'15
Jun 29'15
Jul 11'15
Jul 28'15
Jul 30'15
Jun 25'15
Jun 25'15
Jun 30'15
Jul 2'15
Jul 14'15
Jul 25'15
Jul 26'15
Jun 20'15
Jun 21'15
Jun 24'15
Jun 28'15
Aug 11'15
Aug 15'15
Jun 22'15
Jun 23'15
Jun 29'15
Jul 2'15
Jul 29'15
Aug 1'15
Oct 6'15
Oct 7'15
Oct 11;15
Oct 14'15
Nov 16'15
Nov 17'15
Aug 20'15
Aug 22'15
Aug 30'15
Sep 11'15
Jan 4 '16
Jan 6'16
Dec 5;'15
Aug 1'15
Aug 1'15
Jun 24'15
Jun 28'15
Jul 12'15
Jul 27'15
Jul 29'15
Aug 1'15
Jul 27'15
Jun 29'15
Jul 1'15
Jul 8'15
Jul 23'15
Jul 25'15
Jul 27'15
Aug 18'15
Jun 23'15
Jun 27'15
Aug 10'15
Aug 13'15
Aug 18'15
Aug 3'15
Jun 28'15
Jul 1'15
Jul 28'15
Jul 30'15
Aug 3'15
Nov 18'15
Oct 10'15
Oct 13'15
Nov 15'15
Nov 16'15
Nov 18'15
Jan 7'16
Aug 29'15
Aug 31'15
Jan 3'16
Jan 5 '16
Jan 7'16
Jan 7'16
TOTAL CONTRACT PERCENT CIVIL
PREPARED BY :
FRANCISCO SUMCAD JR
I NT E R NA T IO N A L
CIVIL ENGINEER
Remarks
Completed
0.76%
1.45%
0.76%
Planned/Require
d
Previous
0.76%
0.76%
0.76%
100%
100%
0.01%
0.06%
0.01%
0.06%
0.01%
100%
100%
0.00%
0.01%
0.01%
0.01%
0.01%
0.01%
0.01%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0.01%
0.01%
0.01%
0.01%
100%
100%
100%
100%
100%
100%
100%
100%
0.01%
0.07%
100%
100%
100%
100%
0.01%
0.01%
0.01%
0.01%
100%
100%
100%
100%
95%
95%
95%
95%
0.01%
0.01%
0.01%
0.01%
100%
100%
100%
100%
90%
90%
90%
90%
0.04%
0.04%
0.04%
100%
100%
100%
0.05%
0.05%
0.01%
100%
100%
100%
100%
100%
0.00%
0.01%
0.01%
0.01%
0.01%
0.01%
0.01%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0.01%
0.01%
100%
100%
100%
100%
0.30%
Completed
Delayed(Completed)
Delayed(Completed)
Delayed(Completed)
Delayed(Completed)
0.05%
0.05%
Delayed(Completed)
0.09%
0.09%
Delayed(Completed)
Delayed(Completed)
0.05%
0.05%
Partialy Completed
0.05%
0.05%
0.08%
Delayed(No Activity)
Delayed(No Activity)
Delayed(No Activity)
0.04%
0.10%
0.08%
0.04%
0.10%
0.08%
0.04%
0.10%
Delayed(No Activity)
Delayed(No Activity)
0.30%
Delayed(Completed)
0.01%
0.06%
0.01%
0.06%
Delayed(Completed)
Delayed(Completed)
Delayed(Completed)
0.05%
Delayed(Completed)
0.05%
This Week
Delayed(Completed)
0.09%
0.10%
0.10%
0.08%
0.05%
0.15%
0.08%
0.05%
0.10%
0.10%
0.08%
0.05%
0.15%
0.08%
0.05%
0.04%
0.05%
100%
100%
100%
100%
0.01%
0.01%
0.01%
0.01%
100%
100%
100%
100%
95%
95%
95%
95%
0.01%
0.01%
0.01%
0.01%
0.10%
0.10%
100%
100%
100%
100%
100%
100%
90%
90%
30%
30%
70%
60%
60%
5%
0.04%
0.04%
100%
100%
0.02%
0.02%
0.15%
0.08%
0.05%
100%
100%
100%
100%
100%
20%
5%
10%
5%
0.05%
100%
100%
0.05%
100%
100%
0.09%
Delayed(Completed)
Delayed(On going)
0.05%
0.01%
0.01%
0.10%
0.10%
0.08%
0.05%
0.15%
0.08%
0.05%
1.08%
0.37%
Completed
0.01%
0.08%
0.01%
0.08%
Delayed(Completed)
Delayed(Completed)
Completed
Completed
0.06%
Delayed(Completed)
0.05%
0.02%
0.11%
0.08%
0.11%
0.04%
0.05%
0.02%
0.11%
0.08%
0.11%
On going
On going
On going
On going
0.09%
0.09%
0.07%
0.05%
100%
100%
100%
100%
0.05%
0.05%
100%
100%
100%
100%
0.02%
0.02%
0.02%
0.01%
100%
100%
100%
100%
95%
95%
95%
95%
0.02%
0.02%
0.02%
0.02%
100%
100%
100%
100%
80%
80%
60%
60%
5%
5%
0.02%
0.02%
0.05%
0.02%
0.11%
0.08%
100%
100%
100%
100%
100%
100%
100%
95%
95%
95%
85%
5%
0.06%
0.05%
100%
100%
95%
85%
10%
0.02%
0.02%
0.09%
0.09%
0.07%
100%
100%
100%
100%
100%
100%
100%
35%
100%
15%
0.02%
100%
100%
0.01%
0.01%
0.01%
0.04%
0.01%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0.03%
0.02%
0.02%
0.02%
0.15%
100%
100%
100%
100%
100%
100%
100%
100%
100%
70%
10%
0.01%
0.04%
0.10%
100%
100%
100%
80%
80%
5%
5%
0.09%
100%
30%
5%
0.04%
0.05%
0.02%
0.11%
0.08%
0.11%
On going
On going
0.05%
100%
100%
100%
100%
0.06%
0.02%
0.02%
0.02%
0.01%
0.06%
Partialy Completed
0.06%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0.10%
Delayed(Completed)
Delayed(Completed)
0.06%
0.00%
0.01%
0.01%
0.02%
0.02%
0.01%
0.01%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0.06%
Delayed(Completed)
0.10%
0.01%
0.05%
0.09%
0.09%
0.07%
0.09%
0.09%
0.07%
0.02%
0.09%
0.02%
0.09%
5%
2.25%
0.50%
Completed
Completed
Completed
Delayed(Completed)
0.09%
0.09%
Completed
Completed
On going
0.15%
0.05%
0.38%
0.10%
0.38%
0.15%
0.05%
0.10%
0.38%
No activity
0.13%
0.08%
0.20%
0.20%
0.08%
0.13%
0.08%
0.20%
0.20%
0.08%
0.13%
0.08%
0.20%
0.20%
0.08%
0.10%
0.13%
0.06%
0.13%
0.08%
0.20%
0.20%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
30%
30%
30%
0.05%
0.05%
0.05%
0.04%
0.04%
0.05%
0.09%
0.26%
0.13%
0.12%
0.05%
0.09%
0.26%
0.13%
0.12%
0.05%
0.09%
0.26%
0.13%
0.12%
0.05%
0.09%
0.26%
0.13%
0.12%
0.05%
100%
100%
100%
100%
100%
0.00%
0.03%
0.00%
0.03%
0.00%
100%
100%
0.00%
0.01%
0.01%
0.01%
0.01%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0.02%
0.02%
100%
100%
100%
100%
0.05%
0.05%
100%
100%
70%
40%
0.02%
0.02%
0.03%
0.16%
0.07%
0.02%
0.02%
0.07%
0.05%
0.13%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
5%
5%
5%
0.76%
0.25%
Completed
On going
Completed
Completed
Completed
Delayed(Completed)
0.05%
0.05%
On going
0.10%
0.10%
On going
0.04%
0.16%
0.07%
0.02%
0.02%
0.07%
0.05%
0.13%
0.03%
0.16%
0.07%
0.02%
0.02%
0.07%
0.05%
0.13%
0.04%
0.03%
0.16%
0.07%
0.02%
0.02%
0.07%
0.05%
0.13%
30%
60%
1.80%
0.17%
Completed
0.01%
0.03%
0.01%
0.03%
Completed
Delayed(Completed)
Delayed(Completed)
0.02%
0.08%
0.01%
0.00%
0.02%
0.08%
0.01%
0.00%
0.01%
0.04%
0.01%
0.04%
0.01%
100%
100%
0.00%
0.01%
0.02%
0.02%
0.08%
0.01%
0.00%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
70%
0.01%
100%
40%
0.00%
0.01%
0.03%
0.03%
0.07%
0.01%
0.00%
100%
100%
100%
100%
100%
100%
100%
40%
40%
40%
40%
0.01%
100%
40%
0.00%
0.01%
0.02%
0.03%
0.07%
0.01%
0.00%
100%
100%
100%
100%
100%
100%
100%
40%
40%
40%
40%
0.01%
100%
40%
0.00%
0.01%
0.02%
0.03%
0.07%
0.01%
0.00%
100%
100%
100%
100%
100%
100%
100%
40%
40%
40%
40%
0.02%
100%
50%
50%
0.00%
0.01%
0.01%
0.01%
0.01%
100%
100%
100%
100%
100%
50%
100%
50%
0.01%
0.01%
100%
100%
50%
0.04%
0.04%
100%
100%
0.01%
0.01%
100%
100%
0.01%
0.01%
100%
100%
0.01%
100%
0.00%
0.00%
100%
100%
0.17%
On going
No activity
On going
On going
On going
0.03%
0.07%
0.01%
0.00%
0.03%
0.07%
0.01%
0.00%
0.01%
0.03%
0.01%
0.03%
40%
40%
0.16%
On going
No activity
On going
On going
On going
0.03%
0.07%
0.01%
0.00%
0.03%
0.07%
0.01%
0.00%
0.01%
0.03%
0.01%
0.03%
40%
40%
0.16%
On going
No activity
On going
On going
On going
0.03%
0.07%
0.01%
0.00%
0.03%
0.07%
0.01%
0.00%
0.02%
0.04%
0.02%
0.04%
40%
40%
0.22%
On going
On going
Completed
Completed
0.03%
0.03%
On going
0.08%
0.02%
0.03%
0.08%
0.02%
0.03%
0.23%
0.01%
0.04%
100%
0.01%
0.04%
50%
0.04%
0.07%
0.04%
0.03%
0.00%
0.01%
0.01%
0.01%
0.01%
100%
100%
100%
100%
100%
0.01%
0.01%
0.01%
0.01%
100%
100%
100%
100%
0.03%
0.03%
100%
100%
0.01%
0.01%
0.01%
0.01%
100%
100%
100%
100%
0.02%
0.02%
100%
100%
0.04%
0.07%
0.04%
0.03%
0.22%
0.01%
0.03%
0.03%
0.08%
0.03%
0.03%
0.01%
0.03%
0.01%
100%
0.00%
0.01%
0.01%
0.01%
0.01%
100%
100%
100%
100%
100%
0.01%
0.01%
100%
100%
0.04%
0.04%
100%
100%
0.01%
0.01%
100%
100%
0.02%
0.02%
100%
100%
0.01%
100%
0.00%
0.01%
0.00%
0.01%
0.01%
0.01%
0.01%
100%
100%
100%
100%
100%
100%
100%
0.01%
0.01%
0.01%
0.01%
100%
100%
100%
100%
0.04%
0.04%
100%
100%
0.01%
0.01%
0.01%
0.01%
100%
100%
100%
100%
0.02%
0.02%
100%
100%
0.01%
100%
0.002%
0.004%
0.014%
100%
100%
100%
0.01%
0.01%
0.03%
0.00%
0.00%
100%
100%
100%
100%
100%
0.00%
100%
0.00%
0.00%
0.01%
100%
100%
100%
0.03%
0.08%
0.03%
0.03%
0.26%
0.01%
0.05%
0.04%
0.08%
0.04%
0.03%
0.01%
0.05%
0.04%
0.08%
0.04%
0.03%
0.23%
0.08%
On going
0.01%
0.02%
100%
0.02%
0.03%
0.00%
0.00%
0.07%
0.005%
0.02%
0.02%
10%
0.03%
0.00%
0.00%
0.01%
0.01%
0.03%
0.00%
0.00%
100%
100%
100%
100%
100%
0.00%
100%
0.00%
0.00%
0.01%
100%
100%
100%
0.01%
0.01%
0.03%
0.01%
0.00%
100%
100%
100%
100%
100%
0.01%
100%
100%
0.01%
0.05%
0.05%
0.01%
0.01%
0.01%
0.01%
0.02%
100%
100%
100%
100%
100%
100%
100%
100%
100%
70%
50%
0.01%
100%
100%
0.01%
0.01%
0.06%
0.06%
0.01%
0.01%
0.01%
0.02%
100%
100%
100%
100%
100%
100%
100%
100%
100%
50%
50%
0.01%
100%
100%
0.02%
0.01%
0.05%
0.05%
0.01%
0.01%
0.01%
0.02%
100%
100%
100%
100%
100%
100%
100%
100%
100%
50%
50%
0.08%
0.01%
0.02%
0.02%
0.03%
0.00%
0.00%
0.18%
Completed
0.01%
0.12%
0.01%
0.12%
0.01%
0.12%
0.01%
0.01%
0.01%
0.02%
0.01%
0.01%
0.01%
0.02%
0.01%
0.01%
0.01%
0.02%
0.01%
0.13%
0.01%
0.13%
0.01%
0.13%
0.18%
Completed
0.01%
0.01%
0.01%
0.02%
0.01%
0.01%
0.01%
0.02%
0.01%
0.01%
0.01%
0.02%
0.01%
0.12%
0.01%
0.12%
0.01%
0.12%
0.18%
Completed
0.01%
0.01%
0.01%
0.02%
0.01%
0.01%
0.01%
0.02%
0.01%
0.01%
0.01%
0.02%
0.06%
0.00%
0.04%
0.00%
0.04%
0.00%
0.04%
0.00%
0.00%
0.00%
0.01%
0.00%
0.00%
0.00%
0.01%
0.00%
0.00%
0.00%
0.01%
0.00%
0.04%
0.00%
0.04%
0.00%
0.04%
0.00%
100%
0.01%
0.00%
0.01%
0.02%
0.00%
0.00%
0.00%
0.01%
100%
100%
100%
100%
100%
100%
100%
100%
0.00%
100%
0.01%
0.00%
0.01%
0.02%
0.00%
0.00%
0.00%
0.01%
100%
100%
100%
100%
100%
100%
100%
100%
0.00%
100%
0.00%
0.01%
0.01%
0.02%
0.00%
0.00%
0.00%
0.01%
100%
100%
100%
100%
100%
100%
100%
100%
0.00%
100%
0.00%
0.01%
0.02%
0.01%
0.00%
0.00%
0.00%
0.01%
100%
100%
100%
100%
100%
100%
100%
100%
0.00%
100%
0.00%
0.01%
0.01%
0.01%
0.00%
0.00%
0.00%
0.01%
100%
100%
100%
100%
100%
100%
100%
100%
0.00%
100%
0.00%
0.01%
0.01%
0.01%
0.00%
0.00%
0.00%
0.01%
100%
100%
100%
100%
100%
100%
100%
100%
0.06%
0.00%
0.00%
0.00%
0.01%
0.00%
0.00%
0.00%
0.01%
0.00%
0.00%
0.00%
0.01%
0.00%
0.04%
0.00%
0.04%
0.00%
0.04%
0.06%
0.00%
0.00%
0.00%
0.01%
0.00%
0.00%
0.00%
0.01%
0.00%
0.00%
0.00%
0.01%
0.00%
0.03%
0.00%
0.03%
0.00%
0.03%
0.06%
0.00%
0.00%
0.00%
0.01%
0.00%
0.00%
0.00%
0.01%
0.00%
0.00%
0.00%
0.01%
0.00%
0.03%
0.00%
0.03%
0.00%
0.03%
0.06%
0.00%
0.00%
0.00%
0.01%
0.00%
0.00%
0.00%
0.01%
0.00%
0.00%
0.00%
0.01%
0.00%
0.03%
0.00%
0.03%
0.00%
0.03%
0.06%
0.00%
0.00%
0.00%
0.01%
0.00%
0.00%
0.00%
0.01%
0.00%
0.00%
0.00%
0.01%
0.36%
0.08%
0.10%
0.17%
0.08%
0.10%
0.17%
0.08%
0.01%
0.01%
0.01%
0.02%
0.01%
0.01%
100%
100%
100%
100%
100%
100%
0.01%
0.01%
0.02%
0.03%
0.01%
0.02%
100%
100%
100%
100%
100%
100%
0.02%
0.01%
0.04%
0.07%
0.01%
0.03%
100%
100%
100%
100%
100%
100%
0.10%
0.17%
AD JR
NTERNATIONAL
0.12%
0.07%
0.05%
0.18%
0.16%
0.49%
0.67%
1.02%
12.00%
0.18%
0.16%
0.49%
0.67%
1.02%
12.00%
0.07%
0.05%
0.18%
0.16%
0.49%
0.67%
1.02%
12.00%
0.07%
0.01%
0.01%
0.02%
0.03%
0.00%
0.00%
100%
100%
100%
100%
100%
100%
0.01%
0.00%
0.01%
0.02%
0.00%
0.00%
100%
100%
100%
100%
100%
100%
0.01%
0.01%
0.13%
0.01%
0.01%
100%
100%
100%
100%
100%
0.02%
0.01%
0.10%
0.01%
0.01%
100%
100%
100%
100%
100%
0.04%
0.04%
0.37%
0.01%
0.03%
100%
100%
100%
100%
100%
0.04%
0.01%
0.60%
0.01%
0.01%
1.02%
12.00%
100%
100%
100%
100%
100%
100%
0.05%
0.18%
0.16%
0.49%
0.67%
1.02%
12.00%
OV
FAIZ UR REHMAN
PROJECT ENGINEER (CIVIL)
SAUDI ENGINEERING GROUP INTERNATIONAL
ORING
To date
Balance
Remarks
Previous
This Week
To date
100%
0%
Completed
0.760%
0.000%
0.760%
100%
0%
Completed
0.007%
0.000%
0.007%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
Completed
Completed
Completed
Completed
Completed
Completed
Completed
0.001%
0.006%
0.008%
0.011%
0.011%
0.009%
0.011%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.001%
0.006%
0.008%
0.011%
0.011%
0.009%
0.011%
100%
100%
100%
100%
0%
0%
0%
0%
Completed
Completed
Completed
Completed
0.014%
0.014%
0.014%
0.014%
0.000%
0.000%
0.000%
0.000%
0.014%
0.014%
0.014%
0.014%
100%
100%
0%
0%
Completed
Completed
0.014%
0.075%
0.000%
0.000%
0.014%
0.075%
95%
95%
95%
95%
5%
5%
5%
5%
On going
On going
On going
On going
0.009%
0.013%
0.013%
0.009%
0.000%
0.000%
0.000%
0.000%
0.009%
0.013%
0.013%
0.009%
90%
90%
90%
90%
10%
10%
10%
10%
On going
On going
On going
On going
0.011%
0.011%
0.011%
0.011%
0.000%
0.000%
0.000%
0.000%
0.011%
0.011%
0.011%
0.011%
100%
0%
Completed
0.007%
0.000%
0.007%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
Completed
Completed
Completed
Completed
Completed
Completed
Completed
0.001%
0.006%
0.009%
0.011%
0.011%
0.010%
0.011%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.001%
0.006%
0.009%
0.011%
0.011%
0.010%
0.011%
100%
100%
0%
0%
Completed
Completed
0.013%
0.012%
0.000%
0.000%
0.013%
0.012%
100%
100%
0%
0%
Completed
Completed
0.012%
0.012%
0.000%
0.000%
0.012%
0.012%
100%
100%
0%
0%
Completed
Completed
0.038%
0.048%
0.000%
0.000%
0.038%
0.048%
95%
95%
95%
95%
5%
5%
5%
5%
On going
On going
On going
On going
0.009%
0.012%
0.014%
0.010%
0.000%
0.000%
0.000%
0.000%
0.009%
0.012%
0.014%
0.010%
90%
90%
90%
90%
75%
10%
10%
10%
10%
25%
On going
On going
On going
On going
On going
0.010%
0.010%
0.003%
0.003%
0.073%
0.000%
0.000%
0.007%
0.007%
0.005%
0.010%
0.010%
0.010%
0.010%
0.078%
25%
75%
On going
0.005%
0.001%
0.006%
15%
85%
On going
0.008%
0.004%
0.013%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
0.008%
0.000%
0.008%
0.003%
0.008%
0.011%
0.015%
0.015%
0.014%
0.012%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.000%
0.003%
0.008%
0.011%
0.015%
0.015%
0.014%
0.012%
100%
100%
100%
100%
0%
0%
0%
0%
Completed
Completed
Completed
Completed
0.015%
0.016%
0.015%
0.014%
0.000%
0.000%
0.000%
0.000%
0.015%
0.016%
0.015%
0.014%
100%
100%
0%
0%
Completed
Completed
0.048%
0.050%
0.000%
0.000%
0.048%
0.050%
95%
95%
95%
95%
5%
5%
5%
5%
On going
On going
On going
On going
0.016%
0.016%
0.016%
0.013%
0.000%
0.000%
0.000%
0.000%
0.016%
0.016%
0.016%
0.013%
80%
80%
65%
65%
20%
20%
35%
35%
On going
On going
On going
On going
0.012%
0.012%
0.009%
0.009%
0.000%
0.000%
0.001%
0.001%
0.012%
0.012%
0.010%
0.010%
100%
95%
95%
95%
90%
0%
5%
5%
5%
10%
Completed
On going
On going
On going
On going
0.024%
0.017%
0.044%
0.019%
0.090%
0.000%
0.000%
0.000%
0.000%
0.005%
0.024%
0.017%
0.044%
0.019%
0.095%
95%
95%
5%
5%
On going
On going
0.060%
0.039%
0.000%
0.005%
0.060%
0.043%
100%
100%
40%
100%
15%
0%
0%
60%
0%
85%
Completed
Completed
On going
Completed
On going
0.023%
0.023%
0.032%
0.092%
0.011%
0.000%
0.000%
0.005%
0.000%
0.000%
0.023%
0.023%
0.037%
0.092%
0.011%
100%
0%
Completed
0.016%
0.000%
0.016%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
Completed
Completed
Completed
Completed
Completed
0.006%
0.014%
0.014%
0.044%
0.014%
0.000%
0.000%
0.000%
0.000%
0.000%
0.006%
0.014%
0.014%
0.044%
0.014%
100%
100%
100%
100%
80%
0%
0%
0%
0%
20%
Completed
Completed
Completed
Completed
On going
0.028%
0.023%
0.021%
0.020%
0.106%
0.000%
0.000%
0.000%
0.000%
0.015%
0.028%
0.023%
0.021%
0.020%
0.121%
85%
85%
15%
15%
On going
On going
0.012%
0.030%
0.001%
0.002%
0.013%
0.031%
35%
65%
On going
0.028%
0.005%
0.033%
35%
35%
35%
65%
65%
65%
On going
On going
On going
0.029%
0.038%
0.017%
0.005%
0.006%
0.003%
0.034%
0.045%
0.020%
100%
0%
Completed
0.002%
0.000%
0.002%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
Completed
Completed
Completed
Completed
Completed
0.001%
0.006%
0.006%
0.009%
0.009%
0.000%
0.000%
0.000%
0.000%
0.000%
0.001%
0.006%
0.006%
0.009%
0.009%
100%
100%
0%
0%
Completed
Completed
0.023%
0.023%
0.000%
0.000%
0.023%
0.023%
100%
100%
0%
0%
Completed
Completed
0.036%
0.021%
0.016%
0.031%
0.052%
0.052%
100%
0%
Completed
0.013%
0.000%
0.013%
100%
100%
100%
70%
0%
0%
0%
30%
Completed
Completed
Completed
On going
0.002%
0.009%
0.022%
0.016%
0.000%
0.000%
0.000%
0.000%
0.002%
0.009%
0.022%
0.016%
40%
60%
On going
0.005%
0.000%
0.005%
40%
40%
40%
40%
60%
60%
60%
60%
On going
On going
On going
On going
0.001%
0.005%
0.010%
0.011%
0.000%
0.000%
0.000%
0.000%
0.001%
0.005%
0.010%
0.011%
40%
40%
60%
60%
On going
On going
0.005%
0.002%
0.000%
0.000%
0.005%
0.002%
40%
60%
On going
0.005%
0.000%
0.005%
40%
40%
40%
40%
60%
60%
60%
60%
On going
On going
On going
On going
0.001%
0.004%
0.008%
0.011%
0.000%
0.000%
0.000%
0.000%
0.001%
0.004%
0.008%
0.011%
40%
40%
60%
60%
On going
On going
0.005%
0.002%
0.000%
0.000%
0.005%
0.002%
40%
60%
On going
0.005%
0.000%
0.005%
40%
40%
40%
40%
60%
60%
60%
60%
On going
On going
On going
On going
0.001%
0.004%
0.008%
0.011%
0.000%
0.000%
0.000%
0.000%
0.001%
0.004%
0.008%
0.011%
40%
40%
60%
60%
On going
On going
0.005%
0.002%
0.000%
0.000%
0.005%
0.002%
100%
0%
Completed
0.011%
0.011%
0.022%
100%
100%
0%
0%
Completed
Completed
0.001%
0.007%
0.001%
0.000%
0.001%
0.007%
100%
0%
Completed
0.011%
0.000%
0.011%
100%
0%
Completed
0.007%
0.007%
0.015%
100%
0%
10%
90%
Completed
0.006%
0.000%
0.006%
0.00000%
0.00048%
0.00048%
100%
0%
Completed
0.009%
0.000%
0.009%
100%
70%
50%
0%
30%
50%
Completed
On going
On going
0.006%
0.035%
0.025%
0.000%
0.000%
0.000%
0.006%
0.035%
0.025%
100%
0%
Completed
0.005%
0.000%
0.005%
100%
50%
50%
0%
50%
50%
Completed
On going
On going
0.007%
0.007%
0.029%
0.000%
0.000%
0.000%
0.007%
0.007%
0.029%
100%
0%
Completed
0.006%
0.000%
0.006%
100%
50%
50%
0%
50%
50%
Completed
On going
On going
0.017%
0.006%
0.024%
0.000%
0.000%
0.000%
0.017%
0.006%
0.024%
26.9217%
1.1987%
28.120%
Previous
This Week
To date
4400005408
Hot
Contrac
Subcontr
Schedule
Work Discription
Mobilization and Preparation of Civil Works
1 PLANNED (CUMULATIVE)
1.1
2 ACTUAL (CUMULATIVE)
380 kV Building Civil Work
1 PLANNED (CUMULATIVE)
2.1
2 ACTUAL (CUMULATIVE)
132 kV Building Civil Works
1 PLANNED (CUMULATIVE)
3.1
2 ACTUAL (CUMULATIVE)
Control Building Civil Works
1 PLANNED (CUMULATIVE)
4.1
2 ACTUAL (CUMULATIVE)
13.8 kV Building Civil Works
1 PLANNED (CUMULATIVE)
5.1
2 ACTUAL (CUMULATIVE)
RC Cable Tannels (5m wide)
6.1
6.2
6.3
6.4
6
6.5
6.6
6.7
6.8
6.9
Duration
46
Start
Jun
Finish
Aug
Contract %
Factor
2015
Jun
15
0.760%
6.3%
6.3%
146
1.450%
12.1%
12.1%
143
Oct 25'14
Apr 8'15
1.080%
9.0%
9.0%
185
Nov 29'14
Jul 1'15
2.250%
18.8%
18.8%
120
0.760%
6.3%
6.3%
277
1.800%
15.0%
71
Jan11'15
Apr 2'15
1.39%
71
1.39%
68
1.33%
68
1.33%
92
1.80%
7.2%
97
Jul 9'15
Oct29'15
1.90%
92
Jul 18'15
Nov 1'15
1.80%
109
2.13%
99
1.94%
100.0%
99.00%
97.90%
96.80%
95.70%
94.60%
93.50%
92.40%
91.30%
90.20%
89.10%
88.00%
86.90%
85.80%
84.70%
83.60%
82.50%
81.40%
80.30%
79.20%
78.10%
77.00%
75.90%
74.80%
73.70%
72.60%
71.50%
70.40%
69.30%
68.20%
67.10%
66.00%
64.90%
63.80%
62.70%
61.60%
60.50%
59.40%
58.30%
57.20%
56.10%
55.00%
30
10
0.633
6.9
10
11
12
13
14
15
16
17
18
19
20
21
22
1 PLANNED (CUMULATIVE)
2 ACTUAL (CUMULATIVE)
Transformer 500 MVA T-1
1 PLANNED (CUMULATIVE)
7.1
2 ACTUAL (CUMULATIVE)
Transformer 500 MVA T-2
1 PLANNED (CUMULATIVE)
8.1
2 ACTUAL (CUMULATIVE)
Transformer 500 MVA T-3
1 PLANNED (CUMULATIVE)
9.1
2 ACTUAL (CUMULATIVE)
Transformer 67 MVA T-1
1 PLANNED (CUMULATIVE)
10.1
2 ACTUAL (CUMULATIVE)
Transformer 67 MVA T-2
1 PLANNED (CUMULATIVE)
11.1
2 ACTUAL (CUMULATIVE)
Transformer 67 MVA T-3
1 PLANNED (CUMULATIVE)
12.1
2 ACTUAL (CUMULATIVE)
47 MVA Reactor-1
1 PLANNED (CUMULATIVE)
13.1
2 ACTUAL (CUMULATIVE)
47 MVA Reactor-2
1 PLANNED (CUMULATIVE)
14.1
2 ACTUAL (CUMULATIVE)
47 MVA Reactor-3
1 PLANNED (CUMULATIVE)
15.1
2 ACTUAL (CUMULATIVE)
Power Duct Banks
1 PLANNED (CUMULATIVE)
16.1
2 ACTUAL (CUMULATIVE)
Communication Duct Banks
1 PLANNED (CUMULATIVE)
17.1
2 ACTUAL (CUMULATIVE)
Bust Duck foundations
1 PLANNED (CUMULATIVE)
18.1
2 ACTUAL (CUMULATIVE)
Gantry foundations
1 PLANNED (CUMULATIVE)
19.1
2 ACTUAL (CUMULATIVE)
External LP,LM,SLP Foundation
1 PLANNED (CUMULATIVE)
20.1
2 ACTUAL (CUMULATIVE)
Boundary Wall Reinforced concrete works
1 PLANNED (CUMULATIVE)
21.1
2 ACTUAL (CUMULATIVE)
Earthworks (external site works) & Other civil works
1 PLANNED (CUMULATIVE)
22.1
2 ACTUAL (CUMULATIVE)
54
0.180%
1.50%
1.50%
68
0.180%
1.50%
1.50%
51
0.180%
1.50%
1.50%
38
0.060%
0.5%
0.5%
38
0.060%
0.5%
0.5%
39
0.060%
0.5%
0.5%
21
0.060%
0.5%
0.5%
22
Jul 6'15
Jul 30'15
0.060%
0.5%
0.5%
21
Jun16'15
Jul 11'15
0.060%
0.5%
0.5%
67
0.360%
3.0%
3.0%
38
0.120%
1.00%
1.00%
51
0.180%
1.50%
1.50%
36
0.160%
1.33%
1.33%
37
0.490%
4.1%
4.1%
120
0.670%
5.6%
5.6%
30
Dec 5;'15
1.020%
8.5%
8.5%
Jan 7'16
53.90%
52.80%
51.70%
50.60%
49.50%
48.40%
47.30%
46.20%
45.10%
44.00%
42.90%
41.80%
40.70%
39.60%
38.50%
37.40%
36.30%
35.20%
34.10%
33.00%
31.90%
30.80%
29.70%
28.60%
27.50%
26.40%
25.30%
24.20%
23.10%
22.00%
20.90%
19.80%
18.70%
17.60%
16.50%
15.40%
14.30%
13.20%
12.10%
11.00%
9.90%
8.80%
7.70%
6.60%
5.50%
4.40%
3.30%
2.20%
1.10%
0.00%
12.0%
100%
107%
PLAN CUMMULATIVE PERCENTAGE ACCOMPLISTMENTS
ACTUAL CUMMULATIVE PERCENTAGE ACCOMPLISTMENTS
VARIANCE
0.63
0.63
PREPARED BY :
FRANCISCO SUMCAD JR
INT ERNATIONAL
FAIZ UR REHMAN
INT ERNATIONAL
CIVIL ENGINEER
SAUDI ENGINEERING GROUP INTERNATIONAL
PROJECT ENGINEER(CIVIL)
SAUDI ENGINEERING GROUP INTERNATION
pproved work schedule and planned values not available and have to provided by the contractor)
As of August 10,2015
Report No. 11
QASSIM - 5 (UNAYZAH) 380/132/13.8 KV BSP # 9059
AL MASHARIQ CO.
AL FAHD Co.
Contractor
Subcontractor
2015
Jul
15
28
1.773
2015
Aug
Dec
Jan
Feb
March
April
31
32
2.027
15
28
1.773
30
2
0.127
15
31
15
31
15
28
15
31
15
4
0.483
6
0.725
8
0.967
9
1.087
10
1.208
12
1.450
12
1.450
10
1.208
9
1.087
8
0.967
6
0.725
6
0.725
4
0.360
8
0.720
8
0.720
8
0.720
10
0.900
11
0.990
12
1.080
10
0.900
9
0.810
8
0.720
8
0.720
4
0.360
1
0.188
6
1.125
6
1.125
6
1.125
7
1.313
7
1.313
8
1.500
10
1.875
8
1.500
2
0.127
8
0.507
10
0.633
12
0.760
14
0.887
14
0.887
6
0.083
16
0.222
18
0.250
22
0.306
16
0.222
18
0.250
14
0.186
May
June
30
15
31
15
8
1.500
7
1.313
7
1.313
6
1.125
6
1.125
12
0.760
10
0.633
9
0.570
7
0.443
2
0.127
19
0.264
16
0.222
3
0.042
19
0.264
18
0.250
18
0.250
11
0.153
18
0.239
20
0.266
20
0.266
18
0.239
10
0.133
14
0.186
18
0.239
20
0.266
20
0.266
18
0.239
10
0.133
12
0.216
13
0.234
14
0.252
14
0.252
15
0.270
14
0.252
14
0.252
4
0.072
64.05
62.06
59.79
56.84
12
0.180
48.66
10
0.150
12
0.180
53.60
24
0.360
24
0.360
24
0.360
16
0.240
18
0.270
22
0.330
20
0.300
18
0.270
25
0.375
28
0.420
25
0.375
10
0.150
6
0.030
36
0.180
36
0.180
3
0.015
34
0.170
34
0.170
36
0.180
12
0.180
43.23
38.41%
37.48
10
0.050
31.84
28.12%
26.45
20.94
5
0.150
18.48
16.79
15.04
13.43
12.29
10.50
10.51
8.90
6.60
8.49
6.81
7.84
8.49
6.81
-1.7
10.5
7.84
-2.7
13.43
8.90
-4.5
5.28
2.41
2.4
AIZ UR REHMAN
5.28
6.60
1.3
16.79
10.51
-6.3
20.94
12.29
-8.7
26.45
15.04
-11.4
31.84
18.48
-13.4
37.48
26.90
-10.6
43.23
28.12
-10.3
48.66
53.60
56.84
59.79
62.06
64.05
CT ENGINEER(CIVIL)
RING GROUP INTERNATIONAL
y the contractor)
2015
June
July
30
15
August
31
15
Sep
31
15
Oct
30
15
Nov
31
15
Dec
30
15
31
2016
Jan
15
100.00
6.33
97.82
93.27
6
1.125
1
0.188
90.16
100.00
12.08
100.00
9.00
100.00
18.75
88.87
86.04
100.00
6.33
82.85
80.61
100.00
1.39
78.93
77.27
177.27
1.39
75.24
100.00
1.33
73.12
100.00
1.33
70.23
67.31
100.00
1.80
5
0.095
13
0.247
14
0.266
15
0.285
14
0.266
14
0.266
13
0.247
12
0.228
100.00
1.90
12
0.216
13
0.234
14
0.252
16
0.288
16
0.288
14
0.252
13
0.234
2
0.036
4
0.085
12
0.256
12
0.256
14
0.298
14
0.298
12
0.256
12
0.256
10
0.213
10
0.213
100.00
2.13
12
13
13
14
14
13
13
100.00
100.00
1.80
0.077
0.232
0.252
0.252
0.271
0.271
0.252
0.252
0.077
1.94
100.00
1.50
100.00
1.50
100.00
1.50
22
0.110
35
0.175
100.00
0.50
28
0.140
100.00
0.50
20
0.100
45
0.225
100.00
0.50
55
0.275
40
0.200
100.00
0.50
60
0.300
100.00
0.50
58
0.290
42
0.210
100.00
0.50
18
0.540
20
0.600
22
0.660
20
0.600
24
0.240
35
0.350
38
0.380
3
0.030
16
0.240
24
0.360
28
0.420
26
0.390
16
0.213
38
0.507
38
0.507
8
0.107
15
0.450
118.48
1.00
6
0.090
70.23
73.12
75.24
115.04
1.50
112.29
1.33
8
0.447
67.31
100.00
3.00
77.27
10
0.558
78.93
10
0.558
80.61
16
0.653
38
1.552
38
1.552
8
0.327
10
0.558
12
0.670
14
0.782
12
0.670
82.85
86.04
88.87
90.16
108.90
4.08
10
0.558
10
0.558
4
0.223
100.00
5.58
30
2.550
47
3.995
23
1.955
100.00
8.50
93.27
97.82
100.0
100.0