Basic Sample Test
Basic Sample Test
Practice Questions
1999 APICSThe Educational Society for Resource Management. All right reserved.
No part of this publication covered by the copyright herein may be reproduced or copied in any
form or by any means without the written permission of the publisher.
APICSThe Educational Society for Resource Management
5301 Shawnee Road
Alexandria, VA 22312-2317
(703) 354-8851
(800) 444-2742
Stock #09205, 10/99
Acknowledgments
APICS has developed these practice questions for the Basics of Supply Chain
Management examination program. This test is composed of questions that have
been developed with the help of two APICS chapters and subject matter experts.
It includes 60 questions similar to those found in the certification exam. The
questions were reviewed and edited to ensure accurate content and consistency
by the Basics of Supply Chain Management Committee of the Curricula and
Certification Council. The test is accompanied by an answer key as well as text
references with specific page numbers for further study.
APICS acknowledges those who put in the time and effort to make these practice
questions possible.
2.
3.
5.
4.
engineer-to-order
make-to-order
assemble-to-order
make-to-stock
6.
production planning
material requirements planning (MRP)
purchasing planning
production activity control (PAC)
8.
5
300
220 units
240 units
280 units
340 units
Which of the following identifies the demand for capacity at a work center in
a specific time period?
(a)
(b)
(c)
(d)
bill of labor
dispatch list
scheduled receipts
work center load
Part
A
Quantity per
not applicable
1
2
2
1
1
9.
B
C
E
C
G
2
2
2
4
4
How many units of part C are required to produce one unit of part A?
(a)
(b)
(c)
(d)
2
4
6
8
A only
B, C, and G only
A and B only
A, B, C, and G only
11. The setup time for an operation is two hours and the run time is 10 minutes
per piece. The scheduled operation time for 100 units is
(a)
(b)
(c)
(d)
130 minutes
1,000 minutes
1,100 minutes
1,120 minutes
lot-size inventory
fluctuation inventory
anticipation inventory
decoupling inventory
1.5
1.6
4.0
6.4
18. An item has a lead time of six weeks and an average demand of 150 units
per week. The safety stock for the item is 300 units and the order quantity is
2,000 units. The order point for the item is
(a)
(b)
(c)
(d)
300 units
900 units
1,200 units
2,000 units
19. Which of the following is most consistent with ABC analysis and control?
(a) All items should have the same level of control.
(b) A small number of items account for a large portion of annual usage
value.
(c) Items need tight control.
(d) Perpetual inventory records are required for all items.
22. If a purchased part order is late, which of the following would be the most
likely source to determine which customer order would be affected?
(a)
(b)
(c)
(d)
where-used report
planning bill
routing
pegging report
23. Which of the following best describes the use of bills of material in planning
systems?
(a)
(b)
(c)
(d)
1
20
22
2
20
18
3
30
25
4
20
20
5
25
19
24. The mean absolute deviation (MAD) for the data given is
(a)
(b)
(c)
(d)
2.2
3
11
15
25. How many of what products are needed and when products are needed are
questions of which of the following?
(a) priority
(b) capacity
(c) revenue
(d) margins
26. The end items and quantities to be produced by period are defined by which
of the following?
(a)
(b)
(c)
(d)
reduces paperwork
bypasses the buyer
employs the latest technology
supports unlimited forms of communications
28. In most cases, the fastest way to increase capacity to meet a short-term
requirement is to
(a)
(b)
(c)
(d)
a pull signal
a dispatch list
the production plan
a control chart
32. The balance sheet for a firm shows which of the following?
(a)
(b)
(c)
(d)
2
100
102
3
100
105
4
100
98
5
100
101
6
100
103
Total
600
604
33. The projection for the seventh month using a three-month moving average
would be
(a)
(b)
(c)
(d)
100
101
103
105
34. Which of the following links product family planning and component
planning?
(a) production planning
35. Which of the following production processes is most appropriate for highvolume bulk products?
(a)
(b)
(c)
(d)
project
jobbing
batch
continuous
tracking signal
mean absolute deviation (MAD)
demand filter
standard deviation
100
1
200
2
200
3
200
4
200
300
300
300
100
zero units
100 units
200 units
300 units
38. Which of the following is the most likely impact of doubling the ordering costs
for an item?
(a)
(b)
(c)
(d)
item master
bill of material
routing
shop calendar
Items 41 and 42 are based on the following information for a single work
center.
Number of machines = 4
Number of shifts = 1
Shift length = 40 hours
Efficiency = 90%
Utilization = 90%
Actual output
Week 1 = 160 hours
Week 2 = 140 hours
Week 3 = 150 hours
Week 4 = 150 hours
41. Which of the following is the rated capacity for the work center?
(a) 130 hours
(b) 144 hours
(c) 150 hours
42. Which of the following is the demonstrated capacity for the work center?
(a)
(b)
(c)
(d)
130 hours
144 hours
150 hours
160 hours
43. Which of the following is used to manage queues and lead times?
(a)
(b)
(c)
(d)
forward scheduling
rough-cut capacity planning
material requirements planning
input/output control
Pareto analysis
cause-and-effect diagram
process flow diagram
root cause analysis
46. Which of the following is used to determine the feasibility of the material
requirements plan?
(a) resource requirements planning
(b) rough-cut capacity planning
47. Which of the following combinations is best suited for developing customer
promise dates in the make-to-order environment?
(a)
(b)
(c)
(d)
48. Which of the following is a benefit to the supplier of a long-term customersupplier relationship?
(a)
(b)
(c)
(d)
product performance
aesthetics
conformance
aftermarket service
(a)
(b)
(c)
(d)
52. Total employee involvement will result in an increase in which of the following
roles for first-line supervision?
(a)
(b)
(c)
(d)
controlling
coaching
disciplining
reporting
53. Which of the following groups should be the first to receive education on total
quality management concepts?
(a)
(b)
(c)
(d)
senior management
quality inspectors
production operators
production supervision
finance
distribution
quality control
engineering
55. Which of the following would most likely serve as an effective measure of
supplier performance?
(a)
(b)
(c)
(d)
component price
internal scrap rate
transportation mode
delivery time
post-sales service
product features
quality controls
competitive pricing
57. Providing customers with what they want at low cost describes the
relationship between which of the following?
(a)
(b)
(c)
(d)
60. Which of the following is typically the largest element of physical distribution
costs?
(a)
(b)
(c)
(d)
order processing
material handling
transportation
protective packaging
Answer
Content Code
Reference
IB4
2
3
4
5
b
c
a
a
III A 1
IV C
II D 2
II D 1
Introduction to Materials
Management, J.R.
Tony Arnold, 3rd edition,
Prentice Hall,
1997, pp. 3-4
APICS Dictionary, ninth edition
Arnold, pp. 328-329
Arnold, p. 195
Arnold, pp. 194-195
6
7
8
9
10
b
c
d
d
c
ID
III C 2
III B 3
III A 3
III A 3
11
12
13
14
15
d
b
c
d
c
III D 3
III C 4
III B 4
IV A 2
IV A 2
16
17
18
c
c
c
IC1
IC3
IV A 5
19
20
b
b
IV A 4
IV C
21
22
23
24
25
d
d
d
b
a
IV A 4
III C 4
III A 2 a
II D 2
ID1
26
27
28
29
30
c
a
b
a
d
ID2
IV B 4
III B 1
IE2
IE2
Arnold, p. 19
Arnold, p. 187
Arnold, p. 130
Arnold, pp. 401-402
Arnold, p. 402
31
32
33
34
35
a
c
b
b
d
III C 3
IC1
II D 2
ID
III A 1
36
37
38
39
40
a
c
a
c
c
II D 2
III C 3
IV A 6
IV A 2
III A 3
41
42
43
44
45
a
c
d
a
c
III B 2
III B 2
III D 4
IF2
III B 4
46
47
48
49
50
c
b
a
c
b
III C 4
III D 1 b
IE2
IF2
IV A 4
51
52
53
54
55
a
b
a
b
d
III D 5
IE2
IF2
IA
III E
56
II A
Arnold, p. 185
57
58
59
60
a
b
c
c
IG
II C
IV B
IV C 1
Arnold, p. 439
Arnold, p. 418
Arnold, p. 405
Arnold, pp. 328-330