BSCM Sample Final Exam With Answers
BSCM Sample Final Exam With Answers
BSCM Sample Final Exam With Answers
2. Which of the following strategies produces the shortest delivery lead time?
a) Make-to-order
b) Assemble-to-order
c) Make-to-stock
d) Chase strategy
7. Item A has a lead time of one week and is made from components B and C. B
& C have a lead time of 2 weeks. If there is a planned order receipt for item A in
week #5, when will the orders for B & C be released?
a) Period 4
b) Period 3
c) Period 2
d) Period 1
1 2 3 4 5
x
x
x
x
x
x
10. Demand for an item that is unrelated to the demand for any other item is
a) Dependent demand.
b) Stable demand.
c) Dynamic demand.
d) Independent demand.
JAN
200
FEB
300
MAR
200
APR
400
MAY
300 SUM = 1400
500
a) 220
b) 280
c) 340
d) 380
17._______________ are generated by the priority planning system and involve the
translation of the priorities, generally given in units of product or some common
unit, into hours of work required at each work center in each time period:
a) Capacity requirements
b) Capacity bills
c) Work center reports
d) Bills of labor
18. Given the following parent-component information, how many Cs are required to
make one A?
A
Parent
A
B
C
E
Component
B(2)
E(2)
G(2)
C(4)
C(4)
H(2)
B(2)
C(4)
E(2)
G(2)
G(2)
a) 20
b) 16
c) 24
d) 32
C(4)
H(2)
G(2)
19. Using the parent-component relationships from question 18, which components are
purchased?
a) G only
b) G and H only
c) B, C and G only
d) G, E, and H only
20. (Available time) x (utilization) x (efficiency) is called?
a) effectiveness
b) useful capacity
c) demonstrated capacity
d) rated capacity
21. Which of the following is NOT an input needed in capacity requirements planning?
a) open shop orders
b) rough-cut capacity
c) lead times
d) planned order releases
22. In one week a work center produces 130 standard hours of work. The hours
available are 120 and 105 hours are actually worked. The utilization is:
a) 80.8%
b) 87.5% (105/120 x 100%)
c) 92.3%
d)108.3%
G(2)
A
25. Choose the best statement? (Use BOM in question #18)
a) item B is the parent of item C.
b) item C is the parent of item E.
c) item A is the parent of item B.
d) item A is the parent of items B, D, and E
C(4)
B(2)
C(4)
E(2)
G(2)
H(2)
G(2)
27. Which of the following statement is best?
a) A bottleneck will control the throughput of all products processed by it
b) Work centers after the bottleneck should work at full capacity
c) Work centers feeding the bottleneck should work at full capacity
d) none of the above is true
29. A company that manufactures snow blowers would be likely to carry which kind of
inventory?
a) lot size inventory
b) hedge inventory
c) anticipation inventory
d) spare parts inventory
G(2)
31. The annual cost of goods sold is $10 million, average inventory is $2.5 million,
owners equity is $5 million, and selling expenses are $4 million. What is the
inventory turn?
a) 2.0
b) 4.0 ($10M/$2.5M)
c) 1.3
d) 6.0
32. Annual demand is $20,000, ordering cost is $30 per order, cost of carrying is 30%,
unit cost is $10. Calculate the EOQ.
a) 141
2AS
IC
b) 200
c) 447
d) 632
33. A particular SKU has a lead time of 6 weeks, average demand of 150 units per
week, and safety stock of 300 units. The order quantity is 2,000 units, and it is
purchased in boxes of 100 units. What is the order point?
a) 300
b) 900
c) 1200 OP = DDLT + SS (6 x 150) + 300 = 1,200
d) 2000
37. Which of the following would be included in preventing the costs of poor quality?
a) allow extra time for breaks
b) keeping buffer inventory between operations
c) use of statistical process control
d) separating the defected products from good ones
38. The ideal product from the customers point of view:
a) does not waste material or labor
b) has short setup time
c) meets of exceeds expectations
d) has the lowest cost possible
39. Which of the following is considered most important for maintaining a long term
supplier partnership?
a) consistent quality
b) fastest delivery
c) lowest cost
d) geographic proximity
40. An inventory item has a demand of 40 units per week, a lead time of 4 weeks, and
safety stock is set at 50 units. Calculate the order point.
a) 160
b) 210 OP = DDLT + SS (40 x 4) + 50 = 210
c) 260
d) 40
41. If the safety stock is 50 and order quantity is 100 units, what is average inventory?
a) 50
b) 75
c) 100 (100/2) + 50 = 100 Q/2 + SS
d) 150
44. When an MRP report generated, where is the first place one should look?
a) inventory levels
b) planned order receipts
c) gross requirements
d) exception report
46. Who is the customer for the production department in a make to stock company?
a) private label customers
b) marketing and sales
c) quality department
d) all of the above
47. A bill of material should be structured so that:
a) is an aid in planning
b) reflects how the product is built
c) satisfy all the users
d) all of the above is true
52. Which one of the following is considered the single most desirable factor in
successful system implementation?
a) education
b) short setup and implementation time
c) use an outside expert as consultant
d) top management understanding of how system works
53. In materials management, what is needed, how much is needed, when it is needed
are questions of:
a) priority
b) capacity
c) marketing
d) not a concern of materials management
54. Which one of the following is the correct planning hierarchy sequence?
a) MPS, MRP, PAC, S&OP
b) Resource Plan, CRP, PAC
c) Business Plan, Resource Plan, Strategic Plan
d) MPS, MRP, PAC
63. In TOC, when the company can produce more than is demanded the constraint is:
a) Physical resource
b) Behavior-based
c) External market
d) Machine time
64. In Drum-Buffer-Rope, the Drum is:
a) Stock in front of the constraint
b) Communicates between the constraint and the release of materials
c) Inventory before the constraint
d) Schedule established at the constraint resource
65. In Throughput Accounting which of the following receives first priority?
a) Reduce operating expenses
b) Increase throughput
c) Reduce inventory investment
d) None of the above
66. Supply chain partners are important in the UN Global Compact Model because?
a) Firms must find and use the cheapest labor available globally
b) Firms must identify the low-cost supplier
c) Firms must ensure compliance among their partners
d) Firms must force their suppliers to participate
67. Corporate Social Responsibility (CSR) is?
a) The same as sustainability
b) Relates only to responsible use of resources
c) Relates only to social responsibility
d) An enabler of sustainability
13
25
37
49
14
26
38
50
15
27
39
51
16
28
40
52
17
29
41
53
18
30
42
54
19
031
43
55
20
32
44
56
21
33
45
57
10
22
34
46
58
11
23
35
47
59
12
24
36
48
60
Answers
1
13
25
37
49
14
26
38
50
15
27
39
51
16
28
40
52
17
29
41
53
18
30
42
54
19
31
43
55
20
32
44
56
21
33
45
57
10
22
34
46
58
11
23
35
47
59
12
24
36
48
60
Alan L. Milliken
61
62
63
64
65
66
67