In statistical quality control, the individual/moving-range chart is a type of control chart used to monitor variables data from abusiness or industrial process for which it
is impractical to use rational subgroups.[1]
The chart is necessary in the following situations:[2]:231
1.
Where automation allows inspection of each unit, so rational subgrouping has less benefit.
2.
Where production is slow so that waiting for enough samples to make a rational subgroup unacceptably delays monitoring
3.
For processes that produce homogeneous batches (e.g., chemical) where repeat measurements vary primarily because of measurement error
The "chart" actually consists of a pair of charts: one, the individuals chart, displays the individual measured values; the other, the moving range chart, displays the
difference from one point to the next. As with other control charts, these two charts enable the user to monitor a process for shifts in the process that alter the mean or
variance of the measured statistic.
Interpretation[edit]
As with other control charts, the individuals and moving range charts consist of points plotted with the control limits, or natural process limits. These limits reflect what the
process will deliver without fundamental changes.[3]:43 Points outside of these control limits are signals indicating that the process is not operating as consistently as
possible; that some assignable cause has resulted in a change in the process. Similarly, runs of points on one side of the average line should also be interpreted as a
signal of some change in the process. When such signals exist, action should be taken to identify and eliminate them. When no such signals are present, no changes to
the process control variables (i.e. "tampering") are necessary or desirable.[3]:125
Assumptions[edit]
The normal distribution is NOT assumed nor required in the calculation of control limits. Thus making the IndX/mR chart a very robust tool. This is demonstrated by
Wheeler using real-world data[4], [5] and for a number of highly non-normal probability distributions.[6]
, is calculated as
. For
ranges.
is
.
Next, the upper control limit (UCL) and lower control limit (LCL) for the individual values (or upper and lower natural process limits) are calculated by adding or
subtracting 2.66 times the average moving range to the process average:
The value 2.66 is obtained by dividing 3 by the sample size-specific d2 anti-biasing constant for n=2, as given in most textbooks on statistical process control (see, for
example, Montgomery[2]:725).
Creation of graphs[edit]
Once the averages and limits are calculated, all of the individuals data are plotted serially, in the order in which they were recorded. To this plot is added a line at the
average value, x and lines at the UCL and LCL values.
On a separate graph, the calculated ranges MRi are plotted. A line is added for the average value, MR and second line is plotted for the range upper control limit
(UCLr).
Analysis[edit]
The resulting plots are analyzed as for other control charts, using the rules that are deemed appropriate for the process and the desired level of control. At the least, any
points above either upper control limits or below the lower control limit are marked and considered a signal of changes in the underlying process that are worth further
investigation.
Potential pitfalls[edit]
The moving ranges involved are serially correlated so runs or cycles can show up on the moving average chart that do not indicate real problems in the underlying
process.[2]:237
In some cases, it may be advisable to use the median of the moving range rather than its average, as when the calculated range data contains a few large values that
may inflate the estimate of the population's dispersion.[7]
Some have alleged that departures in normality in the process output significantly reduce the effectiveness of the charts to the point where it may require control limits to
be set based on percentiles of the empirically-determined distribution of the process output[2]:237 although this assertion has been consistently refuted. See Footnote 6.
Many software packages will, given the individuals data, perform all of the needed calculations and plot the results. Care should be taken to ensure that the control limits
are correctly calculated, per the above and standard texts on SPC. In some cases, the software's default settings may produce incorrect results; in others, user
modifications to the settings could result in incorrect results. Sample data and results are presented by Wheeler for the explicit purpose of testing SPC
software.[7] Performing such software validationis generally a good idea with any SPC software.