Part 4 Proc 71
Part 4 Proc 71
825
1 Introduction
BIM(Building information model) is widely applied and gets good achievements in the field of
construction. It influents the management of construction project in many aspects and raises some new
requirements of cultivating and training abilities for the project managers. This issue has already
attracted some academics attention to do some research, but now most of them focused on the design
field. Through analyzing definitions and characteristics of BIM, this paper discusses and studies some
effects on the project managers brought by it with a typical case.
The concept of building information model rising in the 1970s, it produced by accompanying with
information technology using in the construction. Due to long time of the development, the concept of
the presenter understood from several aspects related to this question. Therefore, it often appeared in
different names, such as Single Building Model/SBM, Integrated Building Model/IBM, Generic
Building Model/GBM or Virtual Building Model/VBM, Graph soft, etc. and had many concepts of
building information model, for instance, AIA said that building information model is a kind of
information model with project information database based on the model of the associated technology;
AGC considered that building information model is a tool of object-oriented building development,
which used 5D modeling concept, information technology and software to realize mutual operability of
construction project design, operation, maintenance, and realized the communication of information.
NIBS-Facility Information Council defined that an open industrial standards in the physical and function
of facilities and characteristics of the project life cycle of information in the form of computation, to
realize the better value of the project.
Summarizing related materials, building information model can be considered to have the
following characteristics: the information contained in BIM involving the whole project life cycle;
provide with supports for the collaborative construction project; involving information can be calculated,
emphasize the digitized information completely; defined by parameter the interaction of the building
component consists; the 2D / 3D real-time parameter display/and editor; complete the way of graphical
data report. [1]
826
project design and implement, about 590 mistakes are found and solved. For example, at an early stage
of design, with BIM, the team finds many problems in the structure of facility pipeline and then they
quickly solved them.
3D BIM provides a platform for parties to communicate. It is good for communicating and making
decisions more easily for all parties through 3D coordinative meeting. Using various software tools, all
members in the team can conveniently look and go through the model. They can get a better
understanding of designs and achieve better results in building.
In the virtual site built with BIM, all members and logistics organizations are arranged coordinately
before starting to work. It ensures that the project is implemented smoothly.
When the project is completed, general contractor hands over BIM to the owner, which reflected the
projects achievements, to operate and maintain the project.
2.2 Costs and Profits of Application of BIM
2.2.1 Costs of BIM
The total cost of building and maintenance of BIM is $90,000(take up about 0.2% in project
budget), and $40,000 is paid by the owner.
2.2.2 Profits of BIM
With BIM, the project team can find about 590 potential conflicts in advance. Therefore, about
$600,000 additional expenditure can be saved, and at the same time, about one months delay (1143h)
can be avoided.
In the process of the project, all parties communicate with each other on the basis of BIM. After
completing the project, all parties can find advantages of application of BIM and be familiar with its
process so that they can cooperate with each other in the future.
Due to the success in the application of BIM, the project rewards BITS in 2007 granted by AGC.
structural
engineer
architect
structural
engineer
civil
engineer
civil
engineer
facilities
engineer
facilities
engineer
Building Information
Model
owner
supervising
owner
supervising
engineer
engineer
contractor
contractor
property
manager
property
manager
Due to these changes, BIM makes new requirements for the project managers in abilities, qualities,
etc. and has a far-reaching impact on all aspects of cultivating project management talents [3-4] as
following:
It requires the project managers to set up the BIM-centered concept of information communication
and know convenience and profits of project management brought by BIM. In the information
communication of new projects (figure 1), BIM is the core and all delivery and communication of
information is based on it. Under this situation, the project managers should set up the BIM-centered
concept of information communication. The concept should contain two levels at least: Firstly, make
827
clear the functions of BIM; Secondly, be able to tell the differences and associations between BIM and
traditional 3D model in order to make it effective. Meanwhile, the project manager should fully
understand the benefits brought by BIM so as to function it well.
According to the standpoints of AGC, the effects of BIM on project management are as following:
finding conflicts (such as the structure of pipeline, etc.), setting up visual model, judging the
construction sit condition more reliably and protesting it with higher quality and less creative chances.
Whats more, it helps the managers to prepare more schemes, such as, different construction order,
logistics organization, cranes location and costs, etc. It also helps non-professional members to see
visual final products, so the number of re-examining and the costs of project guaranteeing are reduced [5].
Therefore, it is easy to find that the effects of BIM on project management are in all fields so that the
project managers should recognize it.
Having good command of tools and technologies related to BIM. Because BIM becomes the core
and basis of information communication, so the project managers should not only have a good command
of BIM tools, but also fully understand some technologies related to project management. At the present,
solutions of BIM are Autodesks Revit, Bentleys MicroStation TriForma and Graphsofts ArchiCAD,
etc. These varied solutions are widely used in construction and they can be worked as a basis to guiding
some managerial jobs and building models applied in management work, though they are mainly
adopted to build construction, structure and MEP models and have some differences between models of
the project management. In addition, some products can be used to build models that applied in the
process of construction, etc. For example, some construction software like Autodesks Naviswork,
Garphisofts Constructor are better adopted in the project management. In the case mentioned above,
Naviswork is served as a basic tool for all parties in the project.
Fully understand some problems caused by BIM. The application of BIM has changed the project
management work and procedures and the ways of communication for parties. Hence, the project
manager should fully understand some problems caused by BIM. For instance, how to add items related
to BIM in a contract? How to deal with some risks caused by it? How to get rid of the costs? And how
to cope with some changes of the team structure? etc. Due to these complicated problems, on one hand,
some research is needed to solve these problems; On the other hand, the project managers should keep a
clear head when meeting with these problems. When they make full use of BIM, some potential risks
should be concerned.
4 Conclusion
BIM is the new achievement when IT technology is used in construction field. It has a profound
influence on construction. The paper mainly discusses the effects of BIM on information of the project
management. And with the development of theory and technology of BIM, it will have a gigantic effect.
As a project manager, it will push the project management forward in the future as long as he/she has a
good command of theory and technology.
References
[1] ZhangYong, FuJun, WangQuanfeng. Construction Project Management Based on Building
information modeling [J]. Journal of Huaqiao University (Natural Science), 2008, 29(3): 424-426 (In
Chinese)
[2] Ding Shizhao. The Introduction Theory on Construction Project [M]. Beijing: China Architecture &
Building Press, 2005 (In Chinese)
[3] Salman Azhar, et a1. Building Information Modeling(BIM): A New Paradigm for Visual Interactive
Modeling and Simulation for Construction Projects: First International Conference on Construction
in Developing Countries(ICCIDC-I)[C]. Karachi: NED University of Engineering and Technology,
2008: 435-446
[4] Li Jiancheng. Building Information Model and Construction Project Management [J]. Project
Management Technology, 2006(1): 58-60 (In Chinese)
[5] Li Jiancheng. Building Information Modeling and Architecture Discipline Teaching[J]. Architectural
Journal, 2007(7): 100-101 (In Chinese)
[6] The Associated General Contractors of America. The Contractors Guide to BIM[EB OL].
[2007-12-25]. www.agcnebuilders.com/documents/BIMGuide.pdf.PMT