Load Sharing Module Woodward
Load Sharing Module Woodward
Load Sharing Module Woodward
(Revision G, 2/2013)
Original Instructions
Read this entire manual and all other publications pertaining to the work to be
performed before installing, operating, or servicing this equipment.
Practice all plant and safety instructions and precautions.
General
Precautions Failure to follow instructions can cause personal injury and/or property damage.
Revisions
This publication may have been revised or updated since this copy was produced.
To verify that you have the latest revision, check manual 26311 , Revision Status &
Distribution Restrictions of Woodward Technical Publications, on the publications
page of the Woodward website:
www.woodward.com/publications
The latest version of most publications is available on the publications page. If
your publication is not there, please contact your customer service representative
to get the latest copy.
Proper Use
Translated translation was made. Be sure to check manual 26311 , Revision Status &
Publications Distribution Restrictions of Woodward Technical Publications, to verify whether
this translation is up to date. Out-of-date translations are marked with . Always
compare with the original for technical specifications and for proper and safe
installation and operation procedures.
RevisionsChanges in this publication since the last revision are indicated by a black line
alongside the text.
Woodward reserves the right to update any portion of this publication at any time. Information provided by Woodward is
believed to be correct and reliable. However, no responsibility is assumed by Woodward unless otherwise expressly
undertaken.
Manual 02036
Copyright Woodward 19992013
All Rights Reserved
Manual 02036
Contents
WARNINGS AND NOTICES ............................................................................III
ELECTROSTATIC DISCHARGE AWARENESS ................................................. IV
CHAPTER 1. GENERAL INFORMATION ........................................................... 1
Introduction .............................................................................................................1
Description ..............................................................................................................1
CHAPTER 2. INSTALLATION.......................................................................... 5
Introduction .............................................................................................................5
Unpacking ...............................................................................................................5
Location Considerations .........................................................................................5
General Wiring Requirements ................................................................................6
Power Requirements ..............................................................................................6
Shielded Wiring ......................................................................................................7
Generator Connections ..........................................................................................8
Current Transformers .............................................................................................8
Load Sharing Lines, Droop, and Auxiliary Contacts ...............................................8
Output to the Caterpillar Digital Electronic Control .................................................9
Synchronization Connections .................................................................................9
Speed Trim Potentiometer......................................................................................9
CHAPTER 3. SETUP AND CALIBRATION ...................................................... 10
Introduction ...........................................................................................................10
Phasing Check .....................................................................................................11
Phase Correction Procedure ................................................................................12
Load Gain Adjustment ..........................................................................................15
Droop Adjustment .................................................................................................16
Setting Droop for an Isolated Load.......................................................................16
Setting Droop for an Infinite Bus ..........................................................................17
CHAPTER 4. THEORY OF OPERATION ......................................................... 18
Introduction ...........................................................................................................18
Power Supply .......................................................................................................18
Power Sensor .......................................................................................................18
Load Comparator Circuit ......................................................................................18
Speed Trim Circuit ................................................................................................19
Isochronous Load Sharing....................................................................................19
Droop Operation ...................................................................................................19
Auxiliary Equipment ..............................................................................................19
Pulse Width Modulation ........................................................................................19
CHAPTER 5. TROUBLESHOOTING ............................................................... 20
CHAPTER 6. SERVICE OPTIONS ................................................................. 22
Product Service Options .......................................................................................22
Woodward Factory Servicing Options ..................................................................23
Returning Equipment for Repair ...........................................................................23
Replacement Parts ...............................................................................................24
Engineering Services............................................................................................24
How to Contact Woodward ...................................................................................25
Technical Assistance ............................................................................................25
Woodward
Manual 02036
ii
Woodward
Manual 02036
Overspeed /
Overtemperature /
Overpressure
Personal Protective
Equipment
Eye Protection
Hearing Protection
Hard Hat
Gloves
Safety Boots
Respirator
Always read the proper Material Safety Data Sheet (MSDS) for any
working fluid(s) and comply with recommended safety equipment.
Start-up
Automotive
Applications
Woodward
iii
Manual 02036
Battery Charging
Device
Electrostatic
Precautions
When replacing a PCB, keep the new PCB in the plastic antistatic
protective bag it comes in until you are ready to install it. Immediately
after removing the old PCB from the control cabinet, place it in the
antistatic protective bag.
iv
Woodward
Manual 02036
Chapter 1.
General Information
Introduction
The Woodward Load Sharing Module is made for use with Caterpillar engines
equipped with a Caterpillar digital speed control with a pulse width modulated
(PWM) input. The Load Sharing Module allows use of Woodward power
generation accessories and allows load sharing between the Caterpillar digital
speed control equipped engines and engines controlled with Woodward
electronic controls.
Part Number
9907-175
9907-838
Power Supply
24 Vdc
24 Vdc
Description
The Load Sharing Module provides isochronous and droop load-sharing
capability for engines equipped with Caterpillar digital controls in generator set
applications. Additional equipment in the control system can include the
Woodward SPM-A Synchronizer, Paralleling Phase Switch, Import/Export
Control, Precision Frequency Control, Automatic Generator Loading Control, and
Automatic Power Transfer and Loading Control.
Figure 1-1 shows a typical system using a Load Sharing Module.
Manual 02036
Woodward
Manual 02036
Woodward
Manual 02036
Woodward
Manual 02036
Chapter 2.
Installation
Introduction
This section contains general installation instructions for the Load Sharing
Module. Environmental precautions and location considerations are included to
determine the best location for the Load Sharing Module. Additional information
includes unpacking instructions, electrical connections, and an installation checkout procedure.
Unpacking
Before handling the Load Sharing Module, read page iii, Electrostatic Discharge
Awareness. Be careful when unpacking the Load Sharing Module. Check the unit
for signs of damage such as bent or dented panels, scratches, and loose or
broken parts. Notify the shipper of any damage.
Location Considerations
Consider these requirements when selecting the mounting location:
All wiring to/from the Load Sharing Module should be limited to 30 m (98 ft)
in length.
Woodward
Manual 02036
Power Requirements
The Load Sharing Module is powered from a 24 Vdc source. The 24 Vdc source
must be a minimum of 18 Vdc and a maximum of 32 Vdc continuous. If a battery
is used for operating power, an alternator or other battery charging device is
necessary to maintain a stable supply voltage.
To prevent possible serious damage to the Load Sharing Module,
make sure the alternator or other battery charging device is turned
off or disconnected before disconnecting the battery from the unit.
6
Woodward
Manual 02036
Shielded Wiring
All shielded cable must be twisted conductors with either a foil or braided shield.
Do not attempt to tin (put solder on) the braided shield. All signal lines should be
shielded to prevent picking up stray signals from adjacent equipment. Connect
the shields to the terminals indicated in the plant wiring diagram. Wire exposed
beyond the shield must be as short as possible.
The other end of the shields must be left open and insulated from any other
conductor. Do not run shielded signal wires with other wires carrying large
currents. See Woodward application note 50532, EMI Control in Electronic
Governing Systems, for more information.
Where shielded cable is required, cut the cable to the desired length and prepare
the cable as instructed below and shown in Figure 2-1.
Woodward
Manual 02036
Generator Connections
Use 1 mm (18 AWG) or larger wire for all PT and CT connections.
The spacing between the lugs on terminals 3 and 4 must be 6.5 mm
(0.256 inch) or greater to comply with the European Union Low
Voltage Directive (see Figure 1-3). The lugs must have insulated
sleeves.
Current Transformers
Power source current transformers should be sized to produce 5 A secondary
current with maximum generator current (37 A secondary current at full load is
acceptable). CT burden is 0.1 VA. To prevent lethal high voltage from developing
on leads to the terminals, the Load Sharing Module contains internal burden
which must be connected across the power source current transformers
whenever the unit is running. Ammeters may be installed on the leads from the
current transformers.
Connect phase A CT to terminals 4 and 5. Connect phase B CT to terminals 6
and 7. Connect Phase C CT to terminals 8 and 9. Observe correct phasing as
shown in the plant wiring diagram, Figure 1-3.
Woodward
Manual 02036
Use twisted 0.5 mm (20 AWG) or larger shielded wire to connect the load
sharing lines to the other Load Sharing Modules. Connect the (+) wire from the
other Load Sharing Modules to terminal 10. Connect the () wire from the other
Load Sharing Modules to terminal 11. Connect the shield of the load share wiring
to terminal 12. The shield should always be connected only to terminal 12. No
other shields should be connected to this terminal.
Synchronization Connections
If an SPM-A synchronizer is used, connect twisted-pair 0.5 mm (20 AWG) or
larger shielded wire from the synchronizer to terminals 24(+) and 25(). Tie the
shield to terminal 21. Do not connect the shield at the synchronizer end of the
wiring.
Woodward
Manual 02036
Chapter 3.
Setup and Calibration
Introduction
Use this calibration procedure after a Load Sharing Module is installed on a
generator set, to obtain the needed operating characteristics during load sharing.
1.
Check that the proper voltage is connected to terminals 15(+) and 16().
Proper polarity must be maintained. See the plant wiring diagram, Figure
1-3.
2.
Remove wires from load sharing line terminals 10 and 11, and from the
SPM-A Synchronizer (if used) at terminals 24 and 25.
3.
4.
5.
6.
7.
Check the load signal voltage between terminals 22 and 23. Adjust the
LOAD GAIN potentiometer for 6.0 Vdc signal. If this voltage is not
obtainable, set the load signal as close as possible to 6 Vdc.
8.
9.
Check the voltage between terminals 22 and 23. This voltage should be 0.0
0.25 Vdc. If this voltage is not correct, the Load Sharing Module unit is
faulty or there may still be load on the generator.
10
Woodward
Manual 02036
Phasing Check
HIGH VOLTAGEA high voltage across open CTs (current
transformers) can cause death or serious injury. Do not disconnect a
CT from the Load Sharing Module while the engine is running. The
CTs can develop dangerously high voltages and may explode if open
circuited while the engine is running.
For this check, the generator set must be running isochronously, not paralleled,
and with a power factor greater than 0.8.
10. Check that the potential connections are made as follows and correct them
if they are not.
Phase A to terminal 1
Phase B to Terminal 2
Phase C to Terminal 3
The most accurate calibration is made at full load. However, if it is
not possible to run the generator set at full load, run it at less than
full load, and reduce the voltage readings given in this calibration
procedure proportionally. For example: run a 200 kW generator set at
100 kW and divide all voltages given in this calibration procedure by
2. If you reduce the load in this manner, be sure to reduce it the same
amount throughout this calibration procedure.
11. Start the engine and apply full load to the generator set.
12. Using a dc voltmeter, measure the load signal at terminals 22 and 23. Adjust the
load gain potentiometer to give a 6 Vdc load signal. If 6 Vdc is not obtainable, set
the load signal as close as possible to 6 Vdc. Record this voltage.
13. Shut down the generator set.
HIGH VOLTAGEA high voltage across open CTs (current
transformers) can cause death or serious injury. Do not disconnect a
CT from the Load Sharing Module while the engine is running. The
CTs can develop dangerously high voltages and may explode if open
circuited while the engine is running.
14. Disconnect the wire from terminal 5 that comes from the phase A CT and
connect both wires from this CT to terminal 4.
15. Start the generator set and apply full load.
16. Measure the load signal at terminals 22 and 23. If the phase B and C
current transformers are connected correctly, this voltage will be 1/3 lower
than the voltage recorded in step 13. For example: if the reading was 6 volts
in step 13, the reading in this step should be approximately 4 volts.
17. Shut down the generator set.
18. Reconnect the phase A CT wire to terminal 5.
19. If the reading in step 16 was correct, proceed to Load Gain Adjustment later in
this chapter. Otherwise, perform the following Phase Correction Procedure.
Woodward
11
Manual 02036
2.
Label each CT wire with the phase and polarity that you think it should be.
Even though this identification may prove to be wrong during this procedure,
this step is necessary so that the individual wires may be identified during
the description of the procedure.
12
Woodward
Manual 02036
4.
5.
Connect the two wires from the phase A CT to phase A input terminals 4
and 5.
Be prepared to make an emergency shutdown when starting the
engine, turbine, or other type of prime mover, to protect against
runaway or overspeed with possible personal injury, loss of life, or
property damage.
6.
7.
Measure the load signal voltage between terminals 22 and 23 and record
this voltage.
8.
Shut the generator set down and reverse the phase A wires on terminals 4
and 5.
9.
10. Measure the load signal voltage between terminals 22 and 23 and record
this voltage.
11. Shut the generator set down.
12. Remove the phase A CT wires from terminal 4 and 5 and connect the
phase A CT wires to the phase B input terminals 6 and 7.
Woodward
13
Manual 02036
Woodward
Manual 02036
2.
Measure the load signal voltage and adjust the LOAD GAIN potentiometer
for 6 0.1 Vdc.
If the load signal voltage cannot be raised to 6 volts, and the phasing has been
checked and is correct, it will be necessary to use a lower load signal voltage.
Set the full load signal voltages of all generator sets in the system to the same
voltage.
Woodward
15
Manual 02036
Droop Adjustment
Droop is usually expressed as a percentage. Droop percentage is calculated by
dividing the difference between the no load speed and the full load speed by the
rated speed.
The DROOP potentiometer only needs to be adjusted when the generator set is
to be operated in droop mode. The method of setting droop depends on whether
the load on the generator set is an isolated load or an infinite bus. Once adjusted,
the droop potentiometer will not have to be readjusted unless a different droop
percentage is desired.
Open the OPEN FOR DROOP switch (or disconnect the wires from
terminals 13 and 14).
2.
Start the engine and adjust the speed for rated with no load.
3.
4.
Woodward
Manual 02036
With the generator not paralleled, adjust the speed above rated frequency
by the percent droop required (set engine at 63 Hz for 5 percent droop on a
60 Hz system).
2.
3.
4.
Synchronize the generator with the bus and parallel it with the bus.
5.
6.
If it is necessary to set the droop without pulling 100 percent load, set the engine
speed accordingly for the desired percent of droop at the load to be pulled. For
example: Five percent droop at 50 percent load will require a no load rated speed
of 61.5 Hz, not 63 Hz, on a 60 Hz system.
Woodward
17
Manual 02036
Chapter 4.
Theory of Operation
Introduction
This chapter describes the operation of the Load Sharing Module and its internal
circuits. Figure 1-4 is a block diagram of the circuits in the module.
The Load Sharing Module senses the power output of a generator and provides
a pulse-width modulated signal to the Caterpillar digital speed control to adjust
the power output of the engine-generator set to match the reference power level.
The Load Sharing Module can also produce a droop condition (instead of
isochronous load-sharing) for the engine with Caterpillar digital speed control,
making it possible to connect the generator set in parallel with either a generator
set which is running isochronously, or with an infinite bus.
Power Supply
The internal power supply generates a regulated dc voltage for the operation of
the circuits in the Load Sharing Module. The power supply gets its power from
the engine 24 Vdc power source. To prevent damage to the Load Sharing
Module that uses an alternator or battery charging device, make sure the
charging device is turned off before disconnecting or connecting the 24 Vdc
supply to the unit.
Power Sensor
Generator load is measured by the power-sensor circuit of the Load Sharing
Module. The power-sensor circuit senses current amplitude, and produces a load
signal proportional to the current amplitude times the power factor. The potential
input comes from potential transformers (PTs) and the current input comes from
the current transformers (CTs). The circuit uses these two inputs to generate a
load signal which is then filtered and sent to the controller circuit. The load signal
voltage of each generator set will be proportional to the percentage of rated load
on the generator set.
Ammeters and voltmeters may be driven with the same PT and CT wires.
18
Woodward
Manual 02036
Droop Operation
In droop operation, a portion of the load signal voltage is fed to the controller
circuit. This voltage is used by the comparator circuit to reduce the control output
by a percentage determined by the DROOP potentiometer. The output is
reduced, and the Caterpillar digital speed control reduces engine power
according to the desired droop percentage.
When a generator set using the Load Sharing Module is paralleled in droop with
other generator sets, the common load signal on the paralleling lines is not used.
The frequency of the generator set will therefore vary with load, so it must be
determined by a different means. In an isolated system with two or more
generator sets paralleled, if isochronous speed control is required, one of the
generator sets must be running in the isochronous (constant speed) mode. This
generator set maintains the frequency of the system. If a generator set is in
droop and is paralleled with an infinite bus, the bus determines and maintains the
frequency. The DROOP percentage and the speed setting on the Caterpillar
digital speed control determine the amount of the load that is carried by the
generator, when running in droop.
Auxiliary Equipment
The Woodward SPM-A synchronizer functions by biasing the output of the Load
Sharing Module. All other Woodward auxiliary generating control equipment
functions by biasing the voltage on the load-sharing lines.
Woodward
19
Manual 02036
Chapter 5.
Troubleshooting
The following trouble-shooting guide is an aid in isolating trouble to the Load
Sharing Module, engine control, plant wiring, or elsewhere. The guide assumes
that the system wiring, soldered connections, switch and relay contacts, and
input and output connections are correct and in good working order. Make the
checks in the order indicated.
To prevent possible serious damage to the Load Sharing Module, do
not attempt to service the unit beyond that described in the operating
instructions. All other servicing should be referred to qualified
service personnel.
SYMPTOMS
Undesirable speed decrease
with load increase.
CAUSE
Droop mode switch is open or
auxiliary contact is open. Load
Sharing Module is in droop
mode.
Improper engine operation.
Operate the engine and
observe speed while applying
load.
Faulty engine control.
Disconnect the Load Sharing
Module and load the engine as
a single, isolated unit.
Open or intermittent wire.
EMI (Electromagnetic
Interference).
Unstable system.
Unstable voltage regulator.
Poor system stability.
Load Signal voltage is low.
Adjusting LOAD Gain won't
raise it.
20
TEST/REMEDY
Jumper Load Sharing Module terminals 13
and 14. If this corrects the problem, replace
wiring or switch as required. The module
will not go into droop with the terminals
connected.
If droop occurs near the full load point only,
it is possible the engine is not producing the
horsepower called for or is being
overloaded.
If speed continues to decrease with load,
engine operation may be faulty.
Check all wiring for continuity and tight
connections. Repair if necessary.
Remove ground loops. Shield all wiring
(load sharing lines, output to the speed
control, speed trim pot, and SPM-A
synchronizer input. Route wiring away from
noise sources.
Check system for proper operation.
Consult voltage regulator manufacturers
manual for proper adjustment.
Reduce the load signal voltage of each unit
in the system to three volts.
Perform phasing check. If phasing check
indicates need, perform procedure for
correct phase wiring.
Check for 5 amp CT output at full load.
Change to a lower primary current CT if
necessary.
Woodward
Manual 02036
SYMPTOMS
Load Signal voltage is too
high. Adjusting LOAD GAIN
will not lower it.
CAUSE
CT output too high.
Woodward
TEST/REMEDY
Check for 5 amp CT output at full load. (CT
output must be between 3 and 7 amps at
full load.) Change to a higher primary
current CT if necessary.
Check for maximum voltage from terminals
22 to 23. If possible check the voltage from
terminal 19 to 20. If the Load Sharing
Module is putting out a maximum signal, the
problem is either in the wiring to the engine
control, the engine control, or the engine.
Be sure the speed settings of all off-line
units at no load are identical. Adjust as
necessary. Resynchronize.
Check that load gain settings of all load
sharing units are correct. See load gain
adjustment in Chapter 3. Adjust as
necessary.
Perform the transformer phasing check in
Chapter 3. Correct as necessary.
Properly adjust the generator voltage
regulators.
Jumper Load Sharing Module terminals 13
and 14. Observe engine operation. Replace
wiring or switch as required.
21
Manual 02036
Chapter 6.
Service Options
Product Service Options
If you are experiencing problems with the installation, or unsatisfactory
performance of a Woodward product, the following options are available:
A Full Service Distributor has the primary responsibility for sales, service,
system integration solutions, technical desk support, and aftermarket
marketing of standard Woodward products within a specific geographic area
and market segment.
You can locate your nearest Woodward distributor, AISF, RER, or RTR on our
website at:
www.woodward.com/directory
22
Woodward
Manual 02036
Woodward
23
Manual 02036
Packing a Control
Use the following materials when returning a complete control:
packing materials that will not damage the surface of the unit;
a strong tape around the outside of the carton for increased strength.
To prevent damage to electronic components caused by improper
handling, read and observe the precautions in Woodward manual
82715, Guide for Handling and Protection of Electronic Controls,
Printed Circuit Boards, and Modules.
Replacement Parts
When ordering replacement parts for controls, include the following information:
Engineering Services
Woodward offers various Engineering Services for our products. For these services,
you can contact us by telephone, by email, or through the Woodward website.
Technical Support
Product Training
Field Service
Technical Support is available from your equipment system supplier, your local FullService Distributor, or from many of Woodwards worldwide locations, depending
upon the product and application. This service can assist you with technical
questions or problem solving during the normal business hours of the Woodward
location you contact. Emergency assistance is also available during non-business
hours by phoning Woodward and stating the urgency of your problem.
Product Training is available as standard classes at many of our worldwide
locations. We also offer customized classes, which can be tailored to your needs
and can be held at one of our locations or at your site. This training, conducted
by experienced personnel, will assure that you will be able to maintain system
reliability and availability.
Field Service engineering on-site support is available, depending on the product
and location, from many of our worldwide locations or from one of our FullService Distributors. The field engineers are experienced both on Woodward
products as well as on much of the non-Woodward equipment with which our
products interface.
For information on these services, please contact us via telephone, email us, or
use our website: www.woodward.com.
24
Woodward
Manual 02036
Engine Systems
Turbine Systems
You can also locate your nearest Woodward distributor or service facility on our
website at:
www.woodward.com/directory
Technical Assistance
If you need to telephone for technical assistance, you will need to provide the following information.
Please write it down here before phoning:
Your Name
Site Location
Phone Number
Fax Number
Engine/Turbine Model Number
Manufacturer
Number of Cylinders (if applicable)
Type of Fuel (gas, gaseous, steam, etc)
Rating
Application
Control/Governor #1
Woodward Part Number & Rev. Letter
Control Description or Governor Type
Serial Number
Control/Governor #2
Woodward Part Number & Rev. Letter
Control Description or Governor Type
Serial Number
Control/Governor #3
Woodward Part Number & Rev. Letter
Control Description or Governor Type
Serial Number
If you have an electronic or programmable control, please have the adjustment setting positions or
the menu settings written down and with you at the time of the call.
Woodward
25
Manual 02036
Appendix.
LSM Control Specifications
POWER SUPPLY
INPUTS
3-phase PT Inputs
3-phase CT Inputs
Sync Input
Speed Trim
Droop Switch
OUTPUTS
Load Signal
PWM Output
ADJUSTMENTS
Droop
Load Gain
26
Woodward
Manual 02036
ENVIRONMENTAL
Operating Temperature
Salt Fog
Humidity
Vibration
Shock
Installation
Overvoltage Category
Air Quality
DIMENSIONS
Linear (maximum)
Weight
40 G, 11 ms sawtooth pulse.
Category III.
Pollution Degree 2.
Length: 273.6 mm (10.77 in)
Width: 214.1 mm (8.43 in)
Height: 59.2 mm (2.33 in)
1397 g (49.3 oz) approximate
*When used with a speed control having a gain of 0.382% speed change
per 1% duty cycle change.
Woodward
27
Manual 02036
Revision History
Changes in Revision G
28
Woodward
Manual 02036
Declarations
Woodward
29