Amadeus Training User Guide v1
Amadeus Training User Guide v1
Amadeus Training User Guide v1
User Guide
Version 1.0
1 June 2012
1 June 2012
Page 1 of 23
Document control
Security level
Company
Version
Amadeus IT Group SA
Date
Change
Comment
1.0
01 June 2012
Audience = all
1 June 2012
Page 2 of 23
Table of Contents
1
1 June 2012
Page 3 of 23
1 June 2012
Page 4 of 23
1 June 2012
Page 5 of 23
The frequency with which the capture and restore process happens varies, but they are
usually spaced at approximately 4 month intervals.
Remember to look at the official capture and restore dates before scheduling training in
order to avoid delivering training on the day of a restore. After the first restore cycle, you
may want to take time to check that the data has restored as you expected.
Any updates to Production data will appear in Amadeus Training (SKL) after the next full
capture/restore process.
For example: Data loaded after the capture on 26 May, will appear on Amadeus Training
only after the capture and restore cycle of 22Sep/27Oct completes:
1 June 2012
Page 6 of 23
1 June 2012
Page 7 of 23
If you create a PNR in Amadeus Training, you do not create a booking or reduce
inventory in Production.
You can update EOS agreements (Extended Ownership Security) to increase your
security in Amadeus Training without making the changes in Production.
Such changes will last until the next restore unless a work order is opened and the data is
requested to be permanently available (as explained in section 2.2).
1 June 2012
Page 8 of 23
It takes least effort to have data loaded from Production to Amadeus Training using the
standard capture/restore process. The data must be in Production in time for a full
capture/restore process to complete.
Check the official capture/restore dates to work out when the data needs to be on
Production in order to be restored to Amadeus Training in time for the delivery of any
planned training course. .
2. By work orders - requesting data to be loaded by work order allows data to be loaded to
Amadeus Training only (and not to Production), or load it to Amadeus Training at the
same time it is loaded into Production. The work order specifies if the data is to be
loaded once only to Amadeus Training or after each restore on Amadeus Training.
Data must be loaded to Amadeus Training by work order if the data could
adversely impact the data in Production.
1 June 2012
Page 9 of 23
In
Amadeus
Training?
Segment Sell
Dynamic Discount Fares
Information Pages
Service Fee Manager
Availability
Ancillary Services
Yes*
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Profiles
Yes
Yes
Queues
Yes
Yes
Local security
Yes
Yes
Yes
Yes
Air displays
Yes
Yes
Yes
Yes
Teletype
No
Yes**
No
No
Offers
No
Yes
PNR history
No
Yes
Negotiated Fares
Fare Quote
Amadeus Ticketless Access
Yes
Yes
Yes
Yes
Yes
Yes
Electronic Ticketing
Yes
Yes
Pricing
Yes
Yes
Ticketing, TST
Yes***
Yes
No
Yes***
Yes
Yes
Yes***
Yes
Yes***
Yes
EMD
No
Yes
Yes
Yes
Reservations
Fares
Ticketing
1 June 2012
Page 10 of 23
In
Practice
Training?
In
Amadeus
Training?
Cars
No
Yes
No
Yes
Yes
Yes
No
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
NO
e-Travel
Help Desk
Corporate
1 June 2012
Page 11 of 23
3.2 Functionality
There are some changes from the Production and the Practice Training environments that
need to be taken into consideration when planning and performing a training course.
In Practice Training, links are not in place with the external world. This means that bookings
made on non Alta airlines do not target inventory and use simulated messages to generate
the replies.
On Amadeus Training, Amadeus will have a link to the test system of the target airline thus
enabling a real interaction with the other system. This is required so that ticketing (and
potentially Ancillary Services) may be performed on Non Alta Hosted Airlines. The
drawback of having interactive links is that the following:
Amadeus does not control what the receiving system sends back
Amadeus does not control when the receiving system may be down or does not reply
Whenever possible, it is recommended to use Alta hosted airlines but in certain markets, it
will be necessary to use other airlines.
6.1P100
6.2P100
7.1P100 and higher
Note: Access requires the correct setup in WebConfig, and any issues can be opened as
Incident Reports (IRs).
Notes:
The Plus components (Cars Plus, Hotels Plus etc.) are not smart tabs. They are new
generation components of Selling Platform..
Smart keys are basically scripts of cryptic entries, and smart keys work correctly in
Amadeus Training.
1 June 2012
Page 12 of 23
Comments
The dedicated urls below are available with V5.2 or higher for a
direct connection to Amadeus Training:
training.amadeusvista.com (by Internet)
training.1a.amadeusvista.com (by Amadeus network)
Comments
1 June 2012
Page 13 of 23
1 June 2012
Page 14 of 23
HELPT
HESKL
AFCHK
SKL01
1APR1
SKL02
ATC1
SKL03
1ATR1
SKL04
1AWWW
SKL05
HDCTS
SKL06
ALTNG
SKL07
SUTNG
SKL08
The user group SKL08 has been set with values necessary for training delivery for
example, EOT is authorized and TRCS is set to allow refunds.
All training offices in Amadeus Training will be set to use the user group SKL08 by
default from the 30 June 2012 onwards.
Training offices are considered to be those with the setting CTO = TRN.
1 June 2012
Page 15 of 23
3.5.2 Refunds
Performing refunds is permitted by everyone using Amadeus Training.
You may need to check that the user group being used in Amadeus Training has TRCS set if
you are using a user group other than those detailed in section 3.5.1.
3.6 Printing
To deliver training on Amadeus Training you are recommended to use the virtual training
printer that is set up by default for all user groups in Amadeus Training.
1 June 2012
Page 16 of 23
sign in to Amadeus Training SKL in order to see the settings for user groups in SKL.
The settings can be different in Amadeus Training, and any changes made in Amadeus
Training do not affect Production.
2. An easy way to verify that you are working in Amadeus Training is to check the system
date - it is always 5 weeks behind Production. The DD entry shows you the system date.
3. After each restore your training password will be over-ridden by the newly captured
Production password (could be an old one!). Please bear this in mind when the next
restore happens.
4. Avoid delivering training during scheduled outages.
5. After a restore, remember to check your course entries before delivering your training
Amadeus Training.
1 June 2012
Page 17 of 23
1 June 2012
Page 18 of 23
IE
IF
J2
JJ
JP
JU
JZ
KA
KC
KL
KQ
LH
LJ
LN
LO
LR
LY
MD
ME
MK
MR
MS
MX
NF
NH
NP
NT
NZ
OK
OS
OU
OV
PC
PH
PU
PZ
Q8
QA
QC
QF
1 June 2012
Page 19 of 23
Solomon Airlines
Islas Airways
Azerbijan Airlines
TAM
Adria Airways
JAT
Skyways AB
Dragonair
Air Astana
KLM Royal Dutch Airlines
Kenya Airways
Lufthansa
Jin Air
Libyan Airlines
LOT Polish Airlines
LACSA
El Al
Air Madagascar
Middle East Airlines
Air Mauritius
Mongolian Airlines
Egyptair
Mexicana
Air Vanuatu
All Nippon
Nile Air
Binter Canarias
Air New Zealand
Czech Airlines
Austrain
Croatian Airlines
Estonian Air
Pegasus Airlines
Transavia Denmark
Pluna
TAM Mercosur
Trans Air Congo
Mexicana Click
Camair CO
QANTAS
QI
QR
RC
RJ
S4
SA
SB
SE
SN
SP
SQ
SS
SV
T0
T7
TA
TG
TK
TL
TP
TU
TX
UD
UG
UU
UX
V0
VA
VQ
VS
VU
VV
VY
WF
XK
YM
ZI
1 June 2012
Page 20 of 23
Cimber Sterling
QATAR
Atlantic Airways
Royal Jordanian
SATA International
South African Airways
Air Calin
XL Airways France
Brussels Airlines
SATA Air Aores
Singapore Airlines
Corsair
Saudi Arabian Airlines
TACA Peru
Twin Jet
TACA
Thai Airways
Turkish Airlines
Airnorth
TAP
Tunisair
Air Caraibes
Hex Air
Tunisair Express
Air Austral
Air Europa
Conviasa
Virgin Australia
Viking Hellas Airlines
Virgin Atlantic
Air Ivoire
Aerosvit Airlines
Vueling Airlines
Wideroe
CCM Airlines
Montenegro Airlines
Aigle Azur
1 June 2012
Page 21 of 23
9B
JP
A3
EI
A4
VV
ZI
KC
UU
BT
AB
SB
TX
UX
AF
VU
MD
MK
NZ
FJ
NF
A5
TL
NH
RC
OS
AV
J2
NT
BA
BD
SN
FB
QC
CX
XK
QI
CF
V0
Corsair
Croatian Airlines
Czech Airlines
Delta Airlines
Donbassaero Airlines
Dragonair
Egyptair
El Al
Ero Sun d'Or
Estonian Air
Ethiad
Finnair
Golden Air
Hahn Air
Hex Air
IBERIA
Icelandair
Islas Airways
JAT
Jin Air
Kenya Airways
KLM Royal Dutch Airlines
LACSA
Libyan Airlines
LOT Polish Airlines
Lufthansa
Mexicana
Mexicana Click
Middle East Airlines
Mongolian Airlines
Montenegro Airlines
Nile Air
Norwegian Air Shuttle
Pegasus Airlines
Pluna
QANTAS
QATAR
Rossyia Airlines
Royal Air Maroc
Royal Jordanian
1 June 2012
Page 22 of 23
SS
OU
OK
DL
7D
KA
MS
LY
2U
OV
EY
AY
DC
HR
UD
IB
FI
IF
JU
LJ
KQ
KL
LR
LN
LO
LH
MX
QA
ME
MR
YM
NP
DY
PC
PU
QF
QR
FV
AT
RJ
Safi Airways
SATA Air Aores
SATA International
Saudi Arabian Airlines
Singapore Airlines
Skyways AB
Solomon Airlines
South African Airways
TACA
TACA Peru
TAM
TAM Mercosur
TAP
Thai Airways
Trans Air Congo
Transavia Denmark
Tunisair
Tunisair Express
Turkish Airlines
Twin Jet
Viking Hellas Airlines
Virgin Atlantic
Virgin Australia
Vueling Airlines
Wideroe
XL Airways France
1 June 2012
Page 23 of 23
4Q
SP
S4
SV
SQ
JZ
IE
SA
TA
T0
JJ
PZ
TP
TG
Q8
PH
TU
UG
TK
T7
VQ
VS
VA
VY
WF
SE