East Kalimantan, one of the economic center in Kalimantan Coridor has identify
some investment point which scattered in 7 Industrial zone from southern to
northen part of the province. Reinforcement of infrastructure is the main rule
to connecting intra and inter industrial zone, industrial zone with other region
and economic corridor.
6.
7
8
9
PROJECT
Development of Pulau Balang Bridge (long section)
Development of Loa Kulu Bridge
Development of Aji Tullur Jejangkat Bridge
Development of Maratua Airport
Development of West Kutai Balikpapan Railway
INVESTMENT
IDR 1,6 Trilion
IDR 750 Billion
IDR 505 Billion
IDR 270 Billion
US$ 1,8 Billion
IDR 1 Trilion
IDR 1 Trilion
IDR 1 Trilion
PROJECT
Expansion of Sepinggan International Airport,
Balikpapan
Biogas Plant, PT. REA Kaltim
IDR 25 Miliar
INVESTMENT
IDR 50 Billion
7.
PROJECT
INFORMATION
1.
Inaugurated
2.
Inaugurated
4.
Groundbreaking
5.
Groundbreaking
6.
Groundbreaking
7.
Groundbreaking
8.
Groundbreaking
9.
Groundbreaking
10.
Groundbreaking
11.
Groundbreaking
12.
Groundbreaking
13.
Groundbreaking
14.
Groundbreaking
15.
Inaugurated
16.
Groundbreaking
17.
Mahakam II Bridge
Groundbreaking
18.
Groundbreaking
19.
Groundbreaking
20.
Groundbreaking
21.
Groundbreaking
22.
Groundbreaking
8.
PROJECT
INFORMATION
23.
Groundbreaking
24.
Groundbreaking
25.
Groundbreaking
26.
Groundbreaking
27.
Kaliorang Dam
Groundbreaking
28.
Groundbreaking
29.
Marangkayu Dam
Groundbreaking
30.
Groundbreaking
31.
Groundbreaking
32.
Groundbreaking
33.
Groundbreaking
9.
PROJECT
INFORMATION
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
Maratua Airport
17.
18.
19.
10.
PROJECT
INFORMATION
20.
21.
22.
23.
24.
Education Centre
25.
26.
27.
28.
29.
11.
12.
13.
Border Zone/National
Strategic ZOne
Derawan Tourism
Industrial Zone
Maloy Industrial
Estate And
International Port
(Proposed to be
Special Economic
Zone)
Industrial Zone, Based
on Gas And Condensat
Samarinda Industrial Zone,
Based on Service Industry
Kariangau
Industrial Estate
14.
15.
16.
AMOUNT (Rp)
20.000.000.000
100.000.000.000
163.200.000.000
25.000.000.000
499.919.750.000
50.000.000.000
460.286.056.034
2.018.405.806.034
17.
18.
FUNDING :
Development of Kariangau Port supported by :
State Government through State Budget (APBN)
Provincial government through Provincial Budget (APBD)
PT. Pelindo IV
19.
Amount (IDR)
Process
Type of Job
2009 - 2013
Trestle,
Reclamation,
Sheet Pile,
management
office
APBD 1
(Province
Budget)
APBN (National
Budget)
2009 - 2011
Trestle
PT. Pelindo IV
2008 - 2011
Land side
20.
21.
22.
23.
PROJECT DESCRIPTION :
To reach Kariangau Container Terminal, from the National road of Samarinda-Balikpapan,
constructed access road along 11 Km. This pathway starts from Km. 13 Balikpapan, which
will be linked to the Samarinda-Balikpapan Freeway
SCOPE OF WORKS :
work includes land clearing, bridge and road construction, also handling landslide at
some point passed
OBJECTIVE :
Unwrap access to the Kariangau container terminal from the main highway
EXPECTED IMPACT :
Convenience movement of goods and passengers to perform activities in the Kariangau
Industrial Estate. Furthermore, the ease of access will have an impact on the optimization
of transport costs and quality of commodities carried. This course will improve the quality
and quantity of movement of economic activity.
FUNDING HISTORY :
East Kalimantan Government :
APBD 2009 : IDR 15 Billion
APBD 2010 : IDR 30 Billion
APBD 2011 : IDR 56,5 Billion
APBD 2012 : IDR 40 Billion
APBD 2013 : IDR 20 Billion
24.
Construction Progress
East Kalimantan Infrastructure Digest _BAPPEDA KALTIM
25.
26.
No
Main Job
Year
Cost
1.
2007
IDR10 Billion
2.
2008
IDR20 Billion
3.
2009
IDR80 Billion
4.
2010
IDR66 Billion
5.
2011
IDR21,9 Billion
6.
2011
IDR20 Billion
7.
Bridge Construction
2012
IDR65 Billion
8.
Bridge Construction
2013
IDR66 Billion
TOTAL
Rp. 348,9 M
27.
Long Section
Short Section
Project Location
28.
29.
Sign of project beginning; 2x100 MW Power Plant Development; March 25 th, 2011
Access Road
Turbine
30.
PROJECT SCOPE :
Construction of the dam with the capacity of 4.5 Million Cubic and the output
262 L/Sec.
EXPECTED IMPACT :
Providing adequate water supply for Balikpapan communities and Kariangau Industrial
Estate
PROGRESS :
Construction is ongoing
Planned to merger with PT. Pertamina pond reservoir.
31.
32.
33.
34.
35.
PROJECT SCOPE :
Development of Airspace Side Facility: Runway (2,100 x 45 m2), Appron
(100 x 535 m2), Strength (Boeing 737-400)
Development of Land Side Facilities: Infrastructure (Environment Roads and
Drainage), Terminal Building (12 700 m2), Technical Building (10 types), Supporting
Building(11 types)
EXPECTED IMPACT :
Goods and passengers flow, as well as service flow between and beyond the city
work fluently
Minimize and reduce travel time also travel costs
Increased the economic growth in East Kalimantan and Indonesia
36.
37.
Construction Progress
38.
39.
40.
41.
Construction Progress
42.
PROJECT SCOPE :
Construction of widening and improving road condition
EXPECTED IMPACT :
Acessibility in Samarinda generally, towards Palaran container port particullary will be
more reliable. This condition expected bring improvement in Samarinda economic
activity.
COST AND FUNDING SCHEME :
Funded by Provincial Budget of 2011-2013; Multiyears contract 2011-2013
43.
Construction Progress
44.
PROJECT SCOPE :
Development of 220 meters span, 16,9 meters wide, and high vertical clearance
along 22 meter
Development of access road
OBJECTIVE :
Overcome the overcapacity problem in the existing bridge (Mahakam Bridge)
ESTIMATED COST :
Expected to cost IDR 252 Billion (Bridge), IDR400 Billion (Access Road)
Existing Bridge
(Mahakam)
Mahakam IV Bridge
45
46.
47.
Construction Work
East Kalimantan Infrastructure Digest _BAPPEDA KALTIM
48.
SUPPORTING INFRASTRUCTURE
Maloy International Seaport Development
Access Road towards Industrial Area Development
Ma. Wahau Lb. Tutung ( 115 Km), Tabang Lb. Tutung (185
Km) Railway Development
Manor Bulatn Bridge Development
Coal Terminal Development
Power Plant 1400 MW and Aluminum smelter Development
Water resources sector Development
The Masterplan
49.
50.
51.
52.
53.
state budget (APBN) to develop Maloy Access road through APBN remaining balance
STATUS :
Road along 12 + 5 Km has opened from national road access.
54.
Construction Progress
55.
56.
57.
58.
PROJECT DESCRIPTION :
Beside the existence of plantation sector, East Kutai is also endowed with natural
wealth. Distribution of Mining and mineral commodity certainly need a gateway as the
exit and entry point of coal trading activities.
OBJECTIVE :
Provide a reliable seaport transportation facilities for the distribution of mining
commodities in East Kutai, especially coal commodities.
SCOPE :
Coal port development with a large capacity, in order to support export and import
activities
EXPECTED IMPACT :
Improve the ability of export products such as coal, wood, CPO and agriculture
product.
Improve regional economic growth, Kalimantan generally, East Kalimantan particullary
Bring social contribution to the surrounding area
FUNDING SCHEME :
East Kalimantan Government in cooperation with private sector, namely MEC INFRA with
the investment amount about US$ 250 Million
PROGRESS :
MEC INFRA has got permit to develop coal terminal that can be able to accomodate big
ships for the export and import of coal and other goods.
59.
60.
PROJECT DESCRIPTION :
In order to support construction and development of Maloy Industrial Estate,
electricity infrastructure is a variable which have to available. Therefore, in conjunction
with the construction of roads, electrical infrastructure is required. East Kalimantan and
East Kutai Government built necessary infrastructure in cooperation with several private
companies to provide electricity sector.
Development of potential area projected not to trade commodities as raw materials,
but the downstream product. Start from this downstreaming effort, it's required to build
factory in industrial area, to deliver value-added producs.
Coal port development with a large capacity, in order to support export and import
activities
OBJECTIVE :
Providing electricity infrastructure which capable to supplying East Kutai District generally
and Maloy Industrial Area particullary.
SCOPE :
Power Plant will produce 1400 MW Electricity (1250 MW for Smelter) and the
remaining for local community; 6 x 120 MW (Phase I) and 4 x 120 MW (Phase II)
Smelter capacity is about 0,25 Million Tons (Phase I) and 0,25 Million Tons (Phase II)
EXPECTED IMPACT :
Improve export ability products such as coal, wood, CPO and agriculture product.
Improve regional economic growth, Kalimantan generally, East Kalimantan particullary
Bring social contribution to the surrounding area
FUNDING SCHEME :
East Kalimantan Government in cooperation with private sector, namely MEC Coal and
NALCO with the investment amount about US$ 15 Billion
STATUS :
Got agreement letter from Indonesian Investment Coordinating Board
(1.840/III/PMA/2009) December 31st 2009, located in East Kutai District
61.
Power Plant and Smelter will be built in Muara Wahau, East Kutai District
62.
SELANGKAU SYSTEM :
Retrieval descharge plan : 500 l/sec
Length of transmission pipelines: 10,85 Km
KALIORANG SYSTEM:
Retrieval descharge plan : 350 l/sec
Length of transmission pipelines : 12,99 Km
SEKERAT SYSTEM :
Retrieval descharge plan : 500 l/sec
Length of transmission pipelines : 20,17 Km
63.
64.
= Land Indication
= Existing Farmland
65.
DISTRICT
INDICATION
AREA
BERAU
11.901,42
12.500
62.751
BULUNGAN
73.976,77
32.746
50.000
KUTAI BARAT
56.942,42
39.150
70.000
KUTAI
KARTANEGARA
76.826,99
36.347
36.347
KUTAI TIMUR
39.545,58
4.876
62.630
MALINAU
1.306,60
1.933
1.933
NUNUKAN
12.434,19
500
46.700
PENAJAM PASER
UTARA
9.474,48
1.500
1.400
PASER
15.159,44
5.500
5.500
TANA TIDUNG
4.916,93
6.200
6.200
302.484,81
141.252 Ha
343.461
TOTAL
66.
67.
68.
69.
70.
71.
SCOPE :
Construction of airport landside and airside, also other main facilities, complement
and supporting facilities
EXPECTED IMPACT :
Increasing Economic Growth in Berau District and the surrounding areas
Increasing level of welfare for Berau Community and the surrounding area,
especially those who working in tourism sector.
FUNDING SOURCE :
Kalimarau development performed simultaneously with the funding source from East
Kalimantan and Berau Government.
72.
73.
74.
75.
76.
77.