MHP Training Modul 1
MHP Training Modul 1
MHP Training Modul 1
Workers Village
Tea Factory
Storage Pond
Penstock
Powerhouse
Headrace Canal
OTHER SCHEME 1
There are of course many
variations on the design layout of
the system. As an example, the
water is entered directly to the
turbine from a channel without a
penstock. This type is the simplest
method to get the waterpower.
OTHER SCHEME - 2
Another variation is that the channel could be eliminated, and the penstock will run
directly to the turbine. Variations like this will depend on the characteristics of the
particular site and the requirements of the user of system.
CONCEPT OF MHP
A hydro scheme requires both water flow and a drop in
height (referred to as Head) to produce useful power.
The power conversion absorbs power in the form of
head and flow, and delivering power in the form of
electricity or mechanical shaft power.
The flow rate is the quantity of water flowing past a point at a given time. Typical
units used for flow rate are cubic metres per second (m3/s), litres per second (lps).
The head is the vertical height in metres (m) from the level where the water enters
the intake pipe (penstock) to the level where the water leaves the turbine housing
P = Q x H x g x E0
P = Power output in kW
Q = Usable flow rate in m3/s
H = Gross head in m
g = Gravitational constant (9.8 m/s2)
E0 = Efficiency factor of system (0.8 to 0.9)
KOMPONEN PLTM
Intake Bendung
KOMPONEN PLTM
Saluran penghantar
Saluran pelimpas
Kolam pengendap
lumpur
Saluran Tertutup
Headpond (Bak Penenang)
Saluran pelimpas headpond
Pipa Penstock Saluran pelimpas
FRANCIS
PELTON
STUDI KASUS
Aliran turbulen
Transformer di pagar
SALURAN DITUTUP KARENA RAWAN LONGSOR PADA LERENG