Sumber:
Frekuensi per
Uraian Tahun
(1) (2)
A.1.1. Gaji/Upah
1 Pengamat Pengairan 12.00
2 Juru Pengairan 12.00
3 Staf Pengairan 12.00
4 Petugas Pintu Air 12.00
Rp 1,100,400,000.00
1.00 OB Rp 500,000 Rp 6,000,000
3.00 OB Rp 400,000 Rp 14,400,000
2.00 OB Rp 2,500,000 Rp 60,000,000
34.00 OB Rp 2,500,000 Rp 1,020,000,000.00
Rp 14,183,500.00
Rp 234,200,000.00
1.00 unit Rp 150,000,000 Rp 150,000,000.00
4.00 unit Rp 16,000,000 Rp 64,000,000.00
1.00 unit Rp 6,000,000 Rp 6,000,000.00
1.00 unit Rp 1,200,000 Rp 1,200,000.00
6.00 bh Rp 750,000 Rp 4,500,000.00
1.00 bh Rp 2,500,000 Rp 2,500,000.00
1.00 bh Rp 6,000,000 Rp 6,000,000.00
Rp 26,940,000.00
Rp 142,025,000.00
53 bh Rp 275,000 Rp 14,575,000.00
53 bh Rp 475,000 Rp 25,175,000.00
53 bh Rp 1,500,000 Rp 79,500,000.00
5 bh Rp 15,000 Rp 75,000.00
5 bh Rp 135,000 Rp 675,000.00
5 bh Rp 15,000 Rp 75,000.00
Uraian
(1)
-
-
-
-
-
Uraian
(1)
Pengeluaran lain-lain
Fasilitas Kantor, untuk mendukung kegiatan pemeliharaan
Biaya pencetakan Formulir untuk kegiatan pemeliharaan jaringan irigasi
Biaya fotocopy dokumen, updating peta & skema, serta buku pemberdayaan P3A/GP3A/IP3A
Biaya pencetakan Formulir untuk kegiatan pemeliharaan jaringan irigasi
Pengadaan Peralatan Kerja, untuk mendukung kegiatan pemeliharaan
Cangkul
Parang / sabit
Garuk sampah
Ember
Mesin pemotong rumput
Oli
Gemuk
Thiner
Kuas
Rp 24,638,504
4.00 500.00 m2 Rp 1,074 Rp 2,147,832.00
26.00 6.00 bh Rp 38,123 Rp 5,947,110.00
2.00 150.00 m2 Rp 38,479 Rp 11,543,562.00
1.00 1.00 ls Rp 5,000,000 Rp 5,000,000.00
Rp 12,895,325
4.00 250.00 m2 Rp 1,074 Rp 1,073,916.00
26.00 3.00 bh Rp 38,123 Rp 2,973,555.00
2.00 50.00 m2 Rp 38,479 Rp 3,847,854.00
1.00 1.00 ls Rp 5,000,000 Rp 5,000,000.00
Rp 601,320,702
12.00 23452.00 m2 Rp 1,074 Rp 302,225,736.38
12.00 21661.00 m2 Rp 1,074 Rp 279,145,133.71
4.00 60.00 bh Rp 32,294 Rp 7,750,632.00
4.00 80.00 bh Rp 38,123 Rp 12,199,200.00
Rp 143,671,218
12.00 6633.00 m2 Rp 1,074 Rp 85,479,417.94
12.00 4214.00 m2 Rp 1,074 Rp 54,305,784.29
4.00 23.00 bh Rp 32,294 Rp 2,971,075.60
4.00 6.00 bh Rp 38,123 Rp 914,940.00
Rp 19,180,000
Rp 3,234,000
Rp 41,477,120
Uraian
(1)
Uraian
(1)
Rp 1,337,359,544
1.00 4287.22 m3 Rp 119,580 Rp 512,665,037.62
1.00 1123.39 m3 Rp 119,580 Rp 134,334,706.59
1.00 159.75 m3 Rp 119,580 Rp 19,102,866.66
1.00 10.00 m3 Rp 119,580 Rp 1,195,797.60
1.00 224.28 m3 Rp 119,580 Rp 26,819,348.57
1.00 907.50 m3 Rp 119,580 Rp 108,518,632.20
1.00 345.68 m3 Rp 119,580 Rp 41,335,733.54
1.00 555.90 m3 Rp 119,580 Rp 66,474,388.58
1.00 7613.72 m3 Rp 56,072 Rp 426,913,032.85
Rp 306,983,181
1.00 265.10 m3 Rp 119,580 Rp 31,700,594.38
1.00 1302.59 m3 Rp 119,580 Rp 155,762,801.68
1.00 180.00 m3 Rp 119,580 Rp 21,524,356.80
1.00 1747.69 m3 Rp 56,072 Rp 97,995,427.83
Rp 533,945,092
1.00 80.00 bh Rp 96,540 Rp 7,723,160.80
1.00 60.00 bh Rp 65,028 Rp 3,901,701.60
1.00 190.00 m2 Rp 38,479 Rp 7,310,922.60
1.00 1.00 bh Rp 5,000,000 Rp 5,000,000.00
1.00 41.00 m3 Rp 2,009,866 Rp 82,404,502.93
1.00 6150.00 kg Rp 2,995,078 Rp 184,197,321.60
1.00 1400.00 m2 Rp 115,609 Rp 161,853,106.80
1.00 66.00 m3 Rp 72,036 Rp 4,754,376.00
1.00 2.00 ls Rp 16,875,000 Rp 33,750,000.00
1.00 2.00 ls Rp 18,500,000 Rp 37,000,000.00
1.00 27.00 ls Rp 150,000 Rp 4,050,000.00
1.00 8.00 ls Rp 250,000 Rp 2,000,000.00
Rp 162,409,303
1.00 6.00 bh Rp 96,540 Rp 579,237.06
1.00 23.00 bh Rp 65,028 Rp 1,495,652.28
1.00 125.00 m2 Rp 38,479 Rp 4,809,817.50
1.00 1025.00 m2 Rp 115,609 Rp 118,499,596.05
1.00 1.00 ls Rp 16,875,000 Rp 16,875,000.00
1.00 1.00 ls Rp 18,500,000 Rp 18,500,000.00
1.00 6.00 ls Rp 150,000 Rp 900,000.00
1.00 3.00 ls Rp 250,000 Rp 750,000.00
Rp 10,000,000
Uraian
(1)
D.1.2. Perjalanan Dinas dalam rangka Kegiatan Manajemen O&P Jaringan Irigasi
1 Transportasi Kegiatan Manajemen O&P Jaringan Irigasi
- Transportasi Instruktur (2 Org, 1 Keg PP Pesawat)
- Transportasi Narasumber/ Pakar (2 Org, 1 Keg PP Pesawat)
- Transportasi Peserta (20 Org, 1 Keg)
Uraian
(1)
Pengeluaran Lain-lain
Perlengkapan Pelatihan (36 Orang peserta + 2 Orang pengarah, 2 Orang instruktur)
- Seragam Pelatihan
- Topi Pelatihan
- Tas Pelatihan
- ATK (Buku, Balpoint, Pensil)
Kebutuhan Lainnya untuk Pelatihan
- Sewa Gedung Pertemuan (1 Unit x 3 Hari )
- Makan peserta kegiatan (pengarah, instruksi, nara sumber, peserta, panitia pelaksana, pembantu umum)
- Sewa Kamar Hotel untuk Peserta ( 13 Kamar x 3 Hari )
- Sewa In Focus/ proyektor
Rp 12,160,000
Rp 14,000,000
Rp 43,220,000
Kategori Lingkup OP
(1)
Operasi Jaringan Irigasi
Pemeliharaan Rutin
Pemeliharaan Berkala
Managemen OP (Pelatihan/Fasilitas)
Total AKNOP
PPn 10%
Total AKNOP + PPn 10%
Biaya AKNOP Per HA (3794 HA)
Dibulatkan
Terbilang : Satu Juta Tiga Ratus Delapan Puluh Tujuh Ribu Rupiah
h per Tahun 2018
AKNOP per Kategori
(Rp)
(2)
Rp 1,517,748,500
Rp 846,416,869
Rp 2,350,697,120
Rp 69,380,000
Rp 4,784,242,489.03
Rp 478,424,248.90
Rp 5,262,666,737.94
Rp 1,387,102.46
Rp 1,387,000.00
Ribu Rupiah
ANALISA HARGA SATUAN PEKERJAAN
1 2 4 5
A Tenaga Kerja
1. Pekerja OH 2.700
2. Tukang Batu OH 0.900
3. Mandor OH 0.270
Jumlah Harga Tenaga Kerja
B Bahan
1. Batu belah m3 1.200
2. Pasir Pasang m3 0.520
3. Portland cement kg 163
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15%
F Harga Satuan Pekerjaan per - m (D+E)
3
1 2 4 5
A Tenaga Kerja
1. Pekerja OH 1.800
2. Tukang Batu OH 0.900
3. Mandor OH 0.180
Jumlah Harga Tenaga Kerja
B Bahan
1. Batu belah m3 1.200
2. Pasir Pasang m3 0.520
3. Portland cement kg 163
Jumlah Harga Bahan
C Peralatan
1. Molen kapasitas 0,3 m3 sewa-hari 0.076
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15%
F Harga Satuan Pekerjaan per - m3 (D+E)
P.04.e Plesteran tebal 1,5 cm dengan mortar tipe S (setara campuran 1 PC : 3 PP)
1 2 4 5
A Tenaga Kerja
1. Pekerja OH 0.384
2 Tukang Batu OH 0.192
3 Kepala tukang OH 0.019
4 Mandor OH 0.019
Jumlah Harga Tenaga Kerja
B Bahan
1. Pasir pasang m3 0.030
2. Portland cement kg 7.776
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15%
F Harga Satuan Pekerjaan per - m2 (D+E)
1 2 4 5
A Tenaga Kerja
1. Pekerja OH 0.830
2. Mandor OH 0.083
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15%
F Harga Satuan Pekerjaan per - m (D+E)
2
1 2 4 5
A Tenaga Kerja
1. Pekerja OH 0.240
2. Mandor OH 0.024
Jumlah Harga Tenaga Kerja
B Bahan
1. Solar non subsidi Liter 0.900
Jumlah Harga Bahan
C Peralatan
1. Pompa Diesel Sewa/Hari 0.150
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 15%) 15%
F Harga Satuan Pekerjaan per - m2 (D+E)
Cara Mekanis
1 m3 Galian lumpur
1 2 4 5
A Tenaga Kerja
1. Pekerja OH 0.240
2. Mandor OH 0.024
Jumlah Harga Tenaga Kerja
B Peralatan
1. Excavator Jam 0.035
Jumlah Harga Peralatan
C Jumlah Harga tenaga, Bahan dan Peralatan (A+B)
D Overhead + Profit (Contoh 15%) 15%
E Harga Satuan Pekerjaan per - m2 (C+D)
Harga Satuan Jumlah
(Rp) (Rp)
6 7
105,800.00 285,660.00
138,000.00 124,200.00
194,800.00 52,596.00
Jumlah Harga Tenaga Kerja 462,456.00
300,000.00 360,000.00
231,800.00 120,536.00
1,770.00 288,510.00
Jumlah Harga Bahan 769,046.00
105,800.00 190,440.00
138,000.00 124,200.00
194,800.00 35,064.00
Jumlah Harga Tenaga Kerja 349,704.00
300,000.00 360,000.00
231,800.00 120,536.00
1,770.00 288,510.00
Jumlah Harga Bahan 769,046.00
500,000.00 38,000.00
Jumlah Harga Peralatan -
1,118,750.00
xD 167,812.50
1,286,562.50
n 1 PC : 3 PP)
Harga Satuan Jumlah
(Rp) (Rp)
6 7
105,800.00 40,627.20
138,000.00 26,496.00
172,200.00 3,271.80
194,800.00 3,701.20
Jumlah Harga Tenaga Kerja 74,096.20
231,800.00 6,954.00
1,770.00 13,763.52
Jumlah Harga Bahan 20,717.52
105,800.00 87,814.00
194,800.00 16,168.40
Jumlah Harga Tenaga Kerja 103,982.40
105,800.00 25,392.00
194,800.00 4,675.20
Jumlah Harga Tenaga Kerja 30,067.20
6,350.00 5,715.00
Jumlah Harga Bahan 5,715.00
200,000.00 30,000.00
Jumlah Harga Peralatan 30,000.00
65,782.20
xD 9,867.33
75,649.53
105,800.00 25,392.00
194,800.00 4,675.20
Jumlah Harga Tenaga Kerja 30,067.20
500,000.00 17,700.00
Jumlah Harga Peralatan 17,700.00
47,767.20
xC 7,165.08
54,932.28
ANALISA HARGA SATUAN PEKERJAAN
285,660.00
124,200.00
52,596.00
462,456.00
360,000.00
120,536.00
288,510.00
769,046.00
-
1,231,502.00
184,725.30
1,416,227.30
Jumlah
(Rp)
7
40,627.20
26,496.00
3,271.80
3,701.20
74,096.20
6,954.00
13,763.52
20,717.52
-
94,813.72
14,222.06
109,035.78
Jumlah
(Rp)
7
87,814.00
16,168.40
103,982.40
-
103,982.40
15,597.36
119,579.76
Jumlah
(Rp)
7
25,392.00
4,675.20
30,067.20
5,715.00
5,715.00
30,000.00
30,000.00
65,782.20
9,867.33
75,649.53
LAMPIRAN A.9
DAFTAR HARGA SATUAN DASAR TENAGA KERJA,
BAHAN DAN ALAT, KABUPATEN BARITO TIMUR 2019
1 2 4 3
I UPAH TENAGA KERJA
1 Tukang Besi Konstruksi L.01
2 Tukang Besi Tulangan L.02
3 Kepala Tukang Besi L.03
4 Tukang Kayu Kasar L.04 ( Plafond,Kuda2,Gording,R.Atap )
5 Tukang Kayu Halus L.05 ( Kusen )
6 Kepala Tukang Kayu L.06
7 Tukang Batu Kasar L.07 Tukang Batu Kasar
L.08 Tukang Batu Halus
8 Tukang Batu Halus
( Bata,Plester,Acian list )
9 Kepala Tukang Batu L.09
10 Tukang Cat Biasa L.10
11 Kepala Tukang Cat L.11
12 Tukang Listrik L.12
13 Kepala Tukang Listrik L.13
14 Pekerja L.14
15 Mandor L.15
II PERALATAN BERAT
A ROLLER
1 BOMAG
2 BOMAG Mini Tandem Roller
3 BOMAG Pneumatic Type Roller Model BW25H
( 8 Ton Clacc )
4 BOMAG Single Vibratory Roller Model BW211d-40
( 11 Ton Class )
5 BOMAG Tandem Roller
6 CATERPILLAR CB
7 SAKAI CR271 Double Drum Vibrating Roller
( Tandem Roller )
8 SAKAI HVBOST Hand Guida
Vibrating Roller ( Baby Roller )
9 SAKAI SV525TF Drum Vibrating
Roller ( Smooth Drum )
10 SAKAI SV525TF Drum Vibrating
Roller ( Pad Fool )
11 SAKAI SW399 Double Drum
Vibrating Roller ( Tandem Roller )
12 SAKAI SW352-1 Double Drum
Vibrating Roller
13 SAKAI SW5029-Double Drum
Vibrating Roller ( Tandem Roller )
14 SAKAI SW625 Double Drum
Vibrating Roller ( Tandem Roller )
15 SAKAI TS205 Pneumatic Tine Roller
B CRANE
1 Self Loader UNIC High-Carrier/Self-Loader UL-150BRS
C GRADER
1 CATERPILLAR 120K
2 HIDROMEK MG330
3 BOMAG BF233C
4 CATERPILLAR AP
5 BACKHOE LOADER
6 CATERPILLAR 415
7 CATERPILLAR 428
8 CATERPILLAR 32002
9 DOOSAN Excavator DX225 LCA
10 HITACHI Excavator Standard DX130 ( Bucket 0,5m3 )
11 HITACHI Excavator Standard DX200-G( Bucket 0,91m3 )
12 HYUNDAI Robex R110-7
13 HYUNDAI Rovex R140LC-95
14 HYUNDAI Rovex R220LC-95H
15 HYUNDAI Robex Wheel excavator R140W-95
16 KOMATSU Hydraulik excavator model PC130-7
17 KOMATSU Hydraulik excavator model PC160LC-8
18 KOMATSU Hydraulik excavator model PC200-BMO
19 SANY SY
20 SUMITOMO SH21DLF-5
D WHELL LOADER
1 CATERPILLAR 908H2/CAB/GPB 1,0 CUM
2 CATERPILLAR 908H2/CAB/GPB 1,0 CUM
3 CATERPILLAR 91 4G
4 CATERPILLAR 91 4G / ROPSCAB/GPB
5 CATERPILLAR 924K
6 CATERPILLAR 924K / ROPSCAB/GPB
7 HITACHI Whell Loader Hitachi ZW120G
8 HITACHI Whell Loader Hitachi ZW140
9 HITACHI Whell Loader Hitachi ZW220
10 KOMATSU Whell Loader Model WA150-5
11 KOMATSU Whell Loader Model WA200-5
E BULLDOZER
1 CATERPILLAR D3
2 CATERPILLAR D4KLGP/ROBSCAB / VPATBLADE
3 CATERPILLAR D5KLGP/ROBSCAB / VPATBLADE
4 CATERPILLAR D5KXL/ROBSCAB / VPATBLADE
5 CATERPILLAR D5RXL
6 CATERPILLAR D6RXL GP
7 CATERPILLAR D6RXL
8 JOHN DEERE Bulidozer John Doare
9 KOMATSU Bulidozer Model D31-22
10 KOMATSU Bulidozer Model D39-22
11 KOMATSU Bulidozer Model D65P-12
12 KOMATSU Bulidozer Model D66ES S-12EO
13 KOMATSU Bulidozer Model D66ES S-0
H BAHAN KACA
1 Kaca Polos 3 mm
2 Kaca Polos 5 mm
3 Kaca Polos 6 mm
J BAHAN FINISHING
1 Cat kayu/Besi ex. Brilo
2 Plamir Kayu
3 Meni Kayu ex.Nippon
4 Wood Filter Impra
5 Thinner ND IMPALA
6 Amplas
7 Kwas cat
8 Cat Tembok kw1 ex. Duluk : Warna standard
9 Cat Tembok kw2 ex. Vinilex : Warna Standard
10 Plamir Tembok
11 Lem Kayu
12 Seat tape
13 Minyak Bekisting
K BAHAN SANITASI
1 Wastafel
2 Kloset duduk
Kloset jongkok
Urinier
Bak air
Shower Spray
Shower Set
Flooerdrain
Tempat Sabun
Kran zink
Kitchenzink
Kran Dinding
N PERALATAN ELEKTRIKAL
1 Box panel PVC isi 4 MCB Legran
2 MCB 6 A Legran
3 MCB 4 A Legran
4 Kabel NYM 2 x 2,5 mm2
5 Kabel NYN 3 x 2,5 mm2
6 Kabel Telephone 4 x 0,5 mm
7 Isolasi
8 Saklar Tunggal M.18.d Broco
9 Saklar Ganda Broco
10 Stop kontak Broco
11 Outlet TV Broco
12 Outlet Telephone Broco
13 Down light / PLC 13 W
14 Fitting Plafond + Lampu SL Panasonic
15 Lampu TL 2 x 18 watt grille Panasonic
O PINTU
35 Pintu Angkat Type I.B = 0,30 m M.67.a
36 Pintu Angkat Type I.B = 0,40 m M.67.b
37 Pintu Angkat Type I.B = 0,50 m M.67.c
38 Pintu Angkat Type II.B = 0,30 m M.68.a
39 Pintu Angkat Type II.B = 0,40 m M.68.b
40 Pintu Angkat Type II.B = 0,50 m M.68.c
41 Pintu Sorong Baja (satu draad) stang
b = 0,30 , h = 0,30 M.69.a
b = 0,30 , h = 0,50 M.69.b
b = 0,30 , h = 1,00 M.69.c
42 Pintu Sorong Baja (satu draad) stang
b = 0,40 , h = 0,30 M.70.a
b = 0,40 , h = 0,50 M.70.b
b = 0,40 , h = 1,00 M.70.c
43 Pintu Sorong Baja (satu draad) stang
b = 0,50 , h = 0,30 M.71.a
B = 0,50, h = 0,50 M.71.b
b = 0,50 , h = 1,00 M.71.c
44 Pintu Sorong Baja (satu draad) stang
b = 0,60 , h = 0,30 M.72.a
b = 0,60 , h = 0,50 M.72.b
b = 0,60 , h = 1,00 M.72.c
45 Pintu Sorong Baja (satu draad) stang
b = 0,70 , h = 0,30 M.73.a
b = 0,70 , h = 0,50 M.73.b
b = 0,70 , h =1,00 M.73.c
46 Pintu Sorong Baja (satu draad) stang
b = 0,80, h = 0,30 M.74.a
b = 0,80, h = 0,50 M.74.b
b = 0,80, h =1,00 M.74.c
47 Pintu Sorong Baja (satu draad) stang
b = 0,90 , h = 0,30 M.75.a
b = 0,90 , h = 0,50 M.75.b
b = 0,90, h = 1,00 M.75.c
48 Pintu Sorong Baja (satu draad) stang
b =1,00 , h = 0,30 M.76.a
b =1,00 , h = 0,50 M.76.b
b =1,00 , h = 1,00 M.76.c
49 Pintu Sorong Baja (satu draad) stang
b = 1,50, h = 0,30 M.77.a
b = 1,50, h = 0,50 M.77.b
b = 1,50, h = 1,00 M.77.c
50 Pintu Sorong Baja (satu draad) stang
b = 2.00 h = 0.30 M.78.a
b = 2.00 h = 0.50 M.78.b
b = 2,00, h = 1,00 M.78.c
51 Pintu Sorong Baja (dua draad) stang
b = 1,20, h = 1,00 M.79.a
b = 1,20, h = 1,50 M.79.b
b = 1,20, h = 2.00 M.79.c
52 Pintu Sorong Baja (dua draad) stang
b = 1,30, h = 1,00 M.80.a
b = 1,30, h = 1,50 M.80.b
b = 1,30, h = 2,00 M.80.c
53 Pintu Sorong Baja (dua draad) stang
b = 1,40, h = 1,00 M.81.a
b = 1,40, h = 1,50 M.81.b
b = 1,40, h = 2,00 M.81.c
Harga
SATUAN Satuan Dasar
( Rp. )
4 5
Org/Hari 121,000.00
Org/Hari 121,000.00
Org/Hari 121,000.00
Org/Hari 138,000.00
Org/Hari 138,000.00
Org/Hari 145,200.00
Org/Hari 138,000.00
Org/Hari 138,000.00
Org/Hari 172,200.00
Org/Hari 138,000.00
Org/Hari 172,200.00
Org/Hari 138,000.00
Org/Hari 172,200.00
Org/Hari 105,800.00
Org/Hari 194,800.00
1 UNIT 735,000.00
1 UNIT 284,000.00
1 UNIT 1,817,000.00
1 UNIT 1,224,000.00
1 UNIT 1,643,000.00
1 UNIT 2,005,000.00
1 UNIT 350,000.00
1 UNIT 199,000.00
1 UNIT 1,176,000.00
1 UNIT 1,335,000.00
1 UNIT 605,000.00
1 UNIT 557,000.00
1 UNIT 562,000.00
1 UNIT 1,125,000.00
1 UNIT 1,046,000.00
1 UNIT 603,000.00
1 UNIT 2,527,000.00
1 UNIT 2,272,000.00
1 UNIT 2,065,000.00
1 UNIT 5,558,000.00
1 UNIT
1 UNIT 1,510,000.00
1 UNIT 1,065,000.00
1 UNIT 2,010,000.00
1 UNIT 1,486,000.00
1 UNIT 1,477,000.00
1 UNIT 1,842,000.00
1 UNIT 1,256,000.00
1 UNIT 1,530,000.00
1 UNIT 1,589,000.00
1 UNIT 1,705,000.00
1 UNIT 1,486,000.00
1 UNIT 1,680,000.00
1 UNIT 1,974,000.00
1 UNIT 1,465,000.00
1 UNIT 1,739,000.00
1 UNIT 1,477,000.00
1 UNIT 1,239,000.00
1 UNIT 2,124,000.00
1 UNIT 2,077,000.00
1 UNIT 2,736,000.00
1 UNIT 2,600,000.00
1 UNIT 1,907,000.00
1 UNIT 2,224,000.00
1 UNIT 3,256,000.00
1 UNIT 2,052,000.00
1 UNIT 2,385,000.00
1 UNIT 1,721,000.00
1 UNIT 2,051,000.00
1 UNIT 2,726,000.00
1 UNIT 2,613,000.00
1 UNIT 3,412,000.00
1 UNIT 4,267,000.00
1 UNIT 4,009,000.00
1 UNIT 2,971,000.00
1 UNIT 1,905,000.00
1 UNIT 2,481,000.00
1 UNIT 4,105,000.00
1 UNIT 3,110,000.00
1 UNIT 4,071,000.00
bh 800.00
bh 3,500.00
m3 300,000.00
122,500.00
m3 515,100.00
m3 515,100.00
m3 515,100.00
m3 137,300.00
m3 231,800.00
m3 231,800.00
m3 96,200.00
m3 71,700.00
m3 41,300.00
m3 73,200.00
m3 35,500.00
m3 91,000.00
m3 46,000.00
m3 272,000.00
m3 55,000.00
kg 17,800.00
bh 5,500.00
zak 88,500.00
kg 2,870.00
kg 18,342.50
kg 22,770.00
kg 18,342.50
m2 225,000.00
m2 115,129.00
kg 21,800.00
m3 13,500,000.00
m3 6,000,000.00
m3 5,200,000.00
m3 3,000,000.00
btg 15,500.00
m' 143,800.00
m' 143,600.00
m' 143,600.00
utk 483,900.00
bh 45,500.00
bh 228,300.00
bh 242,000.00
bh 63,000.00
bh 450,000.00
m2 147,600.00
m2 203,700.00
bh 17,600.00
bh 17,600.00
bh 160,000.00
bh 90,000.00
bh 35,000.00
m' 25,000.00
60,000.00
m2 120,000.00
m2 100,000.00
m2 100,000.00
kg 20,300.00
kg 20,300.00
kg 20,300.00
kg 550.00
kg 67,045.00
kg 14,000.00
kg 27,000.00
kg 27,500.00
Ltr 10,000.00
Ltr 8,222.50
bh 16,000.00
kg 70,000.00
kg 37,500.00
kg 12,800.00
kg 25,000.00
bh 15,000.00
Ltr 5,500.00
unt 1,636.00
unt 1,520,000.00
unt 350,000.00
unt 410,000.00
bh 584,430.00
unt 232,400.00
unt 598,000.00
bh 70,000.00
bh 44,000.00
bh 131,600.00
unt 250,000.00
bh 27,000.00
Lbr 89,800.00
m 20,000.00
m2 135,941.50
m' 37,500.00
m' 45,000.00
m' 72,000.00
m' 160,000.00
m' 249,000.00
m' 435,000.00
bh 45,000.00
bh 35,000.00
bh 1,690,000.00
bh 1,300,000.00
bh 25,000.00
bh 35,000.00
unt 950,000.00
unt 722,300.00
bh 150,000.00
bh 60,000.00
bh 43,400.00
m' 22,000.00
m' 28,000.00
m' 15,000.00
bh 5,000.00
bh 25,000.00
bh 30,000.00
bh 20,000.00
bh 43,575.00
bh 43,575.00
bh 173,460.00
bh 75,000.00
bh 64,515.00
Buah 2,250,000.00
Buah 2,500,000.00
Buah 3,750,000.00
Buah 3,125,000.00
Buah 3,750,000.00
Buah 4,375,000.00
Buah 9,125,000.00
Buah 10,250,000.00
Buah 13,000,000.00
Buah 9,625,000.00
Buah 10,750,000.00
Buah 13,750,000.00
Buah 10,250,000.00
Buah 11,375,000.00
Buah 14,625,000.00
Buah 10,562,500.00
Buah 11,937,500.00
Buah 15,375,000.00
Buah 11,062,500.00
Buah 12,625,000.00
Buah 16,125,000.00
Buah 11,625,000.00
Buah 13,125,000.00
Buah 16,875,000.00
Buah 12,125,000.00
Buah 13,750,000.00
Buah 17,687,500.00
Buah 12,937,500.00
Buah 14,500,000.00
Buah 18,500,000.00
Buah 15,187,500.00
Buah 17,250,000.00
Buah 22,437,500.00
Buah 17,750,000.00
Buah 20,187,500.00
Buah 26,197,500.00
Buah 90,625,000.00
Buah 96,375,000.00
Buah 101,375,000.00
Buah 93,250,000.00
Buah 98,062,500.00
Buah 104,000,000.00
Buah 94,750,000.00
Buah 102,687,500.00
Buah 112,562,500.00
PEMBUATAN
KET :
HARGA KET :
SATUAN
456,600.00
474,200.00
66,500.00
66,500.00
66,500.00
58,500.00
65,500.00
56,500.00
66,500.00
REKAP HSP AUDIT TEKNIS
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
27
28
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
51
52
53
54
55
51
53
55
56
Sumber : Hasi Analisa
REKAP HSP AUDIT TEKNIS
Uraian
Pembabatan rumput dengan mesin
1m2 tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/ tumbuhan diameter < 15cm
1 m3 galian tanah biasa sedalam < 1 m
1 m3 galian tanah biasa sedalam s.d. 2 m
1 m3 galian tanah biasa sedalam s.d. 3 m
1 m3 galian tanah biasa dengan kedalaman > 3m
1 m3 galian lumpur sedalam ≤ 1 m
1 m3 galian lumpur sedalam s.d. 2 m
1 m3 galian lumpur sedalam s.d. 3 m
Galian pasir untuk fondasi bangunan sedalam s.d 3 m’
Galian pasir untuk fondasi bangunan dengan kedalaman > 3m
Timbunan tanah atau urugan tanah kembali (1 m3)
Pemadatan tanah (1 m3)
Timbunan pasir sebagai bahan pengisi (1 m3)
Pemadatan pasir sebagai bahan pengisi (1 m3)
Mengangkut 1 m3 hasil galian dengan jarak angkut > 3m s.d. < 5m
Mengangkut 1 m3 hasil galian dengan jarak angkut 5 m
Mengangkut 1 m3 hasil galian dengan jarak angkut 10 m
Mengangkut 1 m3 hasil galian dengan jarak angkut 30 m
Mengangkut 1 m3 hasil galian dengan jarak angkut 50 m
Mengangkut 1 m3 hasil galian dengan jarak angkut 100 m
Mengangkut 1 m3 hasil galian dengan jarak angkut 200 m
Mengangkut 1 m3 hasil galian dengan jarak angkut 300 m
Mengangkut 1 m3 hasil galian dengan jarak angkut 400 m
Mengangkut 1m3 hasil galian dengan jarak angkut 500 m
Bongkar 1 m3 pasangan batu
1 m3 persiapan pemanfaatan kembali material batu dari bekas bongkaran pas. batu
Bongkar 1 m3 pasangan bata merah
Siaran dengan campuran 1 PC:2 PP
Siaran dengan campuran 1 PC:3 PP
Plesteran dengan campuran 1 PC:2 PP (tebal 1 cm)
Plesteran dengan campuran 1 PC:3 PP (tebal 1 cm)
Plesteran dengan campuran 1 PC:4 PP (tebal 1 cm)
Plesteran dengan campuran 1 PC:2 PP (tebal 1.5 cm)
Plesteran dengan campuran 1 PC:3 PP (tebal 1.5 cm)
Plesteran dengan campuran 1 PC:4 PP (tebal 1.5 cm)
Pasangan batu kosong (1 m³)
Pasangan batu kali (1 m³)
Pasangan batu bronjong kawat Tipe A uk. L=2,0m x B=1,0 m x T= 1,0
Tipe B Bronjong kawat uk. L=3,0m x B=1,0 m x T= 1,0 m berisi batu
Pasangan bronjong pabrikasi (tenaga kerja untuk 1m3 batu bronjong)
1 m panjang cerucuk kayu/dolken diameter 8 cm – 10 cm
Pemasangan modul 1 m3 bronjong kawat menjadi struktur krib sungai
Pemasangan geotekstil (1 m2), Tipe-A
Pemasangan geotekstil (1 m2), Tipe-B
Pemasangan Pipa GIP dia 2 inchi
Pasangan pipa suling-suling (1 m')
Pengecatan per m2
Pengecatan Pintu B> 0.6
Pengecatan Pintu B< 0,6
Pelumasan Pintu stang tunggal < 1 m
Pelumasan Pintu stang ganda > 2m
1 m³beton mutu, f’c = 7,4 MPa (K100)
1 m³ beton mutu, f’c = 14,5 MPa (K175)
3 m³ beton mutu, f’c = 19,3 MPa (K255)
Pembesian 100 kg dengan besi polos atau ulir
Sumber : Hasi Analisa
HSP (Rp.)
1,074
10,880
81,113
97,249
109,495
10,085
119,580
144,072
21,611
129,665
14,407
47,544
72,036
377,513
48,332
32,952
32,952
36,141
47,302
56,072
86,443
126,227
172,732
219,237
259,098
293,759
34,260
86,443
86,101
84,647
88,466
86,149
83,853
115,609
113,292
108,648
762,482
1,226,838
3,274,773
4,794,808
622,311
30,180
78,291
33,882
44,897
173,689
221,087
38,479
96,540
65,028
32,294
38,123
1,640,815
2,009,866
2,095,599
2,995,078