Building Defects
Building Defects
ON
CRACKS
SUBMITTED TO:
SUBMITTED BY:
AR. ANIL KUMAR
SEMESTER
(SEC-A)
RITU CHAUHAN
9TH
B.ARCH
2) IMPROPER LEVELLING
It may cause:
i).improper squaring of building corner.
ii). uneven thickness of courses in building.
iii).improper alignment of wall
iv).Improper Gradient of the sewage line.
vi). Improper Gradient of road and connection to the main road
REMEDIAL MEASURES
(i.Levelling instrument and theodolite should be invariably used
for out of
buildings, surface drainage, sewage disposal or water supply
works.
(ii. The survey instruments should be kept in proper
adjustment. The instruments including the optical parts should
be kept clean.
PAINT DEFECTS:
Not all painting defects are caused by the individual doing the
job. It
sometimes happens that the coating itself is at fault. Chalking,
checking, and
cracking are the most common types of product defects.
Chalking: Chalking is the result of paint weathering at the
surface of the
coating. The vehicle is broken down by sunlight and other
destructive forces,
leaving behind loose, powdery pigment that can easily be
rubbed off with
the finger. Chalking takes place rapidly with soft paints, such as
those based
on linseed oil. Chalking is most rapid in areas exposed to
sunshine.
REMEDIAL MEASURES:
(i. Properpositioning the door andwindow frame
(ii. If a wall between are junctions has openings at
window level totaling to more than 50 to 60% of its length,
engineering of wall by RCC pillars is necessary.
REMEDIAL MEASURES
(i. Without using concrete mixer and vibrator no concreting
should be
done.
(ii. Curing of concrete and mortar works should be ensured as
stipulated in code.
(iii. All slabs should be cast dense, particularly roof slab. Cover
below
reinforcement rods should be ensured at all places, by
providing
ample cover blocks in a reliable manner.
REMEDIAL MEASURES
CAUSES
Generally we see the chocking of Drainage and sewage
line. It may be because of not consideration of following points