SMB/5558/R: Strategic Business Plan (SBP)
SMB/5558/R: Strategic Business Plan (SBP)
SMB/5558/R: Strategic Business Plan (SBP)
Secretariat
Date
China
21 Jan 2015
Please ensure this form is annexed to the Report to the Standardization Management Board if it has been prepared during a meeting, or sent to the
Central Office promptly after its contents have been agreed by the committee.
Title of TC
Overhead Electrical Conductors
A Background
TC 7 was set up in October 1928 to prepare recommendations for bare aluminium wires and
conductors.
The scope of TC7 activities nowadays covers the preparation of international standards of all kinds of
overhead electrical conductors (stranded with round or formed wires and with or without gaps between
layers), variety of conductor wires and core wires applicable to the overhead stranded conductors,
guidance for fabrication and utilization of overhead electrical conductors, test methods for assessment
of overhead electrical conductor performance in operation, and standards on characteristics of the
accessories and hardware for overhead lines.
Some innovative high performance wires (fiber or carbon reinforced) require the development of new
types of overhead electrical conductors and the standards of these newly developed overhead
conductors should be prepared accordingly by TC7.
Application of aerial optical cables used either for phase conductors or ground wires are still booming.
TC7 is focusing on the preparation of these family specifications of overhead conductors incorporating
optical fibres and making contribution to this work in cooperation with SC86A.
B Business Environment
B.1 General
In developing countries, there are many new overhead line constructions, in contrast to other countries,
especially the developed countries where new constructions have slowed and older overhead lines
started reaching the end of their life cycle and may need refurbishment, upgrading, or uprating, without
having to replace supporting structures. This increases the pressure on TC 7 to offer standards of a
variety of conductor types and sizes that meet such needs. The refurbishment of existing lines may
require the availability of more conductor types (stranded with round or formed wires and with gap(s)or
no gap ), using new kinds of alloys (such as heat resistant aluminium alloy or aluminium alloy of
optimized compromise of high strength and conductivity), and conductors of new types not covered in
IEC 61089 (e.g. annealed aluminium conductor steel supported, ACSS).
The surge in optical needs for the purposes of communications, supervision, and control between
substations in electrical transmission and distribution systems have already led to the development of a
number of aerial optical cables to be installed on electrical power lines, and work is continuing in this
area.
6/9
SMB/5558/R
The annual gross production of overhead conductors is about 10 million tons, among which the America
takes up 20%, Europe and Asia respectively take 20% and 35%, and the Africa and other areas take up
25%. Almost every country all over the world has manufacturers, and the total manufacturer number
besides China estimated in the hundreds. Among hundreds of factories in China, most are small
enterprises. There are only more than 10 Chinese factories whose annual production can reach 30,000
tons.
Business is affected by the fluctuant price of the metal, oil and other global indicators.
7/9
SMB/5558/R
in B.3 are produced. The features of these new type conductors lie in the new materials and new
techniques caused by the continuously improved conductive performance of aluminium and intensity of
core. Therefore, TC7 should prepare new standards to meet these changes.
ISO TC 79/SC 6
Overhead lines
SC 18A
Electric cables for ships and mobile and fixed offshore units
TC 20
Electric cables
TC 55
Winding wires
TC 46
SC 86A
Terminology
Cooperation established:
- Liaison officers, experts participating in product/horizontal committees, TC 11
- Experts working in other TC/SCs and reporting to TC 7 for information, SC 86A, CIGRE/ B2
- A tight relationship between TC7 and CENELEC TC7X.
8/9
SMB/5558/R
3 In view of the trends in the business environment and market demand greater involvement by
developing countries should be encouraged;
4 Keep TC7 standards up to date to reflect new/changing technologies and user requirements both in
the marketplace and customer IEC and ISO Technical committees;
5 Maintain and promote the awareness of TC 7 publications.
D.2 Strategies
1 Encourage Convenors and Project Leaders to use the collaboration tools for planning work, meetings
and scheduling up to three years ahead;
2 Monitor the market and technology trends to assist the development of standard;
3 Engage with IEC Central Office at the earliest stage of any procedural or structural problems likely to
cause delay;
4 Maximise consensus for both new work and amendments/revisions before formal entry into the
procedures;
5 Regularly review target dates for all work.
E Action plan
1 Restart the work of IEC 62641 of the combination of the standards of aluminium and aluminium alloy ,
formed or round wires for overhead electrical conductors - Restart 2015;
2 Put forward the work of IEC 62774 of the combination of the standards of core wires for overhead
electrical conductors - Complete CD 2015;
3 Put forward to the maintenance work regarding conductors standards after the combination of the
wires - Complete 2017;
4 Put forward the work of PT62818 of non-metallic supporting member material for use in conductors Complete 2016;
5 Prepare the new standard of carbon fiber core conductors - Start 2015;
6 Start the work of joint WG with TC11 to develop standard on hardware and fittings for high
temperature conductors - Start 2015;
7 Start the work of revise of stress/strain test method in IEC 61089 - Start 2015.
9/9
SMB/5558/R