MTC of B-D Road
MTC of B-D Road
MTC of B-D Road
Maintenance of Butchireddypalem -Dagadarthi road from KM. 12/0 to 13/5 & 21/0 to 27/6 u
Maintanance of all roads in (R&B) Section, Allur for the year 2014-15
(Single package)
Rs.
AUTHORITY:-
NECESSITY:-
PROVISIONS:-
1
2
3
4
5
6
7
8
or the Sub-work of
C HBG chips.
parapet walls
arapets
nding
earence
Xerox charges
Mtc of Butchi-Dagadarthi road From Km. 12/0 to 13/5 & 21/0 to 27/6 For The Year 2015-16 i
Nellore District.
Description
Nos
Est amount:97,200
B
Qty
1.50
m3
Providing BT patch work for pot holes using 40mm HBG IRC metal with
required quantity of 9.5-11.2mm HBG IRC machine crushed key chips and
80/100 grade bitumen @ 42.00kgs per cum removal of loose materials in the
pot holes , trimming the edges to provide firm vertical faces cleaning applying
tack coat filling pot holes duly tamping to fill all voids etc complete and as
directed by the Engineer -in Charge .
Km 12/0 to 27/6
4.00
m3
Providing BT patch work for using 12-14mm HBG IRC machine crushed chips
and 80/100 grade bitumen @ 72.00kgs per cum removal of loose materials in
the pot holes , trimming the edges to provide firm vertical faces cleaning
applying tack coat filling pot holes duly tamping to fill all voids etc complete
and as directed by the Engineer -in Charge .
Km 12/0 to 27/6
3.50
m3
3500
1.00
7000
-3500
3500
sqm
Stripping the excess soil from the shoulders surface with an average depth of
stripping as 75mm to achieve the approved level for sectioning th berms /
shoulders including all labour charges for dumping the stripped earth from
shoulders on the side slopes etc. complete.
Km 12/0 to 27/6
2
500
1.00
1000
S.No
Description
Nos
complete
Qty
100
1.00
0.3
30.00
m3
Brick masonry in C.M. (1:6) mix using II nd class Bricks including cost, and
conveyance of cement sand, Bricks and all other materials confirming to APSS
specifications to site and all labour charges for mixing mortar construction of
masonry water curing with all leads and lifts for conveyance of water cost of
scaffolding charges etc complete and as directed by the Engineer-In-Charge
during execution of work
for damaged parapets(2*2)
3.00
0.4
0.60
2.88
3.00
m3
16.32
17.00
m2
White washing two coats with best shell lime including cost and conveyance of
lime, gum, cunjee water and all labour charges for applying etc complete.
for Culvert parapets
100.00
m2
10 Painting to tree bands with ready mixed first quality synthetic enamel paint of approved
brand and shade over 1 coat of wood primer of approved brand including cost and
conveyance of all materials to work site and all operational, incidental, labour charges
etc., complete for finished iem of work as per SS 1212
tree bands
90
1.2
0.9
97.20
97.20
m2
3.00
hrs
5.00
S.No
Description
Nos
Qty
nos
S.No
Description
Nos
Qty
st amount:97,200
Rate
Amount
1460.10
m3
2190
3982.80
m3
15931
5251.70
m3
18381
3.70
sqm
12950
7.70
7700
Rate
Amount
sqm
56.60
m3
1698
4252.70
12758
m3
2394.40
10 m2
4070
156.83
10 m2
1568
110.00
m2
10692
690.00
hrs
2070
200.00
1000
Rate
Amount
each
91009
4550
1360
280
97200
Rate
Amount
14
SEINIORAGE CHARGES
Mtc of Butchi-Dagadarthi road From Km. 12/0 to 13/5 & 21/0 to 27/6 For The Year
Sl.No
Description of Item
Item quantity in
Cum
Coefficient
4.00
1.33
1.50
1.33
3.50
1.33
3.00
512
3.00
0.28
17.00
0.021
30.00
1.00
304385564.xlsx
304385564.xlsx
HARGES
Total Quantity
in Cum
5.32
50
266.00
2.00
50
99.75
4.66
50
232.75
1536.00
35
53.76
0.84
40
33.60
0.36
40
14.28
30.00
22
660.00
Total Amount
1360.14
say
304385564.xlsx
1360.00
304385564.xlsx
BREAK UP DETAILS
1. KIND OF MATERIAL:-
2. KIND OF MATERIAL:-
Gravel.
Quarry at km 13/4 of B-D road with 0.20 KM ct.
CT
10 % CT
Butchi-Dagadarthi road km.13/4 to 12/0 & 13/4 to 27/6
(Average lead ((13.4-12.0)+(27.6-13.4))/2 =7.80)
3. KIND OF MATERIAL:-
Country bricks.
Kilns at Km. 11/2 of RI road with 0.20 KM CT
CT
10 % CT
RI road km. 11/2 to 18/0
PR road
A-U road Km.0/6 to 3/10
KK road Km.5/8 to 0/0
B-D road Km.27/6 to12/0
(Average lead (27.6-12.0)/2 =7.80)
4. KIND OF MATERIAL:-
0.200
0.020
4.800
18.800
7.800
31.620
6. KIND OF MATERIAL:-
0.200
0.020
6.800
0.260
3.400
5.800
7.800
24.280
CT
10 % CT
KT road km. 0/0 to 4/8
New NH 5 road km. 183/6 to 202/4
B-D road Km.27/6 to12/0
(Average lead (27.6-12.0)/2 =7.80)
5. KIND OF MATERIAL:-
0.200
0.020
7.800
8.020
7.800
7.800
Chennai local
New NH 5 road km. 0/0 to 202/4
B-D road Km.27/6 to12/0
(Average lead (27.6-12.0)/2 =7.80)
5.000
202.40
7.800
215.20
0 KM CT.
OR
16.00 KMS.
OR
8.00 KMS.
OR
24.00 KMS.
OR
32.00 KMS.
OR
8.00 KMS.
OR
215.00 KMS.
NAME OF WORK :-Butchi-Dagadarthi road From Km.12/0 to 13/5 & 21/0 To 27/6 For The Year 2015-16 in SPSR Nellore Distict
LEAD STATEMENT
Sl.N
o
Description of Metal
Source of Supply
Lead in
Kms
Conveyance
Initial cost
less stacking
Blasting
charges
Machine
crushing
charges
Seigniorage
charges
Quarry at km 4/6
of B-D road
16.00
195.35
419.00
70.00
0.00
0.00
- do -
16.00
195.35
456.00
70.00
0.00
0.00
- do -
16.00
195.35
588.00
70.00
0.00
0.00
40 to 45 mm IRC and
MoRTH HBG M/C metal
- do -
16.00
195.35
588.00
70.00
147.00
0.00
25 to 27 mm IRC and
MoRTH HBG M/C metal
- do -
16.00
195.35
944.00
70.00
236.00
0.00
19 to 22 mm IRC and
MoRTH HBG M/C metal
- do -
16.00
195.35
984.00
70.00
246.00
0.00
12 to 14 mm IRC and
MoRTH HBG M/C metal
- do -
16.00
195.35
780.00
70.00
195.00
0.00
- do -
16.00
195.35
656.00
70.00
164.00
0.00
- do -
16.00
195.35
504.00
70.00
126.00
0.00
- do -
16.00
195.35
308.00
70.00
77.00
0.00
10
Source of Supply
Lead in
Kms
Conveyance
Initial cost
less stacking
Blasting
charges
Machine
crushing
charges
Seigniorage
charges
- do -
16.00
195.35
340.00
0.00
0.00
0.00
- do -
16.00
195.35
85.00
0.00
0.00
0.00
13 Gravel
Quarry at km 13/4
of B-D road
8.00
106.93
103.00
0.00
0.00
0.00
Quarry at Km 1/4
of NBB road
32.00
368.51
462.00
0.00
0.00
0.00
Quarry at Km 21/2
of B-D road
8.00
106.93
342.00
0.00
0.00
0.00
16 II nd class Bricks
Quarry at Km 11/2
of R-I road
24.00
412.45
4700.00
0.00
0.00
0.00
17 Cement
0.00
0.00
5900.00
0.00
0.00
0.00
18 Shell lime
0.00
0.00
950.00
0.00
0.00
0.00
215.00
376.25
39995.97
0.00
0.00
0.00
Sl.N
o
11
Description of Metal
12 Stone Dust
19
Bitumen 80/100 as on
16.05.15
IOCL Chennai
Sl.N
o
Description of Metal
Source of Supply
Lead in
Kms
Conveyance
Initial cost
less stacking
Blasting
charges
Machine
crushing
charges
Seigniorage
charges
Sl.N
o
Description of Metal
Source of Supply
Lead in
Kms
Conveyance
Initial cost
less stacking
Blasting
charges
Machine
crushing
charges
Seigniorage
charges
SSR 2014-15.
Deduct stacking
Toal Cost per
charges for
Cum
conveyance
-8.70
675.65
-8.70
712.65
-8.70
844.65
-8.70
991.65
-8.70
1436.65
-8.70
1486.65
-8.70
1231.65
-8.70
1076.65
-8.70
886.65
-8.70
641.65
Deduct stacking
Toal Cost per
charges for
Cum
conveyance
-8.70
526.65
-8.70
271.65
-5.50
204.43
-5.50
825.01
-5.50
443.43
-10.00
5102.45
0.00
5900.00
0.00
950.00
-900.00
39472.22
Deduct stacking
Toal Cost per
charges for
Cum
conveyance
Deduct stacking
Toal Cost per
charges for
Cum
conveyance
Mtc of Butchi-Dagadarthi road From Km. 12/0 to 13/5 & 21/0 to 27/6 For The Year 2015-16 in SPS
DATAS
S.N
o
Quantity
Unit
Description
1
2
3
4
1 Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate
to Wet Mix macadem specification including cost,seignorage of all materials and
including premixing the material with water at OMC in Mechanical mix plant
carriage of mixed material by tipper to site , laying in uniform layers with paver in
base courses on well prepared surface and compacting with Vibratory roller to
acheive the desired density etc., as directed by the Engineer-in-Charge and as per
MoRT&H specification.406 (4th revision) for finished item of work.
(A)
0.48
2.00
10.00
(B)
6.60
6.00
6.00
6.00
3.90
3.00
(C)
89.10
118.80
89.10
(D)
0.00
(E)
(F)
Unit = cum
Taking output = 225 cum
Labour
Rate
5
nos. Mate
345.00
357.00
295.00
Total
Machinery
hr
Wet mix plant of 60 tonne hr. capacity
hr
Electric generating set 125 KVA
hr
front end loader 1 cum capacity
hr
Mechanical Paver finisher 100 TPH
hr
smooth wheeled roller 8 Ton
hr
Water tanker
Total
Material
cum 45 to 22.40mm IRC HBG metal @ 30%
(Av. Of 40-45, 25-27, 19-22mm )
cum 22.4 to 2.36mm IRC HBG metal @ 40%
(Av. Of 19-22, 12-14, 9.5-11.2, 5-7mm and 2.36mm to 5mm)
cum
2.36mm to 75 micron @ 30% (2.36mm & below)
Total
Over head charges @ 5%
%
Add for Over head charges @ 5% on (A)+(B)+( C)
Total of (A) + (B)+( C)+(D)
Add Contractors Profit at 10% on (E)
Cost per 225 cum (E) + (F)
Rate per 1 cum
Rate to be adopted per 1 cum
1646.00
1320.00
1646.00
0.00
1146.70
624.00
1304.98
1064.65
526.65
Providing BT patch work for pot holes using 40mm HBG IRC metal with required
quantity of 9.5-11.2mm HBG IRC machine crushed key chips and 80/100 grade
bitumen @ 42.00kgs per cum removal of loose materials in the pot holes , trimming
the edges to provide firm vertical faces cleaning applying tack coat filling pot holes
duly tamping to fill all voids etc complete and as directed by the Engineer -in
Charge .
Unit = 1cum
(C)
1.00
Material
cum 40 mm IRC HBG metal
991.65
S.N
o
1
Quantity
2
0.13
42.00
Unit
Description
3
4
cum 10-12 mm HBG key chips
Kgs 80/100 graded bitumen packed
Rate
5
1076.65
39472.22
Total
0.00
2.86
nos
Labour charges
0.27
hrs
1.00
1131.61
295.00
1146.70
and
80/100 grade bitumen at 72 kgs per 1.0 cum, removal of loose materials in the pot holes,
trimming the edges to provide for vertical faces, cleaning, applying tack coat, filling pot holes
duly tamping, to fill all voids etc complete and as directed by the Engineer-In-Charge .
1.00
0.15
72.00
cum
cum
Kgs
1231.65
443.43
39472.22
Total
0%
2.86
0.27
1.00
Labour charges
smooth wheeled roller 8 Ton
Men & Materials.
cum For tools and Plants.
1298.16
295.00
1146.70
Total
Rate to be adopted per 1 cum
4
Clearing the Juliflora (Prosafis) jungle including uprooting and removing of stumps clearing
away from site, burning etc., complete as directed by the Engineer-in-Charge during
execution of work./1m2
1.00
3.70
Rate to be adopted per 1 Sq.m
Stripping the excess soil from the shoulders surface with an average depth of
stripping as 75mm to achieve the approved level for sectioning th berms /
shoulders including all labour charges for dumping the stripped earth from
shoulders on the side slopes etc. complete.
By mechanical means
Taking output 100 Sq.m
0.10
day Mate
2.50
day Mazdoor
345.00
295.00
Add for sundries for caution boards tools for ramming etc.,
S.N
o
Quantity
Unit
Description
1
2
3
4
6 Removal of unserviceable soils upto SDR including excavation, loading and disposal
Rate
5
upto 1000 mts etc., complete including seignioarge charges for finished item of
work
Engineer-in-Charge
Unit : Cum
Taking out put = 360 Cum
Page 58 of MoRT&H SDB
(A) Labour
0.08
day Mate
345.00
2.00
day Mazdoor unskilled
295.00
Total
(B) Machinery
360.00
cum Rate as per G.O.Ms No 10 Dt 26/7/2005
13.00
16.36
Hrs Tippers 5.50 cum Capacity
922.00
Total
(C) Seignorage Charges
360.00
cum Seignorage charges
0.00
Total
(D) Over head charges @ 5%(10%-VAT) on (A)+(B)+( c)
(E) Total of (A)+(B)+( C)+(D)
(F) Add contractors Profit at 10% on (E)
cost per 360 Cum (E)+(F)
Rate per Cum
Rate to be adopted per 1 cum
1.00
1/6
1.00
825.01
8496.00
28.00
Total
Brick masonry in C.M. (1:6) mix using II nd class Bricks including cost, Seigniorage charges
and conveyance of cement sand, Bricks and all other materials confirming to APSS
specifications to site and all labour charges for mixing mortar construction of masonry water
curing with all leads and lifts for conveyance of water cost of scaffolding charges etc
complete and as directed by the Engineer-In-Charge during execution of work.
512.00
0.20
0.42
0.98
0.70
2.10
Nos
cum
Nos
Nos
Nos
Nos
4853.15
2269.01
357.00
345.00
295.00
295.00
Total
Rate to be adopted per 1 cum
1.00
1/5
1.00
825.01
8496.00
28.00
S.N
o
1
Quantity
2
Unit
3
Description
4
Rate
5
Total
cum
Nos
Nos
Nos
Nos
Cost of CM 1:5
Mason Ist class
Mason IInd class
Man Mazdoor
Woman Mazdoor
2552.21
357.00
345.00
295.00
295.00
Total
Rate to be adopted per 10 Sqm
11 White washing two coats with best shell lime including cost and conveyance of lime,
gum, cunjee water and all labour charges for applying etc complete.
0.07
0.48
1.12
0.50
2.70
cum
Nos
Nos
Nos
Nos
950.00
357.00
345.00
295.00
295.00
Total per 100 Sqm
Rate per 10 Sqm
12 Painting to tree bands with ready mixed first quality synthetic enamel paint of
approved brand and shade over 1 coat of wood primer of approved brand including
cost and conveyance of all materials to work site and all operational, incidental,
labour charges etc., complete for finished iem of work as per SS 1212
Unit : Sqm
Page 221,222 of MORT&H SDB
Taking out put = 10 Sqm
(A) Labour
0.33
nos. Painter I class
0.77
nos. Painter II class
Total
(B) Material
Cost of synthetic enamel paint
1.10
Litre
440.00
345.00
253.00
Total
Per
6
Amount
7
day
165.60
day
day
714.00
2950.00
3829.60
hr
hr
hr
hr
hr
hr
10863.60
7920.00
9876.00
0.00
4472.13
1872.00
35003.73
cum
116274.02
cum
126480.42
cum
46924.52
289678.96
Rs.
cum
0.00
328512.29
0.00
328512.29
1460.05
1460.10
991.65
Per
6
cum
MT
Amount
7
139.96
1657.83
2789.44
0.00
each
843.70
hour
309.61
40.00
Rs.
3982.75
3982.80
cum
cum
MT
1231.65
66.51
2842.00
4140.16
cum
0.00
Each
hrs
843.70
Rs.
227.80
40.00
5251.66
5251.70
Sq.m
Rs.
3.70
3.70
day
day
Rs.
34.50
737.50
0.20
772.20
7.722
7.70
Per
6
Amount
7
SDB
day
day
27.6
590.00
617.6
cum
Hrs
4680.00
15083.92
19763.92
cum
0.00
Rs.
0.00
20381.52
0.00
20381.52
56.62
56.60
cum
cum
cum
Rs.
825.01
1416.00
28.00
2269.01
1000 Nos
cum
Each
Each
Each
Each
Rs.
cum
cum
cum
2484.81
453.80
149.94
338.10
206.50
619.50
4252.65
4252.70
825.01
1699.20
28.00
Per
6
Rs.
cum
Each
Each
Each
Each
Rs.
cum
Each
Each
Each
Each
Rs.
Amount
7
2552.21
535.96
235.62
531.30
147.50
944.00
2394.38
2394.40
66.50
171.36
386.40
147.50
796.50
1568.26
156.83
day
day
145.20
265.65
410.85
Litre
278.30
689.15
Rs.
0.00
1100.00
0.00
1100.00
110.00
110.00
0.00
0.00
LEAD CHARGES
Earth/Grave
Metal
l/Sand
loading
unloading
stacking
0.25
0.5
1
2
3
4
5
6
7
8
46.05
13.95
0.00
27.63
27.63
27.63
38.68
51.67
62.72
73.77
84.82
95.88
106.93
92.11
13.95
0.00
26.67
26.67
26.67
37.37
51.67
62.72
73.77
84.82
95.88
106.93
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
117.98
129.04
140.09
151.14
162.19
173.25
184.30
195.35
206.40
217.46
228.51
239.56
250.61
261.67
272.72
283.77
294.82
305.88
316.93
327.98
339.04
350.09
359.30
117.98
129.04
140.09
151.14
162.19
173.25
184.30
195.35
206.40
217.46
228.51
239.56
250.61
261.67
272.72
283.77
294.82
305.88
316.93
327.98
339.04
350.09
359.30
32
33
34
35
368.51
377.72
386.93
396.14
368.51
377.72
386.93
396.14
36
405.35
405.35
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
414.56
423.77
432.98
442.19
451.40
460.61
469.82
479.04
488.25
497.46
506.67
515.88
525.09
534.30
543.51
552.72
561.93
571.14
580.35
589.56
598.77
607.98
617.19
626.40
635.61
644.82
654.04
663.25
672.46
681.67
690.88
700.09
709.30
718.51
727.72
736.93
746.14
414.56
423.77
432.98
442.19
451.40
460.61
469.82
479.04
488.25
497.46
506.67
515.88
525.09
534.30
543.51
552.72
561.93
571.14
580.35
589.56
598.77
607.98
617.19
626.40
635.61
644.82
654.04
663.25
672.46
681.67
690.88
700.09
709.30
718.51
727.72
736.93
746.14
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
755.35
764.56
773.77
782.98
792.19
801.40
810.61
819.82
829.04
838.25
847.46
856.67
865.88
875.09
884.30
893.51
902.72
911.93
921.14
930.35
939.56
948.77
957.98
967.19
976.40
985.61
994.82
1004.04
1013.25
1022.46
1031.67
1040.88
1050.09
1059.30
1068.51
1077.72
1086.93
1096.14
1105.35
1114.56
1123.77
1132.98
1142.19
755.35
764.56
773.77
782.98
792.19
801.40
810.61
819.82
829.04
838.25
847.46
856.67
865.88
875.09
884.30
893.51
902.72
911.93
921.14
930.35
939.56
948.77
957.98
967.19
976.40
985.61
994.82
1004.04
1013.25
1022.46
1031.67
1040.88
1050.09
1059.30
1068.51
1077.72
1086.93
1096.14
1105.35
1114.56
1123.77
1132.98
1142.19
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
1151.40
1160.61
1169.82
1179.04
1188.25
1197.46
1206.67
1215.88
1225.09
1234.30
1243.51
1252.72
1261.93
1271.14
1280.35
1289.56
1298.77
1307.98
1317.19
1326.40
1335.61
1344.82
1354.04
1363.25
1372.46
1381.67
1390.88
1400.09
1409.30
1418.51
1427.72
1436.93
1446.14
1455.35
1151.40
1160.61
1169.82
1179.04
1188.25
1197.46
1206.67
1215.88
1225.09
1234.30
1243.51
1252.72
1261.93
1271.14
1280.35
1289.56
1298.77
1307.98
1317.19
1326.40
1335.61
1344.82
1354.04
1363.25
1372.46
1381.67
1390.88
1400.09
1409.30
1418.51
1427.72
1436.93
1446.14
1455.35
Material Rates
60 to 63 mm IRC & MoRTH HBG metal
50 to 55 mm IRC & MoRTH HBG metal
40 to 45 mm IRC & MoRTH HBG metal
Roughstone 300mm (HBG) for revetment
Roughstone 225mm (HBG) for revetment
SS Revetment work 225mm
SS Revetment work 300mm
SS Revetment work 450mm
Laterite for Revetment 225mm
Laterite for Revetment 300mm
Jeddy stone above 450 mm to 600 mm
Quarry spall(Field picked metal)
Av. Of rate 25mm & 40mm
150 mm soling stone HBG metal
40 to 45 mm IRC & MoRTH HBG M/C metal
25 to 27 mm IRC & MoRTH HBG M/C metal
19 to 22 mm IRC & MoRTH HBG M/C metal
12 to 14 mm IRC & MoRTH HBG M/C metal
9.5 to 11.20 mm IRC & MoRTH HBG M/C metal
5 to 7 mm IRC & MoRTH HBG M/C metal
2.36 to 5 mm IRC & MoRTH HBG M/C metal
HBG Stone chips 2.36 mm and below
Gravel
40 mm SS-5 m/c HBG metal
25 mm SS-5 m/c HBG metal
20 mm SS-5 m/c HBG metal
12 mm SS-5 m/c HBG metal
10 mm SS-5 m/c HBG metal
6 mm SS-5 m/c HBG metal
Sand for concrete
Sand for Filling
HYSD Steel
Mild Steel
Cement
Mild Steel 6mm
SSR
Page
No
419.00
17
456.00
17
588.00
16
156.00
154.00
144.00
164.00
136.00
118.00
138.00
188.00
13
13
13
13
13
13
13
45.00
95.00
588.00
944.00
984.00
780.00
656.00
504.00
308.00
340.00
103.00
620.00
994.00
1036.00
822.00
692.00
532.00
462.00
342.00
44000.00
43000.00
5900.00
45000.00
16
16
16
16
16
16
16
18
18
15
15
15
15
14
14
19
19
..
.
..
Blasting charges
Blasting charges
Blasting charges for rough stone
Seigniorage charges
70.00
70.00
Metal
50.00
Gravel/earth
Sand
Labour Rates
Mate
Mazdoor skilled
Mazdoor unskilled
Machinery Rates
Dozer 80 HP for spreading @ 200 cum per hour
Motor grader 3.35 M Blade @50 cum/Hr
Hydralic excavator
Front end loader 1 cum capacity
Tipper 5.5 cum
Vibratory roller 8T
smooth wheeled roller 8 Ton
Water tanker 6 KL
Tractor
Tractor with Rotavator
Tractor with ripper attachment @ 60 cum per hour
Air compressor 250 cfm
Wet mix plant of 60 tonne hr. capacity
Mechanical broom @ 1250 sqm/hr.
Bitumen pressure distributor @1750 sqm/hr
Emulsion pressure distributor @1750 sqm/hr
Hot mix plant 40 to 60 TPH
Mechanical Paver finisher 100 TPH
Hydraulic self propelled chip spreader @ 1500 sqm/hr.
Finish rolling with 6-8 tonne smooth wheeled tandem roller.
Pneumatic road Roller
GSB Plant 50 Cum
Generator 250 KVA
Generator set 125 KVA
Generator set 35 KVA
Concrete mixer 0.4/0.28 cum
Tipper 5.50 cum capacity per Tonne per km
Tipper 5.50 cum per km
Plate compactor/Power rammer
Sand for Mortar
22.00
40.00
17
17
As per
345.00
357.00
295.00
2575.60
3216.00
2848.50
1646.00
922.00
2678.30
1146.70
624.00
415.00
422.00
422.00
507.50
1646.00
357.00
1498.00
860.00
19120.00
2249.00
2567.00
1646.00
1283.00
1143.00
1850.00
1320.00
861.70
453.00
7.22
72.20
48.00
606.00
GO
.-Do.-Do10
10
25
25
25
25
25
25
25
25
25
25
25
25
26
26
26
26
26
26
26
26
26
26
27
27
28
27
28
19
Blacksmith
Driller
Blaster
385.00
440.00
440.00
10
9
8
5
6
7
8
9
10
11
12
13
14
15
16
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
84.1
96.7
109.3
121.9
134.5
147.1
159.7
172.3
184.9
197.5
210.1
222.7
73.77
84.82
95.88
106.93
117.98
129.04
140.09
151.14
162.19
173.25
184.3
195.35
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
235.3
247.9
260.5
273.1
285.7
298.3
310.9
323.5
336.1
348.7
361.3
373.9
386.5
399.1
409.6
420.1
430.6
441.1
451.6
462.1
472.6
483.1
493.6
206.4
217.46
228.51
239.56
250.61
261.67
272.72
283.77
294.82
305.88
316.93
327.98
339.04
350.09
359.3
368.51
377.72
386.93
396.14
405.35
414.56
423.77
432.98
40
41
42
43
10.5
10.5
10.5
10.5
504.1
514.6
525.1
535.6
442.19
451.4
460.61
469.82
44
10.5
546.1
479.04
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
556.6
567.1
577.6
588.1
598.6
609.1
619.6
630.1
640.6
651.1
661.6
672.1
682.6
693.1
703.6
714.1
724.6
735.1
745.6
756.1
766.6
777.1
787.6
798.1
808.6
819.1
829.6
840.1
850.6
861.1
871.6
882.1
892.6
903.1
913.6
924.1
934.6
488.25
497.46
506.67
515.88
525.09
534.3
543.51
552.72
561.93
571.14
580.35
589.56
598.77
607.98
617.19
626.4
635.61
644.82
654.04
663.25
672.46
681.67
690.88
700.09
709.3
718.51
727.72
736.93
746.14
755.35
764.56
773.77
782.98
792.19
801.4
810.61
819.82
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
945.1
955.6
966.1
976.6
987.1
997.6
1008.1
1018.6
1029.1
1039.6
1050.1
1060.6
1071.1
1081.6
1092.1
1102.6
1113.1
1123.6
1134.1
1144.6
1155.1
1165.6
1176.1
1186.6
1197.1
1207.6
1218.1
1228.6
1239.1
1249.6
1260.1
1270.6
1281.1
1291.6
1302.1
1312.6
1323.1
1333.6
1344.1
1354.6
1365.1
1375.6
1386.1
829.04
838.25
847.46
856.67
865.88
875.09
884.3
893.51
902.72
911.93
921.14
930.35
939.56
948.77
957.98
967.19
976.4
985.61
994.82
1004.04
1013.25
1022.46
1031.67
1040.88
1050.09
1059.3
1068.51
1077.72
1086.93
1096.14
1105.35
1114.56
1123.77
1132.98
1142.19
1151.4
1160.61
1169.82
1179.04
1188.25
1197.46
1206.67
1215.88
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
1396.6
1407.1
1417.6
1428.1
1438.6
1449.1
1459.6
1470.1
1480.6
1491.1
1501.6
1512.1
1522.6
1533.1
1543.6
1554.1
1564.6
1575.1
1585.6
1596.1
1606.6
1617.1
1627.6
1638.1
1648.6
1659.1
1225.09
1234.3
1243.51
1252.72
1261.93
1271.14
1280.35
1289.56
1298.77
1307.98
1317.19
1326.4
1335.61
1344.82
1354.04
1363.25
1372.46
1381.67
1390.88
1400.09
1409.3
1418.51
1427.72
1436.93
1446.14
1455.35