RCC81 Foundation Pads
RCC81 Foundation Pads
RCC81 Foundation Pads
COUNCIL
Project
Porta Cabin
Client
Location
Advisory Group
Footing Under Column
Made by
Single column
base
MATERIALS
fcu
fy
Densities - Concrete
Bearing pressure
25
400
23.6
100
DIMENSIONS mm
BASE
L = 550
B = 550
depth H = 250
ex = 0
20
50
18
Revision
Job No
Tony
1.5
1.05
c
s
mm
N/mm
kN/m
kN/m (net allowable increase)
mm
kN/m
concrete
steel
COLUMN
h = 350
b = 200
ey = 0
Axial (kN)
Mx (kNm)
My (kNm)
Hx (kN)
Hy (kN)
h agg
cover
Soil
Page
14-Feb-16
Checked
N/mm
Date
Tony
characteristic
IMPOSED
Key
WIND
29.0
Grnd Brg Pressure
Bending
97%
fsx
(As/Asprov) fsy
STATUS Err:520
Shear
v xx
v yy
no wind
with wind
punching
characteristic
97.3
97.3
97.3
97.3
97.3
97.3
97.3
97.3
REINFORCEMENT
Mxx =
0.4
b=
550
d = Err:520
As = Err:520
PROVIDE Err:520
As prov = Err:520
25.0%
0.0%
mm
Err:520
Myy =
1.1
b=
550
d = Err:520
As = Err:520
PROVIDE Err:520
As prov = Err:520
Err:520
BEAM SHEAR
Err:520
Vxx =
0.0
kN at d from col face
v = Err:520 N/mm
or Vxx =
0.0
kN at 2d from col face
v = Err:520 N/mm
vc = Err:520 N/mm
PUNCHING SHEAR
Err:520
d ave = Err:520 mm
As prov = Err:520 %
v = Err:520 N/mm
75.0%
125.0%
100.0%
Efficiency
Err:520
kNm
mm
mm
mm
50.0%
kNm
mm
mm
mm
mm
Err:520
Err:520
Vyy
v
or Vyy
v
vc
=
0.4
kN at d from col face
= Err:520 N/mm
=
0.0
kN at 2d from col face
= Err:520 N/mm
= Err:520 N/mm
Err:520
u crit = Err:520 mm
v max = Err:520 N/mm at col face
vc = Err:520 N/mm
Project
Porta Cabin
Footing Under Column
PAD FOUNDATION DESIGN to BS 8110:1997
Location
Made by Tony
Date
Job No 1
8-Jan-99
sheet 1 of 3
L= 0.55
B= 0.55
CHARACTERISTIC PRESSURES
P
Mx
My
ex
ey
6ex/L
if ex>L/6
k 2-4
k 1-3
6ey/B
if ey>B/6
k 1-2
k 3-4
P/A
corner 1
corner 2
corner 3
corner 4
kN
kNm
kNm
m
m
kN/m
kN/m
kN/m
kN/m
kN/m
G+Q
G+Q+W
30.78
0.00
0.00
0.000
0.000
0.0000
1.3333
1.0000
1.0000
0.0000
1.3333
1.0000
1.0000
101.77
101.77
101.77
101.77
101.77
30.78
0.00
0.00
0.000
0.000
0.0000
1.3333
1.0000
1.0000
0.0000
1.3333
1.0000
1.0000
101.77
101.77
101.77
101.77
101.77
1.4G+1.6Q
1.2(G+Q+W)
43.10
0.00
0.00
0.000
0.000
0.0000
1.3333
1.0000
1.0000
0.0000
1.3333
1.0000
1.0000
78.36
78.36
78.36
78.36
78.36
78.36
0.825
0.825
36.94
0.00
0.00
0.000
0.000
0.0000
1.3333
1.0000
1.0000
0.0000
1.3333
1.0000
1.0000
67.17
67.17
67.17
67.17
67.17
67.17
0.825
0.825
G+W
OK
30.78
0.00
0.00
0.000
0.000
0.0000
1.3333
1.0000
1.0000
0.0000
1.3333
1.0000
1.0000
101.77
101.77
101.77
101.77
101.77
0
Rebar ares
Gross
Gross
Gross
Gross
ULTIMATE PRESSURES
N
Mx
My
ex
ey
6ex/L
if ex>L/6
k 2-4
k 1-3
6ey/B
if ey>B/6
k 1-2
k 3-4
N/L
edge 2-4
edge 1-3
N/B
edge 1-2
edge 3-4
3(L/2-ex)
3(B/2-ey)
kN
kNm
kNm
m
m
kN/m
kN/m
kN/m
kN/m
kN/m
kN/m
m
m
XX MOMENTS
from right
from left
to zero press
local press
M1
M2
choose M
Design Mxx
1.4G+1.6Q
LEFT
RIGHT
m
m
m
kN/m
kNm
kNm
kNm
kNm
0.450
0.100
0.725
78.36
0.4
6.9
0.4
0.100
0.450
0.725
78.36
0.4
6.9
0.4
1.0G+1.4W
OK
1.2(G+Q+W)
LEFT
RIGHT
31.50
0.00
0.00
0.000
0.000
0.0000
1.3333
1.0000
1.0000
0.0000
1.3333
1.0000
1.0000
57.27
57.27
57.27
57.27
57.27
57.27
0.825
0.825
FS o'turn 100
FS o'turn 100
1.0G+1.4W
LEFT
RIGHT
3.11.2.2
3.11.2.2
0.725
67.17
0.3
5.9
0.3
0.725
67.17
0.3
5.9
0.3
0.725
57.27
0.3
5.0
0.3
0.725
57.27
0.3
5.0
0.3
0.4
XX SHEARS
@ d from col face
from right
0.550
m
from left
0.000
m
to zero press
0.275
m
local press
78.36
kN/m
V1
0.0
kN
V2
32.3
kN
choose V
0.0
kN
Design Vxx
0.0
kN
@ 2d from col face
from right
0.550
m
from left
0.000
m
to zero press
0.275
m
local press
78.36
kN/m
V1
0.0
kN
V2
32.3
kN
choose V
0.0
kN
Design Vxx
0.0
kN
0.000
0.550
0.825
78.36
0.0
32.3
0.0
0.000
0.550
0.825
78.36
0.0
32.3
0.0
3.4.5.10
3.4.5.8
0.275
67.17
0.0
27.7
0.0
0.825
67.17
0.0
27.7
0.0
0.275
57.27
0.0
23.6
0.0
0.825
57.27
0.0
23.6
0.0
3.4.5.10
3.4.5.8
0.275
67.17
0.0
27.7
0.0
0.825
67.17
0.0
27.7
0.0
0.275
57.27
0.0
23.6
0.0
0.825
57.27
0.0
23.6
0.0
Area
50.3
78.5
113.1
201.1
314.2
490.9
804.2
1256.6
Dia
8
10
12
16
20
25
32
40
Project
Porta Cabin
Footing Under Column
PAD FOUNDATION DESIGN to BS 8110:1997
Location
YY MOMENTS
from top
0.375
m
from btm
0.175
m
to zero press
0.650
m
local press
78.36
kN/m
M1
1.2
kNm
M2
5.5
kNm
choose M
1.1
kNm
Design Myy
1.1
kNm
YY SHEARS
@ d from col face
from top
0.545
m
from btm
0.005
m
to zero press
0.820
m
local press
78.36
kN/m
V1
0.4
kN
V2
32.1
kN
choose V
0.4
kN
Design Vyy
0.4
kN
@ 2d from col face
from top
0.550
m
from btm
0.000
m
to zero press
0.825
m
local press
78.36
kN/m
V1
0.0
kN
V2
32.3
kN
choose V
0.0
kN
Design Vyy
0.0
kN
REINFORCEMENT
0.175
0.375
0.650
78.36
1.2
5.5
1.1
0.005
0.545
0.820
78.36
0.4
32.1
0.4
0.000
0.550
0.825
78.36
0.0
32.3
0.0
3.11.2.2
0.650
67.17
1.0
4.7
1.0
mm
mm
mm
mm
mm
mm
mm
mm
mm
%
mm
mm
mm
mm
N/mm
N/mm
N/mm
%
PUNCHING SHEAR
d ave
mm
0.650
57.27
0.9
4.0
0.8
3.4.5.10
3.4.5.8
0.820
67.17
0.3
27.5
0.3
0.820
67.17
0.3
27.5
0.3
0.820
57.27
0.3
23.5
0.3
0.820
57.27
0.3
23.5
0.3
3.4.5.10
3.4.5.8
0.825
67.17
0.0
27.7
0.0
0.825
67.17
0.0
27.7
0.0
0.825
57.27
0.0
23.6
0.0
0.825
57.27
0.0
23.6
0.0
Y-Y
550
choose dia
Err:520
20
Err:520
170
0.1558
Err:520
0.0028
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
325
Err:520
Err:520
275
Err:520 Err:520
Err:520
Err:520
Err:520
0.0000
Err:520
0.0000
Err:520 Err:520
Err:520
Err:520
Err:520
0.0039
Err:520
0.0000
Err:520 Err:520
Err:520
Err:520
Err:520
275
Err:520
Err:520
Err:520
Err:520
perimeter falls
Err:520
mm
Err:520
m
Err:520
%
Err:520
N/mm
mm
mm
Y,N
mm
Y,N
kN
N/mm
kN/m
kN
N/mm
Punching
ave
0.00000
Err:520
As X
As Y
ave
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
As X
As Y
.5 x d ave Err:520
R
275
Err:520
Err:520
Err:520
Err:520
Err:520
1.4G+1.6Q
N
v max
ave press
V
v
0.650
57.27
0.9
4.0
0.8
550
choose dia
Err:520
20
Err:520
190
0.1558
Err:520
0.0007
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
2.32
Err:520
325
Err:520
Err:520
275
Err:520 Err:520
Err:520
Err:520
U crit
Area
As prov
vc
0.650
67.17
1.0
4.7
1.0
min As 0.24%
BEAM SHEAR
v@d
v @ 2d
vc
As enhanced
to edges
to 1.5d per
standard perimeter?
U
within base?
Job No 1
8-Jan-99
sheet 2 of 3
3.11.2.2
X-X
b
dia
d
K'
K
z
As
As shear
required
No
ave centres
As prov
=
Lc
Lc max
b central
Final centres
Made by Tony
Date
43.1
Err:520 Err:520
142.47
Err:520
Err:520 Err:520
275
Err:520
Err:520
Err:520
Err:520
275
Err:520
Err:520
Err:520
Err:520
180
270
Err:520
Err:520
Err:520
Err:520
Err:520
275
275
275
0
0.0
0.0000
0.0
0.0000
0.0
0.0000
0
0.303
1.2(G+Q+W)
36.9
Err:520 Err:520
122.12
Err:520
Err:520 Err:520
1.0G+1.4W
31.5
Err:520 Err:520
104.13
Err:520
Err:520 Err:520
Project
Porta Cabin
Footing Under Column
PAD FOUNDATION DESIGN to BS 8110:1997
Location
SIZING TIPS
N
kN
Mx
kNm
My
kNm
ex
m
ey
m
min A
m
min L
mm
min B
mm
sq base iteration 0
sq base iteration 1
sq base iteration 2
sq base iteration 3
SQUARE SIZE
L&B
mm
if L =
550
B
if B =
550
mm
mm
G+Q
G+Q+W
G+W
29.0
0.0
0.0
0
0
0.29
350
200
0.542
0
0
1.085
94
94
0.542
0
0
0.542
0
0
29.0
0.0
0.0
0
0
0.24
29.0
0.0
0.0
0
0
0.24
0.542
0
0
1.085
94
94
0.542
0
0
0.542
0
0
0.542
0
0
1.085
94
94
0.542
0
0
0.542
0
0
542
542
542
53
535
53
428
53
428
or 550 x 535
53
535
53
428
53
428
or 535 x 550
545 SQ
Made by Tony
Date
Job No 1
8-Jan-99
sheet 3 of 3
275
0
Project
Porta Cabin
Client
Advisory Group
Location
Base B3/B4
REINFORCED CONCRETE
COUNCIL
Made by
Combined base
MATERIALS
fcu
fy
Densities - Concrete
Bearing pressure
Axial
Mx
My
Hx
Hy
h agg
cover
Soil
25
400
N/mm
N/mm
23.6
kN/m
125
Date
Tony
mm
mm
18
kN/m
Checked
Revision
Job No
Tony
c
s
20
50
Page
14-Feb-16
1.5
1.05
steel
concrete
characteristic
DEAD
IMPOSED
WIND
225.0
225.0
112.5
Column 2 (lhs)
Axial
Mx
My
Hx
Hy
DEAD
IMPOSED
WIND
225.0
225.0
112.5
50.0
25.0
DIMENSIONS mm
BASE
L
B
depth H
ex
ey
COLUMN 1 (rhs)
= 3000
= 3000
= 750
= 300
= 1000
COLUMN 2 (lhs)
h1 = 300
b1 = 300
h2 = 300
b2 = 300
ex1 = 150
ey1 = 500
ex2 = 150
ey2 = 500
STATUS Err:520
no wind
with wind
104.2
144.5
104.2
144.5
104.2
113.9
104.2
113.9
REINFORCEMENT
Btm Mxx - 405.0
b = 3000
d = Err:520
As = Err:520
Err:520
As prov = Err:520
Err:520
Top Mxx +
0.0
d = Err:520
As = Err:520
Err:520
As prov = Err:520
Err:520
BEAM SHEAR
Vxx =
v=
or Vxx =
v=
vc =
characteristic
Bending
fsx
Shear
mm
As prov =
kNm
mm
mm
Myy +
d=
As =
mm
As prov =
kN at d
N/mm
kN at 2d
N/mm
N/mm
PUNCHING SHEAR
d ave = Err:520 mm
92%
(As/Asprov) fsy
Myy - 251.7
b = 3000
d = Err:520
As = Err:520
kNm
mm
mm
mm
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
v xx
v yy
punching
0.0%
133.1%
Efficiency'
0.000
0.0
0.500
1.000
=
=
=
=
=
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
u crit = Err:520 mm
2.000
2.500
3.000
3.500
-100.0
-200.0
-300.0
-400.0
Moment
-500.0
Err:520
Vyy
v
or Vyy
v
vc
1.500
Columns
Z ero axis
Mx Diagram
0.000
0.0
0.500
1.000
1.500
2.000
-50.0
-100.0
-150.0
-200.0
-250.0
Err:520
2.500
3.000
3.500
Project
Porta Cabin
Base B3/B4
Location
Made by Tony
Date
Combined base
1999 BCA for RCC
Job No 1
14-Feb-16
sheet 1 of 5
L= 3.00
B= 3.00
CHARACTERISTIC PRESSURES
N1
N2
Total N
Mx1
Mx2
Total Mx
ex
My1
My2
Total My
ey
6ex/L
if ex>L/6
k 2-4
k 1-3
6ey/B
if ey>B/6
k 1-2
k 3-4
N/A
corner 1
corner 2
corner 3
corner 4
kN
kN
kN
kNm
kNm
kNm
m
kNm
kNm
kNm
m
kN/m
kN/m
kN/m
kN/m
kN/m
G+Q
G+Q+W
G+W
450.0
450.0
1059.3
67.5
-67.5
0.0
0.000
225.0
-225.0
0.0
0.000
0.0000
1.3333
1.0000
1.0000
0.0000
1.3333
1.0000
1.0000
117.70
117.70
117.70
117.70
117.70
562.5
562.5
1284.3
84.4
-84.4
0.0
0.000
281.3
-212.5
68.8
0.054
0.0000
1.3333
1.0000
1.0000
0.1071
1.3827
1.1071
0.8929
142.70
157.98
157.98
127.42
127.42
337.5
337.5
834.3
50.6
-50.6
0.0
0.000
168.8
-100.0
68.8
0.082
0.0000
1.3333
1.0000
1.0000
0.1648
1.4108
1.1648
0.8352
92.70
107.98
107.98
77.42
77.42
1.4G+1.6Q
1.2(G+Q+W)
1.0G+1.4W
675.0
675.0
1573.0
0.0
0.0
0.0
0.0
0.0
0.0
0.000
0.000
0.0000
1.3333
1.0000
1.0000
0.0000
1.3333
1.0000
1.0000
524.34
524.34
524.34
524.34
524.34
524.34
4.500
4.500
675.0
675.0
1541.2
0.0
0.0
0.0
0.0
82.5
82.5
0.000
0.054
0.0000
1.3333
1.0000
1.0000
0.1071
1.3827
1.1071
0.8929
513.72
513.72
513.72
513.72
568.72
458.72
4.500
4.339
382.5
382.5
924.3
0.0
0.0
0.0
0.0
96.3
96.3
0.000
0.104
0.0000
1.3333
1.0000
1.0000
0.2083
1.4328
1.2083
0.7917
308.10
308.10
308.10
308.10
372.27
243.93
4.500
4.188
OK
Dims
clear x
clear y
Rebar areas
FS o'turn 100
FS o'turn 18.20291 0
Area
50.3
78.5
113.1
201.1
314.2
490.9
804.2
1256.6
Gross
Gross
Gross
Gross
Text
Asx increased
Asy increased
ULTIMATE PRESSURES
N1
N2
Total N
Mx1
Mx2
Mx
My1
My2
My
ex
ey
6ex/L
if ex>L/6
k 2-4
k 1-3
6ey/B
if ey>B/6
k 1-2
k 3-4
N/L
edge 2-4
edge 1-3
N/B
edge 1-2
edge 3-4
3(L/2-ex)
3(B/2-ey)
XX MOMENTS
Column 1
from right
from left
to zero press
local press
M1
M2
add
choose M
Column 2
from right
from left
to zero press
local press
M1
M2
add
choose M
Design Mxx+
304472402.xls
kN
kN
kN
kNm
kNm
kNm
kNm
kNm
kNm
m
m
kN/m
kN/m
kN/m
kN/m
kN/m
kN/m
m
m
1.4G+1.6Q
LEFT
RIGHT
m
m
m
kN/m
kNm
kNm
kNm
kNm
1.500
1.500
3.000
524.34
589.9
0.0
-101.3
405.0
1.200
1.800
3.300
524.34
377.5
-471.9
m
m
m
kN/m
kNm
kNm
kNm
kNm
kNm
1.800
1.200
3.300
524.34
377.5
-471.9
1.500
1.500
3.000
524.34
589.9
0.0
-101.3
405.0
324.0
324.0
OK
1.2(G+Q+W)
LEFT
RIGHT
FS o'turn 100
FS o'turn 14.40468 0
1.0G+1.4W
LEFT
RIGHT
3.11.2.2
3.11.2.2
3.000
513.72
577.9
0.0
-101.3
405.0
3.300
513.72
369.9
-462.3
324.0
3.000
308.10
346.6
0.0
-57.4
229.5
3.300
308.10
221.8
-277.3
183.6
3.11.2.2
3.11.2.2
3.300
513.72
369.9
-462.3
324.0
3.000
513.72
577.9
0.0
-101.3
405.0
3.300
308.10
221.8
-277.3
183.6
3.000
308.10
346.6
0.0
-57.4
229.5
405.0
10:26:57
02/14/2016
BETWEEN
clear span
End V
local press
quad a
if ex<=L/6
quad a
otherwise
choose X bar
from left/right
local press
M1
M2
choose M
Design MxxXX SHEARS
Column 1
from right
from left
to zero press
local press
V1
V2
add
choose V
m
kN
kN/m
m
m
m
m
kN/m
kNm
kNm
kNm
kNm
@d
0.000
0.0
Err:520
Err:520
Err:520
Err:520
0.000
Err:520
Err:520
Err:520
Err:520
Err:520
0.0
304472402.xls
Err:520
Err:520
Err:520
1.4G+1.6Q
LEFT
RIGHT
m
m
Err:520
Err:520
Err:520
Err:520
Err:520
1573.0
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
1573.0
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
1573.0
-675.0
0.0
Err:520
Err:520
Err:520
Err:520
Err:520
1573.0
-675.0
0.0
1.4G+1.6Q
LEFT
RIGHT
m
m
m
kN/m
kNm
kNm
kNm
kNm
1.150
1.850
2.650
524.34
897.3
550.6
-573.8
196.3
0.850
2.150
3.650
524.34
189.4
-1022.5
m
m
m
kN/m
kNm
kNm
kNm
kNm
2.150
0.850
3.650
524.34
189.4
-1022.5
1.850
1.150
2.650
524.34
897.3
550.6
-573.8
196.3
kNm
0.0
Err:520
Err:520
Err:520
Err:520
0.000
Err:520
Err:520
Err:520
Err:520
Err:520
0.0
0.0
Err:520
Err:520
Err:520
Err:520
0.0
Err:520
Err:520
Err:520
Err:520
0.000
Err:520
Err:520
Err:520
Err:520
Err:520
0.0
0.0
Err:520
Project
Porta Cabin
Location
Base B3/B4
PAD FOUNDATION DESIGN to BS 8110:1997
Err:520
Err:520
Err:520
0.0
Err:520
Err:520
Err:520
m
Err:520
kN/m
Err:520
kN
1573.0
kN
-675.0
kN
0.0
kN
@ 2d from col face
from right
Err:520
m
from left
Err:520
m
to zero press
Err:520
m
local press
Err:520
kN/m
V1
Err:520
kN
V2
1573.0
kN
add
-675.0
kN
choose V
0.0
kN
Column 2 @ d from col face
from right
Err:520
m
from left
Err:520
m
to zero press
Err:520
m
local press
Err:520
kN/m
V1
Err:520
kN
V2
1573.0
kN
add
kN
choose V
Err:520
kN
Design Vxx (d)
Err:520
kN
@ 2d from col face
from right
Err:520
m
from left
Err:520
m
to zero press
Err:520
m
local press
Err:520
kN/m
V1
Err:520
kN
V2
1573.0
kN
add
kN
choose V
Err:520
kN
Design Vxx (2d)
Err:520
kN
YY MOMENTS
Column 1
from top
from btm
to zero press
local press
M1
M2
add
choose M
Column 2
from top
from btm
to zero press
local press
M1
M2
add
choose M
Design Mxx+
0.0
Err:520
162.6
251.7
162.6
1.2(G+Q+W)
LEFT
RIGHT
1.0G+1.4W
LEFT
RIGHT
3.4.5.10
3.4.5.8
Err:520
Err:520
Err:520
1541.2
-675.0
0.0
Err:520
Err:520
Err:520
1541.2
Err:520
Err:520
Err:520
Err:520
924.3
-382.5
0.0
Err:520
Err:520
Err:520
924.3
Err:520
3.4.5.10
3.4.5.8
Err:520
Err:520
Err:520
1541.2
-675.0
0.0
Err:520
Err:520
Err:520
1541.2
Err:520
Err:520
Err:520
Err:520
924.3
-382.5
0.0
Err:520
Err:520
Err:520
924.3
Err:520
3.4.5.10
3.4.5.8
Err:520
Err:520
Err:520
1541.2
Err:520
Err:520
Err:520
Err:520
1541.2
-675.0
0.0
Err:520
Err:520
Err:520
924.3
Err:520
Err:520
Err:520
Err:520
924.3
-382.5
0.0
3.4.5.10
3.4.5.8
Err:520
Err:520
Err:520
1541.2
Err:520
Err:520
Err:520
Err:520
1541.2
-675.0
0.0
1.2(G+Q+W)
LEFT
RIGHT
Err:520
Err:520
Err:520
924.3
Err:520
Err:520
Err:520
Err:520
924.3
-382.5
0.0
1.0G+1.4W
LEFT
RIGHT
3.11.2.2
3.11.2.2
2.489
526.55
823.7
823.7
-491.3
223.4
3.489
537.55
201.7
-919.3
178.7
2.338
323.07
462.6
462.6
-228.9
142.8
3.338
335.91
130.1
-504.5
110.9
3.11.2.2
3.11.2.2
3.489
489.89
169.5
169.5
146.4
2.489
500.89
934.5
621.9
-573.8
251.7
10:26:57
3.338
280.29
92.5
92.5
73.3
02/14/2016
2.338
293.13
591.9
419.8
-325.1
175.9
10
Combin
BETWEEN
clear span
End V
local press
quad a
if ex<=L/6
quad a
otherwise
choose X bar
from left/right
local press
M1
M2
choose M
Design MyyYY SHEARS
Column 1
from top
from btm
to zero press
local press
V1
V2
add
choose V
m
kN
kN/m
m
m
m
m
kN/m
kNm
kNm
kNm
kNm
@d
0.700
Err:520
Err:520
Err:520
Err:520
Err:520
0.000
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
304472402.xls
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
0.000
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
0.000
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Combined base
Err:520
Err:520
Made by Tony
Date
1999 BCA
Job No 1
14-Feb-16
Err:520
Err:520
1.4G+1.6Q
LEFT
RIGHT
Err:520
Err:520
Err:520
m
Err:520
kN/m
Err:520
kN
1573.0
kN
-675.0
kN
Err:520
kN
@ 2d from col face
from top
Err:520
m
from btm
Err:520
m
to zero press
Err:520
m
local press
Err:520
kN/m
V1
Err:520
kN
V2
1573.0
kN
add
-675.0
kN
choose V
Err:520
kN
Column 2 @ d from col face
from right
Err:520
m
from left
Err:520
m
to zero press
Err:520
m
local press
Err:520
kN/m
V1
Err:520
kN
V2
1573.0
kN
add
kN
choose V
Err:520
kN
Design Vyy (d)
Err:520
kN
@ 2d from col face
from right
Err:520
m
from left
Err:520
m
to zero press
Err:520
m
local press
Err:520
kN/m
V1
Err:520
kN
V2
1573.0
kN
add
kN
choose V
Err:520
kN
Design Vyy (2d)
Err:520
kN
REINFORCEMENT
Bottom steel
b
dia
d
K'
K
z
As
As shear
required
No
ave centres
As prov
=
Lc
Lc max
b central
Final centres
Err:520
Err:520
m
m
Err:520
Err:520
Err:520
Err:520
Err:520
1573.0
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
1573.0
Err:520
1.2(G+Q+W)
LEFT
RIGHT
1.0G+1.4W
LEFT
RIGHT
3.4.5.10
3.4.5.8
Err:520
Err:520
Err:520
Err:520
-675.0
Err:520
Err:520
Err:520
Err:520
1541.2
Err:520
Err:520
Err:520
Err:520
Err:520
-382.5
Err:520
Err:520
Err:520
Err:520
924.3
Err:520
3.4.5.10
3.4.5.8
Err:520
Err:520
Err:520
Err:520
-675.0
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
1573.0
-675.0
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
1573.0
-675.0
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
1541.2
Err:520
Err:520
Err:520
Err:520
Err:520
-382.5
Err:520
Err:520
Err:520
Err:520
924.3
Err:520
3.4.5.10
3.4.5.8
Err:520
Err:520
Err:520
Err:520
Err:520
1541.2
-675.0
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
1541.2
-675.0
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
924.3
-382.5
Err:520
Err:520
Err:520
Err:520
924.3
-382.5
Err:520
min As 0.24%
X-X
mm
mm
mm
mm
mm
mm
mm
mm
mm
%
mm
mm
mm
mm
3000
choose dia
Err:520
20
Err:520
690
0.1558
Err:520
0.0113
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
9.86
Err:520
325
Err:520
Err:520
Err:520
1000
Err:520 Err:520
Err:520
Err:520
Y-Y
3000
choose dia
Err:520
20
Err:520
Err:520
0.1558
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
1350
Err:520 Err:520
Err:520
Err:520
10:26:57
02/14/2016
Err:520
Min 0.13%bd
As as as %
X-X
Y-Y
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
3.11.1
3.11.3.2
11
Top steel
b
dia
d
K'
K
z
As
As shear
required
No
ave centres
As prov
=
Lc
Lc max
b central
Final centres
BEAM SHEAR
v@d
v @ 2d
vc
As enhanced
X-X
mm
mm
mm
mm
mm
mm
mm
mm
mm
%
mm
mm
mm
mm
N/mm
N/mm
N/mm
%
3000
choose dia
Err:520
20
Err:520
Err:520
0.1558
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
1350
Err:520 Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520 Err:520
Err:520
Err:520
PUNCHING SHEAR
d ave
Err:520
mm
As prov
Err:520
%
vc
Err:520
N/mm
COLUMN 1
L
to edges
1650
mm
to 1.5d per
Err:520
mm
standard perimeter?
Err:520
Y,N
U
Err:520
mm
within base?
Err:520
Y,N
perimeter falls
U crit
Err:520
mm
Area
Err:520
m
N
v max
ave press
V
v
COLUMN 2
to edges
to 1.5d per
standard perimeter?
U
within base?
U crit
Area
N
v max
ave press
V
v
COMBINED
to edges
to 1.5d per
standard perimeter?
U
within base?
U crit
Area
N
ave press
V
v
304472402.xls
kN
N/mm
kN/m
kN
N/mm
Err:520
Err:520
1350
Err:520
Err:520
Err:520
Err:520
Err:520
2000
Err:520
Err:520
Err:520
Err:520
1000
Err:520
Err:520
Err:520
Err:520
675.0
Err:520
174.30
Err:520
Err:520
Err:520
Err:520
R
1650
Err:520
Err:520
Err:520
Err:520
Err:520
675.0
Err:520
168.18
Err:520
Err:520
Err:520
R
1350
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
2000
Err:520
Err:520
Err:520
Err:520
1.2(G+Q+W)
Err:520
Err:520
675.0
Err:520
174.78
Err:520
Err:520
1350
Err:520
Err:520
Err:520
Err:520
perimeter falls
Err:520
mm
Err:520
m
Combined base
1999 BCA
14-Feb-16
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
3.11.1
3.11.3.2
Err:520
Err:520
Err:520
Err:520
Err:520
382.5
Err:520
106.26
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
1.0G+1.4W
Err:520
Err:520
1000
Err:520
Err:520
Err:520
Err:520
1000
Err:520
Err:520
Err:520
Err:520
382.5
Err:520
99.14
Err:520
Err:520
Err:520
1.2(G+Q+W)
1.0G+1.4W
1573.0
174.78
Err:520
Err:520
1541.2
171.24
Err:520
Err:520
924.3
102.70
Err:520
Err:520
Err:520
10:26:57
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
1.4G+1.6Q
Err:520
Err:520
1.0G+1.4W
1000
Err:520
Err:520
Err:520
Err:520
1.4G+1.6Q
mm
mm
Y,N
mm
Y,N
Base B3/B4
PAD FOUNDATION DESIGN to BS 8110:1997
Err:520
1.2(G+Q+W)
Porta Cabin
.5 x d ave Err:520
675.0
Err:520
174.78
Err:520
Err:520
1350
Err:520
Err:520
Err:520
Err:520
Y,N
perimeter falls
Err:520
mm
Err:520
m
kN
kN/m
kN
N/mm
Err:520
Err:520
1.4G+1.6Q
mm
mm
Y,N
mm
kN
N/mm
kN/m
kN
N/mm
Y-Y
3000
choose dia
Err:520
20
Err:520
690
0.1558
Err:520
0.0000
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
Err:520
9.86
Err:520
325
Err:520
Err:520
Err:520
1000
Err:520 Err:520
Err:520
Err:520
02/14/2016
Err:520
Err:520
Err:520
12
SIZING TIPS
min B
kN
kNm
kNm
m
m
m
mm
mm
MINIMUM SIZE
L
mm
B
mm
if L =
3000
B
if B =
L
304472402.xls
mm
G+Q
G+Q+W
G+W
900.0
0.0
0.0
0
0
7.45
600
1500
12417
1300
692
5731
1125.0
0.0
68.8
0
61
7.45
675.0
0.0
68.8
0
102
4.47
1875
12774
1125
8018
1109
7347
763
5055
5731
1300
7347
1300
5055
1300
5735 x 1300
300
2483
375
2808
225
1956
3000 x 2810
300
2483
421
2787
271
1794
2790 x 3000
Porta Cabin
Base B3/B4
PAD FOUNDATION DESIGN to BS 8110:1997
Originated from RCC81.xls on CD
Combined base
1999 BCA
Made by Tony
Job No 1
Date
14-Feb-16
3000
mm
10:26:57
02/14/2016
13
0
700
Dia
8
10
12
16
20
25
32
40
Suggested values for 'e'
0
0
1000
ey2
500
Asx increased
Asy increased
304472402.xls
10:26:57
02/14/2016
14
Combined base
304472402.xls
10:26:57
02/14/2016
15
Combined base
1999 BCA for RCC
sheet 3 of 5
for punching
304472402.xls
10:26:57
02/14/2016
16
Combined base
1999 BCA for RCC
sheet 4 of 5+M138
for punching
304472402.xls
10:26:57
02/14/2016
17
Combined base
1999 BCA for RCC
sheet 5 of 5+M237
304472402.xls
10:26:57
02/14/2016
18
Project
Porta Cabin
Base B3/B4 AND Footing Under Column
Location
Made by Tony
Date
Job No 1
14-Feb-16
sheet 1 of 2
For Graphs
SINGLE PAD USAGE
punching
v yy
Shear
v xx
(As/Asprov) fsy
Bending
fsx
Grnd Brg Pressure
Mx DIAGRAM
Err:520
Err:520
Err:520
Err:520
Err:520
97.3%
74.3
punching
v yy
Shear
v xx
(As/Asprov) fsy
Bending
fsx
Grnd Brg Pressure
dif 0.0
Err:520
Err:520
Err:520
Err:520
Err:520
92.5%
length 3.000
1.4
Left
distance
pressure
press M
Col M
M
Base
My DIAGRAM
0.000
524.3
0.0
0.0
0.0
0.0
1.2
0.0
74.3
0.120
524.3
3.2
0.0
-3.2
0.0
1.2
-405.0
0.240
524.3
13.0
0.0
-13.0
0.0
dif 0.0
0.360
524.3
29.2
0.0
-29.2
0.0
1.5
0.0
0.480
524.3
51.8
0.0
-51.8
0.0
1.5
-405.0
0.600
524.3
81.0
0.0
-81.0
0.0
0.720
524.3
116.6
0.0
-116.6
0.0
1.5
0.0
0.840
524.3
158.8
0.0
-158.8
0.0
1.5
-405.0
0.960
524.3
207.4
0.0
-207.4
0.0
1.080
524.3
262.4
0.0
-262.4
0.0
1.8
0.0
304472402.xls
0.000
524.3
0.0
0.0
0.0
0.9
0.0
0.085
524.3
1.6
0.0
-1.6
0.9
-196.3
0.170
524.3
6.5
0.0
-6.5
c/l
2R
1.200
1.350
1.500
-324.0
0.0
1.8
-405.0
-364.5
0.0
-405.0
0.0
2L
c/l
2R
0.850
1.000
1.150
-162.6
2.2
-196.3
-179.4
-196.3
length 3.000
0.255
524.3
14.6
0.0
-14.6
1.2
0.0
0.340
524.3
26.0
0.0
-26.0
1.2
-196.3
1.500
524.3
506.3
101.3
-405.0
0.0
dif
0.000
1.500
524.3
506.3
101.3
-405.0
0.0
col M
0.0
1.500
524.3
506.3
101.3
-405.0
0.0
1.220
524.3
334.9
148.5
-186.4
dif
0.070
1.290
524.3
374.4
195.8
-178.7
col M
0.0
1.360
524.3
416.2
243.0
-173.2
1.0
Left
distance
pressure
press M
Col M
M
2L
0.425
524.3
40.6
0.0
-40.6
0.510
524.3
58.5
0.0
-58.5
1.9
0.0
10:26:57
0.595
524.3
79.7
0.0
-79.7
1.9
-196.3
02/14/2016
0.680
524.3
104.0
0.0
-104.0
0.765
524.3
131.7
0.0
-131.7
2.2
0.0
19
Project
Location
Porta Cabin
Base B3/B4 AND Footing Under Column
Made by Tony
Date
Job No 1
14-Feb-16
sheet 2 of 2
For Graphs
2L
1.200
-324.0
1.500
524.3
506.3
101.3
-405.0
0.0
c/l
1.350
-364.5
1.500
524.3
506.3
101.3
-405.0
0.0
2R
1.500
-405.0
1.500
524.3
506.3
101.3
-405.0
0.0
1L
1.500
-405.0
1.500
524.3
506.3
101.3
-405.0
0.0
1R
1.800
-324.0
1.500
524.3
506.3
101.3
-405.0
0.0
2L
0.850
-162.6
1.430
524.3
460.1
290.3
-169.9
c/l
1.000
-179.4
1.500
524.3
506.3
337.5
-168.8
2R
1.150
-196.3
1.570
524.3
554.6
384.8
-169.9
1L
1.850
-196.3
1.640
524.3
605.2
432.0
-173.2
1R
2.150
-162.6
1.710
524.3
657.9
479.3
-178.7
304472402.xls
1.7
1.500
524.3
506.3
101.3
-405.0
0.0
1L
1R
1.500
1.800
-405.0
0.0
-324.0
0.0
1.920
524.3
829.4
567.0
-262.4
0.0
dif
0.120
2.040
524.3
936.4
729.0
-207.4
0.0
col M
0.0
2.160
524.3
1049.8
891.0
-158.8
0.0
2.280
524.3
1169.6
1053.0
-116.6
0.0
2.400
524.3
1296.0
1215.0
-81.0
0.0
2.520
524.3
1428.8
1377.0
-51.8
0.0
2.640
524.3
1568.2
1539.0
-29.2
0.0
2.760
524.3
1714.0
1701.0
-13.0
0.0
2.880
524.3
1866.2
1863.0
-3.2
0.0
3.000
524.3
0.0
0.0
0.0
0.0
2.235
524.3
1123.9
992.3
-131.7
dif
0.085
2.320
524.3
1211.0
1107.0
-104.0
col M
0.0
2.405
524.3
1301.4
1221.8
-79.7
2.490
524.3
1395.0
1336.5
-58.5
2.575
524.3
1491.9
1451.3
-40.6
2.660
524.3
1592.0
1566.0
-26.0
2.745
524.3
1695.4
1680.8
-14.6
2.830
524.3
1802.0
1795.5
-6.5
2.915
524.3
1911.9
1910.3
-1.6
3.000
524.3
0.0
0.0
0.0
2.0
1.780
524.3
712.9
526.5
-186.4
1L
1R
1.850
2.150
-196.3
-162.6
10:26:57
02/14/2016
Right
Right
20
Single
Double
Disclaimer
All advice or information from the British Cement Association and/or Reinforced Concrete Cou
intended for those who will evaluate the significance and limitations of its contents an
responsibility for its use and application. No liability (including that for negligence) for an
resulting from such advice or information is accepted by the BCA, RCC or their subcontr
suppliers or advisors. Users should note that all BCA software and publications are sub
revision from time to time and should therefore ensure that they are in possession of the
version.
This spreadsheet should be used in compliance with the accompanying publication 'Spread
for concrete design to BS 8110 & EC2' available from British Cement Association, Telford A
Crowthorne, Berkshire RG45 6YS.
Status of spreadsheet
Public release version.
Revision history RCC81 Foundation Pads
Date
Version
06-Aug-99
RCC81 v1.0
rmation from the British Cement Association and/or Reinforced Concrete Council is
ose who will evaluate the significance and limitations of its contents and take
its use and application. No liability (including that for negligence) for any loss
uch advice or information is accepted by the BCA, RCC or their subcontractors,
isors. Users should note that all BCA software and publications are subject to
me to time and should therefore ensure that they are in possession of the latest
Action
First public release.
Includes version comments
Correction to recommended e's in DOUBLE (RW)
Size (kB)
438
438