100 - Waterpower Dam Bill of Quantities
100 - Waterpower Dam Bill of Quantities
100 - Waterpower Dam Bill of Quantities
Bill Of Quantities
Estimate: A10 - Waterpower & Dam Typical Bill of Quantities
Item
10
20
30
40
10
20
40
50
10
20
30
10
20
30
10
20
10
20
30
40
10
20
30
10
20
30
Description
Unit
Site Access
Access Road Maintenance
Winter Ice Road
Transmission Line Access Road
Full Service Access Road
Quantity
Rate
Amount
km
km
km
km
100.00
100.00
50.00
35.00
76,429.86
44,097.28
139,276.31
289,970.23
7,642,986.00
4,409,728.00
6,963,815.50
10,148,958.05
285.00
102,335.04
29,165,487.55
ha
ha
ha
ha
100.00
100.00
100.00
100.00
15,552.72
17,132.01
22,879.39
25,610.63
1,555,272.00
1,713,201.00
2,287,939.00
2,561,063.00
400.00
20,293.69
8,117,475.00
month
month
month
12.00
24.00
48.00
36,126.19
130,522.28
262,472.20
433,514.28
3,132,534.72
12,598,665.60
84.00
192,437.08
16,164,714.60
lm
m2
m2
4,000.00
2,000.00
15,000.00
194.48
633.76
1,229.81
777,920.00
1,267,520.00
18,447,150.00
21,000.00
975.84
20,492,590.00
m3
m3
30,000.00
250,000.00
615.67
24.60
18,470,100.00
6,150,000.00
280,000.00
87.93
24,620,100.00
1.00
61,277,404.60
61,277,404.60
m2
m3
m3
m2
390,000.00
2,600,000.00
1,300,000.00
73,750.00
54.15
34.61
18.49
55.60
21,118,500.00
89,986,000.00
24,037,000.00
4,100,500.00
3,900,000.00
35.70
139,242,000.00
m3
m3
m3
200,000.00
1,000,000.00
5,000,000.00
39.45
24.88
22.22
7,890,000.00
24,880,000.00
111,100,000.00
6,200,000.00
23.20
143,870,000.00
m3
m3
kg
3,000,000.00
42,187.50
2,671,875.00
18.72
674.42
3.75
56,160,000.00
28,452,093.75
10,019,531.25
3,000,000.00
31.54
94,631,625.00
Dewatering
Dewatering
Dewatering Small Dam
Dewatering Medium Dam
Dewatering Large Dam
Containment Barriers
Grout Curtain
Bentonite Cement Slurry Trench
Concrete Slurry Diaphram Wall
Cofferdams
Cellular Cofferdam
Embankment Cofferdam
Dam Embankment
Small Dam or Dyke Embankment
Medium or Dyke Embankment
Large Dam or Dyke Embankment
Bill Of Quantities
Estimate: A10 - Waterpower & Dam Typical Bill of Quantities
Item
10
20
30
40
10
20
10
20
30
40
10
20
30
10
20
30
10
20
30
40
10
20
30
10
Description
Unit
Quantity
Rate
Amount
m3
m2
ls
m3
750,000.00
800.00
1.00
22,500.00
135.04
354.17
2,744,001.62
872.18
101,280,000.00
283,336.00
2,744,001.62
19,624,050.00
750,000.00
165.24
123,931,387.62
m3
m3
200,000.00
20,000.00
441.59
597.04
88,318,000.00
11,940,800.00
220,000.00
455.72
100,258,800.00
14,070,000.00
42.78
601,933,812.62
m2
m3
m3
m2
4,000.00
150,000.00
2,600,000.00
211,244.32
399.65
9.89
19.36
29.91
1,598,600.00
1,483,500.00
50,336,000.00
6,318,317.56
2,754,000.00
21.69
59,736,417.56
m3
m3
m3
10,000.00
75,000.00
150,000.00
928.77
928.09
928.77
9,287,700.00
69,606,750.00
139,315,500.00
235,000.00
928.55
218,209,950.00
m2
m2
m2
460.00
630.00
795.00
30,713.48
41,035.84
53,054.02
14,128,200.80
25,852,579.20
42,177,945.90
1,885.00
43,585.53
82,158,725.90
235,000.00
1,532.36
360,105,093.46
m2
m3
m3
m2
4,000.00
150,000.00
1,610,000.00
130,000.00
399.65
9.90
22.89
67.50
1,598,600.00
1,485,000.00
36,852,900.00
8,775,000.00
1,760,000.00
27.68
48,711,500.00
m3
m3
m3
10,000.00
50,000.00
150,000.00
941.98
941.98
941.98
9,419,800.00
47,099,000.00
141,297,000.00
210,000.00
941.98
197,815,800.00
m2
460.00
35,816.54
16,475,608.40
Dam Concrete
Mass Concrete Dam
Concrete Gravity Abutments
Spillways
Spillway Excavation
Foundation Preparation
Common Excavation
Rock Excavation
Rockface Preparation
Spillway Concrete
Spillway Concrete (Small)
Spillway Concrete (Medium)
Spillway Concrete (Large)
Intakes
Intake Excavation
Foundation Preparation
Common Excavation
Rock Excavation
Rockface Preparation
Intake Concrete
Intake Concrete (Small)
Intake Concrete (Medium)
Intake Concrete (Large)
Bill Of Quantities
Estimate: A10 - Waterpower & Dam Typical Bill of Quantities
Item
20
30
10
20
30
10
20
30
40
10
20
30
10
20
30
40
50
60
10
20
30
40
10
20
Description
Unit
Quantity
Rate
Amount
m2
m2
630.00
795.00
48,137.15
63,256.57
30,326,404.50
50,288,973.15
1,885.00
51,507.15
97,090,986.05
210,000.00
1,636.28
343,618,286.05
t
t
t
4,536.40
600.00
277.00
28,502.34
16,536.14
17,026.91
129,298,015.18
9,921,684.00
4,716,454.07
13,383.00
10,755.15
143,936,153.25
m2
m3
m3
lm
10,000.00
300,000.00
350,000.00
5,000.00
418.06
8.52
28.65
194.48
4,180,600.00
2,556,000.00
10,027,500.00
972,400.00
500,000.00
35.47
17,736,500.00
m3
m3
m3
15,000.00
75,000.00
225,000.00
1,055.73
0.00
0.00
15,835,950.00
0.00
0.00
315,000.00
50.27
15,835,950.00
t
m2
m2
m2
m2
m2
650.00
6,090.00
6,090.00
3,400.00
300.00
5,000.00
6,427.33
92.89
168.48
153.69
482.52
262.49
4,177,764.50
565,700.10
1,026,043.20
522,546.00
144,756.00
1,312,450.00
6,090.00
1,272.46
7,749,259.80
m2
ea
ea
1.00
4.00
1.00
7,307,239.86
3,591,555.70
223,301.07
7,307,239.86
14,366,222.80
223,301.07
ea
2.00
659,753.17
1,319,506.34
1.00
23,216,270.07
23,216,270.07
MW
MW
1.00
1.00
17,177,005.54
21,471,256.92
17,177,005.54
21,471,256.92
500.00
77,296.52
38,648,262.46
1.00
103,186,242.33
103,186,242.33
Penstocks
Grade Penstocks
Inclined Penstocks
Underground Penstocks
Powerhouses
Powerhouse Excavation
Foundation Preparation
Common Excavation
Rock Excavation
Grouting
Powerhouse Concrete
Powerhouse Concrete (Small)
Powerhouse Concrete (Medium)
Powerhouse Concrete (Large)
Powerhouse Building
Structural Steel Superstructure
Steel Deck Superstructure
Roofing Superstructure
Cladding Superstructure
Powerhouse Doors
Architectural
Powerhouse Equipment
Draftube Stoplogs
Powerhouse Overhead Crane
Overhead Service Crane (5 Tonne for Service & Assembly
Area)
Service Elevator
Grand Total: MW
500.00
3,302,679.91 1,651,339,954.85