EOT Calculation Sheet Revised As Per Sir
EOT Calculation Sheet Revised As Per Sir
EOT Calculation Sheet Revised As Per Sir
EOT -1 ON ACCOUNT OF
Date of Complition Date of Complition CONSTRUCTION PHASE OF EOT ON ACCOUNT OF EOT GRANTED
Maintenance Sanctioned
Sr. No. Construction Phase Date Of Start Construction Phae Maintenance Phase KALIYASAUR AND ADDITION TO PACKAGE-1,2 AND 3, AS PER
Phase budget
(Original) (Original) OF SRIKOT ON DELETION OF MORTH CIRCULAR OCT 2018
SONPRYAG
ORIGINAL DATE OF AS PER EOT GRANTED FURTHER EOT APPLIED AS ON Estimated Cost
SR NO. PACKAGE NAME EPC CONTRACTOR
DURATION
NAME( CONSTRUCTION PHASE)
APPOINTED DATE
COMPLITION /APPROVED ON 27.08.2020 27.08.2020 ON GROUND OF COVID-19 ( in Cr)
1 RUDRAPRYAG BYPASS M/S RGBEL 24 MONTHS 21.11.2017 20.11.2019 26.06.2020 (219 DAYS) 6 Months, i.e., 25.12.2020 112
EPC contractor Applied, Athourity's
2 KALIYASAUR BYPASS REALIG M/S DCIPL 30 MONTHS 16.01.2018 15.07.2020 01.03.2022 ( 593 DAYS) Engineer has asked to provied workprogram 120
for approved EOT
3 SRIKOT TO RUDRAPRYAG M/S RCC 24 MONTHS 21.08.2018 20.08.2020 18.11.2020 (90 DAYS) 6 Moths, I.E 20.02.2021 100
Total sanctioned Budget 332
Supervision Consultant Budget @ 3% 9.96
Contigencies @ 2.8% of Construction
9.296
budget
Total of Supervision and Contigencies 19.256
Consideration for FIN Proposal
1 Revised Contract Price as per Proposal Submitted in June 2020 without adjusting Maintenace Input ( excluding GST)
2 Revised Contract Price as per Proposal Submitted in June 2020 after adjusting Maintenace Input for overlapping and by reducing office space ( excluding GST)
3 No Additional cost for Furniture rental given
4 No RO office visit included
5 Office size has been reduced from Construction phase to maintenace after Dec 2020
6 Vehicle Months has been reduced
7 TL , AHE, OM, Co and OB input has been reduced for overlapping period
8 Cosidered that RGBL and RCC package shall be completed by Dec 2020, any further EOT beyond DEC 2020 may required additional manpower and resources
9 kaliyasaur realignment complition consiodered in March 2022
Annexure-01-
APPENDIX C-2 : SUMMARY OF COSTS
Consultancy Services for Authority’s Engineer of 3 projects on EPC basis (i) Construction of 2-lane with paved shoulders configuration &
strengthening of NH-58 from km 350.00 to km. 355.00 (Kaliyasaur re-alignment) in the State of Uttarakhand (ii) Construction of 2-lane highway &
Name of strengthening of NH-109 from existing km 68.400 to km. 71.200 (Design ch. From 73.600 to 76.120, total length =2.52 km including 775 m long
Work viaduct, Sonprayag bypass) through an Engineering, Procurement and Construction (EPC) Contract on NH-109 in the State of Uttarakhand (iii)
Widening and Strengthening of existing intermediate/ 2 lane to 2 lane with paved shoulders configuration from Km 0.000 (Design Km 0.000) to Km
16.440 (Design Km 18.700) including existing 3.740 km of Rudraprayag Bypass of NH -109 in the State of Uttarakhand on EPC mode
Name of
M/s. Highway Engineering Consultant , Bhopal in Association with M/s. LTelford Consulting Engineers Pvt. Ltd. New Delhi.
Agency
A. Sub Total Remuneration Key , Sub Professional and Support Staff ( I+II) 53,047,200 26,192,528 79,239,728
X Contingencies - - -
Note :
Total price adjustment to be claimed upto March-2022
As per SC 6.2(a)(i) However for evaluation and award of the bid proposals the quoated
11,120,587
initial rate shall be multiplied by the total time input for each poisition on this contract i.e
without considering the increase in the billing rates.
Total price adjustment claimed upto July-2020 2,306,505
Total GST to be paid to the Consultant upto march-2022 14,866,903
GST already paid to the consultant 8,259,621
* Price adjustment applicable @ 5% as per SC 6.2(a)(i) of AE Agreement from 13th Month from last date of bid submission
* Price adjustment applicable @ 2 x 5% as per SC 6.2(a)(i) of AE Agreement
* Bid Submission Date: 15-Sept-2016*
Price adjustment applicable @ 5% as per SC 6.2(a)(i) of AE Agreement from 13th Month from last date of bid submission
17,597,421
20,590,344
12,380,335.22
Annexure-02
APPENDIX C-3 : SUMMARY OF COSTS
Project Name: Consultancy Services for Authority’s Engineer of 3 projects on EPC basis (i) Construction of 2-lane with paved shoulders configuration & strengthening of NH-58 from km 350.00 to km. 355.00 (Kaliyasaur re-alignment) in the State of Uttarakhand (ii) Construction of 2-lane highway & strengthening
of NH-109 from existing km 68.400 to km. 71.200 (Design ch. From 73.600 to 76.120, total length =2.52 km including 775 m long viaduct, Sonprayag bypass) through an Engineering, Procurement and Construction (EPC) Contract on NH-109 in the State of Uttarakhand (iii) Widening and Strengthening of existing
intermediate/ 2 lane to 2 lane with paved shoulders configuration from Km 0.000 (Design Km 0.000) to Km 16.440 (Design Km 18.700) including existing 3.740 km of Rudraprayag Bypass of NH -109 in the State of Uttarakhand on EPC mode
Name of Agency: Highway Engineering Consultant , Bhopal in Association with LTelford Consulting Engineers Pvt. Ltd. New Delhi
I. REMUNERATION FOR LOCAL PROFESSIONAL STAFF
A. Key Personnel
Revised maintenace
Input required Total Man Mon Total Revised Contract
input ,keeping in view Tota Required
from 01.08.2020 Required from amount after for Const
Team available from
MM in MM in to 02.03.2022 start to and maintenace phase
Original Contract Man Month during Construction Construction &
S. Billing Rate Construction Maintenance excluding completion of revised) after Considering Additional
Key Personnel Amount Consumed upto phase (EOT) of Maintenance Remarks
No. (Rs.) period of 24 / DLP of 48 Positions as Construction overlapping of 15 month Amount
(Rs.) 31st July 2020 Kaliyasaur will also Phase ( as per
months months Detailed in Phase (11-01- maintenace with
supervise during revised maint
Annexure -- 2018 to 02-03- Construction phase of
Maintenace works for input)
Remarks 2022) Kaliyasaur bypass
15 months
X Constigencies 24 0 -
Office Supplies. Utilities and
5,713 96 192 1,645,200 120 60
Communication
Maintenace
Office Furniture and Equipment 1,260 552 744 1,633,464 690 552
Software 450,000 1 450,000 1 0
2,083,464
Reports and Document printing 1,688 318 288 1,023,120 397.5 148
13.25
397.5
72 42
27
288 60 4.8 147.216
0
0
1296 60 21.6 662.472
0
0
606 60 10.1 309.767
0
209 104.25
4.96 208.50
74.46 134.04