Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

DE LA SALLE UNIVERSITY DASMARINAS

COLLEGE OF ENGINEERING, ARCHITECTURE AND TECHNOLOGY


ENGINEERING DEPARTMENT ELECTRONICS ENGINEERING

Name: Malabanan, Sahara V.


Department: Main Distribution Frame (MDF)
Period: January 11-14, 2016
Week: Week 1
Date

Accumulated
Time

Jan 11, 2016

8:00 am 5:00 pm

Monday

8 hours

Summary of Activity

Jan 12, 2016

8:00 am 3:00 pm

Tuesday

6 hours

Jan 13, 2016

8:00 am 5:00 pm

Wednesday

8 hours

Jan 14, 2016


Thursday

8:00 am 12:00 pm
4 hours

REMARKS

First day
Orientation in the
facilities
Introduction to the
whole personnel of
the PLDT FCIE

PLDT FCIE does repair


and maintenance of
their facilities. Also, the
company has different
zones, and each zones
has their assigned
places to cover.

Lecture to a system
called clarity.
Overview another
system called IPMS

We learn how to read


the tickets and how to
dispatch people using
their servers.

Lecture about fiber


and copper codes.
Lecture another
system called IPMS

When the dp number is


4:5 it a fiber and when
the dp number is 4:3 it
is a copper line.

Actual Activity to
their telephone
frames.
Checking the
allocated DP pairs
are working

Two DP points are used


but with different type
of readings, one is with
a fuse and the other
one has pins. But
before a line is tapped,
the phone should be on
off hook state to
make sure that the
clients not using the
phone.

Normel B. Talon
Supervisor

DE LA SALLE UNIVERSITY DASMARINAS


COLLEGE OF ENGINEERING, ARCHITECTURE AND TECHNOLOGY
ENGINEERING DEPARTMENT ELECTRONICS ENGINEERING

Name: Malabanan, Sahara V.


Department: Main Distribution Frame (MDF)
Period: January 19-21, 2016
Week: Week 2

Date

Accumulated
Time

Jan 19, 2016

8:00 am 5:00 pm

Tuesday

8 hours

Summary of Activity

Lecture of IPMS
Assigning of Services

REMARKS
IPMS is another system
that the PLDT used to
assign the service order
of the subscribers.
IPMS only allow to
assign for the future
service until 12 nn.

Jan 20, 2016

8:00 am 5:00 pm

Wednesday

8 hours

Jan 21, 2016

8:00 am 2:00 pm

Thursday

5 hours

Activity using clarity


Reading DP/CAPAC

Checking some
telephone numbers if
still working

Sir Alvin taught us


how to jumper the
two DP that has the
same telephone
number. We also
conducted a test to
see if the line works.

The test we made is by


using an incoming and
outgoing call. If the
number can call and
receive calls, the line is
working.

Normel B. Talon
Supervisor

DE LA SALLE UNIVERSITY DASMARINAS


COLLEGE OF ENGINEERING, ARCHITECTURE AND TECHNOLOGY
ENGINEERING DEPARTMENT ELECTRONICS ENGINEERING

Name: Malabanan, Sahara V.


Department: Main Distribution Frame (MDF)
Period: January 26-29, 2016
Week: Week 3

Date

Accumulated
Time

Jan 26, 2016

8:00 am 5:00 pm

Tuesday

8 hours

Jan 27, 2016


Wednesday
Jan 28, 2016
Thursday

Summary of Activity

REMARKS

Activity to the frames


Jumping wires

The test we made is by


using an incoming and
outgoing call. If the
number can call and
receive calls, the line is
working.

8:00 am 5:00 pm

8 hours

Connecting new
subscribers
Lecture to clarity

Connecting wires from


UTAG frames to DP
frames.

IPMS activity
Cleaning of jumping
wires

Assigning the service


for the day and for the
future.

8:00 am 12:00 pm

4 hours

Cleaning the frames to


be able to know if the
available slots.
Jan 29, 2016

8:00 am 12:00 pm

Friday

4 hours

Jan 30, 2016

1:00 pm 5:00 pm

Saturday

Activity to Clarity
called Staging

Staging is a process in a
clarity which is seeing
the process being done
in a subscriber service

Changing of dp and
utag

Normel B. Talon
Supervisor

DE LA SALLE UNIVERSITY DASMARINAS


COLLEGE OF ENGINEERING, ARCHITECTURE AND TECHNOLOGY
ENGINEERING DEPARTMENT ELECTRONICS ENGINEERING

Name: Malabanan, Sahara V.


Department: Main Distribution Frame (MDF)
Period: February 1-4, 2016
Week: Week 4
Date

Accumulated
Time

Feb 1, 2016

8:00 am 5:00 pm

Monday

8 hours

Feb 2, 2016

8:00 am 1200 pm

Tuesday

4 hours

Feb 3, 2016

8:00 am 5:00 pm

Wednesday

8 hours

Feb 4, 2016

8:00 am 5:00 pm

Thursday

8 hours

Summary of Activity

REMARKS

Lecture to new
activity: Call-out

Call-out means to
literally calling out the
subscribers.

Activity: Call-out

Asking the right


address and the
availability of the
subscriber to be able to
assign the technical
department to
dispatch.

Activity: IPMS
Activity: Call-out

Assigning the future


services
Calling the subscribes
if there are some
problem.

Rerouting of the
wires

Some subscribers are


complaining about
some problem
encountered like the
dead line or too noisy.
To solve this, we are
obligated to search
another available
DP/UTAG to their
number.

Normel B. Talon
Supervisor

DE LA SALLE UNIVERSITY DASMARINAS


COLLEGE OF ENGINEERING, ARCHITECTURE AND TECHNOLOGY
ENGINEERING DEPARTMENT ELECTRONICS ENGINEERING

Name: Malabanan, Sahara V.


Department: Main Distribution Frame (MDF)
Period: February 9-11, 2016
Week: Week 5
Date

Accumulated
Time

Feb 9, 2016

8:00 am 5:00 pm

Monday

8 hours

Feb 10, 2016

8:00 am 1200 pm

Tuesday

4 hours

Feb 11, 2016

8:00 am 5:00 pm

Wednesday

8 hours

Summary of Activity

REMARKS

activity: Call-out

This call is about to


check if their
complaints are already
settled

Activity: Call-out

This is to verify their


respective addresses
because of they may
have changed their
locations.

Activity: IPMS
Activity: Call-out

The codes vary between


the two and can be
distinguished easily.

Normel B. Talon
Supervisor

DE LA SALLE UNIVERSITY DASMARINAS


COLLEGE OF ENGINEERING, ARCHITECTURE AND TECHNOLOGY
ENGINEERING DEPARTMENT ELECTRONICS ENGINEERING

Name: Malabanan, Sahara V.


Department: Main Distribution Frame (MDF)
Period: February 15-18, 2016
Week: Week 6
Date

Accumulated
Time

Feb 15, 2016

8:00 am 5:00 pm

Monday

8 hours

Feb 16, 2016

8:00 am 1200 pm

Tuesday

4 hours

Feb 17, 2016

8:00 am 5:00 pm

Wednesday

8 hours

Summary of Activity

REMARKS

Activity: Call-out

Call-out means to
literally calling out the
subscribers.

Activity: Call-out

This call is about to


check if their
complaints are already
settled

Taught us about what


Activity: IPMS
is the difference
Activity: Call-out
Activity: Actual frame between direct feed
and sub curb
connections based on
their codes.
This can be easily
observed due to their
difference on pairs
from the codes.

Feb 18, 2016

8:00 am 5:00 pm

Thursday

8 hours

Frame activity

tap the DP pairs of a


certain telephone
number to check if the
line is working or not.
Each DP pairs has a
Tip and a Ring.
tThere are some lines
that needed to be
changed lines and to
find new ports.

Normel B. Talon
Supervisor

DE LA SALLE UNIVERSITY DASMARINAS


COLLEGE OF ENGINEERING, ARCHITECTURE AND TECHNOLOGY
ENGINEERING DEPARTMENT ELECTRONICS ENGINEERING
Name: Malabanan, Sahara V.
Department: Main Distribution Frame (MDF)
Period: February 22 & 29, 2016
Week: Week 7
Date

Accumulated
Time

Feb 22, 2016

8:00 am 5:00 pm

Monday

8 hours

Feb 29, 2016


Tuesday

Summary of Activity

REMARKS

Activity: Call-out

Asked to call some


subscribers to verify
their schedules for
installation of their
lines.

8:00 am 1200 pm

4 hours

Activity: Test on new


installed frame
Activity: Seeding

The new installed


UAG are checked to
see if the connectivity
are good and is correct.

Normel B. Talon
Supervisor

DE LA SALLE UNIVERSITY DASMARINAS


COLLEGE OF ENGINEERING, ARCHITECTURE AND TECHNOLOGY
ENGINEERING DEPARTMENT ELECTRONICS ENGINEERING

Name: Malabanan, Sahara V.


Department: Main Distribution Frame (MDF)
Period: March 1-3 & 7, 2016
Week: Week 8
Date

Accumulated
Time

Mar 1 2016

8:00 am 5:00 pm

Monday

8 hours

Mar 2, 2016

8:00 am 1200 pm

Tuesday

4 hours

Mar 3, 2016

8:00 am 5:00 pm

Wednesday

8 hours

Summary of Activity

REMARKS

Activity: IPMS
Activity: Call-out

There are days that the


SO are a lot and some
only few orders are.

Activity: Call-out
Activity: IPMS

There are assigning


that specified people
are asked to install.
These people are the
engineers of the
company

The DP of telephone
Activity: IPMS
lines are checked to see
Activity: Call-out
Activity: Actual frame if the Clarity has the
correct one and is to be
updated if some has
changed pairs.
There are some pairs
that were transferred to
another slots due to the
pair is broken.

Mar 7, 2016

8:00 am 5:00 pm

Thursday

8 hours

Frame activity

There are some


assigned landlines that
has problems, either
their number has busy
tones or it has noise.

Normel B. Talon
Supervisor

DE LA SALLE UNIVERSITY DASMARINAS


COLLEGE OF ENGINEERING, ARCHITECTURE AND TECHNOLOGY
ENGINEERING DEPARTMENT ELECTRONICS ENGINEERING

Name: Malabanan, Sahara V.


Department: Main Distribution Frame (MDF)
Period: March 14-17, 2016
Week: Week 9
Date

Accumulated
Time

Mar 14, 2016

8:00 am 5:00 pm

Monday

8 hours

Mar 15, 2016

8:00 am 1200 pm

Tuesday

4 hours

Mar 16, 2016

8:00 am 5:00 pm

Wednesday

8 hours

Summary of Activity

REMARKS

Activity: Call-out

Call-out means to
literally calling out the
subscribers.

Activity: Call-out

This call is about to


check if their
complaints are already
settled

Taught us about what


Activity: IPMS
is the difference
Activity: Call-out
Activity: Actual frame between direct feed
and sub curb
connections based on
their codes.
This can be easily
observed due to their
difference on pairs
from the codes.

Mar 17, 2016

8:00 am 5:00 pm

Thursday

8 hours

Frame activity

tap the DP pairs of a


certain telephone
number to check if the
line is working or not.
Each DP pairs has a
Tip and a Ring.
There are some lines
that needed to be
changed lines and to
find new ports.

Normel B. Talon
Supervisor

DE LA SALLE UNIVERSITY DASMARINAS


COLLEGE OF ENGINEERING, ARCHITECTURE AND TECHNOLOGY
ENGINEERING DEPARTMENT ELECTRONICS ENGINEERING

Name: Malabanan, Sahara V.


Department: Main Distribution Frame (MDF)
Period: March 30, April 4-6, 2016
Week: Week 10
Date

Accumulated
Time

Mar 30 2016

8:00 am 5:00 pm

Monday

8 hours

April 4, 2016

8:00 am 1200 pm

Tuesday

4 hours

April 5, 2016

8:00 am 5:00 pm

Wednesday

8 hours

Summary of Activity

REMARKS

Activity: IPMS
Activity: Call-out

There are days that the


SO are a lot and some
only few orders are.

Activity: Call-out
Activity: IPMS

There are assigning


that specified people
are asked to install.
These people are the
engineers of the
company

Gave numbers to jump


Activity: IPMS
from the Utag to their
Activity: Call-out
Activity: Actual frame corresponding DPs.
Jumping the wires or
changing their ports
are not complicated as
it seems.

April 6, 2016

8:00 am 5:00 pm

Thursday

8 hours

Last Day

They asked us to do
again the things they
taught to us to refresh
our memories and to
see if we have learned
what they have taught
us.

Normel B. Talon
Supervisor

You might also like