Item
Accuracy
Target (%)
Confirmation
Vehicle (CV)
95
Soukaku (SKK)
2
3
Goshi (1W)
100
85 86
76
10-12
1-3
4-6
7-9
10-12
1-3
4-6
Goshi
Soukaku
7-9
Mass Product
Trial ( MPT)
10-12
Qty Defect
100
MPV
112
Rank
17
CV'Feb
59
0
Defect Surface Defect Accuracy
Defect Spot
Weld
16
(14 DA)
12
8
CV
Accuracy
(Trimline,Aspec
Surface, Hole
Position)
Part Surface
Rank
No Defect Outflow
Rank
Current Condition
By Where
Problem
59 DA at NTC
59 Defect Accuracy on
CV Activity (February
2014)
By Category Part
35 DA at
Stamping Part
By Part Number
18 DA at R/F Back door
Stay (67189-0K030)
Items
Qty Problem
Trimline
Aspec Surface
Hole Position
Appearance
Total
0 DA at Others
Supplier
Pareto Diagram
16
24 DA at Sub Assy
Part
12
18
10
0
61671-0K020
53831-0K050
13
18
Part
Trim Pierce 1
Dies NG
Gap
Fitting Panel
NG
February
II
IV
PIC
March
II III IV
April
II III IV
May
II III IV
AA
SURFACE
(-)
STD : 0.5
(+)
ACT : +0.8
Part
(-)
BA
June
II III IV
Schedule
July
II III IV
Aug
II III IV
: STD
: ACT
Lower
Dies
TRIMLINE PLUS
STD : 0.7
ACT : +1.5
Sept
II III IV
Oct
II III IV
Nov
II III IV
Dec
II III IV
Die Repair 3
Judgment
Soukaku
Activity
Judgment
Upper
Dies
STOPPER
PAD
NTC Dies
Maintenance
(Baharudin),
VQPE (Reza)
: STD
: ACT
Lower
RC #2
Result
VQPE
(Reza),NTC
(Budi)
Result and Feedback
Upper
Dies
Upper
Dies
STOPPER
PAD
Lower Dies
LOWER
Spec Material
Equal with
standard
Radius Panel x
Radius Dies
Unmatch
Countermeasure
Panel Not
Fitting
Machine
()
Panel Moved
(+)
( and )
Material
Inefficiently
Fitting Panel
Root Cause
Rank
GAP
1W
DIES
MP
Experience
Level 3
* DA = Defect Accuracy
Ultimate Goal
Spot
Weld
Burry,Marking,Kaji
ri and Emboss
Notes :
MP : Man Power
SOP : Standard of Procedure
NG : Not Good
RC : Root Cause
STEP 4
Reduce 14 DA and
Accuracy Achievement 95%
From NTC Stamping Part
Reinforcement Back Door
Stay (67189-0K030) in
Trim Pierce 1 process until
week IV April 2014
18
20
RC #1
Ideal Condition
Defect Accuracy
Problem Founded
1W
No SOP For
Panel Fitting
STEP 3
STEP 2
Check by
Proto and
Designer
Key Point :
Methods
Form Ability
(Crack,
Shiwa and
Nobi)
Proto Check
Check by
Inspector
Cam Pierce
Man
STEP 1
Rank
67189-0K030
Flange
Rank
y7
Cam Pierce
Actual
2015
CONFIRMATION
VEHICLE (CV)
Inspection
Process
Target
2. Soukaku (SKK) is Trial Confirmation activity both press part and weld tooling.
Reza R.Putra
100
95
95
1. CV Preparation : All CV Part From Supplier Checked Quality and Accuracy Achievement by TMC Proto
20
Muh.Anhar K
85
*Notes :
50
Trim Pierce
1
Forming
Before CV
2014
CV PREPARATION
150
Ndaru J
FMC
Nicholas A
Cutting
Cutting
Lower
Dies
Lower
Dies
NO : SOP-DB00-2301
PROCESS
PANEL FITTING
TANGGAL
: 30-04-2014
REVISI
: 0 KE
HALAMAN
: 1 dari 1
NO FAKTOR
Cutting
Cutting
Add
Weld
Add
Weld
Add
AddWeld
Weld
M
Q
Q
M
Q
Q
Q
Q
M
M
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
LANGKAH KERJA
1.0 Ambil panel buat panel fitting
1.1 Taruh panel diatas die yang akan di panel fitting
1.2 Beri tanda pada panel dengan spidol cat
1.3 Bawa panel ke lokasi mesin plasma
1.4 Lobangi panel yang diberi tanda dengan spidol cat
1.5 Bawa panel dekat dienya yang mau di panel fitting
1.6 Ambil gerinda pada tempatnya
1.7 Rapikan hasil plasma dengan gerinda
1.8 Kembalikan gerinda pada tempatnya
1.9 Bersihkan panel dari kotoran
2.1 Ambil akaipaint dan kwas pada tempatnya
2.2 Oleskan panel bagian yang penting dengan akaipaint
2.3 Kembalikan akaipaint dan kwas pada tempatnya
2.4 Ambil tanah liat pada tempatnya
2.5 Perhatikan bagian yang penting
2.6 Taruh panel diatas die yang akan di panel fitting
2.7 Ketok panel dengan tangan atau tangkai kwas
2.8 Angkat panel
2.9 Panel taruh tempat yang aman
2.9a Ulangi step kerja no:1.9 hingga 2.9
2.9b Hingga bagian penting atarinya benar-benar rata
2.9c Gosok bagian atari
2.9d Sanding bagian-bagian yang kurang penting
2.9e Die selesai proses panel fitting
DEPT
SECT.
LINE
DISAHKAN
: TM
: DAT
: T/O
DIPERIKSA
DIBUAT
LINE HEAD
ILUSTRASI
1
Part Forming
yang OK
: OK : NG
Point Check
OK
59
96
100
86
90
76.6
80
70
Before CV
CV'Feb
Week IV'April
Accuracy Achievement
Accuracy (%)
IMV 5
Nandy J
Problem to Tackle:
18 Defect Accuracy from NTC Stamping Part Reinforcement Back Door Stay (67189-0K030) in Trim Pierce 1 Process
: Main
: Support
2013
LEVEL
Prepared by
Point of Occurence
D. PROJECT MILESTONE
MODEL
Checked by
TMMIN
Supplier
PUD VQPE
ITEM
Supplier
TMMIN
JOB RESPONSIBILITY
Part Accuracy and Quality
Management
Approved by
Stamping Process
Blanking
DEPT. KPI
Acknowledge
Case (Defect)
Division
: Prod.Eng Division
BACKGROUND
Flow Process:
Acknowledge
Case (Defect)
NG
18
Total : 77
Accuracy
76%
After Repair
: OK : NG
OK
74
NG
3
Total : 77
Accuracy
96%
No Handwork ( Full
Dies Output)
5W1H
Item
WHY
WHAT
WHEN
WHERE
WHO
HOW
SOP
NTC Plant
Operator
Fitting Part
Confirmation
(61671-