PDO
PDO
PDO
This document is the property of Petroleum Development Oman, LLC. Neither the whole nor any part of this
document may be disclosed to others or reproduced, stored in a retrieval system, or transmitted in any form by any
means (electronic, mechanical, reprographic recording or otherwise) without prior written consent of the owner.
Document No.
-2-
Restricted
Revision: 4.0
Effective: Aug-11
Document Authorisation
Page 2 of 24
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
II
Revision History
The following are brief revision summary of this document. Details of all revisions prior to these are held on
file by the issuing department.
Revision
No.
Date
Authors
Revision 4.0
Aug-12
Scope / Remarks
The related CMF Documents can be retrieved from the CMF Business Control Portal.
Table of Contents
1.
INTRODUCTION
1.1. Executive Summary
1.2. Purpose
1.3. Scope
1.4. Distribution / Target Audience
1.5. Review and Improvement
Page 3 of 24
5
5
5
5
5
5
Printed: October 20, 2014
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
1.6.
1.7.
2.
3.
4.
5.
6.
Step-out Approval
Definitions and Abbreviations
1.7.1.
Abbreviations
1.7.2.
Definitions
DOCUMENT MANAGEMENT STRATEGY
2.1. General Control Protocol
2.2. Document Planning
2.2.1.
Design Document Planning
2.2.2.
Vendor Document Planning
2.3. Document File Format
2.3.1.
General Format
2.3.2.
Sets and Sizes of Files
2.3.3.
Document Title - Guideline
2.3.4.
Drawing Practice
2.4. Document Handover
2.4.1.
Design Document Handover
2.4.2.
Vendor Document Handover
2.5. As-Built Update Strategy
2.6. Correspondence Numbering and Control
ROLES AND RESPONSIBILITIES
DOCUMENT REVIEW AND EXCHANGE
4.1. Collaboration Media
4.2. Exchange of Documents
4.2.1.
Document Transmittal
4.2.2.
CSV Files
4.3. Review and Return of Comments
4.3.1.
Review of Document
4.3.2.
Cancelling Document
4.3.3.
Return of Comments
4.4. Document Approval
DOCUMENT TAXONOMY
5.1. Document Numbering
5.2. Issue and Status Code
5.3. Revision Convention and Control
5.3.1.
Review Return Codes
5.4. Renumbering of Old System Documents
5.5. Vendor Documents Numbering
APPENDIXES
Appendix 1 User Feedback Form
Appendix 2 - Document Review and Update Process
Appendix 3 - Vendor Document Requirement Listing (VDRL)
Appendix 4 - Request/Advice/Record Form
Appendix 5 - Document Status Code Descriptions
Appendix 6 Vendor A4 Document Cover Sheet
Appendix 7 - Vendor Document Schedule (VDS) Blank template
Appendix 8 - Vendor Document Requirement Catalogue (VDRC)
Page 4 of 24
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
INTRODUCTION
Executive Summary
PDO engineering function has adopted an Information Management (IM) strategy that delivers a common
framework for IM practice in PDO and shall be used in conjunction with the requirement of Engineering Information
Specification (EIS); Project Contract Scope of Work SP-2144; Project Data Specification SP-2142; Handover and AsBuilt Documentation SP-1131; and Plant Lifecycle Information Plan (PLIP) SP-2143.
They constitute the body of business control documentation supporting the implementation of document
management in engineering projects.
Purpose
The purpose of this procedure is to define the requirements for Document Management in Engineering Projects. The
requirements comprise:
Document exchange process refers to the flow of documents within the project team as well as between the project
team and external parties.
Scope
This document specifies the document management standard to be implemented in Engineering project(s) and
Operations. It covers the general strategy for document management, Vendor requirement, review and exchange
method and taxonomy. It defines the relationships, roles and responsibilities of project team members, IM team,
Contractor(s) and Vendor(s) during the implementation.
Step-out Approval
Should compliance with the specification or EIS be considered inappropriate or the intended activity cannot be
effectively completed or safely performed, then step out approval must be obtained from the Document Owners
in accordance with PR-1247 Project Change Control and Standards Variance (Projects) prior to any changes or
activities associated with the specification being carried out.
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
In addition to the glossary and definition on the EIS, the following specific definition of abbreviations applies:
AIC
AI-PS
CSV
CMMS
DCC/DC
DCAF
DCS
DDR
Document Control System - System set up and used by DCC/DC to provide document control
services during the life of a project.
Document Deliverables Register list of all project deliverables to be delivered in a project.
DRM
Document Review Matrix distribution of all project deliverables as listed on the DDR
EDMS
Electronic Document Management System (Livelink) PDO system used for document storage/
retrieval
Engineering Procurement and Construction
Engineering Maintenance Contract
Engineering and Operations Information Management
Enterprise Resource Planning
External Project Contractor responsible for all or part of the Design, Engineering, Procurement,
Construction, Commissioning or Management of a project, or operation or maintenance of a
facility
Final Investment Decision
File Transfer Protocol; the platform that allows document exchange between project team and
external parties.
Inter-Discipline Check; review cycle involving team members/disciplines outside the originating
discipline/team
Information Management
Invitation To Tender
Portable Document Format - Application or Scanned rendition format for read only files.
EPC
EMC
EOIM
ERP
EPC, EMC,
ODC etc
FID
FTP
IDC
IM
ITT
PDF
PDO
PCAP
PM
PDMS
RFI
TA
VDRC
VDRL
VDS
Page 6 of 24
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
WP
Work Package; a group of activities that are considered as one unit from the planning
perspective.
Definitions
Assai/Livelink
Refers to a combination of Assai and Livelink to provide a system of secure document control
and storage solution for all documents (issued and work-in-progress).
List of deliverables critical for the Operations and Maintenance of an Asset.
Assai Project Data Controller: Assai module used by the DCC
Assai module used by users for document (control, planning, distribution, Review and
approval) process. Revision control is typical functions provided. Details can be found on
http://www.assai.nl/.
AI-PS
Assai PDC
Assai Web
Contractor
Deliverable(s)
DCAF
Electronic Image
Document
IM deliverables
Livelink
Native File
Shall
Should
May
User
Controlled /
Uncontrolled
Document
Security
Registers and
Filling
Compound File
Page 7 of 24
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
Document Planning
Document planning implemented should align with the actual project deliverables progress measurement
methodology, and should be monitored at document or work package level. Document planning in project is based
purely on attained progress of document or work package against target.
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
PDO engages indirectly with a vendor when the vendor received PO from a Contractor with PDO. In this situation,
the Contractor takes full responsibility for ensuring completeness of IM requirement outlined on the PO, and ensures
actual compliance to this specification.
In both situation, vendor document will be submitted and approved against discipline scope of work as set out in
the Purchase Order package before any pre-commissioning or commissioning activity is undertaken. However if
supplied equipment requires a modification during installation, commissioning or initial operation, the party making
modification at this stage, will red-line mark-up all the affected drawing and documents clearly indicating where
the changes were made. The requirement for updating the master vendor drawing shall be determined by the PO
requirement for the affected equipment. The timescale for the submission of these modified documents by the
vendor will be regulated against conditions laid out in the contractual stipulations of the Purchase Order.
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
Each electronic file shall be self contained, i.e. will not require or call in any other project delivered electronic files
for viewing or updating other than agreed reference files. It is not acceptable for non-standard (Korean or Cyrillic)
character set to be required to be installed on user machine to allow the file to be used. All project documents shall
be produced in compliance with ISO standard A1, A3, and A4 sizes.
Where hardcopy submission forms part of the deliverable requirements in a Project, the issue, review and approval
process is the same as specified in this document but the following requirement shall also be met as a minimum:
Hard copy prints to be submitted in collated sets.
Hard copies shall be submitted in a clearly legible paper format.
Documents shall be scanned at their original size directly from the original hard copy.
Images shall be scanned in an orientation that allows viewing without rotation.
Paper copies submitted in a size over A3 should be fan folded such that the title block will be visible and allows
easy insertion into plastic wallets.
A4 documents to be stapled or bound dependent on size.
Standard number of copies to be submitted for review should be agreed with PDO.
Unless specifically requested by PDO to deliver native file for review and when review cannot be effectively
performed in pdf format, external part (ies) shall submit review file(s) made from the rendition of native file with
signature page signed and inserted. However the following document types shall be submitted in native format at all
revision: all schedules, ASCI files and all IM deliverables. Final document submission shall be in both pdf and native
format. The pdf files shall be a direct native file rendition and content/text searchable as opposed to a scanned pdf
with signature page signed and inserted; the Vendor or Contractor has to demonstrate that a particular deliverable
item could not be delivered in native format
Where dates are held in databases the format shall be DD-MM-YYYY e.g. 05-10-2010 while dates used on
correspondence, etc shall be e.g. 12 December 2007.
When assembling split files into sets of files, the following shall apply:
1. Nominate the primary document and treat it in the same way as any other document, giving it a document
number (primary), and revision.
2. Assign the same document number and revision to all other (secondary) files in the Set, but name each with a
Document Title reflecting the sequence of the files, as they should appear in the complete document.
Acceptable examples are:
1.
Vendor Manual Centrifugal Pump Model XYZ Sections 1 to 5 (primary)
Vendor Manual Centrifugal Pump Model XYZ Sections 6 to 10 (secondary)
Vendor Manual Centrifugal Pump Model XYZ Appendix 1 (secondary)
Vendor Manual Centrifugal Pump Model XYZ Appendix 2 (secondary)
2.
Compressor Station Layout PDF(primary)
Page 10 of 24
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
Drawing Practice
Format
Drawings shall conform to ISO 216 Standard A sizes: A1, A3 and A4.
Format A0 and other non-standard sizes shall not be used.
Suitability for Reduction
Drawings produced in A1 and A3 format shall be provided with margins to enable binding after reduction.
These shall be as follows:
A1 to A3 The A1 shall be provided with a blank margin 40mm on the left hand side of the drawing.
A3 to A4 - The A3 shall be provided with a blank margin 35mm at the top border of the drawing.
A1
A3
A4
Height in mm
2.0
2.0
2.0
Document Handover
Page 11 of 24
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
Deliverables to be delivered at the end of an Engineering Project are contained in the Plant Lifecycle Information Plan
(PLIP); however additional breakdown of vendor deliverables are contained in VDRL, Appendix 3. These deliverables
shall be delivered and accepted before Engineering Project close-out, including all modification as a result of
commissioning and pre-commissioning activities.
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
Page 13 of 24
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
Page 14 of 24
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
Assai is a PDO standard tool that provides Document Control solution during the
project. It is composed of:
Assai PDC - A module used by the DCC Team to create document numbers,
load and distribute documents
AssaiWeb - A module used by other project staff to find, access, review,
comment and approve documents.
Document Control Center The DCC shall also be responsible for:
Managing and maintaining the Assai/LL set-up, including user lists and
distribution matrices
Registration of all document in Assai and timely distribution to relevant
team members
Responsible for ensuring that all documentation are correctly numbered as
per the requirements laid out in this specification
Ensure that comment received outside Assai are delivered/issued to
originator
Ensuring that document from Contractors meet this specification
Provide support to team member on document control system and
processes
Producing relevant reports to Project Management
Contractor(s)
Responsible for all or part of the: Design, Procurement, Construction, and
Commissioning of a facility.
All Contractor(s) shall ensure that every document listed on the Document
Deliverables Register (DDR), etc generated during contract execution is numbered
in line with the requirement of this specification. Where in doubt, the Contractor
should seek guidance from Project DCC.
It is the responsibility of the Contractor to ensure that Sub-contractor and Vendor
comply with the provisions of this specification.
Petroleum Development PDO; Initiates the project and ultimately pays for its design and construction.
Oman (PDO
Project Team
PDO staff assigned/mandated to deliver project scope.
Page 15 of 24
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
Document Originator
Document Owner or
Technical Authority(TA)
Document Custodian
Approver
Responsible Engineer
Construction Site
Representative
Asset Information Center
Archive Management
Reviewers
Document Templates
Page 16 of 24
Individual who either writes a document or creates it by collating the various inputs
from other project team members.
Originator is also responsible for:
Obtain document number from DCC for the document being produced
Responsible for ensuring that all documentation are correctly numbered as
per the requirements laid out in the relevant sections of this document
Ensuring documents are produced using correct project template.
Deliver document to project DCC by means and formats as described in this
specification in a timely manner to avoid unnecessary delay to project
schedule
Advise distribution list for each document and closeout date for each
document review cycle if different from standard.
Collating, clarifying and incorporating review comments. This includes
resolving conflicting opinions and feedback between reviewers.
Provides
confidentiality
requirements
(Unclassified,
Restricted,
Confidential, Most Confidential) to DCC
Ensuring that documents are approved to the correct level of authority
prior to issue to the project DCC for distribution.
He/She owns document content, responsible for the completion and execution
of the document and ultimately responsible for the document quality in terms of
business relevance and audit ability.
Accountable person on the business area where the document is applied. In project
this role is the PM (or delegate).
Relevant person identified on the DRM to approve the document.
Review document schedule from external parties, and identify the documents that
must be submitted for review and approval or for information. After approval
of schedule, the responsible engineer will add the distribution matrix to identify
reviewing parties for each document item.
Ensures that document received for comments are processed and returned
to Contractor/Vendor within a specified timeframe, and ultimately delivers
the document or work package. Delegation of this role shall be officially
communicated.
Ensure that all changes made during the construction phase are marked on the
related document and a copy returned to Document Originator for as built to be
made.
Responsible for assigning Project code, Area code & Plant/Unit code to project
team during project to enable IM team generate/assign document numbers to
project document.
Custodian of all PDO asset drawing files and provides native drawing files for
project update/use.
Maintain the Projects Documentations in the archive for the specified retention life
of the document
Review document and provide comments to the originator within the review
window.
AIC to provide drawing template for use by the Contractor.
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
Quality Management
Page 17 of 24
The Document Controller will ensure that the correct template, document number,
revision status and title are on a document prior to issue or distribution, and will
facilitate the timely document review turnaround. The responsible Engineer shall
ensure that document is developed using the correct template and that all metadata are populated on the document.
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
Collaboration Media
PDO maintain a sharing and collaboration area on a File Transfer Protocol (FTP) and Livelink extranet site for the
purposes of sending and receiving formally transmitted documentation with external parties. All document sent to
the Project team should be forwarded via this FTP site. A detailed folder structure will be set up and agreed with each
external party with required access permissions in place.
Note that the FTP site has a limited size hence documents sent by the first party should be removed and stored in
appropriate location once received by the other party. Documentation sent via any other communication medium
will not be accepted unless prior approval has been sought and granted by the project team.
Exchange of Documents
Internal document issued within project team shall be under the cover of an internal transmittal. Internal document
distribution shall be according to the distribution matrix or completed RFI. External document issued to or from the
project team for the purposes of review, approval or information should be placed to the FTP or Livelink extranet
site under the cover of a transmittal. An E-mail notification should be sent to relevant DCC notifying them about the
placement.
Document Transmittal
Both internal and external transmittals should contain the following information as a minimum:
Unique Transmittal Number
Purpose for Issue
Transmittal Date
Expected due date for (return of comments)
Project Document Number
Document Title
Revision Code
Document Status Code
Sender: Address, telephone, fax and e-mail details
Name of Sender
Purchase Order or Contract Number (For Vendor or Contractor)
CSV Files
Contractor shall submit a CSV file with every document submittal, or where document planning is in place, as a file
containing all projected document issues with associated planned, and actual dates. The CSV file will be used to load
document Meta data in project document control system. This will save time on manual input and therefore speed
up document processing time. The recommended template for the CSV file is inserted below; note that the order of
data column, should not to be changed. Any subsequent changes to the document schedule will require submission
of updated CSV file for loading purposes
Page 18 of 24
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
CSV Template.xls
Cancelling Document
Responsible Engineer shall notify DCC of intention to cancel a document. DCC shall Cancel/supersede document and
clearly stamping CANCELLED as such and re-issue for information in Assai to all stakeholders. If the cancellation
was initiated from a contractor or vendor, the party shall notify the project team. The stamping of a drawing or
document as cancelled is preferable to overlaying it electronically as such overlays can be lost on placement into the
EDM system. Stamped front sheets and drawing blocks can be scanned to sit in front of the superseded document or
drawing. Cancelled document numbers shall on no account be re-allocated to newly created documentation. If the
document is superseded, the party superseding shall clearly identify on the document, and in their document control
system which document it has been superseded by.
Return of Comments
All comments made as a result of formal review of project external documentation shall be returned via the DCC. DCC
shall communicate comments via the dedicated project FTP or Livelink extranet site under the cover of an external
transmittal while following-up with an email notification to the receiver advising comment placement.
Project team members will be trained to use AssaiWeb to enable them review and provide comment (directly to
ASSAI comment template or to mark-up and load to Livelink) on document assigned to them. Hands-on training shall
be provided by the DCC team but users will benefit primarily from learning by doing. With this in mind, DCC will
always be available to provide one-on-one assistance when required.
There will be two primary ways to use Assai/LL while providing comments:
1. Entering comments directly using comment template on AssaiWeb referencing the appropriate section(s) of the
document being reviewed, or
2. Marking-up hardcopy drawing or electronic copy of the document and sent to DCC, who will upload it to the
same folder on Assai/Livelink containing the document under review. In this case, the reviewer must indicate as
comments, in AssaiWeb comments template that his/her comments have been submitted by mark-up.
Document Approval
Page 19 of 24
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
Document shall jointly be approved by the TA or document owner and, or PM (or delegate) electronically (via
Assai) before signing on the hardcopy (if required), when the electronic approval is considered insufficient. When
a document is issued for approval (IFA), it should only be issued to designated approver as shown on distribution
matrix; the remaining review parties during the IDC review gets it FYI.
Drawing shall be checked and approved by the originating party at each revision submittal. This shall be applicable for
both Master Drawing and Project drawing changes.
Drawings shall not be accepted by PDO Engineering Drawing Office (AIC), unless the applicable boxes on the Revision
history have been completed by the Contractor and sign off by the applicable Technical Authority.
Page 20 of 24
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
DOCUMENT TAXONOMY
Document Numbering
The format of document numbering is shown below:
Area
Code
Unit/Plant
Code
Originator
Code
Discipline
Code
Document
Type
Sequential
No.
Sheet No.
Alpha
(3)
Alpha/
Numeric
(2)
Numeric
(6)
Alpha (2)
Numeric (4)
Numeric
(5)
Numeric
(4)
AAA
BB
CCCCCC
DD
EEEE
GGGGG
HHHH
Area Code: As defined in Corporate ERP System (SAP) (level 5). This code will be supplied by the Asset
Information Centre (AIC) via the Request / Advice / Record Form see Appendix 4
Unit/Plant Code: As defined by the Asset Information Centre (AIC) for new and existing facilities. This code will be
supplied by the AIC on the Request / Advice / Record Form see Appendix 4
Originator Code: As defined in Corporate ERP System (SAP) for existing organizations/entities registered as
vendors (i.e. SAP vendor list). When the document is generated by project team, the code is 000000 while if
the document is generated by a Contractor, then the code becomes the SAP registration code for that PO, or
Contract.
NOTE: Updates to drawings that already have an Originator Code should retain the existing Originator code.
Discipline Code: Refers to the technical discipline to which the document is predominantly related.
Document Type: A standard 4-character numeric code denoting the type of document based on content. This is
the main classification code for documents and is based on the standard list of allowable document types in EIS.
Sequential Number: A five digit numeric field starting from 00001, denoting one unique document in that
discipline and document type pattern; however where there are many of the same document type pattern
produced during the life of Project, the next will take 00002, etc.
Sheet Number: 4-digit number identifying the number of sheets applicable to that drawing number. Shall start
with 0001. Documents with a front sheet shall have 0000.
Single sheet documents (e.g. General Arrangement Drawings, Detail drawings, Schematics, Data Sheets, etc.) shall
always be designated as Sheet 0001. Where additional information is continued on to subsequent sheets, those
sheets shall be numbered as Sheet 0002, 0003 etc. In this situation the drawing title block shall clearly identify
the sheet number as part of a set (e.g. Sheet 1 of 2).
For clarification, a sheet is a separate electronic file. Multiple pages within a single file (such as a line list) should
be noted as pages, not sheets. For the purpose of project execution activities, dispensation may be applied
for the use of document grouping to facilitate effective document review and approval. However during final
submission, these grouped documents shall be split back to single sheet before delivery to PDO.
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
Issue codes (transmittal code) are those codes that are used to identify the purpose for which a document is issued
while status codes are used to identify the current state of the document in the development chain. The following
table illustrates how status and issue code are to be applied in engineering projects:
Illustrating with a document development eg during FEED
Rev
01 (first issue)
02
03
03
Rev
03
04
04
Title
Hazardous Area Classification Drawing
Hazardous Area Classification Drawing
Hazardous Area Classification Drawing
Hazardous Area Classification Drawing
Document
Status
IFR
IFR
IFR
IFI
Approval
Code
D
B
AFD
If Review
Return Code is
D
B
A
01 (first issue)
Plot Plan
IFX
IFX
02
Plot Plan
IFI
AFX
Code B
Revise and Re-issue. Incorporate comments and re-issue for review. Work may proceed.
Code C
Review not Required. Incorporate comments and proceed. Do not re-issue for review.
Code D
Rejected. Incorporate comments and re-issue for review. Work may NOT proceed.
Page 22 of 24
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
Document numbers in use outside the requirement of this procedure will be re-numbered to align with this
procedure. However to facilitate cross references to older drawings, the two numbers (old and new) will be displayed
in the main title block, with the old number shown in a separate but prominent position. With the exception of the
sequence number, which shall be the ORIGINAL sequence number prefaced by 9, the new number shall be formed by
using the taxonomy in this document. The Originator code is 000000 and constant for all re-numbered document.
Page 23 of 24
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.
Revision: 4.0
Effective: Aug-11
APPENDIXES
Appendix 1 User Feedback Form
User Feedback
Form.docx
Page 24 of 24
The controlled version of this CMF Document resides online in Livelink. Printed copies are UNCONTROLLED.