1.0 INTRODUCTION
is
To start the plant the user only has to press the start button.
But he has to make sure that the plant not in operation
when he press start. Otherwise the plant will shut down
due to abnormal condition. After the start button is pressed
the control system checks circuit breaker position, water
level, valve position and national grid condition. If only all
those conditions are satisfied then proceed to start the
plant. First it sends a signal to open the Main Inlet Valve
(MIV) and wait for 30 seconds until it fully opens. Then
opens the valves inside the turbine called wicked
gates18.5% initially.
Then it starts the frequency controlling in order to bring
the generator frequency to grid frequency by controlling
wicked gates. When the frequency is getting closer to
each other it displays a message to user to set the
synchronizer to auto mode.
Just after the synchronizer closes the circuit breaker, the
control system steps into power control mode and
Stepper
Motor
Stepper Motor
Driver
Valve
Position
Sensor
Hydraulic
Valve
Control
Turbine
START /
STOP
Generator
Generator
Frequency
C/B
C/B Position
Sensor
Grid
Frequency
M
I
C
R
O
C
O
N
T
R
O
L
L
E
R
National
Grid
The voltage signals of the grid and the generator are used
in the calculation of their respective frequencies. For this
purpose also we use two micro-controllers.
3.2. Water Level Sensor
Output power utilization with available water supply is a
main function of a governor system. For that purpose
water level must be sensed. In the two mode of operation
water level input behave slightly different manner. In
water mode depending on the water level the valve of the
turbine is opened or closed to optimize the power output
while consuming all the water available at the fore-bay
tank. In power mode for proper operation the water level
should be greater than the minimum allowable water level.