尤斯特拉HL20 Service Manual
尤斯特拉HL20 Service Manual
尤斯特拉HL20 Service Manual
Service Manual
JOSTRA HL 20
Notes
Service Manual
Revision 00
JOSTRA HL 20
Contents
Contents
1
1.1
1.2
1.2.1
1.2.2
1.2.3
1.2.4
1.2.5
1.3
1.4
1.5
1.6
Revision 00
General
Description
2.1
2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.2.5
2.3
2.3.1
2.3.2
2.3.3
2.3.4
2.3.5
2.3.6
2.3.7
2.3.8
2.3.9
2.3.10
2.3.11
2.3.12
2.3.13
Service Manual
Contents
JOSTRA HL 20
ii
Function
3.1
3.2
3.2.1
3.2.2
3.2.3
3.2.4
3.2.5
3.3
3.4
3.5
3.5.1
3.5.2
3.6
3.6.1
3.6.2
3.6.3
3.6.4
3.7
3.7.1
3.7.2
3.7.3
3.7.4
3.7.5
3.7.6
3.7.7
3.7.8
3.7.9
3.7.10
3.7.11
3.7.12
3.7.13
3.8
3.8.1
3.8.2
3.8.3
Service Manual
Revision 00
JOSTRA HL 20
3.9
3.9.1
3.9.2
3.9.3
3.9.4
3.9.5
3.9.6
3.9.7
Trouble Shooting
4.1
4.2
4.2.1
4.2.2
4.2.3
4.2.4
4.2.5
4.2.6
4.2.7
4.3
4.3.1
4.3.2
4.3.3
4.4
4.4.1
4.4.2
4.4.3
4.4.4
4.5
4.5.1
4.5.2
4.5.3
Revision 00
Contents
Maintenance
5.1
5.1.1
5.1.2
5.1.3
5.1.4
Service Manual
iii
Contents
JOSTRA HL 20
5.2
5.2.1
5.2.2
5.2.3
5.2.4
5.2.5
5.2.6
5.2.7
5.2.8
5.2.9
5.2.10
5.3
5.3.1
5.3.2
5.3.3
5.3.4
5.3.5
5.3.6
5.3.7
5.3.8
iv
Service
6.1
6.2
6.2.1
6.2.2
6.2.3
6.2.4
6.2.5
6.2.6
6.2.7
6.3
6.3.1
6.4
6.4.1
6.5
6.5.1
6.5.2
6.5.3
6.5.4
6.5.5
Service Manual
Revision 00
JOSTRA HL 20
6.6
6.6.1
6.7
6.7.1
6.7.2
6.8
6.8.1
6.8.2
6.9
6.9.1
6.9.2
6.9.3
6.9.4
6.9.5
6.9.6
6.9.7
6.9.8
6.9.9
6.9.10
6.9.11
6.9.12
6.9.13
6.9.14
6.9.15
Revision 00
Contents
Installation
7.1
7.1.1
7.1.2
7.1.3
7.2
7.2.1
7.2.2
7.2.3
7.2.4
7.2.5
7.2.6
7.2.7
7.2.8
7.2.9
7.2.10
Service Manual
Contents
JOSTRA HL 20
Appendix A
Description of the HL-20 Selftest .......................................... A-1
Appendix B
Console Wiring Diagram ..........................................................B-1
vi
Service Manual
Revision 00
JOSTRA HL 20
1. General
General
1.1
The monitoring modules including the System Control Panel and the
System Monitoring Unit.
1.2
Service
1.2.1
General
Responsibility for the safe functioning of the equipment reverts to the owner or
user in all cases in which service or repair has been done by a non-professional
or by persons who are not employed by or authorized by MAQUET, and when
the equipment is used for other than its intended purpose.
In addition to the Important information given here and in the related documents
(e. g. in the User's Manual), always pay attention to applicable local and
national regulations.
1.2.2
Hazard notices
WARNING
CAUTION
Revision 00
Service Manual
1-1
1. General
JOSTRA HL 20
1.2.3
Preventive maintenance
The HL 20 must be serviced at regular intervals by personnel trained and
authorized by MAQUET. Refer to chapter 5. Maintenance. Any maintenance
or service must be noted in a log book provided.
1.2.4
Functional check
After any installation, maintenance or service intervention in the HL 20, perform
functions checks according to instructions in chapter 6. Service.
1.2.5
1-2
Service Manual
Revision 00
JOSTRA HL 20
1.3
1. General
Special Notes
Pay attention to the special notes in the manual.
WARNING
CAUTION
NOTE
1.4
Manuals
The HL 20 comprises a number of units. Some of these have their own
instruction manual and are therefore only described in brief in this manual.
Service documentation for the HL 20 consists of:
Revision 00
Manual
Contents
Users Manual
Service Manual
Service Manual
1-3
1. General
1.5
JOSTRA HL 20
Mnemonic
Meaning
ABD
ABS
ADC
AIO
BCM
CCB
CCM
CUED
The Control Unit Error Display. This is the display normally used for
displaying the real time clock, but can display a Master Error Code or a Panel
Error code. A master error is displayed in the form EMnn where nn is a
hexadecimal error code - HEC. A panel error is displayed on the form EPnn
where nn is a HEC.
DIO
DPM
External output
Front panel
The front panel of a unit. On the pump front panel means the tilted panel with
flow knob and displays. On a module front panel means the panel with
external equipment connections, intervention switches etc.
Group
HEC
MIM
MPU
MSG Display
The eight digit lower display on the pump's front panel which normally is
displaying the pump mode and tube size, but also is used when stepping
through the hierarchical menu.
ODU
With ODU means the connector on the bottom side of a pump and on the top
side of the console connecting the pump to the system.
Output
PCB
PSB
PSM
PWM
QTM
RP
RPM Display
The four digit display on the pump's front panel, normally showing the pump
speed in rpm or the calculated flow in lpm. This display is also used to report
internal pump faults.
SCP
1-4
Service Manual
Revision 00
JOSTRA HL 20
1. General
Mnemonic
Meaning
SMU
Sqw signal
ULD
Unit
is a letter - normally P
or
Ln:a-b
where
a-b
Example:
P1:3-4
Test points
Abbreviations used for 0V:
0Vl = 0 V logic. To be used when measuring +5 V.
0Vm = 0 V monitor. To be used when measuring +24 V.
0Vp = 0 V pump. To be used when measuring +24 V.
0Vs = 0 V signal. To be used when measuring +12 V and -12 V.
Revision 00
Service Manual
1-5
1. General
1.6
JOSTRA HL 20
1-6
Service Manual
Revision 00
JOSTRA HL 20
2. Description
Description
2.1
Introduction
The Jostra Heart Lung Machine HL 20 is a modular equipment system for the
regulation, control and monitoring of extracorporeal circulation.
The System Control Panel (SCP) contains all the controls necessary to run and
monitor all system functions, except individual pump settings. External ECG
signals and pressure traces, separate information windows for Cardioplegia and
bypass timing, different data pages of programmed presets and digital input
devices etc. can be displayed on the System Monitoring Unit (SMU).
Electronic modules for the supervision and control of various functions are
installed in a Module Bay at the rear of the Console.
An integrated data collection system collects and records data from all the
modules, and certain other external data inputs connected to the HL 20. This
information is written to Memory Cards for later retrieval and analysis.
The HL 20 is available with either two, four or five pump bays. In each bay a
single head pump or a twin head pump may be mounted. The SMU and SCP
can be mounted at the left, right or centered above the pumps. On right or left
oriented consoles, an integral writing surface folds down in front of the SCP.
More detailed information can be found in the User Manual.
7
7
5
6
4
2
3
1.
2.
3.
4.
Console
Pump Module
Writing board
System Control Panel (SCP)
5.
6.
7.
8.
HL 20 Main Parts
Revision 00
Service Manual
2-1
2. Description
JOSTRA HL 20
2.2
Functional elements
2.2.1
Console
The basic component of the HL 20 is the Console. It contains the complete
power supply for the pumps, the monitoring system and the halogen lamps. The
emergency battery power system is standard equipment on the HL 20 and is
installed inside the Console. The individual supervisory modules are installed
inside the Console and are accessible by opening the rear access door.
Front view
1. Main Switch
2. Monitoring System Switch
3. Battery Operation Warning Light
Rear view
6. Module Access Door
HL 20 Console Functional elements
2-2
Service Manual
Revision 00
JOSTRA HL 20
2.2.2
2. Description
M IM
4-pump version
1.
2.
3.
4.
5.
6.
7.
11.
12.
13.
14.
15.
16.
17.
18.
19.
Revision 00
Service Manual
2-3
2. Description
2.2.3
JOSTRA HL 20
2-4
Service Manual
Revision 00
JOSTRA HL 20
2.2.4
2. Description
Front view
1.
2.
3.
4.
5.
6.
7.
Side view
8. Event keys
9. Clear button
10.Enter button
11.OK LED
12.COM LED
13. (Not Used)
14.Screen Brightness adj.
Revision 00
Service Manual
2-5
2. Description
2.2.5
JOSTRA HL 20
2-6
Service Manual
8. LPM LED
9. Monitoring module intervention
LEDs
10.Status display
11.Menu button
12.Set button
13.Reverse Safety button (only TPM)
Revision 00
JOSTRA HL 20
2. Description
2.3
Technical Data
2.3.1
Performance Standards
The Jostra HL 20 meets following standards:
2.3.2
Console
General
Line voltage, nominal .................................... 230 VAC, 50-60 Hz. Can be
optionally wired for 115 VAC,
60 Hz, 16 Amps.
Battery switch-over voltage ........................... ~ 196 VAC
Maximum current consumption ..................... 7 A
Power supply fuse ......................................... 16 A
Main fuse ....................................................... 7 A
Pump fuses.................................................... 16 A
Monitoring system fuse ................................. 16 A
Distributor socket fuse................................... 12 A
Batteries ........................................................ Two 12 V, 30 AH, gel-filled
Fuse for the halogen lamps........................... 3 A
Operating temperature .................................. 10C to 40C
(50 F to 104 F)
Storage temperature ..................................... 0C to 50C
(32 F to 122 F)
Dimensions (mm)
2-Pump consoles
Measurements: W D H............................ 493 600 1485
(19 24 58 in.)
Weight ........................................................... 50 kg (110 lb.)
4-Pump consoles
Measurements: W D H............................ 855 600 1485
(34 24 58 in.)
Weight ........................................................... 80 kg (176 lb.)
5-Pump consoles
Measurements: W D H ........................... 1036 600 1485
(41 24 58 in.)
Weight ........................................................... 96 kg (211 lb.)
Revision 00
Service Manual
2-7
2. Description
JOSTRA HL 20
Console accessories
Top Shelf, 4-pump console............................MTS
Top Shelf, 5-pump console............................MTS
Cross Mast, 4-pump console .........................CRM
Cross Mast, 5-pump console .........................CRM
Venous Clamps
Venous clamp, standard ................................VCS
Venous clamp, fast-acting ............................VCQ
Gas flow meters: for supplying the oxygenator with gas mixture
Gas flow meter, 2 tubes.................................GFM
O2: 0.2 to 15 LPM
CO2: 0.1 to 2 LPM
Gas flow meter, 3 tubes.................................GFM
O2: 0.2 to 15 LPM
CO2: 0.1 to 2 LPM
O2/CO2: 0.2 to 15 LPM
Sechrist gas blender, 2 hose .........................SGB
(O2/Air mixtures)
O2/Air: 0.2 to 1 LPM
and O2/Air: 2 to 10 LPM
Sechrist gas blender, 3 hose .........................SGB
(O2/Air/CO2 mixtures)
CO2: 0.2 to 1.4 LPM
O2/Air: 0.2 to 1 LPM
and O2/Air: 2 to 10 LPM
Electronic gas blender, 2 hose ......................EGB
(O2/Air mixtures)
O2/Air: 0.2 to 1 LPM
and O2/Air: 2 to 10 LPM
2-8
Service Manual
Revision 00
JOSTRA HL 20
2.3.3
2. Description
Pumps
Single Head Roller Pumps:
Universal tubing clamp system ..................... RPM
Insert tubing clamp system............................ RPM
Pump Accessories
Hand crank, single pump............................... HCS
Hand crank, TwinPump ................................ HCT
Adjustment screwdriver ................................. ASD
IEC 60 601-1
Revision 00
Service Manual
2-9
2. Description
JOSTRA HL 20
Weight
Single pump ...................................................Approx. 18 kg (40 Lb.)
TwinPump ......................................................Approx. 14 kg (31 Lb.)
2.3.4
2.3.5
Display Monitor
System monitor unit .............................SMU
Includes 24 programmable event buttons
Screen type....................................................EL display
Resolution ......................................................640 400
Service Manual
Revision 00
JOSTRA HL 20
2.3.6
2. Description
2.3.7
2.3.8
Revision 00
Service Manual
2-11
2. Description
2.3.9
JOSTRA HL 20
Temperature Measurement
Quad temperature module ...................QTM
Measurements, LWH.................................175 35 130 mm
(7 1.4 5 in.)
Display range .................................................0 to 50 C
(32 to 122F)
Resolution ......................................................0.1 C
Display refresh rate........................................1 Hz
2.3.10
Pressure Control
Dual pressure module ..........................DPM
Measurements, LWH.................................175 35 130 mm
(7 1.4 5 in.)
Display
Range .........................................................- 997 to +997 mm Hg
Resolution ...................................................1 mm Hg
Accuracy......................................................1% of full scale
Linearity.......................................................< 1% of full scale
Capture range ...............................................150 mm Hg
Gain adjustment.............................................30%
Transducer current supply .............................+5 Volt
Alarm range ...................................................through full scale
Control loop precision ....................................2 digits
Reaction time ................................................ 5 seconds
Pressure measurement accessories
2-12
Service Manual
Revision 00
JOSTRA HL 20
2.3.11
2. Description
Input/Output devices
Analogue In / Out module.....................AIO
Input impedance all ports .............................. 10 k
Min. Input voltage for full-scale..................... 0.25 VDC
Max. Input voltage for full-scale..................... 2.5 VDC
(range internally adjustable)
Output
Input
Pin 1
Pin 15
Pressure 2 curve
output
Pin 2
Pin 16
Pressure 1 average
output
Pin 3
Pin 17
Pressure 2 average
output
Pin 4
Pin 18
Temperature 1 output
Pin 5
Pin 19
Temperature 2 output
Pin 6
Free input
Pin 20
Temperature 3 output
Pin 7
Free input
Pin 21
Temperature 4 output
Pin 8
Free input
Pin 22
Pin 9
Circuit ground
Pin 23
Free output
Pin 10 13
Not connected
Pin 24
Circuit ground
Pin 14
Pin 25
Ground
2.3.12
Revision 00
Service Manual
2-13
2. Description
2.3.13
JOSTRA HL 20
JOCAP
JOCAP Serial Reader............................JSR
Software Package and User Manual included.
Computer requirements (PC 486 or compatible)
RAM.............................................................16 Mbyte
HDD.............................................................300 Mbyte
Windows......................................................3.x or 95
Connection ..................................................standard serial RS232 port
JOCAP memory card, 512 Kb .....................JMC
Shock, water, HF and magnetic resistant. Contactless coupled.
Measurements ...............................................120 54 4 mm
(5 2 1/4 in.)
2-14
Service Manual
Revision 00
JOSTRA HL 20
3. Function
Function
3.1
Principles of Operation
The JOSTRA Heart Lung Machine HL 20 consists of four main parts
Pumps (2, 4 or 5)
Console
Power Supply
Control Modules
The SCP is the system main computer as well as the users main interface to
the HL 20 system. It communicates with the SMU, the pumps and the modules
via the central databus (DINBUS). Individual pump settings are however made
on each pump.
The Monitoring Modules DPM, AEP, ULD and ABD can influence any required
pump.
See the other sections of this manual for details.
Revision 00
Service Manual
3-1
3. Function
JOSTRA HL 20
3.2
3.2.1
1. Main Switch
2. Monitoring System Switch
3. Battery Operation Warning Light
The buttons 1,2 and 5 are lit when ON and mains supply is available. When
mains supply is not available and the machine is run on batteries, button 1 is
not lit. The indicator 3 is lit at power failure and the indicator 4 is lit at battery
charge.
3-2
Service Manual
Revision 00
JOSTRA HL 20
3.2.2
3. Function
Voltage Display
On the Console
The Battery Power Control indicator is illuminated at power failure and as long
as the line power is out.
The Battery Charge Control indicator is illuminated as long as the batteries are
charging.
On the SCP
1. Voltage Display
2. Battery Voltage button
The alarm can be switched OFF by pressing the Alarm OFF button (4).
Battery voltage can be checked at any time by pressing the Battery Voltage
button (2). Battery voltage in volts will be displayed as long as the button is
pressed.
Revision 00
Service Manual
3-3
3. Function
3.2.3
JOSTRA HL 20
Mains Operation
The HL 20 is designed to operate from conventional 220 to 240 (optionally 110
to 120) V AC. When operating in this mode, line voltage as a percent of nominal
is displayed in the Console window on the SCP.
That is, when 230 VAC (or optional 100-120 VAC) is detected by the system,
100% is displayed in the window. The lamp next to "Mains" is illuminated,
showing that the system is operating from Mains or line power.
3.2.4
Battery Operation
The power supply in the CCM constantly monitors input voltage. If the line
voltage falls below 85 % 5 % of the nominal voltage, the HL 20 unit is
automatically switched to battery operation.
The Console display on the SCP begins to blink, the "Battery" lamp on the SCP
is illuminated and an acoustic alarm sounds. The alarm can be switched OFF
by pressing the button with the blinking loudspeaker logo on the SCP. The
voltage display blinks, battery voltage is displayed and the "Battery" lamp on the
SCP is illuminated as long as the system is in battery operation. The Battery
Power Control indicator on the Console is lit.
WARNING
Battery Power.
Battery Power is not available if the Main Switch is OFF.
3-4
Service Manual
Revision 00
JOSTRA HL 20
3. Function
The total length of battery operation time of the complete system (one arterial
pump at 4 LPM, three sucker pumps 50 RPM, display and monitoring) is
approximately 1.5 hours.
Revision 00
Service Manual
3-5
3. Function
JOSTRA HL 20
3.2.5
WARNING
3-6
Service Manual
Revision 00
JOSTRA HL 20
3.3
3. Function
Revision 00
Display Board
Service Manual
3-7
3. Function
JOSTRA HL 20
Display Board
IC15
IC5
PM
PP
3-8
Service Manual
Revision 00
JOSTRA HL 20
3. Function
Jumper Settings
Verify jumper settings on new boards are identical with boards being replaced.
If installing a newer revision board then contact MAQUET Technical Support for
assistance.
Test Points
TP0
Ground
TP1
Ground
TP2
+5V DC
TP3
+12V DC
TP5
TP6
TP7
+5V DC
TP8
Ground
TP9
Protective earth
Fuses
F1
1A
F2
4A
Surface mounted components must not be replaced. The PC board is the only
available spare part. The information above is intended for troubleshooting only.
Wiring
Revision 00
Cable
Connected
Panel cable
Service Manual
3-9
3. Function
3.4
JOSTRA HL 20
It also handles:
The JOCAP recorder is mounted inside the SMU. Several push buttons on the
SMU front is designated for the JOCAP system.
3-10
Service Manual
Revision 00
JOSTRA HL 20
3. Function
Monitor Board
Jumper Settings
Verify jumper settings on new boards are identical with boards being replaced.
If installing a newer revision board then contact MAQUET Technical Support for
assistance.
Test Points
Revision 00
TP1
Protective earth
TP2
+5V ref.
TP3
0Vs
TP4
0Vl
TP5
+5V DC
TP6
+12V DV
TP7
-12V DC
TP8
VSYNC
TP9
HSYNC
TP10TP12
R-trig adjustment
Service Manual
3-11
3. Function
JOSTRA HL 20
Fuses
F1
4A
F2
1A
F3
1A
F4
4A
Surface mounted components must not be replaced. The PC board is the only
available spare part. The information above is intended for troubleshooting only.
Wiring
3-12
Cable
Connected
Monitor cable
Service Manual
Revision 00
JOSTRA HL 20
3. Function
3.5
Pumps
3.5.1
closed
Note: Jumper 1 can be removed to silence the pump while
doing service.
P6
Revision 00
Service Manual
3-13
3. Function
JOSTRA HL 20
closed
Test Points
Motor Control Board (on pumps delivered before June 1996)
TP0
Ground
TP1
Ground
TP2
TP3
TP4
3-14
Service Manual
Revision 00
JOSTRA HL 20
3. Function
Test Points
Motor Control Module 1 (on pumps delivered before June 1996)
TP1
Ground
TP5
TP6
Top view
Bottom view
Jumper Settings
Safety System Board
Verify jumper settings on new boards are identical with boards being replaced.
If installing a newer revision board then contact MAQUET Technical Support for
assistance.
Test Points
Safety System Board
Revision 00
TP1
0Vs
TP5
Service Manual
3-15
3. Function
JOSTRA HL 20
Jumper Settings
Motor Control Board
Verify jumper settings on new boards are identical with boards being replaced.
If installing a newer revision board then contact MAQUET Technical Support for
assistance.
Test Points
Motor Control Board (on pumps delivered after June 1996)
3-16
TP0
Ground
TP1
Ground
TP2
TP3
TP4
TP5
+24V
TP6
0Vp
TP7
Mot_Pwm
TP8
Motor
TP105
+15V 0.5V
TP106
TP107
Set_val
TP108
Act_speedwal
Service Manual
Revision 00
JOSTRA HL 20
3. Function
Top view
Bottom view
Jumper Settings
Pump Control Board
Verify jumper settings on new boards are identical with boards being replaced.
If installing a newer revision board then contact MAQUET Technical Support for
assistance.
Test Points
Pump Control Board
Revision 00
TP0
0Vl
TP1
0Vs
TP2
+5V DC
TP3
+12V DC
TP4
-12V DC
TP5
Service Manual
3-17
3. Function
JOSTRA HL 20
Test Points
RPM Optical Tacho Board
TP1
TP2
TP3
Ground
Test Points
Pump Interconnection Board
TP1
3-18
0Vs
Service Manual
Revision 00
JOSTRA HL 20
3.5.2
3. Function
open Note:
Top view
Bottom view
Jumper Settings
Safety System Board
Verify jumper settings on new boards are identical with boards being replaced.
If installing a newer revision board then contact MAQUET Technical Support for
assistance.
Test Points
Safety System Board
Revision 00
TP1
Ground
TP5
Service Manual
3-19
3. Function
JOSTRA HL 20
Jumper Settings
TPM Motor Control Board
Verify jumper settings on new boards are identical with boards being replaced.
If installing a newer revision board then contact MAQUET Technical Support for
assistance.
Test Points
TPM Motor Control Board
TP0
0Vl
TP1
0Vs
TP2
TP3
TP4
TP7
Motor_Pwm
TP8
Motor
TP10
Tacho voltage
TP11
3-20
Service Manual
Revision 00
JOSTRA HL 20
3. Function
Jumper Settings
TPM Control Board
Verify jumper settings on new boards are identical with boards being replaced.
If installing a newer revision board then contact MAQUET Technical Support for
assistance.
Test Points
TPM Control Board
Revision 00
TP0
0Vl
TP1
0Vs
TP2
+5V DC
TP3
+12V DC
TP4
-12V DC
TP5
Service Manual
3-21
3. Function
JOSTRA HL 20
Test Points
TPM Optical Tacho Board
A special test cable might be needed to access the test points.
3-22
TP0 (J1:4)
Ground
TP1 (J1:2)
Service Manual
Revision 00
JOSTRA HL 20
3.6
3. Function
Console
The HL 20 Console contains:
The 19" Rack holds the Power Supply Module and all monitoring modules. All
interconnections between different modules are done through the console
(mainly through the Rear Panel board in the 19 rack).
1. Backup Batteries
2. Mains Transformer
3. Mains Transformer Jumpers
4. Mains Contactor
5. 19 Rack
6. Power Supply Board
Revision 00
Service Manual
3-23
3. Function
3.6.1
JOSTRA HL 20
the contactor,
the transformer
CCM
POWER
BCM
Power Supply Board
3-24
Service Manual
Revision 00
JOSTRA HL 20
3.6.2
3. Function
Settings
Jumper
Jumper
Input Voltage
AG
F B
100 VAC IN
AH
F C
110 VAC IN
DI
230 VAC IN
EK
240 VAC IN
Test Points
Revision 00
Green/Yellow
terminal
Protective earth
U1/V1
AC OUT
2u3/2v3
3 VAC
2u2/2v2
29 VAC
19 VAC
Service Manual
3-25
3. Function
JOSTRA HL 20
Fuses
None
Wiring
Cable
Connected
Earth cable
Temperature probe
Mains Power In
29 VAC cable
3 VAC cable
Input Voltages
One of the following:
NOTE
Input
From
100 VAC
110 VAC
230 VAC
240 VAC
Output Voltages
3-26
Output
To
19 VAC
the PSB
29 VAC
the BCM
3 VAC
the CCM
Service Manual
Revision 00
JOSTRA HL 20
3.6.3
3. Function
Select power source (battery or transformer) for each group. The selection
is controlled via a signal from the CCM.
Select power ON / OFF for each group (power path is cut or closed).
Settings
None
Test Points
Negative battery terminal
0 VDV
24VDC
24VDC
0 VDC
0 VDC
Earth Ground
Fuses
Revision 00
P9 - P10
Monitor circuit-breaker
P11 - P12
Monitor circuit-breaker
P13 - P14
Pump 1 circuit-breaker
P15 - P16
Pump 1 circuit-breaker
P17 - P18
Pump 2 circuit-breaker
P19 - P20
Pump 2 circuit-breaker
P21 - P22
Pump 3 circuit-breaker
P23 - P24
Pump 3 circuit-breaker
P25 - P26
Pump 4 circuit-breaker
P27 - P28
Pump 4 circuit-breaker
Service Manual
3-27
3. Function
JOSTRA HL 20
P29 - P30
Pump 5 circuit-breaker
P31 - P32
Pump 5 circuit-breaker
Wiring
Cable
Connected
19VAC
Battery Connections
Fuse connections
P1-P6
to ON/OFF switches
TP1
to earth ground
Inputs
3-28
Input
To
P1: 3-4
P2: 3-4
P3: 3-4
P4: 3-4
P5: 3-4
P6: 3-4
P9-P10
P11-P12
Monitoring supply main fuse. The rectifier fuse and the main
fuse are fitted in the same physical housing.
P13-P32
P. 2
P. 3
P. 4
P. 5
Rectifier
P13-P14
P17-P18
P21-P22
P25-P26
P29-P30
Main
P15-P16
P19-P20
P23-P24
P27-P28
P31-P32
Service Manual
Revision 00
JOSTRA HL 20
3. Function
Outputs
Output
To
P1: 1-2
P2: 1-2
P3: 1-2
P4: 1-2
P5: 1-2
P6: 1-2
P8:1-8
(Not used)
P8:9-14
P8:15-20
P35-P58
P. 2
P. 3
P. 4
P. 5
Monitoring
+24 Vpower
P35
P39
P43
P47
P51
P55
0V power
P36
P40
P44
P48
P52
P56
0V s+l
P37
P41
P45
P49
P53
P57
Prot. gnd.
P38
P42
P46
P50
P54
P58
P59-P60
NOTE
Revision 00
Service Manual
3-29
3. Function
3.6.4
JOSTRA HL 20
The Battery
To provide the HL 20 system with power at mains power failure two self
contained, maintenance free lead batteries are included in the system.
See Maintenance for information about charging and periods of replacement.
Settings
Interconnection cable connects the two batteries to each other.
NOTE
Test Points
Output
24 VDC
Fuses
None
Wiring
Cable
Connected
Interconnection cable
Inputs
3-30
Outputs
Input
From
Output
To
24 VDC
the PSB
24 VDC
the BCM
Service Manual
Revision 00
JOSTRA HL 20
3. Function
3.7
Modules
3.7.1
M IM
Communication
As the RP board is merely a interconnection board, all connectors are
described under the corresponding units.
The LEVEL/BUBBLE, DUAL PRESSURE, TEMPERATURE, ANALOG IN/OUT
and AUX connectors are also described under THE UNIVERSAL MODULE
INTERFACE.
Revision 00
Service Manual
3-31
3. Function
JOSTRA HL 20
Jumper Settings
3-32
JMP1
open
JMP2
open
JMP3
open
JMP4
open
JMP5
closed
JMP6
closed
JMP7
closed
JMP8
open
JMP9
open
JMP10
open
JMP11
open
JMP12
open
JMP13
open
JMP14
open
JMP15
open
JMP16
open
JMP17
open
Service Manual
Revision 00
JOSTRA HL 20
3. Function
Test Points
On Rear Panel Board
TP0
0Vl
TP1
0Vs
TP2
TP3
+12V DC
TP4
-12V DC
TP5
24V DC
TP6
0V CCB
TP7
0V CCM
TP8
+5V CCB
TP9
Sawtooth
TP10
DB Ground
Fuses
None
Wiring
Cable
Connected
to P4.
Revision 00
PSB
RP
Interconnection board,
mounted on the RP
to P14
29 VAC IN
Battery terminals
to P7
to P6
Fan
to P15
to P3
to P2
Buzzer
to P5
HCU
19 VAC
24VDC
Transformer temperature
sensor
to P11.
3VAC
SYSCOM
Panel LEMO
PSM
to J1 interface.
ABD
to J10 interface.
AIO
to J9 interface.
Service Manual
3-33
3. Function
JOSTRA HL 20
QTM
to J8 interface.
DPMx
to J7 interface.
DPMx
to J6 interface.
CCM
to J3 interface.
BCM
to J2 interface.
MIM
to J4 interface.
DIO
to J5 interface.
SCP
to panel interface.
Inputs
3V AC
19V AC
29V AC
24V DC
Outputs
5V DC
+12V DC
-12V DC
Battery charger output
3-34
Service Manual
Revision 00
JOSTRA HL 20
3.7.2
3. Function
The PSM panel with LEDs, trim potentiometers and test sockets.
An illuminated LED in each field shows that the voltage matches the preset.
Each voltage can be checked at the test socket. Below the test socket is a
potentiometers to precisely trim each voltage.
WARNING
Settings
Test Points
None
-12V DC test
-12.1V
+12V DC test
+12.1V
+5V DC test
+5.1V
Fuses
SI1
4A
Surface mounted components must not be replaced. The PC board is the only
available spare part. The information above is intended for troubleshooting only.
Wiring
Cable
Connected
Power cable
Inputs
Revision 00
Output
Input
From
19.2 - 28 VDC
(typical 24 VDC)
PSB
Output
To
Service Manual
+5.1 VDC
3-35
3. Function
3.7.3
JOSTRA HL 20
Console Control Module (CCM) (and the Battery Charger Module (BCM))
Inside the CCM is one PCB, the Console Control Board (CCB). The CCB
contains an MPU which controls the CCM and transmits pump select and mode
select signals.
The CCM performes the following:
It switches to battery mode when the mains voltage goes below 85%.
It Displays Fuse Error on the SCP in case of a broken fuse on the Fuse
Panel.
It creates the PUMP_SELx and the x_MODE signals. These signals are
used when programming the pumps to different modes.
It sends the signals that handles the start, stop and monitoring of the battery
charging.
3-36
Service Manual
Revision 00
JOSTRA HL 20
3. Function
Jumper Settings
Verify jumper settings on new boards are identical with boards being replaced.
If installing a newer revision board then contact MAQUET Technical Support for
assistance.
Test Points
TP7
Earth
TP0
0V CCB
TP2
+5V DC
TP3
+12V DC
TP5
TP6
+24V DC
TP8
TP9
Fuses
Fuse 1
1A
Fuse 2
4A
Fuse 3
4A
Fuse 4
63 mA
Surface mounted components must not be replaced. The PC board is the only
available spare part. The information above is intended for troubleshooting only.
Revision 00
Service Manual
3-37
3. Function
JOSTRA HL 20
Wiring
Cable
Connected
Ribbon Cable
Main Switch
19V AC IN
3V AC IN
Battery Indicator
Charge Indicator
Inputs
Input
from
P1:A7-A15
P1:A16
P1:A22,A24
P1:B12
P1:B16
P1:B17
P1:B24-B25
P1:B30-B31
P1:B32
Outputs
3-38
Output
To
P1:A17-A21
P1:A23,A25
P1:A27-A30
PSB
P1:B26-B28
P1:B1
P1:B3
P1:B5
P1:B7
Revision 00
JOSTRA HL 20
3. Function
P1:B9
P1:B10
P1:B11
P1:B13
P1:B14
P1:B15
P1:B18-B23
P1:B32
Ubatt
BP-RE
T_HS
B_Hlim
T_BATT
B_Llim
T_TRAFO
ERROR
Ueff
Ubatt
T_HS
is not used
T_BATT
T_TRAFO
FUSES
Revision 00
Service Manual
3-39
3. Function
3.7.4
JOSTRA HL 20
NOTE
This module is always connected to the battery power. The BCM should
always be removed from its interface before any test probes are
connected or disconnected from it.
TP4
F2
POT1
F1
F3
JMP2
JMP1
POT2
TP3
TP1
POT3
TP2
Settings
3-40
JMP1
JMP2
Revision 00
JOSTRA HL 20
3. Function
Test Points
TP1
0V
P1-Z8 (fuse 3
interface side)
TP2
TP3
Fuse 3
(removed)
TP4
40V DC
Fuses
F1
4 A glass fuse
F2
4 A glass fuse
F3
4 A glass fuse
Wiring
Cable
Connected
29V AC IN
BATT
Inputs
Input
From
P1:Z4,
Transformer
P1:D6
P1:Z12
P1:D18
P1:Z20
P1:D22
Outputs
NOTE
Revision 00
Output
To
P1:Z8,
Back up battery
P1:D10
P1:Z32
CCM carries the battery (or charging) voltage divided to suit the
MPU ADC window.
Service Manual
3-41
3. Function
3.7.5
JOSTRA HL 20
CAUTION
3.7.6
Monitor Interface Module (MIM) old version. On the newer Monitor Interface
Module, the MONITOR plug is connected on the RP.
CAUTION
3-42
Service Manual
Revision 00
JOSTRA HL 20
3. Function
Test Points
P1-31
Ground
Fuse 1
+5V DC
Fuse 2
+24V DC 4V
Fuse 3
+12V DC
P1-A8 as ground
Fuse 4
-12V DC
P1-A8 as ground
P1-A8 as ground
S1-19 and
S121 on LEMO
connector
15V DC 1.5V
Fuses
Fuse 1
4 A glass fuse
Fuse 2
4 A glass fuse
Fuse 3
Fuse 4
Wiring
Revision 00
Cable
Connected
SMU Cable
Service Manual
3-43
3. Function
JOSTRA HL 20
Inputs
Input
From
P1:A17
P1:A21
P1:A22-A24
P1:A27
P1:A28
Outputs
3-44
Output
To
P1:A23-A25
Service Manual
Revision 00
JOSTRA HL 20
3.7.7
3. Function
The BUBO
Voltage on TP7-8-9 is normally 1.1V DC. On P1:1 the voltage is normally 3.3V.
Other voltages mean that the module hasn't been able to adjust to tube size or
tube material (PVC/silicone)
On P1:2 pulses indicate air bubbles. Normally 0V
Revision 00
Service Manual
3-45
3. Function
JOSTRA HL 20
Jumper Settings
Level/bub Control Board
Verify jumper settings on new boards are identical with boards being replaced.
If installing a newer revision board then contact MAQUET Technical Support for
assistance.
Test Points
Level/bub Control Board
TP0
0Vl
TP1
0Vs
TP2
+5V DC
TP3
+12V DC
TP4
-12V DC
TP5
+5V DC 5mV
Fuses
Level/bub Control Board
F1
1A
F2
1A
F3
1A
Surface mounted components must not be replaced. The PC board is the only
available spare part. The information above is intended for troubleshooting only.
3-46
Service Manual
Revision 00
JOSTRA HL 20
3. Function
Jumper Settings
Bubble Detector Board
None
Test Points
Bubble Detector Board
TP0
0Vl
TP1
0Vs
TP2
+5V DC
TP3
+12V DC
TP4
-12V DC
TP5
TP12
18V DC 10%
TP19
Protective earth
Fuses
Bubble Detector Board
F1
Surface mounted components must not be replaced. The PC board is the only
available spare part. The information above is intended for troubleshooting only.
Wiring
Revision 00
Cable
Connected
LEMO
Service Manual
3-47
3. Function
JOSTRA HL 20
Inputs
Input
From
P1:A17
P1:A21
P1:A22-A24
P1:A27
P1:A28
P1:A11
P1:A:22-A24
Outputs
3-48
Output
To
P1:A23-A25
P1:A12-A16
The pumps are used to stop the selected pump if air bubbles
or low level (ULD 20) is detected.
P1:A22-A24
Service Manual
Revision 00
JOSTRA HL 20
3.7.8
3. Function
Revision 00
Service Manual
3-49
3. Function
JOSTRA HL 20
Jumper Settings
Verify jumper settings on new boards are identical with boards being replaced.
If installing a newer revision board then contact MAQUET Technical Support for
assistance.
Test Points
3-50
TP1
Ground
TP3
TP4
Clock generator
TP10
+12V DC
TP11
+12V DC
Service Manual
Revision 00
JOSTRA HL 20
3. Function
Fuses
F1
125 mA
F2
1A
Surface mounted components must not be replaced. The PC board is the only
available spare part. The information above is intended for troubleshooting only.
Wiring
The level sensor with its cable is soldered directly to the ULD board.
The cable connection between the ABD and the ULD via LEMO connection
carries power and signals.
Inputs
Input
From
J1:4
ABD 20
Outputs
Revision 00
Output
To
J1:6
J1:7
Service Manual
3-51
3. Function
3.7.9
JOSTRA HL 20
WARNING
NOTE
NOTE
3-52
Service Manual
Revision 00
JOSTRA HL 20
3. Function
Jumper Settings
Verify jumper settings on new boards are identical with boards being replaced.
If installing a newer revision board then contact MAQUET Technical Support for
assistance.
Test Points
TP0
0Vl
TP1
0Vs
TP2
+5V DC
TP3
+12V DC
TP4
-12V DC
TP5
Protective earth
TP6
TP7
Fuses
F1
1A
F2
160 mA
F3
160 mA
Surface mounted components must not be replaced. The PC board is the only
available spare part. The information above is intended for troubleshooting only.
Wiring
Temperature probes.
Inputs
Input
Outputs
Output
From
To
Service Manual
3-53
3. Function
3.7.10
JOSTRA HL 20
DPM 20-440
pressure 1 and 2
DPM 20-441
pressure 3 and 4
WARNING
The DPM can stop as well as slow down a selected pump using the
corresponding xxx_STOP line. The stop line is selected by a stop selector
switch for each channel. The stopping channel reports its identity over the
DINBUS to the stopped pump.
To stop a pump the stop line is pulled low.
To slow down a pump the stop line is pwm.
To synchronise several channels slowing down the same pump the saw-tooth
signal is used.
3-54
Service Manual
Revision 00
JOSTRA HL 20
3. Function
Jumper Settings
Verify jumper settings on new boards are identical with boards being replaced.
If installing a newer revision board then contact MAQUET Technical Support for
assistance.
Test Points
TP0
0Vl
TP1
0Vs
TP2
+5V DC
TP3
+12V DC
TP4
-12V DC
TP5
TP6
TP7
Protective earth
Fuses
F1
1A
F2
160 mA
F3
160 mA
Surface mounted components must not be replaced. The PC board is the only
available spare part. The information above is intended for troubleshooting only.
Wiring
Revision 00
Cable
Connected
Service Manual
3-55
3. Function
JOSTRA HL 20
Inputs
Input
From
P1:A11
P1:A22-A24
Outputs
3-56
Output
To
P1:A12-A16
the pumps are used to stop the selected pump by pulling the
corresponding line low or slowing down the pump by pwm the
corresponding line.
P1:A19
P1:A20
P1:A23, A25
Service Manual
Revision 00
JOSTRA HL 20
3.7.11
3. Function
Revision 00
Service Manual
3-57
3. Function
JOSTRA HL 20
Jumper Settings
Verify jumper settings on new boards are identical with boards being replaced.
If installing a newer revision board then contact MAQUET Technical Support for
assistance.
Test Points
TP1
0Vs
TP7
4.5 0.1V
TP7
TP8
9.0 0.1V
TP9
< 0.5V
TP9
Fuses
Controller Board
F1
1A
F2
1A
F3
1A
Bubble Board
F1
160 mA
Surface mounted components must not be replaced. The PC board is the only
available spare part. The information above is intended for troubleshooting only.
3-58
Service Manual
Revision 00
JOSTRA HL 20
3. Function
Wiring
Cable
Connection
Inputs
Input
From
P1:A17
P1:A21
P1:A27
P1:A28
P1:A11
P1:A22-A24
Outputs
Revision 00
Output
To
P1:A23-A25
P1:A12-A16
The pump stop signals are used to stop the selected pump if air
bubbles or low level (ULD 20) is detected.
P1:A22-A24
Service Manual
3-59
3. Function
3.7.12
JOSTRA HL 20
NOTE
Do not connect the AIO directly to the patient. The AIO should only be
connected to a monitoring device that is of an accepted medical standard
that properly isolates between the patient and the monitoring device.
WARNING
Leakage current .
See warning in User Manual regarding leakage current.
Each external input to the module enters an op-amp where the amplification
can be adjusted from 1 to 10. Each amplified signal is added 2.5V DC to suit
the ADC window. The voltage is limited to 0-5 VDC. These voltages are read by
the MPU.
3-60
Service Manual
Revision 00
JOSTRA HL 20
3. Function
Jumper Settings
Verify jumper settings on new boards are identical with boards being replaced.
If installing a newer revision board then contact MAQUET Technical Support for
assistance.
Revision 00
Service Manual
3-61
3. Function
JOSTRA HL 20
Test Points
TP0
0LI
TP1
0SF
TP2
+5V DC
TP3
+12V DC
TP4
-12V DC
TP5
Protective earth
TP6
TP7
Fuses
F1
1A
Surface mounted components must not be replaced. The PC board is the only
available spare part. The information above is intended for troubleshooting only.
Wiring
Cable
Connected
D-sub connector
Inputs
Input
From
P1:A19
P1:A20
P1:A22, A24
Outputs
3-62
Output
To
P1:A23, A25
P1:A27
P1:A28
Service Manual
Revision 00
JOSTRA HL 20
3.7.13
3. Function
NOTE
DIO Board
Revision 00
Service Manual
3-63
3. Function
JOSTRA HL 20
DIE Board
Jumper Settings
Verify jumper settings on new boards are identical with boards being replaced.
If installing a newer revision board then contact MAQUET Technical Support for
assistance.
Test Points
TP0
ground
TP2
+5V DC
TP4
ground
TP5
+5V DC
TP6
protective earth
Fuses
F1
1A
Surface mounted components must not be replaced. The PC board is the only
available spare part. The information above is intended for troubleshooting only.
Wiring
Four LEMO connectors for connecting external device through RS232 serial
interafce
Inputs
P1:A22, A24
Outputs
P1:A23, A25
3-64
Service Manual
Revision 00
JOSTRA HL 20
3.8
3. Function
Interconnection Overview
Three types of interconnections exist in the HL 20 consoles.
Power distribution
These cables supplies the modules with electrical power.
3.8.1
Power Distribution
To supply the different units in the HL 20 the power distribution is split into
several paths on the Power Supply Board (PSB).
24 V
Battery
19 VAC
Trafo
19 Rack
BCM
MIM
3 VAC
CCM
29 VAC
HL 20 power distribution
The fuse panel is located next to the power supply board. For clarity these are
not shown in the power distribution path. See Detailed Description, Power
Supply Module.
Voltages in the HL 20
+24 V
+5 V
0 Vp
(0 V. pump)
+12 V
-12 V
PE
(Protective ground)
0 Vl
(0 V. logic)
+15 V
Revision 00
Service Manual
3-65
3. Function
3.8.2
JOSTRA HL 20
3-66
Service Manual
Revision 00
JOSTRA HL 20
3. Function
Function
ART_STOP
SUCKER_STOP
AUX_STOP
CARD_STOP
0 Vm
Monitoring system 0 V.
ART_MODE
CARDPL_MODE
AUX_MODE
SUCKER_MODE
R_TRIGGER
CALC_PU_CURVE
PULS_PU_ACTN
PUMP_SEL_1
PUMP_SEL_2
PUMP_SEL_3
PUMP_SEL_4
PUMP_SEL_5
PWM_ECG
/POWER_FAIL
SAWTOOTH
PWM_PRESS1
PWM_PRESS2
PWM_PRES
Revision 00
Service Manual
3-67
3. Function
3.8.3
JOSTRA HL 20
TRANSM. A
TRANSM. B
RECEIVE A
RECEIVE B
DB GND
The bus is symmetric meaning that the wires A and B change their voltage
symmetrically. When A goes high (~5V), B goes low (~0V). The bus is
controlled by a master (located in the SCP) via which all communication
passes.
3-68
Service Manual
Revision 00
JOSTRA HL 20
3. Function
BUS Communication
Over the DINBUS each unit is called by the master. When called, the unit
answers with a message (e.g. a value) and an address (value destination). The
answer is always built up of a fixed size data block. The data block from a
universal module consists of:
ERROR CODE
refer HEC
STATUS
high limit
exceeded, low
limit exceeded,
bypassed, ...
VALUE BLOCK
STOP ID
value 1, value 2,
trend 1, trend 2,
limit 1, limit 2,
reset, ...
which pump is
selected by the
stop select switch.
Call Up Structure
The DINBUS master calls all possible HL 20 modules. Answering modules are
listed as present and non answering modules are listed as non-present.
The DINBUS master then again calls all modules listed as present but only
the first module on the non-present list.
The DINBUS master again calls all present modules. This time the second
module on the non-present list is called.
The procedure continues until all non-present modules has been called
once.
The procedure then starts all over again continuously updating the present and
the non-present lists.
Revision 00
Service Manual
3-69
3. Function
3.9
JOSTRA HL 20
Interfaces
Seven different interfaces exist between the different units. These are:
SCP interface
SMU interface
3-70
Service Manual
Revision 00
JOSTRA HL 20
3.9.1
3. Function
Pin
no
Signal name
Signal origin
Pin
no
Signal name
Signal origin
12
PUMP_SEL
CCM 20
13
R_TRIGGER
SMU 20
14
CALC_PU_CURV
E
(Arterial pump)
Ground
+24 V
0 Vp
ART_STOP
A module
15
PULS_PU_ACTN
(Arterial pump)
SLAVE_STOP
A module
16
ACT_VAL_ARTP
(Arterial pump)
SUCKER_STOP
A module
17
--- (Reserved 1)
AUX_STOP
A module
18
--- (Reserved 2)
CARD_STOP
A module
19
--- (Reserved 3)
0 Vm
20
0Vl, 0Vs
ART_MODE
CCM 20
21
DB_TRANSM_A
SLAVE_MODE
CCM 20
22
DB_RECEIVE_A
CARDPL_MODE
CCM 20
23
DB_TRANSM_B
10
AUX_MODE
CCM 20
24
DB_RECEIVE_B
11
SUCKER_MODE
CCM 20
25
DB_GND
Revision 00
PSB
Service Manual
3-71
3. Function
3.9.2
JOSTRA HL 20
Denom
Signal origin
+5 V
PSM 20
10
0 Vs
+5 V
PSM 20
11
/POWER_FAIL
CCM 20
+5 V
PSM 20
12
R_TRIGGER
SMU 20
+5 V
PSM 20
13
DB_TRANSM_B
DINBUS
0 Vl
14
DB_RECEIVE_B
DINBUS
0 Vl
15
DB_TRANSM_A
DINBUS
0 Vl
16
DB_RECEIVE_A
DINBUS
0 Vl
17
DB_GND
DINBUS
+12 V
18
PROTECTIVE
EARTH
Console
3-72
PSM 20
Pin nr
Service Manual
Denom.
Signal origin
Revision 00
JOSTRA HL 20
3.9.3
3. Function
Denomination
Signal origin
Pin
nr.
Denomination
+5 V
PSM 20
13
DB_TRANSM_A
+5 V
PSM 20
14
DB_GND
+5 V
PSM 20
15
PULS_PU_CRV
(Arterial pump)
0 Vl
16
R_TRIGGER
SMU 20
0 Vl
17
CALC_PU_CRV
(Arterial pump)
0 Vl
18
+15_CRT
SMI 20
+12 V
19
+15_CRT
SMI 20
0 Vs
20
0 Vl
-12 V
21
0 Vl
10
DB_RECEIVE_B
22
PWM_ECG
AIO 20
11
DB_TRANSM_B
23
PWM_PRES
AIO 20
12
DB_RECEIVE_A
24
PROTECTIVE
EARTH
Console
Revision 00
PSM 20
PSM 20
Service Manual
Signal origin
3-73
3. Function
3.9.4
JOSTRA HL 20
Pin #
Denomination
Signal origin
Pin #
Denomination
Signal origin
CCM 20
A1
(Reserved 1)
B1
LINE_LED1
A2
(Reserved 2)
B2
(Reserved 4)
A3
(Reserved 3)
B3
BATT_LED1
A4
+24 V.
B4
(Reserved 5)
A5
0 Vlm
B5
CHARGE_LED1
A6
0 Vlm
B6
(Reserved 6)
A7
/POWER_FAIL
CCM 20
B7
BUZ+
A8
S_F1
PSB
B8
0 Vccb
A9
S_F2
PSB
B9
+5 Vccb
PSM 20
A10
S_F3
PSB
B10
/CHECK
CCM 20
A11
S_F4
PSB
B11
FAN
CCM 20
A12
S_F5
PSB
B12
UBM
BCM 20
A13
S_F6
PSB
B13
/CHARGE
CCM 20
A14
S_F7
PSB
B14
/NOCHARGE
CCM 20
A15
S_F8
PSB
B15
EOCV
EOCV
A16
TEMP_TR
Trafo sensor
B16
TEMP_HTS
(Not used)
A17
ART_MODE
CCM /Arterial p.
B17
TEMP_B
Battery sensor
A18
SLAVE_MODE
CCM /Slave p.
B18
PUMP_SEL1
CCM 20/Pump 1
A19
CARDPL_MODE
CCM /Cardiopl. p.
B19
PUMP_SEL2
CCM 20/Pump 2
A20
AUX_MODE
CCM /Aux. p.
B20
PUMP_SEL3
CCM 20/Pump 3
A21
SUCKER_MODE
CCM /Sucker. p.
B21
PUMP_SEL4
CCM 20/Pump 4
A22
DB_RECEIVE_B
DINBUS
B22
PUMP_SEL5
CCM 20/Pump 5
A23
DB_TRANSM_B
DINBUS
B23
PUMP_SEL6
CCM 20/Pump 6
A24
DB_RECEIVE_A
DINBUS
B24
AC2_H
Main trafo
A25
DB_TRANSM_A
DINBUS
B25
AC1_H
Main trafo
A26
DB_GND
DINBUS
B26
/B_P2
CCM 20
A27
/B_P1
CCM 20
B27
/B_P4
CCM 20
A28
/B_P3
CCM 20
B28
/B_P6
CCM 20
A29
/B_P5
CCM 20
B29
0 Vcc
A30
/B_MONB
CCM 20
B30
AC1_CCB
Main trafo
A31
0 Vp
B31
AC2_CCB
Main trafo
A32
PROTECTIVE_GND
B32
UBATT
Main switch
3-74
CCM 20
Console
Service Manual
CCM 20
CCM 20
CCM 20
Revision 00
JOSTRA HL 20
3.9.5
3. Function
Pin no
Denomination
Signal origin
Z4
+5 V
PSM 20
D6
SENSE +5V
RP board
Z8
0 Vl
D10
SENSE 0V
RP board
Z16
+12 V
PSM 20
D18
0 Vs
Z20
0 Vl
D22
-12 V
Z12
D14
PSM 20
Z24
D26
Revision 00
Z28
0 Vpu
D30
+24 V
PSB
Z32
PE
Console
Service Manual
3-75
3. Function
3.9.6
JOSTRA HL 20
Pin no
3-76
Denomination
Signal origin
+5 V
PSM 20
+5 V
Denomination
Signal origin
17
PULS_PU_ACTN
Arterial pump
PSM 20
18
R_TRIGGER
SMU 20
PSM 20
19
PWM_PRESS1
DPM 20
PSM 20
20
PWM_PRESS2
DPM 20
0 Vl
21
CALC_PU_CURVE
Arterial pump
0 Vl
22
DB_RECEIVE_B
DINBUS
+12 V
23
DB_TRANSM_B
DINBUS
0 Vs
24
DB_RECEIVE_A
DINBUS
-12 V
PSM 20
25
DB_TRANSM_A
DINBUS
10
/POWER_FAIL
CCM 20
26
DB_GND
DINBUS
11
SAWTOOTH
RP board
27
PWM_ECG
AIO 20
12
ART_STOP
A module
28
PWM_PRES
AIO 20
13
SLAVE_STOP
A module
29
(Not used)
14
SUCKER_STOP
A module
30
+24 V
15
AUX_STOP
A module
31
0 Vp
16
CARD_STOP
A module
32
PE
PSM 20
Pin no
Service Manual
PSB
Protective
earth
Revision 00
JOSTRA HL 20
3.9.7
3. Function
Denomination
Description
RXD
Serial data in
TXD
NOSERVICE
GND
Signal ground
The terminal connected to the interface must have the following settings:
Speed:
9600 bps
Data length:
8 bits
Error detection:
No parity
Stop length:
2 bits
Others:
Refer to each module description for detailed self test and operation status
output.
Revision 00
Service Manual
3-77
3. Function
JOSTRA HL 20
Notes
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
3-78
Service Manual
Revision 00
JOSTRA HL 20
4. Troubleshooting
Troubleshooting
4.1
Alarm Response
Each alarm condition on the HL 20 causes the audible alarm to sound and the
affected area to blink. The correct response to each alarm therefore, is to
1. Silence the audible alarm with the override button (the button with the
speaker crossed out), and then,
2. Look for the area that is blinking. This will be either on the System Control
Panel or one of the pump modules.
Once the blinking segment is located, the cause of the alarm can be dealt with.
For convenience, a table of alarm conditions is included following in this
section.
WARNING
Emergency procedures.
Each operator should be familiar with emergency procedures so alarm
conditions can be dealt with rapidly.
NOTE
Revision 00
Each alarm condition creates a new alarm. If a first alarm is silenced and
is then followed by another, the audible alarm is released so each alarm
can be heard. The override switch must be used to silence each new
alarm.
Service Manual
4-1
4. Troubleshooting
JOSTRA HL 20
4.2
Alarm Tables
4.2.1
Console
Alarms are arranged in order of increasing concern
Visual1
Cause
Alarm2
Pump Stop
Correction
ERxx, EPxx or
EMxx3
Software
Error
possible
possible
reset4
system
FUS1, FUS2
Blown Fuse
possible
possible
reset circuitbreaker
EM2c
Blown Fuse
yes
possible
restore fuse
Battery voltage
and battery
LED blink
battery
voltage
< 22 V
double beep;
cannot be
shut OFF
approx. 2
minutes to
system
shutdown
restore line
power
System
shutdown
battery
voltage
< 19.2 V
steady tone
(Flatline)
all stop
restore line
power
1)
2)
3)
4)
4-2
Service Manual
Revision 00
JOSTRA HL 20
4.2.2
4. Troubleshooting
Visual1
Cause
Alarm2
Pump Stop
Correction
ERxx
Hardware or
Software
Error
yes
yes
reset4 pump
Other error
message3
minor errors
possible
possible
reset4 pump
"TEMP"
Pump is
Overheating
no
no
"STOP BUB"
Bubble
detector
stopped
pump
yes
yes
correct
problem,
reset bubble
detector
"STOP LEV"
Fluid level
below
sensor
yes
yes
restore
reservoir
level
"STOP Prx"
Line
pressure out
of limits
yes
yes
restore line
pressure
"NO SEL"
Console
software
error
yes
yes
reset
system
"NO COMM"
Databus
communicati
on lost
yes
yes
switch pump
to FREE
mode
"RUNAWAY"
or RPM-DIFF
Pump head
speed >10%
of set speed
yes
yes
turn speed to
zero then
back up as
desired
ER12
"DIRECT"
Rotation
direction
error
yes
yes
4
reset pump
"!!!!"
2
RUNAWAY
alarms in 5
seconds
yes
yes
reset4 pump
1)
2)
3)
4)
Revision 00
Service Manual
4-3
4. Troubleshooting
4.2.3
JOSTRA HL 20
Bubble Module
Alarms are arranged in order of increasing concern.
Visual1
Cause
Alarm2
Pump Stop
Correction
"Sensor Fault"
lamp ON
sensor faulty
or
disconnecte
d
yes
yes
check
sensor,
cable and
connection
Both Bubble
and Level
Sensor Fault
lamps
illuminated
Bubble/Level
Module
failed selftest
yes
yes
reset4
system
"BUB" LED
blinks at pump
Pump mode
changed on
AEP or ABD
module.
yes
no
Several bubble
segments lit
on SCP
Bubble(s) <5
mm dia.
detected
no
no
look for
bubble
source
Bubble Alarm
Lamp ON
(All segments
lit)
Bubble(s) >5
mm dia.
detected
yes
yes
correct
problem,
press
RESET and
Safety Set
Button
1)
2)
3)
4)
4-4
Service Manual
Revision 00
JOSTRA HL 20
4.2.4
4. Troubleshooting
Level Module
Alarms are arranged in order of increasing concern.
Visual1
Cause
Alarm2
Pump Stop
Correction
"Sensor Fault"
lamp on
sensor faulty
or
disconnecte
d
yes
yes
check
sensor,
cable and
connection
Both Bubble
and Level
Sensor Fault
lamps
illuminated
Bubble/Level
Module
failed selftest
yes
yes
reset4
system
"LEV" LED
blinks at pump
Pump mode
changed on
AEP or ABD
module.
no
no
Several level
segments lit
on SCP
level
variation
detected
no
no
watch
reservoir
Level Alarm
Lamp ON
Level below
sensor
yes
yes
restore level
(selfresetting)
1)
2)
3)
4)
Revision 00
Service Manual
4-5
4. Troubleshooting
4.2.5
JOSTRA HL 20
Pressure Module
Alarms are arranged in order of increasing concern.
Visual1
Cause
Alarm2
Pump Stop
Correction
ERxx
Hardware or
Software
Error
possible
possible
reset4
system
Pressure
Display shows
"CAL"
system is
selfcalibrating
no
no
none, wait
"PRE" LED
blinks at pump
Pump mode
changed on
DPM
module.
no
no
Pressure
display shows
"----"
No
transducer
connected.
no
yes
Pressure
display shows
"-**-"
self-test
failed or
module is
missing
no
no
reset
system and
check
module(s)
Pressure in
window blinks
Pressure is
outside of
alarm limits
yes
yes
correct
pressure or
change limits
1)
2)
3)
4)
4-6
Service Manual
Revision 00
JOSTRA HL 20
4.2.6
4. Troubleshooting
Temperature Module
Alarms are arranged in order of increasing concern.
Visual1
Cause
Alarm2
Pump
Stop
Correction
ERxx
Hardware
or Software
Error
possible
no
reset4
system
Temperature
Display
shows "----"
Sensor
faulty or
disconnect
ed
no
no
check
probe and
cables
Temperature
Display
shows "-**-"
Self-test
failed or
module is
missing
no
no
reset
system and
check
module(s)
Temperature
Display
shows
or
Temperatur
e is <0 C
,or >50 C
yes
no
check
temperatur
e
Temperature
in Display
blinks
Temperatur
e is outside
of alarm
limits
yes
no
correct
temperatur
e or
change
limits
1)
2)
3)
4)
Revision 00
Service Manual
4-7
4. Troubleshooting
4.2.7
JOSTRA HL 20
"Pulsatile" Module
Alarms are arranged in order of increasing concern.
Visual1
Cause
Alarm2
Pump Stop
Pulse Display
shows "-**-"
No ART
PULS pump
selected.
no
no
Pulse Display
shows
External
frequency
not detected
no
no
check
incoming
ECG
Pulse Display
blinks
Heart rate is
outside of
alarm limits
yes
no
Monitor ECG
or change
limits
1)
2)
3)
4)
4-8
Correction
Service Manual
Revision 00
JOSTRA HL 20
4.3
4. Troubleshooting
Pumps
NOTE
4.3.1
4.3.2
Revision 00
Explanation
<=<=
!!!!
ERR
-OK-
HOUR.XXX
NO COMM
NO SEL
RUNAWAY or
RPM-DIFF
V x.x
Explanation
+5 V TEST
+12 V TEST
The +12 V supply differs from the set value by more than
10%
-12 V TEST
The -12 V supply differs from the set value by more than
+10 /-20%.
AD CONV
ARITHMET
BELT!
Belt slip
DIRECT
EEPROM
HEAD
ILL.ERR
KEYSTUCK
4-9
4. Troubleshooting
JOSTRA HL 20
Display
Explanation
LAMPTEST
MODEBLO
MODE-REL
OFFSET
OVERLOAD
PUMP OK
RAM
ROM
RECIRC
REFERENC
REV-REL
SAFETY-S
SET SIZE
SPEED
STOP
STOP BUB
STOP-INP
STOP LEV
STOP PRx
STOP REL
TEMP!!
UNEXPECT
Software error
If one of the above errors occurs the pump stops and an acoustic alarm
sounds.
4.3.3
4-10
Service Manual
Revision 00
JOSTRA HL 20
4. Troubleshooting
4.4
Console
4.4.1
CAUTION
4.4.2
Error Reports
Error reports from each module are shown by a blinking display in the
uppermost window of the affected group. The form of the report is: ERxx, where
a number with two digits is shown for xx.
WARNING
If an error report concerns the System Control Panel itself it is shown in the
Status Window in place of the clock. On this display the form of report is EMxx
or EPxx, whereby here again xx is replaced by two digits.
While it is not usually possible for the user to correct these problems, the
number should be noted before calling MAQUET Technical Support. This will
enable the Service Technician to guide you to the quickest possible resolution
of a problem.
Revision 00
Service Manual
4-11
4. Troubleshooting
4.4.3
JOSTRA HL 20
Error Messages
Code Message
4-12
Code
Message
01
ROM error
02
RAM error
03
EEPROM error
04
A to D converter error
05
06
07
+5 V test error
08
09
0a
0b
Temperature error
0c
0d
0e
0f
10
11
12
Direction error
13
-- not used --
14
15
No PUMP_SEL received
16
17
Unexpected error
18
Arithmetic-unit error
19
1a
Overflow error
20
21
22
Calibration error
23
24
Clock error
25
26
27
28
No master acknowledge
error
29
2a
2b
Fatal error
2c
Blown fuse
2d
Battery overvoltage
2e
7f
81
82
No PUMP_SEL detected
83
84
85
EEPROM error
86
Illegal Mode
87
Illegal Warning
Service Manual
Revision 00
JOSTRA HL 20
4.4.4
4. Troubleshooting
Pressure:
Pressure limit
Gain
1 (all channels)
Temperature:
Upper limit
Lower limit
Pulsatile
Start
20%
Stop
70%
Base flow
0%
Internal frequency
72 BPM
120 BPM
40 BPM
These are replaced with user set parameters by changing them to the desired
value and switching the machine OFF normally.
Revision 00
Service Manual
4-13
4. Troubleshooting
4.5
JOSTRA HL 20
Modules
All microprocessor controlled modules have two LEDs on the front:
The green LED (OK) lights up when all the module self-test has been
completed without error, and the module is ready for use.
The yellow LED (COM or BUS) blinks only when the module is exchanging data
with the master computer.
If you have a problem with any of the modules in your system it is always
advisable to start by checking the two LEDs on the front panel of the
corresponding module.
If the OK LED is out this may mean that there is a fault in the module.
If the COM LED is out it may mean that communication to or from that module
is faulty. The error is probably in the module if the other modules receive their
calls. Otherwise the error is probably in the DINBUS. If the diode flashes but not
at all as often as for the other modules it receives the calls from the master, but
the master does not receive the answer from the module. The error is probably
located in the module.
Note that the COM LED blinks only when the module is exchanging data.
4.5.1
CAUTION
4-14
Service Manual
Revision 00
JOSTRA HL 20
4.5.2
4. Troubleshooting
CAUTION
4.5.3
CAUTION
Revision 00
Service Manual
4-15
4. Troubleshooting
JOSTRA HL 20
Notes
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
4-16
Service Manual
Revision 00
JOSTRA HL 20
5. Maintenance
Maintenance
5.1
5.1.1
General
Clean all surfaces of the whole system including the pump heads, rolls and tube
guides to remove any blood or spilled liquids.
Sponges should be wrung dry to prevent excess liquid from getting inside
components. Ordinary household dish washing liquid is recommended for
cleaning the front pump and control panels. Disinfectants may be used if
needed, but be certain to use only products and processes that are suitable for
plastic surfaces. Avoid excess water near control panels.
Chemical solvents, acids, bases and coarse abrasives should not be used as
these may damage polymer face plates. Chemical solvents such as ether,
acetone etc. should NOT be used in or on any part of the system as such
solvents could damage control panels, connectors, etc. Do not allow any
anesthetics to spill on any part of the system or spare parts. Chemicals such as
Foram (Isofluoran) can be very damaging.
If necessary, a stiff sponge (Scotchbrite or similar) can be used to remove
stubborn stains from the stainless steel and aluminum surfaces. Stainless steel
surfaces may also be polished with mild abrasive polishes made for this
purpose, if desired. Prevent cleaners or polishes from coming in contact with
the plastic panel face plates.
If rust spots develop on stainless steel from repeated exposure to liquids,
contact MAQUET for instructions on spot passivation.
5.1.2
Pumps
CAUTION
Pumps may be lifted off and placed on any flat surface when necessary to clean
under them. Be certain the pump is turned off before removing it from the
Console. All electrical connections are automatically made when the pump is
replaced on the Console.
Revision 00
Service Manual
5-1
5. Maintenance
5.1.3
JOSTRA HL 20
Sensors
Wipe the ultrasound level sensor face with a clean, damp cloth to remove old
gel.
Open the bubble sensor and rinse the white silicone cushion with warm water
until all the gel has been removed.
5.1.4
5-2
Service Manual
Revision 00
JOSTRA HL 20
5. Maintenance
5.2
Preventive Maintenance
5.2.1
General
This section comprise a description of the Preventive Maintenance to be
performed on the HL 20.
Furthermore, there is an Extensive Preventive Maintenance for HL 20 as
described in section 5.3 Extensive Preventive Maintenance. The Extensive
Preventive Maintenance procedure is created for the US Service organization,
but can of course be used worldwide if required.
5.2.2
5.2.3
Console mechanics
Part
Action
Masts
Infusion masts
Access panel
Drawer
Wheels and
brakes
Monitor
Control panel
Halogen lamp
ODU connectors
with covers
Rack connectors Check the LEMO connectors. Varify that the pins are
not backing out when pushed on.
Revision 00
Positioning
dowels
Fan
Service Manual
5-3
5. Maintenance
5.2.4
JOSTRA HL 20
Pump mechanics
Part
Action
Pump ID
Tube locking,
inserts
Occlusion
Guiding pins
Rollers
Pump lid
ODU
connectors,
spring, pin fixing
Check that the connector works properly (springloaded) and that the pins are not defective.
Belt
Fan
5.2.5
Pump electronics
Part
Action
Switches and
breakers
Speed
5-4
RPM/LPM switch
Mode selection
Calibration
mode
Master slave
Check with one stop module that the pump stop in all
modes. Check all pumps.
Service Manual
Revision 00
JOSTRA HL 20
5. Maintenance
Runaway
protection
Overload alarm
WARNING
5.2.6
Error direction
alarm
Reset hour
counter
Action
SCP
Check:
- Pressures, up to 4 pressures
- Temperatures, 4 temperatures
- Level indication, function
- Air bubble alarm, artificial air bubble 5 mm
generates air alarm.
SMU
Check:
- ECG trace
- Pressure trace
- MAP, SYS, DIA data
- Arterial pulsatile trace
- Cardioplegia windows
- Digital in/out function.
Revision 00
Service Manual
5-5
5. Maintenance
5.2.7
JOSTRA HL 20
Battery back-up
Part
Action
Battery mains
switch
Charge circuit
5.2.8
5.2.9
Others
Part
Action
Level Sensor
Bubble Sensor
Electrical safety
Part
Action
Electrical safety
test
5-6
Service Manual
Revision 00
JOSTRA HL 20
5.2.10
5. Maintenance
Equipment:
Type:
Serial No:
Console Mechanics
OK
Masts .......................................................................
Infusion masts .........................................................
Access panel ...........................................................
Drawer .....................................................................
Wheels and brakes .................................................
Monitor ....................................................................
Control panel ...........................................................
Halogen lamp ..........................................................
ODU connectors with covers ..................................
Rack connectors .....................................................
Positioning dowels ..................................................
Fan ..........................................................................
Remarks:
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
Pump mechanics
Type:
Serial number:
Runtime (highest value):
Tube locking, inserts
Occlusion
Guiding pins
Rollers
Pump lid
ODU connector
Belt
Fan
Pump electronics
Switches and breakers
Speed
RPM / LPM switch
Mode selection
Calibration mode, flow adjust
Master - slave, slave adjust
Stop lines and communication
Runaway protection
Overload alarm
Error direction alarm
Reset hour counter
Remarks on Pumps:
Revision 00
Service Manual
5-7
5. Maintenance
JOSTRA HL 20
OK
Remarks:
SCP:
- Pressures .............................................................
- Temperatures .......................................................
- Level indication......................................................
- Air bubble alarm ...................................................
________________________________
________________________________
________________________________
________________________________
SMU:
- ECG trace .............................................................
- Pressure trace ......................................................
- MAP, SYS, DIA values .........................................
- Arterial pulsatile trace ...........................................
- Cardioplegia windows ..........................................
- Digital in/out function ............................................
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
Battery back-up
Automatic battery mains switch ...........................
Charge circuit ..........................................................
________________________________
________________________________
Others
Level sensor ...........................................................
Bubble sensor .........................................................
________________________________
________________________________
Electrical safety
Ground resistance ..................................................
Earth leakage current (normal condition) ...............
Enclosure leakage current (normal condition) ........
NOTE
Date:
____________________________ Ohm
______________________________ A
______________________________ A
During maintenance, the following settings may have been changed in order to test
their function: Flow Calibration, Occlusion, Tube settings, Mode settings, Pressure
limits, Stop lines, Pressure and Temp channels e.t.c.
Please check all settings and values carefully before use.
Signature:
5-8
Service Manual
Revision 00
JOSTRA HL 20
5. Maintenance
5.3
5.3.1
General
Scope
The Extensive Preventive Maintenance procedure to be performed on the
HL 20 as described below is created for the US Service organization, but can of
course also be used worldwide if required.
The Extensive Preventive Maintenance Checklist shall be completed during
this procedure.
Portions of Field Test Procedure: HL 20 are incorporated into the Extensive
Preventive Maintenance. Review these procedures before beginning.
Service Manual
5-9
5. Maintenance
JOSTRA HL 20
Requirements
Completion of MAQUET service training is prerequisite to performing this
procedure.
WARNING
Cleaning
Clean all surfaces, rollers, and tubing guides to remove any blood or spilled
liquids. Always use personal protective equipment and observe precautions for
Blood Bourne Pathogens. Refer to User manual for further information.
5.3.2
Initial inspection
1. Perform the Initial Inspection portion of Field Test Procedure: HL 20 and
complete the User Settings Worksheet before starting the Extensive
Preventive Maintenance.
2. Briefly operate console and all pumps to determine system status.
Verify the console fan operates quietly.
3. Turn off Main and Monitoring system power.
5-10
Service Manual
Revision 00
JOSTRA HL 20
5. Maintenance
ODU Connectors
NOTE
Assure Mains power is off. Only place pumps on flat surfaces to avoid
damage to connector. Skin oils can tarnish the pins avoid contact.
Signal Name
GROUND
24 V
0 Vp
ART_STOP
SLAVE_STOP
SUCKER_STOP
AUX_STOP
CARD_STOP
0 Vm
ART_MODE
SLAVE_MODE
CARDPL_MODE
AUX_MODE
SUCKER_MODE
Signal Origin
CHASSIS
PSB
A Module
A Module
A Module
A Module
A Module
CCM20CCM20CCM20CCM20CCM20-
Pin #
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Signal Name
PUMP_SEL
R_TRIGGER
CLC_PU_CURVE
PULS_PU_ACTN
ACT_VAL_ARTP
(Reserved)
(Reserved)
(Reserved)
0 V1, 0 Vs
DB_TRANSM_A
DB_RECEIVE_A
DB_TRANSM_B
DB_RECEIVE_A
DB_GND
Signal Origin
CCM20SMU20(Art. Pump)
(Art. Pump)
(Art. Pump)
Revision 00
Service Manual
5-11
5. Maintenance
JOSTRA HL 20
Pumps
1. Pin resistance to ground was tested earlier when pump was attached to
HL 20. Measure pump connector resistance if this step was not performed.
2. Residue inside and outside the pump tubing guides may require cleaning as
follows:
Place unit on its side to avoid fluid ingress.
Use warm water and paper towel to remove any external residue.
Dab warm water on guide ends and rotate Teflon guide to free
movement.
Dispel liquid from inside the tubing guide using Silicone spray lubricant.
Always wear eye protection when spraying liquids!
Do not use any petroleum based products!
Wipe any pooled liquid from inside pump housing.
5-12
Service Manual
Revision 00
JOSTRA HL 20
5.3.3
5. Maintenance
HL 20 Console
The HL 20 contains circuit boards which are factory calibrated and
shall not be repaired or adjusted in the field except as outlined in
current service documents. Contact MAQUET Technical Support for
replacement information.
NOTE
AEP
QTM
AIO
DPM
PSM 1
CHI
MIM
DIO
DPM
CCM
BCM 1
-12.10 0.01 V
12.10 0.01 V
5.10 0.01 V
WARNING
Revision 00
Service Manual
5-13
5. Maintenance
JOSTRA HL 20
Battery Replacement
1. The HL 20 battery shall be replaced every 2 years as follows:
Follow the service manual instructions for opening the console.
Remove the cable connecting the two batteries.
Disconnect the (+) and () battery cables and remove the battery bracket.
Exercise care when handling the temperature sensor!
Replace the batteries and attach the (+) and () battery cables, bracket,
and sensor.
2. Perform internal inspection.
Blow out any dust that has accumulated inside console and around fan.
Verify cables are properly routed and secured.
3. Reassemble console following service manual instructions.
Attach the cable connecting the two batteries.
Test the new battery according to Field Test Procedure: HL 20.
Recycling: Worn-out batteries must be recycled or disposed of properly in
accordance with appropriate industrial and environmental standards.
Battery Adjustments
A battery which has failed operational testing and is within two years old may
indicate a problem with the battery charger. Verify Battery Charger Board
(BCB) adjustments if such a failure occurred.
1. A depleted battery is needed to set charging current. Run down the battery
to this state.
2. Verify Mains cable is disconnected and all power is turned off.
3. Remove the Console Control Module (CCM) for disassembly. The BCB and
Console Control Board (CCB) are located inside the CCM.
NOTE
5-14
Service Manual
Revision 00
JOSTRA HL 20
5. Maintenance
JMP2
JMP1
Revision 00
Service Manual
5-15
5. Maintenance
5.3.4
JOSTRA HL 20
Single Pump
1. Remove the 6 screws securing the pump bottom plate and separate from
pump chassis.
Verify cables are properly routed and secured.
5-16
Service Manual
Revision 00
JOSTRA HL 20
5. Maintenance
Limits
Offset
Ref. Test
10
490-510
Label
RPM
LPM
POTI
475 to 525
-96 to -132
SETV
STOP
HEAD
T_MO
Description
RPM display
Flow display in L/min
Flow Pot. Set Value
Motor Tachometer
in RPM
Slave Mode Set Value
Stop Input Value
Head Tachometer
Motor Temperature
12V Test
108 to 132
ACTV
5V Test
-12V Test
HOURS
RUNNING
HOURS
TOTAL
0
5 of set
Varies
Since last
cleared
T_HS
Heatsink Temp.
ACTS
DELT
CORR
Head Tacho in
Pulsatile Mode
Pulsatile Mode Reg.
Deviation
Pulsatile Mode
Motor Reg.
Limits
Varies
Revision 00
Service Manual
5-17
5. Maintenance
JOSTRA HL 20
Safety Board
TP1 (0 volts)
TP5 (5.000 0.005 Vdc)
Motor Control
TP1 (0 V)
TP2 (5 0.1 VDC)
TP3 (12 0.5 VDC)
TP4 (-12 0.5 VDC)
TP106 (5.0000.005 VDC)
Safety Board
Tacho Board
Figure 10: Single pump circuit board test points and adjustments
5-18
Service Manual
Revision 00
JOSTRA HL 20
5. Maintenance
14. Attach oscilloscope to Tacho board test points and TP3 (0 volts) and run
pump at maximum speed. The traces shall look similar to Figure 11.
Verify both traces are centered near 2.5 volts with amplitudes > 2 volts
peak to peak.
Adjust Tacho board if necessary (refer to Figure 10).
POT1 adjusts the signal at TP1 and POT2 adjusts the signal at TP2.
Verify the phase relationship is 90 10 degrees.
Make slight adjustments to the Tacho board orientation if necessary.
NOTE
Figure 11: Typical oscilloscope display for calibrated (single pump) Tacho board
15. Apply BlocLube to all potentiometers that were adjusted.
16. Completely reassemble the pump, remount on HL 20, and test pump
functions according to Field Test Procedure: HL 20.
Revision 00
Service Manual
5-19
5. Maintenance
5.3.5
JOSTRA HL 20
NOTE
Figure 12: Lightly pluck the belt and measure with the Sonic Tension Meter
8. Run the pump at 250 RPM under load for at least 30 minutes and verify the
tension and orientation of belts.
9. Check the Tacho board signals as previously described.
10. Reset Hours Running by closing JP11 (use Berg jumper) on Pump Control
board and performing a cold start. A cold start occurs if power is reapplied
after being off for over 5 seconds.
Important: Resetting hours will also clear flow calibration values (which were
written on the User Settings Worksheet. You must restore these values before
returning pump to active service!
11. Completely reassemble the pump, remount on HL 20, and test pump
functions according to Field Test Procedure: HL 20.
5-20
Service Manual
Revision 00
JOSTRA HL 20
5.3.6
5. Maintenance
Twin Pump
1. Remove the 6 screws securing the pump bottom plate and separate from
pump chassis.
Verify cables are properly routed and secured.
2. Clean the fan and inside of unit with compressed air (preferred) or ESD safe
brush.
3. Use a flashlight and observe the belts. Replace belts which have wear,
cracking, or service life over 5 years (see Belts with Pulley Replacement).
4. Loosen the front panel by removing the 8 screws using a 2.5 mm hex key
wrench. Replace screws which are galled or have worn heads.
5. Use the Terminal Cable to connect a Laptop to one of the Control board
serial connectors (you must remove the 2-wire cable connecting the two
Control boards). Run a terminal program with port settings 9600 8-N-2,
Wyse 50 Emulation.
6. Supply power to the pump from the HL 20 through the Pump Servicing
Cable and operate the unit on its side.
Verify the fan operates quietly.
Verify the motors run smooth and quietly at various speeds.
7. Observe the terminal program (similar to Figure 7) and confirm the following
values. Repeat this procedure for the other Control board.
Measurement
Limits
Offset
Ref. Test
10
490-510
Label
RPM
LPM
POTI
12V Test
108 to 132
ACTV
5V Test
475 to 525
SETV
STOP
Description
RPM display
Flow display in L/min
Flow Pot. Set Value
Motor Tachometer in
RPM
Slave Mode Set Value
Stop Input Value
-12V Test
-96 to -132
HEAD
Head Tachometer
T_MO
Motor Temperature
0
5 of
set
Varies
Since last
cleared
T_HS
Heatsink Temp.
ACTS
HOURS
RUNNING
HOURS
TOTAL
DELT
CORR
Limits
Varies
Head Tacho in
Pulsatile Mode
Pulsatile Mode Reg.
Deviation
Pulsatile Mode Motor
Reg.
NOTE
Revision 00
Service Manual
5-21
5. Maintenance
JOSTRA HL 20
8.
9. Measure between TP11 (5 Vref) and TP1 (0 volts) on Motor Control board.
Verify 5.000 0.005 volts.
Adjust POT2 if necessary.
10. Run pump in forward or reverse direction at maximum speed.
Verify POTI and SETV values are 2500 5
Adjust POT1 on Motor Control board for a HEAD value of 2500 1.
11. Use Figures 14 and 15 to verify test point voltages if necessary.
Control
Safety Board
Motor Control
TP1 (0 volts)
TP1 (0 volts)
TP1 (0 volts)
Control Board
Figure 15: Twin pump circuit board test points and adjustments
12. Attach oscilloscope to Tacho board (use extension cable) and run pump at
maximum RPM.
Verify trace is centered near 2.5 volts with amplitude > 2 volts peak to
peak.
The waveform shall be similar to Figure 11 except single trace.
Adjust Tacho board POT1 if necessary.
13. Apply BlocLube to all potentiometers that were adjusted.
14. Completely reassemble the pump, remount on HL 20, and test pump
functions according to Field Test Procedure: HL 20.
5-22
Service Manual
Revision 00
JOSTRA HL 20
5.3.7
5. Maintenance
NOTE
3. Remove the tacho cable nylon fastener and the following screws which
secure the motor:
Single screw between the motors (6 mm).
Two locking screws along the edge (5 mm).
Tension adjustment screw (4mm).
4. Lift off the motor and set aside.
5. Remove the screws which secure the Belts with Pulley assembly:
Rotate the pulley to expose the locking screw (5 mm).
Tension adjustment screw (3 mm).
6. Remove the old Belts with Pulley assembly. Cut the old belts to prevent their
reuse.
7. Loop the new Rotor belt over the pulleys and lightly secure the locking screw
(5 mm). Hold the assembly while attaching the tension adjustment screw
(3 mm) and tension using the other pump as a reference. Do not over
tension final adjustment will be performed later.
8. Loop the new Motor belt over the pulleys and hold the motor in place while
attaching the tension adjustment screw (4 mm). Lightly secure the locking
screws and tension the Motor belt using the other pump as a reference. Do
not over tension.
Revision 00
Service Manual
5-23
5. Maintenance
JOSTRA HL 20
9. Rotate the pump head by hand a number of times to fully seat and equalize
tension in the belts.
10.Lightly pluck the belts while holding the Sonic Tension Meter 1 cm away
and read the measured frequency. Always take at least three measurements
to assure accuracy.
NOTE
NOTE
12.Perform this procedure for the other pump. Operate pumps at 250 RPM
under load for at least 30 minutes and recheck the tension.
13.Reset Hours Running by closing JP11 (use Berg jumper) and performing a
cold start. A cold start occurs if power is reapplied after being off for over 5
seconds. Do this for both Control boards.
Important: Resetting hours will also clear flow calibration values (which were
written on the User Settings Worksheet. Restore these values before
returning pump to active service!
14.Completely reassemble the pump, remount on HL 20, and test pump
functions according to Field Test Procedure: HL 20.
Twin Pump
Interconnection
Board
5-24
Service Manual
Revision 00
JOSTRA HL 20
5. Maintenance
Figure 16c: Locking screw on the pulley, motor removed, and tacho board and strobe
Figures 16: Various pictures of the Twin Pump, pump head assembly
Revision 00
Service Manual
5-25
5. Maintenance
5.3.8
JOSTRA HL 20
HL 20 Console
HL 20 Serial Number:
Step Performed:
Yes No
Yes No
Pump 2
Pump 3
Pump 4
Pump 5
Pump 6
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Serial Number:
Single / Twin:
Step Performed:
ODU Connector Resistance:
Internal and External
I Strobe
ti 1:
Cleaned Tacho
Cables Routed & Secured:
Cooling Fan Operational:
Motor Runs Smooth:
Verified Terminal Data:
Inspected Belts1:
Replaced Belts:
Speed Adjustments Made:
Tacho Checked / Adjusted:
Field Test Procedure:
1
Single Pump only
5-26
Service Manual
Revision 00
JOSTRA HL 20
5. Maintenance
Notes
.Signature
.Date Performed
Revision 00
Service Manual
5-27
5. Maintenance
JOSTRA HL 20
Notes
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
5-28
Service Manual
Revision 00
JOSTRA HL 20
6. Service
Service
6.1
General
A repair procedure must normally be proceeded by a fault diagnosis procedure
as the complex structure of the system may indicate faults in other parts of the
machine than the fault origin. Always look up the error code presented on the
faulty module or somewhere else in the HL 20 system. See 4 Troubleshooting
and Appendix A Description of the HL 20 Self-test.
CAUTION
Switch off the main switch and unplug the mains cable before
attending service on the HL 20.
Before disconnecting cables, opening the console, removing pumps or
modules always switch the main switch OFF.
See 3 Function for detailed information about the different units and modules
of the HL 20.
Revision 00
Service Manual
6-1
6. Service
JOSTRA HL 20
6.2
6.2.1
Open/Close SCP/SMU
Open
To open the SCP/SMU do as follows
Remove the screw in front (on SMU and on MPL, MPR, MRC or MLC
mounted SCP only) and in the rear.
Push a small screwdriver in the middle hole onto the middle screw until the
board comes loose.
Pull the board out in a downward motion until you can reach the
connector(s) on the rear of the board.
Remove the three screws in the lower rear of the SCP housing (on ROC or
LOC).
Gently pull the lower part of the SCP front panel outwards approximately
10 mm.
Close
6-2
Push the SCP/SMU back in the housing and tighten the screws.
Service Manual
Revision 00
JOSTRA HL 20
6.2.2
6. Service
Install Pump
To install a pump:
1. Switch OFF the HL 20 with the Main Switch.
2. Open the cover over the electrical socket at the intended pump bay on top
of the Console.
3. Make sure that the pump position is turned OFF.
CAUTION
4. Lower the pump straight down on the Console. Two large stainless pins
guide the pump into position, and provide grounding contact with the
Console.
All power connections to the pump are made through a socket on the Console,
and the pump is ready for immediate operation.
6.2.3
Remove Pump
To remove a pump:
1. Switch the Pump OFF.
CAUTION
Revision 00
Service Manual
6-3
6. Service
6.2.4
JOSTRA HL 20
Open/Close Pump
Roller Pump Module (RPM)
Open
CAUTION
Place the pump on its side with the front to the left.
Carefully pull the bottom plate towards you. Twist the inside of the plate
upwards and place the bottom plate on the table.
Close
Before closing check that all connections are in place an that all boards are
fastened.
CAUTION
Place the pump in its natural resting position with the front facing you.
Close
6-4
Before closing the front panel check that all connections are in place.
Service Manual
Revision 00
JOSTRA HL 20
6.2.5
6. Service
Open/Close Console
WARNING
Open
Power down the machine by pressing the main switch to position OFF and
remove the mains cable.
Disconnect the SCP, the SMU and the spotlight cablings and secure them
to the masts.
CAUTION
Remove the bubble sensor and make sure that the level sensor is out of the
way.
CAUTION
NOTE
Do not use a metal tool box or similar as this easily may scratch the
console housing. Sharp corners may even destroy the ON/OFF switches.
NOTE
Revision 00
Secure the SCP, the SMU and the spotlight cablings before opening
the console.
The cablings may fall down and short-circuit the battery poles.
Remove the battery cable connecting the two batteries together in order to
work safely in the machine.
Service Manual
6-5
6. Service
JOSTRA HL 20
1. Stop hinge
2. Battery cable connecting the two batteries together.
3. Lock screw (one on each side of the console)
Opening the console
Close
6.2.6
Lift the stop hinge and close the console by pulling the masts.
Check that the console is properly locked by tightening the two lock screws.
Remove Module
Remove the straight screws on the corners of the module and gently pull the
module out of the 19-rack.
6.2.7
Open/Close Module
CAUTION
6-6
Service Manual
Revision 00
JOSTRA HL 20
6. Service
6.3
SCP Adjustments
6.3.1
Revision 00
Service Manual
6-7
6. Service
JOSTRA HL 20
6.4
SMU Adjustments
6.4.1
6-8
COMM LED
This LED blinks when data is being exchanged with the rest
of the system.
OK LED
This LED is illuminated when all self-tests of the monitor
unit have been completed without fault, and the monitor is
ready for use.
Service Manual
Revision 00
JOSTRA HL 20
6. Service
6.5
Pump Adjustments
6.5.1
Tube Installation
See User Manual.
6.5.2
Occlusion Setting
See User Manual.
6.5.3
NOTE
It is important that this is done accurately as the flow rates which are
recorded in the JOCAP data set when recording a case are based on this
calibration.
1. Select tube size
Press the Menu (page) button on the pump until SET TUBE is displayed.
Press the SET button. Press the Menu button until the correct tube size is
displayed. Then press and hold the SET button for three seconds until a
long beep is heard.
2. Insert the tube and set the occlusion as described in the User Manual.
(Record the micrometer occlusion setting on the pump head so this can be
quickly reset for the same type of tube in the future.)
3. Set the pump to CAL MODE
Press the Menu (page) button until CAL MODE is displayed. Then press
and hold the SET button for three seconds until a long beep is heard and
the display blinks.
4. Connect both ends of the tube to a static supply (bucket) holding at least 10
litres of water. Switch on the pump, and set to about 60 RPM for 1/2" ID or
larger tubes, or approximately 100 RPM for smaller tubes.
NOTE
Do not change the pump speed until the end of the calibration.
5. Move the outlet side of the tube to a collection container, and collect the
output for exactly one minute. Then move the outlet end back to the main
bucket. Measure the volume collected in litres.
Revision 00
Service Manual
6-9
6. Service
JOSTRA HL 20
6. Switch the display to LPM mode. Using the adjusting screwdriver, adjust the
potentiometer on the front channel of the pump so that the LPM reading in
the Display Window agrees with the amount collected in one minute.
7. When you have entered the correct flow in the display and want to
memorise it, press the SET button and hold for three seconds. A long beep
confirms that the programming procedure has been completed and the new
flow curve is memorised.
If you wish to leave the calibration mode without memorising the new value,
merely press any other button.
8. The pump speed may now be changed or the pump switched OFF. The
new flow-rate calibration curve for this tube size is linear, and will remain in
the pump memory even when the pump is switched off.
RPM
TPM
6-10
Service Manual
Revision 00
JOSTRA HL 20
6.5.4
6. Service
Belt replacement
Refer to section Belt Replacement, Single Pump or Belts with Pulley
Replacement, Twin Pump in the Maintenance chapter.
6.5.5
Adjustment procedure
Refer to section Single Pump or Twin Pump in the Maintenance chapter.
6.6
Console Adjustments
6.6.1
Mast Angle
To adjust the mast angle do as follows
Revision 00
Loosen the four screws (3) located under the mast block (2).
Service Manual
6-11
6. Service
JOSTRA HL 20
6.7
Module Adjustments
6.7.1
CCM Board
1. Disassemble the Console Control Module (CCM) and mount it together with
the extension board.
2. At nominal line voltage adjust the POT2 on the CCM Board until the
Console Group display (1) shows 100%.
6.7.2
6-12
Service Manual
Revision 00
JOSTRA HL 20
6.8
6. Service
Check Procedures
This section comprise a check list to help complete an adjustment or service
session. It is important that a thorough check after service is performed to
prevent mistakes of any kind.
After the list some check procedures are described in detail.
Furthermore, there is an extensive test for HL 20 as described in section 6.9
Field Test Procedure. It is recommended this procedure be completed to verify
performance standards following major service intervention or periodic
maintenance of the HL 20. Parts of this procedure may also be used during
system installation. This Field Test Procedure is created for the US Service
organization, but can of course be used worldwide if required.
6.8.1
Checklist
The checklist includes information in two categories:
Replace
Service
SCP
Replace Service
Check
SMU
Replace Service
Check
Pumps
Replace Service
Check
Outside Pump
CAUTION
Revision 00
Check the inside of the pump house and the tube locking for
mechanical damage.
Check that the guiding rollers runs smooth, are tightened and
are not damaged.
Check that the rollers runs smooth and are secured in the
middle of the pin.
Service Manual
6-13
6. Service
JOSTRA HL 20
Replace Service
Check
Check that the tube locking runs smooth, on the insert system
check the spring function.
Check that the occlusion knob is tightened with the two stop
screws.
Occlusion check
(should be performed by MAQUET trained personal only).
Pump Front
Press all the buttons and make sure that they are distinct and
has a good sound.
Pump Bottom Plate
Check that the pins in the ODU connector are secured in the
housing.
Dismount the front panel and make sure that the EMIprotection is secured to the chassis.
Dismount the bottom plate and make sure that the EMIProtection is secured to the plate.
Clean the fan and check the condition of the cables and their
isolation.
6-14
Service Manual
Revision 00
JOSTRA HL 20
6. Service
Replace Service
Check
Revision 00
Service Manual
6-15
6. Service
JOSTRA HL 20
Replace Service
Check
Pump function
X
Start the pump and check that it passes the self test.
Check that the pump are able to switch between LPM and
RPM.
Speed Check
Set the pump to max. speed and check that it shows 250 rpm
1 rpm.
Set the pump to max. speed and check that it shows 250 rpm
1 rpm.
Mode function
X
Set the pump ARTERIAL mode, check that all the modules
with stop functions are stopping the pump.
Set the pump to SLAVE mode, check that all the modules
with stop functions are stopping the pump.
Set the pump to SUCKER mode, check that all the modules
with stop functions are stopping the pump.
Set the pump to AUX mode, check that all the modules with
stop functions are stopping the pump.
Set the pump to CARD mode, check that all the modules with
stop functions are stopping the pump.
The ART PULSE Mode
6-16
Set the pump to ART PULSE mode and check that the pump
can be controlled from the control panel.
Service Manual
Revision 00
JOSTRA HL 20
6. Service
Replace Service
Check
Set the SLAVE pump to SLAVE 1 and check that the pump is
pulsating like the ART pump.
Console
Replace Service
Check
General
X
Check that the front wheels are secured to the body and have
total lock function.
Check that the rear wheels are secured to the body and have
a direction lock function.
Check that the power socket list are secured, works and have
a safety plate.
Check that the position dowels are secured to the body and
not mechanical damaged.
Check that the ODU connectors are secured to the body and
have a cover.
ROC and LOC only
Revision 00
Service Manual
6-17
6. Service
JOSTRA HL 20
Replace Service
Check
Check that the panel runs smooth from side to side and can
be secured at any position.
Check that the monitor runs smooth from side to side and can
be secured at any position.
Check that all the masts and side guards are secured to the
console.
Remove all LEMO plugs from the SCP and the SMU. Check
that both the male and female connector are intact and that
no pin are pushed in.
Remove the Air Bubble Sensor. Check that both the male and
female connector are intact and that no pin are pushed in.
Unscrew the modules one by one and make sure that the
EMI-protection is properly secured.
Mains Transformer
X
6-18
Revision 00
JOSTRA HL 20
6. Service
Replace Service
Check
Check that the screws through the bridge rectifiers are tight.
Battery
X
Modules
Replace Service
Check
Revision 00
Service Manual
6-19
6. Service
JOSTRA HL 20
Replace Service
Check
Check that the DPM sends out an alarm when the pressure
exceeds the limit.
6-20
Revision 00
JOSTRA HL 20
6.8.2
6. Service
WARNING
4. Check that the pump alarm starts indicating LOAD !!! or HEAD.
5. Reset the pump.
Reset the LOAD !!! alarm by turning the speed knob down.
Reset the HEAD alarm by turning the pump OFF.
Revision 00
Service Manual
6-21
6. Service
JOSTRA HL 20
6.9
6.9.1
General
Scope
The Field Test Procedure described below is created for the US Service
organization, but can of course also be used worldwide if required.
It is recommended this procedure be completed to verify performance
standards following major service intervention or periodic maintenance of the
HL 20. Parts of this procedure may also be used during system installation.
Test Equipment
1. Test equipment specifications are listed to facilitate substitution. lternate
test equipment must meet or exceed the following recommendations.
2. Temperature References: YSI Series 400.
Specs: 1.5C, 20.1C, 34.5C, 43.3C, 0.1%.
3. Pressure Transducer Simulator: Fogg System Company BP-28 or
equivalent.
Specs: 0.5 mmHg 0.1% of setting @ 25C, 200/300/3000 Ohms, range
500 mmHg.
4. Photo-Tachometer: Extech 461895 or equivalent.
Specs: 0.05% + 1 digit, 0.1 RPM resolution.
5. Electrical Safety Analyzer: to meet local requirements and device
configuration.
Specs: AAMI or IEC (local requirements).
Recommended Test Equipment
6-22
Service Manual
Revision 00
JOSTRA HL 20
6. Service
Test Tubing
1. Test configuration consists of 1 section PVC tubing segmented with 15 cm
section of same dimension silicon, 3/8 inch ID x 3/32 inch W x length
suitable to reach water container, roughly 2 meter length total. Silicon
portion is to test Air Bubble Detector on both types of tubing. Can also use
separate tubing setups of same dimension and length.
2. Centrifugal pump with 50 cm 3/8 inch ID x 3/32 inch W PVC tubing
attached. Submerge into water to expel all air and loop. Attach adjustable
tubing clamp (miniature tubing cutter with blade removed works well or use
an adjustable flat wrench).
3. Polycarbonate flask for level sensor tests. Permanently attach Level Sensor
pad to flask (Back packers wide mouth water bottle).
4. Water container for 5 mm pellet test (1 liter water bottle).
1050 = 43.34C
b.
1500 = 34.52C
c.
2800 = 20.11C
d.
6810 = 1.51C
Tools
1. Potentiometer adjustment tool (for module switches, potentiometer
adjustments)
2. 10 mm diameter wooden dowel (for pump tests)
Requirements
Completion of MAQUET service training is prerequisite to performing this
procedure. If any portions of the following tests fail then a determination of
impact shall be performed and the decision to return equipment to clinical use
shall be made based on the severity of the non-conformance. Do not return
equipment to clinical use which has failed testing for critical functions. Correct
all non-conformances as soon as possible to maintain users performance
expectations.
WARNING
Revision 00
Service Manual
6-23
6. Service
6.9.2
JOSTRA HL 20
Initial Inspection
1. Check the unit for mechanical defects. Verify the following:
Drawer opens and closes smoothly
Masts go up and down smoothly
Support arm clamps are secure and tension adjustment operates
Front wheels are secured, run smoothly, and have total lock function
Rear wheels are secured, run smoothly, and have directional lock
function
Panel and Monitor can be secured at multiple positions
Panel and Monitor move side to side (as equipped)
Cables and connectors are in good shape
Confirm electronic module screws are secure
Verify hand crank(s) are available and in good shape
2. Check each pump for signs of damage. Verify the following:
Front panel is in good shape
Cover is in good shape
Tubing lock functions
Inserts can be moved and spring function operates
Rollers run freely and no play is detected
Tubing guides rotate smoothly
Occlusion locking mechanism operates (do not adjust).
3. Turn on Main power and Monitoring system power.
Verify audible alarm sounds.
Verify the Monitor (SMU) powers up and traces are displayed on the EL
panel.
Verify all Control Panel LEDs illuminate (in groups) followed by
initialization.
Verify the Control Panel displays Mains voltage (%).
4. Press and hold Mains / Battery.
Verify battery voltage is displayed.
5. Hold down safety switch and press Mains / Battery.
Verify display intensity scrolls through 25%, 50%, and 100% settings.
6. Turn on each pump.
Verify an audible beep sounds, self test is performed, all LEDs light, and
OK is shown.
7. Inspect the following switches & indicators:
Verify Halogen Lamp operates (if applicable).
Verify all on/off switches operate smoothly and lights illuminate.
Verify Charge C indicator illuminates when operated on Mains voltage.
Record the acceptance.
6-24
Service Manual
Revision 00
JOSTRA HL 20
NOTE
6.9.3
6. Service
Battery Capacity
1. Disconnect Mains voltage and continue with the test procedure while
running on batteries:
Verify audible alarm.
Verify Battery B indicator illuminates when operated on battery.
Verify battery life is 1.5 hour minimum when performing test procedure.
Reconnect to Mains voltage when necessary. Battery voltage shall be
>23 V.
Record the acceptance.
Revision 00
Service Manual
6-25
6. Service
6.9.4
JOSTRA HL 20
6-26
Service Manual
Revision 00
JOSTRA HL 20
6.9.5
6. Service
Stop Functions
Pressure and Level stop function tests are performed for each pump and all
modes. It is reasonable to test only the modes which are used at the facility
(refer to worksheet).
1. Set all Pressure Channel and Air-Bubble / Level Detector Stop switch
settings to ART.
2. Program the pumps with Soft Alarms enabled as follows:
Pump 1 ART
Pump 2 SLAVE 1
Pump 3 SUCKER
Pump 4 AUX
Pump 5 CARD
Pump 6 FREE (if applicable)
3. Program all Control Panel pressure alarm upper limits to 105 mmHg.
4. Attach simulators as follows:
PTS to channel I set to < 95 mmHg.
Level Sensor to a polycarbonate flask containing water behind the
sensor.
Water filled tubing in Air-Bubble Detector or override alarm.
5. Start all pumps at maximum RPM.
Verify normal operation.
Verify all 9 Level Detector LEDs are illuminated.
Verify the correct pump Monitoring LED(s) are illuminated (per module
switch settings).
6. Set PTS to 100 mmHg.
Verify Pump 1 reduces speed (it will eventually stop).
Verify Soft alarm activates.
7. Toggle PTS between < 95 and 100 mmHg.
Verify Pump 1 speed is controllable by pressure.
8. Set PTS to > 105 mmHg.
Verify Pump 1 immediately stops.
Verify STOP PR1 is displayed on Pump 1.
9. Decrease PTS to < 95 mmHg.
Verify Pump 1 resumes operation.
Repeat these tests after attaching PTS to Channels II, III, and IV.
PR2, PR3, and PR4 will be displayed accordingly on pump under test.
10. Tilt the bottle to slowly lower the water level.
Verify Bar LEDs gradually extinguish.
Verify Pump 1 speed reduces with water level.
Verify Pump 1 stops when no water is behind the sensor.
11. Enable override feature when no water is behind sensor.
Verify Pump 1 starts.
Record the acceptance.
This completes Stop Functions testing for one stop mode.
Revision 00
Service Manual
6-27
6. Service
JOSTRA HL 20
6.9.6
Control Functions
1. Set Pressure Channel and Air-Bubble / Level Detector Stop switches with
no duplicates:
I = ART
II = SLA
III = SUC
IV = AUX
Air-Bubble / Level Detector = CPL
2. Remove PTS and Override all monitoring alarms.
3. Program the pumps with Soft Alarms disabled as follows:
Pump 1 ART
Pump 2 SLAVE 1
Pump 3 SUCKER
Pump 4 AUX
Pump 5 CARD
Pump 6 FREE
The modes shown here are for the first repetition of this test routine. All tests
are performed for each pump by sequentially changing modes and repeating
the following.
6-28
Service Manual
Revision 00
JOSTRA HL 20
6. Service
Master Slave
1. Adjust ART to 100 RPM. Adjust SLAVE ADJ. potentiometer on SLAVE 1.
Verify slave pump:
Increases with clockwise adjustment.
Decreases with counterclockwise adjustment.
Revolutions adjust from 80 to 120 5 RPM.
2. Adjust ART to 0 RPM.
Verify SLAVE 1 stops.
3. Program SLAVE 1 as SLAVE 2 and repeat Master Slave Tests.
Record the acceptance.
Revision 00
Service Manual
6-29
6. Service
JOSTRA HL 20
6-30
Service Manual
Revision 00
JOSTRA HL 20
6. Service
Revision 00
Service Manual
6-31
6. Service
JOSTRA HL 20
6-32
Service Manual
Revision 00
JOSTRA HL 20
6.9.7
6. Service
6.9.8
Speed Accuracy
1. Program the pumps with Soft Alarms disabled as follows:
Pump 1 ART
Pump 2 SLAVE 1
Pump 3 SUCKER
Pump 4 AUX
Pump 5 CARD
Pump 6 FREE
2. Operate all pumps and press Monitoring system power switch to shut down
Console and Monitor.
Verify all pumps stop, alarm, and display NO COMM. error.
3. Set Pump 1 speed to 0 RPM.
Verify alarm cancels when speed is set to 0 RPM.
Repeat this for all pumps.
4. Press and hold Set until a beep is heard.
Verify pump changes to FREE mode.
Repeat this for all pumps.
5. Press the Monitoring system power switch to restore power and set all
pumps to maximum speed.
Verify Pump 1 operates at 250 1 RPM using tachometer.
Verify it is not possible to reverse the direction of Pump 1 when running.
Record the acceptance.
6. Run Pump 1 in reverse direction at maximum speed.
Verify Pump 1 operates at 250 1 RPM using tachometer.
Verify the reverse indicator illuminates.
Return Pump 1 to normal counter clockwise direction.
Record the acceptance.
7. Repeat Tachometer measurements for all other pumps.
Record the acceptance.
Revision 00
Service Manual
6-33
6. Service
6.9.9
JOSTRA HL 20
Pump Alarms
Runaway (RPM-DIFF in U.S.)
1. Set Pump 1 speed to 0 RPM (clear <=<= display).
2. Turn the pump head by hand in the arrow direction.
Verify the pump alarms RUNAWAY (RPM-DIFF in U.S.).
Verify the audible alarm sounds.
3. Quickly reset the alarm by turning flow adjustment up and then back to 0
RPM.
4. Turn the pump head again by hand in the arrow direction within 5 seconds.
Verify either SAFETY-S (from safety system) or !!!! (from motor control)
is displayed.
Verify the alarm cannot be reset by turning the flow adjustment. Power
cycle Pump 1.
Record the acceptance.
5. Repeat test for all other pumps.
Record the acceptance.
Direction
1. Set Pump 1 speed to 0 RPM (clear <=<= display).
2. Turn the pump head by hand in the direction opposite to the arrows.
Verify the Pump 1 alarms ERR. DIRECT.
Verify the audible alarm sounds.
Power cycle Pump 1.
Record the acceptance.
3. Repeat test for all other pumps.
Record the acceptance.
Overload
1. Set Pump 1 speed to 5 RPM.
2. Stall the pump head (use the wooden dowel).
Verify Pump 1 alarms OVERLOAD (BELT SLIP may also be indicated).
3. Turn the pump head slightly by hand in the arrow direction.
Verify Pump 1 alarms ERR. HEAD.
Power cycle Pump 1.
Record the acceptance.
4. Repeat test for all other pumps.
Record the acceptance.
6-34
Service Manual
Revision 00
JOSTRA HL 20
6.9.10
6. Service
Timers
1. Press Start Stop for Timer 1.
Verify Timer 1 starts and stops.
Verify Monitor displays BYPASS ON (when running) and OFF when
stopped.
2. Press and hold Reset for Timer 1.
Verify the value clears and only a single dot on the right hand side is
illuminated.
3. Press Start Stop for Timer 2.
Verify Timer 2 starts and stops.
Verify Monitor displays AORTA CLOSED (when running) and OPEN
when stopped.
4. Press and hold Reset for Timer 2.
Verify the value clears and only a single dot on the right hand side is
illuminated.
5. Repeat the Timer test procedure for Timer 3 (no indicators on monitor
display).
Record the acceptance.
6.9.11
Temperature Module
1. Attach temperature references to Temperature Probe Box (attached to
QTM).
Verify the displayed channel temperatures correspond to the reference
values:
Channel I = 1.5 0.1C.
Channel II = 20.1 0.1C.
Channel III = 34.5 0.1C.
Channel IV = 43.3 0.1C.
Verify Up and Down Trend LEDs illuminate accordingly.
Record the acceptance.
Revision 00
Service Manual
6-35
6. Service
6.9.12
JOSTRA HL 20
NOTE
2. Program pump as ART and set Air-Bubble Detector Stop switch setting to
position ART.
3. Prime the tubing free of air and attached Air Bubble Detector to PVC portion
on output side of pump.
4. Operate the pump at 50 RPM and introduce a 5 mm test pellet.
Verify the unit causes an Air bubble alarm when pellet passes through
sensor.
Repeat test for a few pellets.
5. Repeat this test with pump operating at 200 RPM.
6. Attach sensor to Silicon portion of test set (if applicable) and repeat 5 mm
Bubbles test.
7. Verify alarm override by holding down safety switch and pressing Override.
Record the acceptance.
Micro-bubbles
1. Operate the pump at 50 RPM
Verify normal operation.
2. Restrict the inlet side of the tubing to create micro-bubbles.
Verify micro-bubbles are detected.
3. Repeat this test with pump operating at 200 RPM.
4. Attach sensor to Silicon portion of test set (if applicable) and repeat Microbubbles test.
Record the acceptance.
6-36
Service Manual
Revision 00
JOSTRA HL 20
6.9.13
6. Service
Revision 00
Service Manual
6-37
6. Service
JOSTRA HL 20
6.9.14
Pump 2
Pump 3
Pump 4
Pump 5
Pump 6
Model
Serial No.
Mode
Flow1 @ 100
Brightness
Soft Alarm?
Hours
Tubing Size
Occlusion2
1
Flow
(TYPICAL)
Pump 1
Pump 2
Pump 3
Pump 4
Single Pump @ 100 RPM
Pump 5
Pump 6
/2
/8
(2.6)
/4
(1.28)
3
/16
1
/8
(0.32)
(1.6)
SIZE
(4.5)
(0.43)
4:1
Twin Pump @ 250 RPM
1
/4
(1.5)
/16
1
/8
Record all flow calibration data if pump hours will be reset
Switch Setting
ART
SLV
SUC
AUX
CPL
I
DPM
Module
II
III
IV
AEP Module
Notify user that service was performed and settings may have been changed!
6-38
Service Manual
Revision 00
JOSTRA HL 20
6.9.14
6. Service
Yes No
Yes No
Yes No
Yes No
II
III
IV
Yes No
5 mm:
Micro:
Pump 1
Pump 2
Pump 3
Pump 4
Pump 5
Pump 6
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Serial Number:
Single / Twin / RotaFlow:
Test Performed:
Stop Functions:
Master Slave:
Pulsatile Internal:
Pulsatile External:
Master Slave Pulsatile:
Accumulators:
Stop Control Functions:
Twin Pump Cardio Slave Mode:
Speed Accuracy Forward:
Speed Accuracy Revered:
Runaway (RPM-DIFF) Alarm:
Direction Alarm:
Overload Alarm:
Electrical Safety:
Record ground resistance:
Ohm
Signature
Date Performed
Service Manual
6-39
6. Service
JOSTRA HL 20
Notes
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
6-40
Service Manual
Revision 00
JOSTRA HL 20
7. Installation
Installation
7.1
Unpacking
7.1.1
Transport Package
The HL 20 is delivered from factory in one package with the pumps separately
packaged inside.
Check all items according to the packing slip.
Before opening the shipping container, make a general inspection of the goods.
In case of visual damages or signs that the container has been subject to rough
handling, immediately report your findings to the freight carrier. If a concealed
shipping damage is discovered after acceptance, file a claim for this damage.
7.1.2
General Unpacking
When unpacking, check that the contents is according to the packing list
delivered with the package.
Inspect every detail for transport damages. In case of visual damages or signs
of rough handling, immediately report your findings to the freight carrier.
Remove all packing material. All packing material must be discarded in
accordance with appropriate industrial and environmental standards.
CAUTION
7.1.3
Cleaning
The equipment need no special cleaning after unpacking. Just remove dust
using a dry soft cloth or similar.
The machine is sold non-sterile. Refer to the Users Manual.
7.2
WARNING
Revision 00
Service Manual
7-1
7. Installation
7.2.1
JOSTRA HL 20
Console mechanics
Part
Action
Masts
Infusion masts
Access panel
Drawer
Wheels and
brakes
Monitor
Control panel
Halogen lamp
ODU connectors
with covers
Rack connectors Check the LEMO connectors. Verify that the pins are
not backing out when pushed on.
7.2.2
7.2.3
7-2
Positioning
dowels
Fan
Total assembly
Part
Action
All modules
installed
Self-check
Pump mechanics
Part
Action
Pump ID
Tube locking,
inserts
Occlusion
Guiding pins
Rollers
Pump lid
Revision 00
JOSTRA HL 20
7.2.4
7. Installation
ODU
connectors,
spring, pin fixing
Check that the connector works properly (springloaded) and that the pins are not defective.
Fan
Pump electronics
Part
Action
Switches and
breakers
Speed
RPM/LPM switch
Mode selection
Calibration
mode
Master slave
Check with one stop module that the pump stop in all
modes. Check all pumps.
Runaway
protection
Overload alarm
WARNING
Error direction
alarm
Revision 00
Service Manual
7-3
7. Installation
7.2.5
JOSTRA HL 20
Action
SCP
Check:
- Pressures, up to 4 pressures
- Temperatures, 4 temperatures
- Level indication, function
- Air bubble alarm, artificial air bubble 5 mm
generates air alarm.
SMU
Check:
- ECG trace
- Pressure trace
- MAP, SYS, DIA data
- Arterial pulsatile trace
- Cardioplegia windows
- Digital in/out function.
7.2.6
Battery back-up
Part
Action
Battery mains
switch
Charge circuit
7.2.7
7-4
Others
Part
Action
Level Sensor
Bubble Sensor
Revision 00
JOSTRA HL 20
7.2.8
7. Installation
Electrical safety
Part
Action
Electrical safety
test
7.2.9
Formal handover
Part
Action
Handover to
customer
Revision 00
Service Manual
7-5
7. Installation
7.2.10
JOSTRA HL 20
Installation Checklist
Equipment:
Type:
Serial No:
Console Mechanics
OK
Masts ......................................................................
Infusion masts .........................................................
Access panel ..........................................................
Drawer ....................................................................
Wheels and brakes .................................................
Monitor ....................................................................
Control panel ..........................................................
Halogen lamp ..........................................................
ODU connectors with covers ..................................
Rack connectors .....................................................
Positioning dowels ..................................................
Fan ..........................................................................
Total assembly
Remarks:
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
OK
Remarks:
________________________________
________________________________
Pump mechanics
Type:
Serial number:
Tube locking, inserts
Occlusion
Guiding pins
Rollers
Pump lid
ODU connector
Fan
Pump electronics
Switches and breakers
Speed
RPM / LPM switch
Mode selection
Calibration mode, flow adjust
Master - slave, slave adjust
Stop lines and communication
Runaway protection
Overload alarm
Error direction alarm
Pump remarks:
7-6
Service Manual
Revision 00
JOSTRA HL 20
7. Installation
OK
Remarks:
SCP:
- Pressures ..............................................................
- Temperatures ........................................................
- Level indication ......................................................
- Air bubble alarm ....................................................
________________________________
________________________________
________________________________
________________________________
SMU:
- ECG trace .............................................................
- Pressure trace .......................................................
- MAP, SYS, DIA values ..........................................
- Arterial pulsatile trace ...........................................
- Cardioplegia windows ...........................................
- Digital in/out function .............................................
________________________________
________________________________
________________________________
________________________________
________________________________
________________________________
Battery back-up
Automatic battery mains switch ............................
Charge circuit ..........................................................
________________________________
________________________________
Others
Level sensor ............................................................
Bubble sensor .........................................................
________________________________
________________________________
Electrical safety
Ground resistance ...................................................
Earth leakage current (normal condition) ................
Enclosure leakage current (normal condition) ........
____________________________ Ohm
_____________________________ A
_____________________________ A
Formal handover
Handover to customer .............................................
________________________________
Other remarks:
Date:
Hospital and
location :
FSE
Name:
FSE
Signature:
Customer
Name:
Customer
Signature:
Revision 00
Service Manual
7-7
7. Installation
JOSTRA HL 20
Notes
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
7-8
Service Manual
Revision 00
JOSTRA HL 20
Appendix A
Revision 00
Service Manual
A-1
1.
JOSTRA HL 20
1.1
General Self-tests ....................................................................................................................4
1.1.1
Internal RAM-Test...............................................................................................................4
1.1.2
ROM-Test ...........................................................................................................................4
1.1.3
External RAM-Test .............................................................................................................5
1.1.4
OFFSET-Test .....................................................................................................................5
1.1.5
+5V-Test .............................................................................................................................5
1.1.6
+12V-Test ...........................................................................................................................5
1.1.7
-12V-Test ............................................................................................................................5
3.
3.1
MASTER-processor .............................................................................................................. 13
3.1.1
Output on the service terminal:........................................................................................ 13
3.1.2
Error messages ............................................................................................................... 14
3.2
Display-processor................................................................................................................. 15
3.2.1
Output on the service terminal......................................................................................... 15
4.
4.1
4.2
5.
5.1
5.2
6.
6.1
6.2
7.
7.1
7.2
8.
8.1
A-2
MODULE AIO20-425........................................................................................27
Output on the service terminal ............................................................................................ 27
Service Manual
Revision 00
JOSTRA HL 20
8.2
8.3
9.
9.1
MODULE DIO20-470........................................................................................31
Output on the service terminal ............................................................................................ 31
9.2
Adjustments on the service terminal.................................................................................. 31
9.2.1
Interface test mode .......................................................................................................... 31
9.2.2
Output of the messages from external devices ............................................................... 32
9.3
10.
10.3
10.4
11.
11.3
11.4
12.
MODULE AEP20-415.......................................................................................49
12.1
12.2
Revision 00
Service Manual
A-3
1.
JOSTRA HL 20
9600 Baud
Stop bits
Parity
None
When the module is switched on the result of the self-test is shown through this
interface. In addition this interface serves for special adjustments or for service
operations.
1.1
General Self-tests
As a microcontroller from the same family is used on all the modules the same or a
similar hardware core is to be found on all the modules, therefore some self-tests
are to be found on all the modules.
1.1.1
Internal RAM-Test
The microcontroller of the family SAB80C5XX have a processor-internal RAM with
256 byte. This processor-internal RAM is written with various data samples and
read back. If the comparison shows an error the processor is held in an endless
loop, which it can only leave through a RESET. Modules with their own display
show the error report ER02. Modules with no display of their own stay in the
endless loop and can no longer show the error.
1.1.2
ROM-Test
The program storage of the modules is an EPROM of the type 27C256 (32K * 8) or
27C512 (64K * 8). The contents of the EPROM are linked byte by byte during the
ROM test and the result must be 0. A result unequal to 0 leads to the error report
ERR-ROM. In the EPROM itself the necessary LRC byte was filed in the last
storage cell of the EPROM while creating the HEX file. An ERR-ROM error can be
caused either by a defect or insufficiently programmed EPROM or through defect
access logic to the EPROM.
A-4
Service Manual
Revision 00
JOSTRA HL 20
1.1.3
External RAM-Test
In addition to the internal data storage the modules have an external 32K * 8 static
RAM. This RAM is also checked through writing and control reading of various
data samples. A faulty RAM test is shown by the report ERR-RAM. The cause can
be hidden in the RAM itself or in the access logic to the RAM.
1.1.4
OFFSET-Test
The microcontrollers used have an internal 8- or 10-Bit A/D-converter before which
a multiplexer has been connected. With this A/D-converter the supply voltages on
the board are monitored and the analog signals are measured. This A/D-converter
needs an external 5V reference voltage, which must be aligned to 5,00V 0,01V.
The first check of the A/D-converter takes place in the offset test. Thereby the A/Dconverter input bound to GND is measured. If the measured value at the
SAB80C517A is larger than 10 digits the A/D converter is graded as defect. With
all the other microcontrollers the threshold lies at 8 digits.
In case of an error the error report ERR-OFFSET is given.
A faulty or non-aligned reference voltage can also lead to an OFFSET error. This is
to be expected when all the other voltage monitoring are faulty.
1.1.5
+5V-Test
Through an entry of the processor-internal A/D-converter the +5V supply voltage
that is divided through a voltage divider is measured. The voltage value measured
is output through the service interface. The supply voltage must lie between +5V
5%. When the tolerance range is left the error report ERR-p5V is given.
1.1.6
+12V-Test
Through an entry of the processor-internal A/D-converter the +12V supply voltage,
which is divided down through a voltage divider, is measured. The voltage value
measured is output at the service interface. The +12V supply must lie between
+12V 10%. When the tolerance range is left the error report ERR-p12V is given.
1.1.7
-12V-Test
Through an entry of the processor-internal A/D-converter the -12V supply voltage
that has been adapted to a positive voltage through a voltage divider is measured.
The voltage value measured is output at the service interface. The -12V supply
must lie between -12V +10% and -20%. When the tolerance range is left the error
report ERR-n12V is given.
Revision 00
Service Manual
A-5
JOSTRA HL 20
2.1
MASTER-processor
2.1.1
AFTER COLDSTART:
PASSED
PASSED
PASSED
PASSED
PASSED
0
498
119
06
02
FD
02
Self-Test PASSED
CYCLE
43
A-6
PAGE
02 FD
ERROR
00
Service Manual
Revision 00
JOSTRA HL 20
PASSED
PASSED
0
504
120
Self-Test PASSED
CYCLE
43
PAGE
02 FD
ERROR
00
During the Warmstart long tests will not take place (RAM-Test, DualportRam-Test
und EEPROMTest).
2.1.2
Revision 00
Service Manual
A-7
2.1.3
JOSTRA HL 20
Error messages
Error code
A-8
Error description
Possible reasons
EM 01 ERR_ROM
EM 02 ERR_RAM
EM 03 ERR_EEPROM
EEPROMtest failed
EM 05 ERR_OFFSET
OFFSETtest of the
processor internal ADconverter failed
EM 07 ERR_5VTEST
EM 08 ERR_p12VTEST
EM 17
ERR_UNEXPECTED
Fatal error!
EM 25 ERR_DPRAM
EM 29 ERR_PANEL
Panel doesnt
acknowledge
EM 2B ERR_FATAL
Fatal error
EM 2A ERR_ILLKEY
EM 7F WARN_EEPROM
DEFAULT-settings copied
from EPROM into
EEPROM
Service Manual
Revision 00
JOSTRA HL 20
2.2
PANEL-processor
2.2.1
PASSED
PASSED
PASSED
0
0
496
120
499
PASSED
Self-Test PASSED
Warmstart
The output on the service terminal is the same as during the COLDSTART. During
the WARMSTART there is no lamp test.
JNS PANEL-Modul
--------------------------Software Revision V2.4
Ramtest intern:
Romtest:
DUALPORT-RAMtest:
Offset8:
+5V Test:
+12V Test:
Ref. Test:
Lamptest:
PASSED
PASSED
PASSED
0
0
507
121
500
PASSED
Self-Test PASSED
Revision 00
Service Manual
A-9
2.2.2
JOSTRA HL 20
Error messages
Error code
2.2.3
Error description
Possible reasons
EP 01 ERR_ROM
EP 02 ERR_RAM
Microcontroller defect
EP 25 ERR_DPRAM
EP 05 ERR_OFFSET
EP 06 ERR_REF
+5V-referencetest failed
EP 07 ERR_5VTEST
EP 08 ERR_p12VTEST
Fatal error!
EP 26 ERR_RTC
REAL-TIME-CLOCK
doesnt acknowledge
REAL-TIME-CLOCK defect;
REAL-TIME-CLOCK not
accessible
EP 28 ERR_MASTER
Master doesnt
acknowledge
EP 0A ERR_LAMP
EP 14 ERR_KEYSTUCK
Key is hanging
A-10
Display
Ext. frequency BPM
pressure 1
pressure 2
console
hypo-water-temperature
temperature 2
temperature 4
timer 2
real time
Service Manual
No.
2
4
6
8
10
12
14
16
Display
BMP
delta-pressure
art. flow
hypo-set-temperature
temperature 1
temperature 3
timer 1
timer 3
Revision 00
JOSTRA HL 20
2.2.4
No.
LED
No.
LED
64
BUBBLE-BAR Bit 0
65
BUBBLE-BAR Bit 1
66
BUBBLE-BAR Bit 2
67
BUBBLE-BAR Bit 3
68
BUBBLE-BAR Bit 4
69
BUBBLE-BAR Bit 5
70
BUBBLE-BAR Bit 6
71
BUBBLE-BAR Bit 7
72
LEVEL-BAR Bit 8
73
LEVEL-BAR Bit 9
74
BUBBLE-BAR Bit 8
75
BUBBLE-BAR Bit 9
76
LEVEL-BAR Bit 0
77
LEVEL-BAR Bit 1
78
LEVEL-BAR Bit 2
79
LEVEL-BAR Bit 3
80
LEVEL-BAR Bit 4
81
LEVEL-BAR Bit 5
82
LEVEL-BAR Bit 6
83
LEVEL-BAR Bit 7
84
LEVEL-ALARM
85
LEVEL-SENSOR FAULT
86
BUBBLE-ALARM
87
BUBBLE-SENSOR FAULT
88
TEMP-TREND1-
89
TEMP-TREND1+
90
TEMP-TREND4-
91
TEMP-TREND4+
92
TEMP-TREND3-
93
TEMP-TREND3+
94
TEMP-TREND2-
95
TEMP-TREND2+
96
TEMP-CH-SEL1
97
TIM 3 H/M
98
TIM 2 H/M
99
TIM 1 H/M
100
HYP-SEL4
101
HYP-SEL3
102
HYP-SEL2
103
HYP-SEL1
104
TEMP-CH-SEL4
105
TEMP-CH-SEL3
106
TEMP-CH-SEL2
107
PR TREND 3-
108
PR TREND 3+
109
PR TREND 2-
110
PR TREND 2+
111
PR TREND 1-
112
PR TREND 1+
113
PULSE BPM
114
PULSE %
115
PULSE ASS.3
116
PULSE ASS.2
117
PULSE ASS.1
118
BATT.
119
LINE
120
HYP CIRC
121
122
TEMP TREND
123
PR KPA
124
PR ZERO2
125
PR ZERO1
126
PR OR2
127
PR OR1
128
BUBBLE OR
129
LEVEL OR
130
PR TREND
131
PULSE INT.
132
PULSE EXT.
133
AUDIO
134
PULSE CONT.
Revision 00
Display
ext. frequency (BPM)
pressure 1
pressure 2
console
hypo-water-temperature
Service Manual
No.
2
4
6
8
10
Display
BPM
delta-pressure
art. flow
hypo-set temperature
temperature 1
A-11
11
13
15
17
19
Nr.
64
66
68
70
72
74
76
78
80
82
84
86
88
90
92
94
96
98
100
102
104
106
108
110
112
114
116
118
120
122
124
126
128
130
132
134
136
138
140
142
144
146
A-12
JOSTRA HL 20
temperature 2
temperature 4
timer 2
pressure 3
real time
LED
BUBBLE-BAR Bit 0
BUBBLE-BAR Bit 2
BUBBLE-BAR Bit 4
BUBBLE-BAR Bit 6
LEVEL-BAR Bit 8
BUBBLE-BAR Bit 8
LEVEL-BAR Bit 0
LEVEL-BAR Bit 2
LEVEL-BAR Bit 4
LEVEL-BAR Bit 6
LEVEL-ALARM
BUBBLE-ALARM
TEMP-TREND1TEMP-TREND4TEMP-TREND3TEMP-TREND2TEMP-CH-SEL1
TIM 2 H/M
HYP-SEL4
HYP-SEL2
TEMP-CH-SEL4
TEMP-CH-SEL2
PR1 TRENDPR2 TRENDPR1/2 TRENDPULSE %
PULSE ASS.2
BATT.
PR4 TRENDPR3 TRENDHYP CIRC
TEMP TREND
PR2 ZERO
PR2 OVR
PR4 ZERO
PR4 OVR
PR1/2 TREND
PULSE INT.
BUBBLE OR
AUDIO
PR3/4 KPA
HYP HEAT
Service Manual
12
14
16
18
Nr.
65
67
69
71
73
75
77
79
81
83
85
87
89
91
93
95
97
99
101
103
105
107
109
111
113
115
117
119
121
123
125
127
129
131
133
135
137
139
141
143
145
temperature 3
timer 1
timer 3
pressure 4
LED
BUBBLE-BAR Bit 1
BUBBLE-BAR Bit 3
BUBBLE-BAR Bit 5
BUBBLE-BAR Bit 7
LEVEL-BAR Bit 9
BUBBLE-BAR Bit 9
LEVEL-BAR Bit 1
LEVEL-BAR Bit 3
LEVEL-BAR Bit 5
LEVEL-BAR Bit 7
LEVEL-SENSOR FAULT
BUBBLE-SENSOR FAULT
TEMP-TREND1+
TEMP-TREND4+
TEMP-TREND3+
TEMP-TREND2+
TIM 3 H/M
TIM 1 H/M
HYP-SEL3
HYP-SEL1
TEMP-CH-SEL3
PR1/2 TREND+
PR1 TREND+
PR2 TREND+
PULSE BPM
PULSE ASS.3
PULSE ASS.1
LINE
PR4 TREND+
PR3 TREND+
HYP PAT MODE
PR1/2 KPA
PR1 ZERO
PR1 OVR
PR3 ZERO
PR4 OVR
PULS CONT.
PULSE EXT.
LEVEL OR
PR3/4 TREND
HYP COOL
Revision 00
JOSTRA HL 20
3.
Module SMU20-490
The module SMU20-490 consists of two processing units. The MASTER-processor
handles the communication to the HL-20 and prepares the data for the display
processor. He also writes the HL-20 data and the events to the memory card. The
display processor controls the display of the HL-20. The DISPLAY processor also
handled the keys SPEED, HALT, PAGE SELECT and EVENTS.
All other keys were read by the Master-processor.
MASTER- and DISPLAY-processor are connected by a DUAL-Port-RAM.
3.1
MASTER-processor
3.1.1
PASSED
PASSED
PASSED
PASSED
0
506
120
121
Self-Test PASSED
Revision 00
Service Manual
A-13
3.1.2
JOSTRA HL 20
Error messages
Error code
ER 01 ERR_ROM
Error description
Program memory
defect; A incorrect
LRC has been found
Data memory defect
ER 02 ERR_RAM
ER 25 ERR_DPRAM
ER 05 ERR_OFFSET
ER 07 ERR_5VTEST
ER 08 ERR_p12VTEST
ER 09 ERR_n12VTEST
ER 17 ERR_UNEXPECTED
A-14
Possible reasons
EPROM defect; access control of
EPROM defect
Service Manual
Revision 00
JOSTRA HL 20
3.2
Display-processor
3.2.1
m
p
t
YOUR SELECTION: t
ATTENTION With the actual software version, there are no good results by
pressing any key.
Revision 00
Service Manual
A-15
JOSTRA HL 20
4.
Modul CCM20-450
4.1
JNS CONSOLE
----------------------Software Revision: V1.2
SELFTEST
Ramtest intern:
Ramtest:
Offset:
+12V Test:
TEMP- TEST
PASSED
PASSED
0
119
PASSED
Romtest:
PASSED
+5V Test:
507
Self-Test PASSED
Ueff Ubatt T_HS T_BATT T_TRAFO FUSE's BP-RE B_Hlim B_Llim ERROR
103
250
0
23
40
63
127
283
192
00
Self-Test PASSED
A-16
Ueff
Ubatt
T_HS
T_BAT
T
T_TRAF
O
FUSE's
BP-RE
103
250
23
40
63
127
B_Hlim
B_Llim
ERROR
283
192
00
Ueff
Ubatt
T_HS
T_BATT
T_TRAFO
FUSEs
Service Manual
Revision 00
JOSTRA HL 20
FUSESTATUSByte:
b7
b6
b5
b4
Fuse pump 4
b3
Fuse pump 3
b2
Fuse pump 2
b1
Fuse pump 1
b0
Fuse monitoring
Example above:
63 as 3F hexadecimal
b0 to b5 fuse closed
b6,b7 fuse open, blown or not available
Battery-Power-Relais-Status.
This byte shows the status of the battery-power-relais on the
power-supply board. A 1 in this byte shows this relais in line-mode;
a 0 shows a relais in battery-mode,
BP-StatusByte:
b7
not used
b6
Monitoring
b5
Pump 6
b4
Pump 5
b3
Pump 4
b2
Pump 3
b1
Pump 2
b0
Pump 1
Example above:
127 as 7F in hexadec. --> Relais of pumps and monitoring in line
mode.
Revision 00
B_Hlim
Limit of the battery voltage. By reaching this limit the loading of the
battery will be stopped and the error message ERR_BATLIM (ER
2D) will be displayed. The limit is 3% over the calculated maximal
loading voltage (depending on battery temperature: 0C 28,3V;
25C = 27,3 V; 50C = 26,4V)
B_Llim
Low limit of the battery voltage = 19,2V: By going deeper than this
battery voltage all battery-line-relais will be switched into line mode
and a further discharging avoided.
ERROR
Service Manual
A-17
4.2
Error messages
Error code
ER 01 ERR_ROM
ER 02 ERR_RAM
ER 05 ERR_OFFSET
Error description
Possible reasons
Program memory defect; EPROM defect; access control to the
An incorrect LRC found. EPROM defect
Data memory defect
SRAM defect; access control to the
RAM defect, microcontroller defect
(internal RAM)
Offset test of internal
Not adjusted reference voltage; ADAD-Converter failed
converter defect; AD-input pin not
connected
ER 07 ERR_5VTEST
ER 08 ERR_p12VTEST
+12V-supplyvoltage test
failed
ER 17 ERR_UNEXPECTED
ER 04 ERR_ADCONV
ER 0B ERR_TEMP
ER20 ERR_PSEL
ER2C ERR_FUSE
ER 2D ERR_BATLIM
A-18
JOSTRA HL 20
Service Manual
Revision 00
JOSTRA HL 20
5.
Module ABD20-410
5.1
PASSED
PASSED
PASSED
Offset8:
+12V Test:
-12V Test:
Threshold:
SAWTOOTH:
STOP-Test:
LEVEL-TEST:
0
119
- 121
109
PASSED
PASSED
PASSED
Self-Test PASSED
LEVEL: Sig2: BUBBLE: MIKRO: BUB_INT: REGUL: SILIKON: ALARM: STOP: SB SBP ER
255
0
0
0
0
YES
YES
NO
01 321 0 00
Self-Test PASSED
Revision 00
LEVEL:
Sig2:
BUBBLE:
MIKRO:
BUB_INT:
REGUL:
SILIKON:
ALARM:
255
YES
YES
NO
STOP:
SB
SBP
ER
01
321
00
LEVEL
(Sig1)
Sig2
BUBBLE
MIKRO
BUB_INT
REGUL
SILIKON
ALARM
Service Manual
A-19
STOP
JOSTRA HL 20
Stop byte shows the stop identification and the status of the stop
lines.
Stop-Byte:
b7
b6
b5
b4
b3
b2
Stop
--
--
--
Stop
Stop-Identification
Level
Bubble-Level-Modul
Bubble
b1
b0
Stop identification:
A-20
b2
b1
b0
no stop function
illegal status
illegal status
SB
Measured voltage of the signal SB. This signal is the sum of the 3
channels of the detector logic (in the ready state: set value = 3 * 1,1
V = 3,3 V +- 10%; example above 3.21 V)
SBP
ERROR
Service Manual
Revision 00
JOSTRA HL 20
5.2
Error messages
Error code
ER 01 ERR_ROM
ER 02 ERR_RAM
ER 04 ERR_ADCONV
ER 05 ERR_OFFSET
ER 06 ERR_REF
ER 08 ERR_p12VTEST
ER 09 ERR_n12VTEST
ER 0D ERR_STOP
ER 17 ERR_UNEXPECTED
ER 21 ERR_OVERRIDE
ER 23 ERR_SAWTOOTH
Revision 00
Error description
Possible reasons
Program memory defect; EPROM defect; access control of the
EPROM defect
A incorrect LRC has
been found
Data memory defect
SRAM defect; access control of
SRAM defect; microcontroller defect
(internal RAM)
Timeout of processor
Microcontroller defect
internal AD-converter
Reference voltage not adjusted; ADOffset test of the
converter defect; AD-input not
processor internal ADconnected
converter
Threshold voltage test
Threshold voltage out of tolerance;
failed
AD-converter defect; reference
voltage not adjusted;
+12V-supply voltage test +12V-supply voltage out of tolerance;
failed
reference voltage not adjusted; ADconverter defect; AD-input not
connected; wrong voltage distributor;
-12V-supply voltage test -12V-supply voltage out of tolerance;
failed
reference voltage not adjusted; ADconverter defect; AD-input not
connected; wrong voltage distributor;
Stoprelais defect; stopcontrol logic
Stop logic test failed or
defect; PWM-output defect;
error of the stop
stopselection switch not o.k.; ADselection switch
converter defect; AD-logic defect;
stopselection switch tuned during
operation;
Illegal software status
Fatal error!
Override status in the
The Override status is stored twice in
software not equal.
the software and is not equal. Data
transmission error from the MASTERmodule;
Synchronization voltage No saw tooth voltage available;
of the stoplogic not o.k.
reference voltage not adjusted; ADconverter defect
Service Manual
A-21
JOSTRA HL 20
6.
Module QTM20-430
6.1
PASSED
PASSED
PASSED
Offset8:
+5V Test:
+12V Test:
-12V Test:
Ref. Test:
Offset12
AD12 Test:
0
503
118
- 120
781
0
PASSED
Self-Test PASSED
Temp1: Temp2: Temp3: Temp4: R6800: R4700: R2200: R1355: R1200: OFFSET CORR: ER
10000 10000 10000 10000 156
904
2554 3700 4000
0
10028 00
2560 3707 4008
-1
10013
Self-Test PASSED
A-22
Temp1:
Temp2:
Temp3:
Temp4:
R6800:
R4700:
R2200:
R1355:
10000
10000
10000
10000
156
904
2554
3700
2560
3707
R1200:
OFFSE
T
CORR:
ER
4000
10028
00
4008
-1
10013
TEMP1
TEMP2
TEMP3
TEMP4
R6800
R4700
Revision 00
JOSTRA HL 20
6.2
R1355
R1200
OFFSET
CORR
ER
Error messages
Error code
ER 01 ERR_ROM
ER 02 ERR_RAM
ER 04 ERR_ADCONV
ER 04 ERR_ADCONV
ER 05 ERR_OFFSET
ER 05 ERR_OFFSET
ER 06 ERR_REF
ER 07 ERR_5VTEST
ER 08 ERR_p12VTEST
ER 09 ERR_n12VTEST
ER 17 ERR_UNEXPECTED
ER 22 ERR_CALIBRATION
Revision 00
Error description
Possible reasons
Program memory defect; EPROM defect; access control of the
EPROM defect
a incorrect LRC has
been found
Data memory defect
SRAM defect; access control of the
SRAM defect; microcontroller defect
(internal RAM)
Microcontroller defect
Timeout of the
processor- internal ADconverter
AD12-Test failed
12-Bit-AD-converter defect; measure
circuit or test circuit defect
Reference voltage not adjusted; ADOFFSET test of the
converter defect; AD-input not
processor- internal ADconnected
converter failed
OFFSET-Test of the12- Multiplexer DG506 defect; ADBit AD-converter failed
converter MX574 defect; access
control of MX574 defect;
Reference voltage test
failed
Service Manual
A-23
JOSTRA HL 20
7.
Module DPM20-440
7.1
PASSED
PASSED
PASSED
Offset8:
+12V Test:
-12V Test:
Ref. Test:
Offset12
AD12 Test:
SAWTOOTH:
STOP-Test:
0
116
- 118
500
- 1
PASSED
PASSED
PASSED
Self-Test PASSED
CH1
CH2
Prx_1:
10
0
Prx_2:
3
0
Limx:
200
200
Self-Test PASSED
A-24
Offsx:
0
0
Prx_1:
Prx_2:
Limx:
Offsx:
Mx:
CH1
10
200
487
CH2
200
487
Prx_1:
Prx_2:
Limx:
High limit
Offsx:
Mx:
Service Manual
STOP-ID
ERROR
BC
00
Revision 00
JOSTRA HL 20
STOP-ID
b6
b5
stop
stop-id ch2
b4
ch2
7.2
b2
b1
stop
stop-id ch1
b0
ch1
stop chx:
0 = no STOP;
stop-id:
000
no stop function
001
010
011
100
101
110
illegal stopid
111
illegal stopid
1 = STOP
ERROR
CH1
Values of channel1
CH2
Values of channel2
Error messages
Error code
ER 01 ERR_ROM
ER 02 ERR_RAM
ER 04 ERR_ADCONV
ER 04 ERR_ADCONV
ER 05 ERR_OFFSET
ER 05 ERR_OFFSET
ER 06 ERR_REF
ER 08 ERR_p12VTEST
ER 09 ERR_n12VTEST
Revision 00
b3
Error description
Possible reasons
Program memory defect; EPROM defect; access control of the
EPROM defect
A incorrect LRC has
been found
Data memory defect
SRAM defect; access control of the
SRAM defect; microcontroller defect
(internal RAM)
Microcontroller defect
Timeout of the
processor internal ADconverter
12-Bit AD-converter test AD-converter defect; Multiplexer
failed
defect; PWM-output defect;
Reference voltage not adjusted; ADOFFSET test of the
converter defect; AD-input not
processor internal ADconnected
converter failed
OFFSET-test of the12Multiplexer defect; AD-converter
Bit AD-converter failed
MX574 defect; access control of
MX574 defect;
Reference voltage test
5.00V-referencevoltage out of
failed
tolerance or not adjusted; ADconverter defect; AD-input not
connected; wrong voltage distributor
+12V-supply voltage test +12V-supply voltage out of tolerance;
failed
reference voltage not adjusted; ADconverter defect; AD-input not
connected; wrong voltage distributor;
-12V-supply voltage test -12V-supply voltage out of tolerance;
failed
reference voltage not adjusted; ADconverter defect; AD-input not
connected; wrong voltage distributor;
Service Manual
A-25
ER 0D ERR_STOP
ER 17 ERR_UNEXPECTED
ER 18 ERR_ARIT
ER 21 ERR_OVERRIDE
ER 23 ERR_SAWTOOTH
ER 2E ERR_TIMEOUT
A-26
JOSTRA HL 20
Service Manual
Revision 00
JOSTRA HL 20
8.
Module AIO20-425
8.1
PASSED
PASSED
PASSED
Offset10:
+12V Test:
-12V Test:
0
125
- 126
Self-Test PASSED
SYS-PRES
- 3
DIAS_PRES
- 2
Self-Test PASSED
Revision 00
MEAN_PRES
0
AUX1:
3
AUX2:
-2
AUX3:
0
ERROR:
00
SYS-PRES
DIAS_PRES
MEAN_PRES
AUX1:
AUX2:
AUX3:
ERROR:
-3
-2
-2
00
SYS_PRES
DIAS_PRES
MEAN_PRE
S
AUX1
Voltage at the input AUX1 multiplicities with the input-gain as 10Bit value; input voltage range from -2.5V to + 2.5 V shown as -511
to +512. The Poti 6 can adjust the displayed value to the input
voltage.
AUX2
Service Manual
A-27
8.2
JOSTRA HL 20
AUX3
Voltage at the input AUX3 multiplicities with the input-gain as 10Bit value; Input voltage range from -2.5V to + 2.5 V shown as 511 to +512. The Poti 8 can adjust the displayed value to the input
voltage.
ERROR
TEST OUTPUT
TEST INTERCONNECTION (need testconnector)
TEST INPUT-OUTPUT (need testconnector)
DISPLAY INPUT Voltage
<ESC>
END
ESC
A-28
Service Manual
Revision 00
JOSTRA HL 20
TEST OUTPUT
TEST INTERCONNECTION (need testconnector)
TEST INPUT-OUTPUT (need testconnector)
DISPLAY INPUT Voltage
<ESC>
END
305
530
616
697
775
860
943
105
320
530
612
695
780
858
944
The first line shows the 8 output values. The second line displays the measured
AD-values.
By a gain of 1 (adjusted with POT 1 to POT 8) the AD-values must show the output
values with a tolerance of +-10% (line 1 equal line 2).
By pressing <3> a test is activated to set every second a new analog value to
the outputs and read it back by the connected inputs. By pressing <ESC> the test
is stopped; each other key switches the test into the single step mode (one step
per received character from the service terminal) and by pressing <l> the cyclic
mode is restarted.
TEST OUTPUT
TEST INTERCONNECTION (need testconnector)
TEST INPUT-OUTPUT (need testconnector)
DISPLAY INPUT Voltage
<ESC>
END
Test input:
<l> = loop; <ESC> = end
-----------------------------------------------ECG
AUX2:
AUX3:
-2466
-2417
The input values of ECG and PRES are going from -2500 to + 2500. The other
input values are going from 0 to 2500 according to the applied voltage (2500 ==
2.500V).
Revision 00
Service Manual
A-29
JOSTRA HL 20
By pressing <4> a display mode is activated to display the analog input voltage.
TEST OUTPUT
TEST INTERCONNECTION (need testconnector)
TEST INPUT-OUTPUT (need testconnector)
DISPLAY INPUT Voltage
<ESC>
END
- 10
- 5
AUX2:
AUX3:
- 10
The displayed values are showing the input voltage on the analog inputs (2500 =
2,500V).
8.3
Error messages
Error code
ER 01 ERR_ROM
ER 02 ERR_RAM
ER 04 ERR_ADCONV
ER 08 ERR_p12VTEST
ER 09 ERR_n12VTEST
ER 17 ERR_UNEXPECTED
ER 05 ERR_OFFSET
A-30
Error description
Program memory defect.
A incorrect LRC has been
found.
Data memory defect
Service Manual
Possible reasons
EPROM defect; access control of
the EPROM defect
SRAM defect; access control of the
SRAM defect, microcontroller defect
(internal RAM)
Microcontroller defect
Reference voltage not adjusted; ADconverter defect; AD-input not
connected
+12V-supply voltage out of
tolerance; reference voltage not
adjusted; AD-converter defect; ADinput not connected; wrong voltage
distributor
-12V-supply voltage out of
tolerance; reference voltage not
adjusted; AD-converter defect; ADinput not connected; wrong voltage
distributor
Fatal error!
Revision 00
JOSTRA HL 20
9.
Module DIO20-470
9.1
PASSED
PASSED
PASSED
Self-Test PASSED
HOST running
0
9.2
00
01
HOST running
00
01
9.2.1
<Shift> <X>
<Shift> <A>
<Shift> <H>
Revision 00
Service Manual
A-31
JOSTRA HL 20
0
1
2
3
YOUR SELECTION: _
<ESC> leaves the test mode. The test mode is described in the adjustment
procedure of the DIO-module.
9.2.2
HEX-mode:
BIOMEDICUS 540D: 49 44 20 42 49 4F 2D 43 4F 4E 20 30 31 32 20 30 33 36 37 0D
BIOMEDICUS 540D: 45 54 20 30 30 30 30 32 33 34 20 30 30 31 39 32 33 34 20 30 33
42 35 0D
BIOMEDICUS 540D: 44 41 20 2B 30 32 33 34 20 2D 32 30 35 20 30 30 30 30 20 30
20 30 20 31 20 30 20 30 20 30 35 30 45 0D
BIOMEDICUS 540D: 44 41 20 2B 30 32 33 34 20 2D 32 30 35 20 30 30 30 30 20 30
20 30 20 31 20 30 20 30 20 30 35 30 45 0D
9.3
Error messages
Error code
ER 01 ERR_ROM
A-32
ER 02 ERR_RAM
Error description
Program memory defect
A incorrect LRC was
found
Data memory defect
ER 17 ERR_UNEXPECTED
Service Manual
Possible reasons
EPROM defect; access control of the
EPROM defect
SRAM defect; access control of the
SRAM defect, microcontroller defect
(internal RAM)
Fatal error!
Revision 00
JOSTRA HL 20
10.
Module RPM20-310
10.1
10.1.1
At COLDSTART
JNS PUMP
----------------------Software Revision V2.2
COLDSTART
Ramtest intern: PASSED
Ramtest:
PASSED
KEY-PORT TEST:
Offset:
Ref. Test:
+12V Test:
TEMP- TEST
SAFETY-SYS. Test:
SAFETY-STOP Test:
MODE RELAIS
HOURS RUNNING
0
Romtest:
PASSED
EEPROM Test:
PASSED 01 FE
PASSED
0
A/D Test:
PASSED
497
+5V Test:
504
120
-12V Test:
- 116
PASSED
LAMP TEST:
PASSED
PASSED
STOP RELAIS
PASSED
PASSED
REVERSE RELAIS
PASSED
PASSED
STOP-INPUT-TEST
PASSED
HOURS TOTAL * 6
0000FF37 hex
Self-Test PASSED
RPM LPM POTI ACTV SETV STOP HEAD T_MO T_HS ACTS DELT CORR
220 2.82 2191 2196 2189
0
2202
31
27
0
0
0
In the COLDSTART all displays and LEDs were switched on and the buzzer
sounds. After 1 second the software version number is displayed in the FLOWdisplay and the account of the operation hours since the last service is displayed in
the DIALOG-display. After second this information is overwritten by the
messages OK on the FLOW-display and PUMP OK on the DIALOG-display. A
detected error is displayed as ERR. on the FLOW-Display and an error message
on the DIALOG-display.
After the COLDSTART the software checks the pump mode, which is stored twice
(pump-mode and complemented pump-mode) in the EEPROM If the complement
shows the same pump-mode as the PUMP_MODE the pump switches into this
mode. In the other cases the pump will start as FREE pump.
After a coldstart the pump is always running in forward direction.
The tube size is read out of the EEPROM and displayed in the DIALOG-display
beside the pump-mode.
Revision 00
Service Manual
A-33
10.1.2
JOSTRA HL 20
At WARMSTART
JNS PUMP
----------------------Software Revision V2.2
WARMSTART
Ramtest intern:
KEY-PORT TEST:
Offset:
Ref. Test:
+12V Test:
TEMP- TEST
SAFETY-SYS. Test:
SAFETY-STOP Test:
REVERSE RELAIS
MODE RELAIS
STOP-INPUT-TEST
HOURS RUNNING
HOURS TOTAL * 6
PASSED
PASSED
0
A/D Test:
497
+5V Test:
120
-12V Test:
PASSED
PASSED
STOP RELAIS
PASSED
PASSED
PASSED
PASSED
0
0000FF37 hex
PASSED
504
- 116
PASSED
Self-Test PASSED
RPM LPM POTI ACTV SETV STOP HEAD T_MO T_HS ACTS DELT CORR
220 2.82 2191 2196 2189
0
2202
31
27
0
0
0
During a WARMSTART the release number of the software is displayed on the
FLOW-display and the running hours since the last service is displayed on the
DIALOG-display. After about 1 second this information is overwritten by the
message OK on the FLOW-display and PUMP OK on the DIALOG-display.
A detected error is displayed as ERR. on the FLOW-display and as error
message on the DIALOG-display (for example. ERR. EEPROM)
After the WARMSTART the software checks the pump mode, which is stored twice
(pump-mode and complemented pump-mode) in the EEPROM If the complement
shows the same pump-mode as the PUMP_MODE the pump switches into this
mode. In the other cases the pump will start as FREE pump.
The direction of the pump is read out of the EEPROM and selected.
Also the tube size and the pulsatile values as START, STOPP, BASE_FLOW,
PULSRATE, HIGH- and LOW-LIMIT as well as the ASSIST-mode were set after
reading out of the EEPROM. So after a WARMSTART the pump starts with the last
mode before power off.
A-34
KEY-PORT
TEST
Offset : 0
A/D Test:
Service Manual
Revision 00
JOSTRA HL 20
Revision 00
+ 5V Test:
504
+12V Test:
120
TEMP Test:
LAMP Test:
During the lamp test all LEDs and displays were switched on for
one second. The buzzer sounds for second. The user must
check this. The alphanumerical displays were checked by writing
and control reading of the display registers.
SAFETYSYS. Test:
The main processor checks the state of the status lines SS_OK1
and SS_OK2. On these lines the safety system shows the main
processor an error status. SS_OK1 must be HIGH and SS_OK2
must be LOW in the error free state. All other combinations are
showing an error.
STOPRELAIS:
SAFETYSTOP Test:
The main processor switches the RA-MODE lines into the test
mode
The main processor finishes the test modes by setting the RAmode lines into the normal mode.
A-35
REVERSERELAIS:
JOSTRA HL 20
REV2
REVERSE-CTRL
OFF
OFF
LOW (forward)
ON
OFF
LOW
OFF
ON
HIGH (reverse)
ON
ON
LOW
ON
OFF
LOW
MODERELAIS:
STOPINPUTTEST:
A-36
HOURS
RUNNING 0
The operating hours since the last service are displayed. A closed
Jumper RES_HOUR on the controller board may clear the
operating hours to 0 during the eeprom-test in the coldstart. Also
the parameters in the EEPROM were overwritten by the default
settings. So after a service it is necessary to calibrate the tube
sizes again.
HOURS
TOTAL * 6
Service Manual
Revision 00
JOSTRA HL 20
10.2
RPM
LPM
POTI
ACTV
SETV
STOP
HEAD
T_MO
220
2.82
2191
2196
2189
2202
31
T_HS
ACTS
DELT
CORR
27
RPM
LPM
POTI
Flowpoti value (= SET value; not in Slavemode; example above 219,1 RPM)
ACTV
SETV
STOP
HEAD
T_MO
T_HS
ACTS
DELT
CORR
Revision 00
Service Manual
A-37
10.3
JOSTRA HL 20
TOLERANCE
ERROR REACTION
ER 05
+5 V
+- 5%
ER 07
+12V
+- 10%
ER 08
- 12V
+- 20%
ER 09
> 60C
FAN fast
Motor temperature
> 70C
Warning TEMP
Motor temperature
> 90C
Error message ERR
TEMPERAT:
ER 0B
> 60C
FAN fast
> 70C
Warning TEMP
> 90C
Error message ERR
TEMPERAT:
A-38
ER 0B
ER 85
Watching runaway
Headtacho
> Setvalue +10%
RUNAWAY
Headtacho
< Setvalue -10%
OVERLOAD
Headtacho
< Motortacho -10%
BELT SLIP
Headtacho
> 250 RPM.
OVERSPEED
Headtacho
> 250 Umdr. /Min.
KEY!
No communication to the
MASTER for more than 5
seconds
NO COM
NO SEL
ER 12
Service Manual
Revision 00
JOSTRA HL 20
10.4
Error messages
Error code
Revision 00
Error description
Possible reasons
ER 01 ERR_ROM
ER 02 ERR_RAM
ER 03 ERR_EEPROM
EEPROMtest failed
ER 04 ERR_ADCONV
Microcontroller defect
ER 05 ERR_OFFSET
ER 06 ERR_REF
ER 07 ERR_5VTEST
ER 08 ERR_p12VTEST
ER 09 ERR_n12VTEST
ER 0A ERR_LAMPTEST
ER 0B ERR_TEMP
ER 0C ERR_REV-REL
ER 0D ERR_STOP-REL
ER 0E ERR_MODE-REL
Service Manual
A-39
A-40
JOSTRA HL 20
ER 0F ERR_STOP-INP
ER 10 ERR_S-STOP
ER 11 ERR_SCHUTZ-S
ER 12 ERR_DIRECTION
ER 13 ERR_ILLEGAL
illegal errorcode
ER 14 ERR_KEY
key is hanging
ER 15 ERR_MODEBLO
ER 16 ERR_HEAD
ER 17
ERR_UNEXPECTED
illegal softwarestatus
Fatal error!
ER 18 ERR_ARITHMET
Arithmetic error
Division by 0 by calculating
the new pump parameters;
datatransmission error
between MASTER and pump;
ER 19 ERR_ILLEGAL
Fatal error!
ER 81 ERR_MODUSED
ER 82 ERR_MODPSEL
ER 83 ERR_MODCLK
ER 84 ERR_MODSEL
ER 85 ERR_MODEEPROM
EEPROM defect;
ER 87 ERR_MAXWARN
Fatal error!
Service Manual
Revision 00
JOSTRA HL 20
11.
Module TPM20-330
11.1
11.1.1
At COLDSTART
JNS TWIN
----------------------Software Revision V1.3
COLDSTART
Ramtest intern: PASSED
Ramtest:
PASSED
KEY-PORT TEST:
Offset:
0
Ref. Test:
497
+12V Test:
120
TEMP- TEST
SAFETY-SYS. Test:
SAFETY-STOP Test:
MODE RELAIS
HOURS RUNNING
Romtest:
EEPROM Test:
PASSED
PASSED
PASSED
PASSED
PASSED
0
PASSED
PASSED 01 FE
A/D Test:
PASSED
+5V Test:
504
-12V Test:
- 116
LAMP TEST:
STOP RELAIS
REVERSE RELAIS
STOP-INPUT-TEST
HOURS TOTAL * 6
PASSED
PASSED
PASSED
PASSED
0000FF37 hex
Self-Test PASSED
RPM LPM POTI ACTV SETV STOP HEAD T_MO T_HS ACTS DELT CORR
220 2.82 2191 2196 2189
0 2202
31
27
0
0
0
In the COLDSTART all displays and LEDs were switched on and the buzzer
sounds. After 1 second the software version number is displayed in the FLOWdisplay and the account of the operation hours since the last service is displayed in
the DIALOG-display. After second this information is overwritten by the
messages OK on the FLOW-display and PUMP OK on the DIALOG-display. A
detected error is displayed as ERR. on the FLOW-Display and an error message
on the DIALOG-display.
After the COLDSTART the software checks the pump mode, which is stored twice
(pump-mode and complemented pump-mode) in the EEPROM If the complement
shows the same pump-mode as the PUMP_MODE the pump switches into this
mode. In the other cases the pump will start as FREE pump.
After a coldstart the pump is always running in forward direction.
The tube size is read out of the EEPROM and displayed in the DIALOG-display
beside the pump-mode.
Revision 00
Service Manual
A-41
11.1.2
JOSTRA HL 20
At WARMSTART
JNS TWIN
----------------------Software Revision V1.3
WARMSTART
Ramtest intern:
KEY-PORT TEST:
Offset:
Ref. Test:
+12V Test:
TEMP- TEST
SAFETY-SYS. Test:
SAFETY-STOP Test:
REVERSE RELAIS
MODE RELAIS
STOP-INPUT-TEST
HOURS RUNNING
PASSED
PASSED
0
497
120
PASSED
PASSED
PASSED
PASSED
PASSED
PASSED
0
A/D Test:
+5V Test:
-12V Test:
PASSED
504
- 116
HOURS TOTAL * 6
0000FF37 hex
Self-Test PASSED
RPM LPM POTI ACTV SETV STOP HEAD T_MO T_HS ACTS DELT CORR
220 2.82 2191 2196 2189
0
2202
31
27
0
0
0
A-42
KEY-PORT
TEST
Offset : 0
A/D Test:
Revision 00
JOSTRA HL 20
Revision 00
+ 5V Test:
504
+12V Test:
120
TEMP Test:
LAMP Test:
During the lamp test all LEDs and displays were switched on for
one second. The buzzer sounds for second. The user must
check this. The alphanumerical displays were checked by writing
and control reading of the display registers.
SAFETYSYS. Test:
The main processor checks the state of the status lines SS_OK1
and SS_OK2. On these lines the safety system shows the main
processor an error status. SS_OK1 must be HIGH and SS_OK2
must be LOW in the error free state. All other combinations are
showing an error.
STOPRELAIS:
SAFETYSTOP Test:
The main processor switches the RA-MODE lines into the test
mode
The main processor finishes the test modes by setting the RAmode lines into the normal mode.
A-43
REVERSERELAIS:
JOSTRA HL 20
REV2
REVERSE-CTRL
OFF
OFF
LOW (forward)
ON
OFF
LOW
OFF
ON
HIGH (reverse)
ON
ON
LOW
ON
OFF
LOW
MODERELAIS:
STOPINPUTTEST:
A-44
HOURS
RUNNING 0
The operating hours since the last service are displayed. A closed
Jumper RES_HOUR on the controller board may clear the
operating hours to 0 during the eepromtest in the coldstart. Also the
parameters in the EEPROM were overwritten by the default
settings. So after a service it is necessary to calibrate the tube
sizes again.
HOURS
TOTAL * 6
Service Manual
Revision 00
JOSTRA HL 20
11.2
RPM
LPM
POTI
ACTV
SETV
STOP
HEAD
T_MO
220
2.82
2191
2196
2189
2202
31
T_HS
ACTS
DELT
CORR
27
RPM
LPM
POTI
Flowpoti value (= SET value; not in Slavemode; example above 219,1 RPM)
ACTV
SETV
STOP
HEAD
T_MO
T_HS
ACTS
DELT
CORR
Revision 00
Service Manual
A-45
11.3
JOSTRA HL 20
TOLERANCE
ERRORREACTION
ER 05
+5 V +- 5%
ER 07
+12V +- 10%
ER 08
-12V +- 20%
ER 09
> 60C
FAN fast
Motor temperature
> 70C
Warning TEMP
Motor temperature
ER 0B
> 60C
FAN fast
> 70C
Warning TEMP
> 90C
Error message ERR
TEMPERAT:
A-46
ER 0B
ER 85
Watching runaway
RUNAWAY
OVERLOAD
BELT SLIP
OVERSPEED
Headtacho
/Min
KEY!
No communication to the
MASTER for more than 5
seconds
NO COM
NO SEL
ER 12
Service Manual
Revision 00
JOSTRA HL 20
11.4
Error messages
Error code
Revision 00
Error description
Possible reasons
ER 01 ERR_ROM
ER 02 ERR_RAM
ER 03 ERR_EEPROM
ER 04 ERR_ADCONV
Microcontroller defect
ER 05 ERR_OFFSET
ER 06 ERR_REF
ER 07 ERR_5VTEST
ER 08 ERR_p12VTEST
ER 09 ERR_n12VTEST
ER 0A ERR_LAMPTEST
ER 0B ERR_TEMP
ER 0C ERR_REV-REL
ER 0D ERR_STOP-REL
ER 0E ERR_MODE-REL
ER 0F ERR_STOP-INP
ER 10 ERR_S-STOP
Service Manual
A-47
A-48
JOSTRA HL 20
ER 11 ERR_SCHUTZ-S
ER 12 ERR_DIRECTION
ER 13 ERR_ILLEGAL
ER 14 ERR_KEY
Key is hanging
ER 15 ERR_MODEBLO
ER 16 ERR_HEAD
Fatal error!
ER 18 ERR_ARITHMET
Arithmetic error
ER 19 ERR_ILLEGAL
Fatal error!
ER 81 ERR_MODUSED
ER 82 ERR_MODPSEL
ER 83 ERR_MODCLK
ER 84 ERR_MODSEL
ER 85
ERR_MODEEPROM
EEPROM defect;
ER 87 ERR_MAXWARN
Fatal error!
Service Manual
Revision 00
JOSTRA HL 20
12.
Module AEP20-415
12.1
PASSED
PASSED
PASSED
Offset8:
+12V Test:
-12V Test:
Threshold:
SAWTOOTH:
STOP-Test:
0
119
- 121
109
PASSED
PASSED
Self-Test PASSED
LEVEL: Curr: BUBBLE: MIKRO: BUB_INT: REGUL: SILIKON: ALARM: STOP: SB SBP ER
3
173
0
0
0
YES
YES
NO
01 321 0
00
Self-Test PASSED
Revision 00
LEVEL:
CURR:
BUBBLE:
MIKRO:
BUB_INT:
REGUL:
SILIKON:
ALARM:
173
YES
YES
NO
STOP:
SB
SBP
ER
01
321
00
LEVEL
8-bit AD-converter value of the CLS in digits (example 3). If the signal is >
100, the pump is stopped.
CURR
8-bit AD-converter value of the CLS current consumption. If the signal is <
128 or > 205, the pump is stopped and SENSOR FAULT lights up.
BUBBLE
MIKRO
BUB_INT
REGUL
SILIKON
ALARM
Service Manual
A-49
STOP
JOSTRA HL 20
Stop byte shows the stop identification and the status of the stop lines.
Stop-Byte:
b7
b6
b5
b4
b3
b2
Stop
--
--
--
Stop
Stop-Identification
Bubble
Stop ID:
A-50
b1
b0
Level Bubble-Level-Modul
b2
b1
b0
No stop function
Illegal status
Illegal status
SB
Measured voltage of the signal SB. This signal is the sum of the 3 channels
of the detector logic
(in the ready state: set
value = 3 * 1,1 V = 3,3 V +- 10%; example above 3.21 V)
SBP
Measured voltage of the signal SBP. Input signal depends on the size of the
bubbles (0... 3,3 V; example above 0.00 V)
ERROR
Service Manual
Revision 00
JOSTRA HL 20
12.2
Error messages
Error code
Revision 00
Error description
Possible reasons
ER 01 ERR_ROM
ER 02 ERR_RAM
ER 04 ERR_ADCONV
Timeout of processor
internal AD-converter
microcontroller defect
ER 05 ERR_OFFSET
ER 06 ERR_REF
ER 08 ERR_p12VTEST
ER 09 ERR_n12VTEST
ER 0D ERR_STOP
ER 17 ERR_UNEXPECTED
Fatal error!
ER 21 ERR_OVERRIDE
ER 23 ERR_SAWTOOTH
Synchronisation voltage
of the stop logic not o.k.
Service Manual
A-51
JOSTRA HL 20
Notes
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
A-52
Service Manual
Revision 00
JOSTRA HL 20
Appendix B
Appendix B
Console Wiring Diagram
Revision 00
Service Manual
B-1
JOSTRA HL 20
Notes
Revision 00
Service Manual
Maquet Critical Care AB, 2006. All rights reserved. MAQUET reserves the right to modify the design and specifications contained herein without prior notice.
Order No.: 705371. Revision 00, March 2006. Price group: 7. Printed in Sweden.