Pospondent Notice
Pospondent Notice
Pospondent Notice
Dated: 10.04.2015
To
Members of the Validation Committee
& Generating Companies
(As per list enclosed)
Subject: Meeting of Validation Committee for the Application Period from 1st
May,2015 to 30th June 2015 for implementation of CERC (Sharing of InterState Transmission
Charges
and
Losses) Regulations, 2015. Postponement Notice.
Sir,
I am directed to state that the 1st meeting of the Validation Committee which was
scheduled to be held on 15.04.2015 has been postponed as it was coinciding OCC
meeting in NRPC and it being a holiday in some States in the Eastern Region. The meeting
is now scheduled to be held in NLDC Conference Room at 3:00 pm on 17.04.2015.
All the members of the Validation Committee and Generating Companies are
requested to attend the meeting through video conferencing from respective RLDCs.
RPCs and RLDCs are requested to host this meeting notice on their web site and also
to coordinate with the representatives of all State Transmission Utilities and Generating
Companies to facilitate them to attend the meeting through video conferencing facility
available at the RLDCs.
The meeting will be proceeded by lunch.
Yours faithfully,
S/d
(Vikram Singh)
Deputy Chief (Engg.)
Page 1
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
SRPC
14.
ERPC
15.
16.
NERPC
17.
18.
SLDC
19.
KPTCL
Shri S. Sumanth
Director(Transmission),
KPTCL
Karnataka
Power
Transmission
Corp.Ltd.,
Kauvery Bhavan, K.G. Road,
Bangalore 560009
20.
UPPTCL
Name of
Statutory
Bodies
1.
NTPC
2.
NHPC
3.
NEEPCO
4.
NLC
5.
SJVN
Page 3